Combined Notice of Filings #1, 6149-6151 [2020-02109]
Download as PDF
Federal Register / Vol. 85, No. 23 / Tuesday, February 4, 2020 / Notices
khammond on DSKJM1Z7X2PROD with NOTICES
Energy (ENERGISE) 4 funding
opportunities.
SETO has supported solar prediction
technologies in its Solar Forecasting
funding program, launched in 2013,
which delivered WRF-Solar 5—a version
of the Weather Research and Forecasting
(WRF) model 6 that is optimized for
solar irradiance, and more recently in
the Solar Forecasting 2 funding
program, launched in 2018. This latter
program prioritizes improvements in the
prediction of solar irradiance for
horizons between 3 and 48 hours ahead,
the successful integration of
probabilistic solar power forecasts with
generation unit scheduling, and the
creation of an open-source framework
for the efficient and transparent
evaluation of irradiance and power
forecast models.
SETO hosted a workshop on October
7–8, 2019, in Washington, DC to review
the progress of projects awarded under
the Solar Forecasting 2 funding program
and to better understand the remaining
challenges associated with the
variability and prediction uncertainty of
solar generation. At the event, subject
matter experts and SETO-funded
researchers presented on the state-ofthe-art of solar irradiance forecasting,
opportunities for the integration of
hybrid systems with solar plants in the
bulk power system, and efforts
associated with the DOE-funded
projects. These efforts work to improve
the WRF-Solar model, use machine
learning and other artificial intelligence
methods to better predict irradiance
under variable cloud cover and during
ramps, and calculate the optimal
amount of generation reserves using
probabilistic solar power forecasts. An
extended session was dedicated to the
demonstration of the current state of
Solar Forecast Arbiter,7 which is an
open-source platform designed to
facilitate objective, transparent, and
auditable evaluation of irradiance and
power forecasts. The participants
openly discussed emerging challenges
regarding the prediction of solar
irradiance and power in a world with
increasing solar and renewable
penetration, and an increasing
population of behind-the-meter variable
loads. The detailed workshop agenda
and presentations are available on the
SETO website.8
4 https://www.energy.gov/eere/solar/fundingopportunity-announcement-enabling-extreme-realtime-grid-integration-solar-energy.
5 https://ral.ucar.edu/projects/wrf-solar.
6 https://www.mmm.ucar.edu/weather-researchand-forecasting-model.
7 https://SolarForecastArbiter.org.
8 https://www.energy.gov/eere/solar/downloads/
solar-forecasting-2-workshop.
VerDate Sep<11>2014
17:48 Feb 03, 2020
Jkt 250001
In this RFI, SETO is seeking
additional feedback on these topics from
industry, electric utilities, balancing
authorities, academia, research
laboratories, government agencies, and
other stakeholders. The main goal is to
lower the integration cost of high
penetrations of solar power to the bulk
power and distribution systems by
making the prediction of solar
generation more accurate and effective.
Such a development could be realized
by leveraging advances in ground and
remote sensing, numerical modeling of
atmospheric processes, artificial
intelligence techniques, and stochastic
optimization. The questions are given as
follows and responders are welcome to
answer all or any subset of the
questions.
Confidential Business Information
Pursuant to 10 CFR 1004.11, any
person submitting information that he
or she believes to be confidential and
exempt by law from public disclosure
should submit via email two well
marked copies: One copy of the
document marked ‘‘confidential’’
including all the information believed to
be confidential, and one copy of the
document marked ‘‘non-confidential’’
with the information believed to be
confidential deleted. DOE will make its
own determination about the
confidential status of the information
and treat it according to its
determination.
Signed in Washington, DC, on January 27,
2020.
Rebecca Jones-Albertus,
Director, Solar Energy Technologies Office.
[FR Doc. 2020–02123 Filed 2–3–20; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC20–29–000.
Applicants: Northeast Energy
Associates, A Limited Partnership,
North Jersey Energy Associates, A
Limited Partnership, Vistra Energy
Corp., NextEra Energy, Inc.
Description: Errata to January 7, 2020
Application for Authorization Under
Section 203 of the Federal Power Act, et
al. of Northeast Energy Associates, A
Limited Partnership, et al.
Filed Date: 1/28/20.
Accession Number: 20200128–5202.
PO 00000
Frm 00009
Fmt 4703
Sfmt 4703
6149
Comments Due: 5 p.m. ET 2/11/20.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG20–71–000.
Applicants: Blooming Grove Wind
Energy Center LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Blooming Grove
Wind Energy Center LLC.
Filed Date: 1/29/20.
Accession Number: 20200129–5053.
Comments Due: 5 p.m. ET 2/19/20.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1910–019;
ER10–1911–019.
Applicants: Duquesne Light
Company, Duquesne Power, LLC.
Description: Notice of Change in
Status of the Duquesne MBR Sellers.
Filed Date: 1/28/20.
Accession Number: 20200128–5191.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER12–162–027;
ER11–2044–032; ER11–3876–023.
ER13–1266–028; ER15–2211–025;
ER18–1419–001.
Applicants: MidAmerican Energy
Company, Bishop Hill Energy II LLC,
CalEnergy, LLC, Cordova Energy
Company LLC, MidAmerican Energy
Services, LLC, Walnut Ridge Wind, LLC.
Description: Notice of Non-Material
Change in Status of the Berkshire
Hathaway Filing Parties.
Filed Date: 1/28/20.
Accession Number: 20200128–5198.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER16–902–005.
Applicants: Voyager Wind I, LLC.
Description: Notice of Non-Material
Change in Status of Voyager Wind I,
LLC.
Filed Date: 1/29/20.
Accession Number: 20200129–5097.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER19–1073–002;
ER10–2460–015; ER10–2461–016;
ER10–2463–015; ER10–2466–016;
ER10–2917–019; ER10–2918–020;
ER10–2920–019; ER10–2921–019;
ER10–2922–019; ER10–2966–019;
ER10–3167–011; ER11–2201–019;
ER11–2383–014; ER11–3941–017;
ER11–3942–020; ER11–4029–015;
ER12–1311–015; ER12–161–019; ER12–
2068–015; ER12–645–020; ER12–682–
016; ER13–1139–019; ER13–1346–011;
ER13–1613–012; ER13–17–013; ER13–
203–011; ER13–2143–012; ER14–1964–
010; ER14–25–015; ER14–2630–012;
ER16–287–005; ER17–482–004; ER19–
1074–002; ER19–1075–002; ER19–1076–
002; ER19–2429–001; ER19–529–002.
E:\FR\FM\04FEN1.SGM
04FEN1
khammond on DSKJM1Z7X2PROD with NOTICES
6150
Federal Register / Vol. 85, No. 23 / Tuesday, February 4, 2020 / Notices
Applicants: Alta Wind VIII, LLC, Bear
Swamp Power Company LLC, BIF II
Safe Harbor Holdings LLC, BIF III
Holtwood LLC, Black Bear Development
Holdings, LLC, Black Bear Hydro
Partners, LLC, Black Bear SO, LLC,
BREG Aggregator LLC, Brookfield
Energy Marketing Inc., Brookfield
Energy Marketing LP, Brookfield Energy
Marketing US LLC, Brookfield Power
Piney & Deep Creek LLC, Brookfield
Renewable Energy Marketing US,
Brookfield Renewable Trading and
Marketi, Brookfield Smoky Mountain
Hydropower LP, Brookfield White Pine
Hydro LLC, Carr Street Generating
Station, L.P., Erie Boulevard
Hydropower, L.P., Granite Reliable
Power, LLC, Great Lakes Hydro
America, LLC, Hawks Nest Hydro LLC,
Mesa Wind Power Corporation,
Rumford Falls Hydro LLC, Safe Harbor
Water Power Corporation, Windstar
Energy, LLC, Bishop Hill Energy LLC,
Blue Sky East, LLC, California Ridge
Wind Energy LLC, Canadaigua Power
Partners, LLC, Canadaigua Power
Partners II, LLC, Erie Wind, LLC,
Evergreen Wind Power, LLC, Evergreen
Wind Power III, LLC, Imperial Valley
Solar 1, LLC, Niagara Wind Power, LLC,
Prairie Breeze Wind Energy LLC,
Regulus Solar, LLC, Stetson Wind II,
LLC, Vermont Wind, LLC, Stetson
Holdings, LLC.
Description: Amendment to October
30, 2019 Notice of Change in Status of
the Brookfield Companies and
TerraForm Companies.
Filed Date: 1/29/20.
Accession Number: 20200129–5103.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER19–1639–002.
Applicants: South Peak Wind LLC.
Description: Notice of Non-Material
Change in Status of South Peak Wind
LLC.
Filed Date: 1/28/20.
Accession Number: 20200128–5187.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER19–1778–001.
Applicants: Glen Ullin Energy Center,
LLC.
Description: Notice of Non-Material
Change in Status of Glen Ullin Energy
Center, LLC.
Filed Date: 1/28/20.
Accession Number: 20200128–5189.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER20–276–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2020–01–29_Deficiency Response
Prairie Power Attachment O to be
effective 1/1/2020.
Filed Date: 1/29/20.
Accession Number: 20200129–5148.
VerDate Sep<11>2014
17:48 Feb 03, 2020
Jkt 250001
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20–884–000.
Applicants: Hanwha Q CELLS USA
Corp.
Description: Request for Waiver of
Hanwha Q CELLS USA Corp.
Filed Date: 1/27/20.
Accession Number: 20200127–5208.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER20–287–001.
Applicants: CPV Fairview, LLC.
Description: Compliance filing:
Compliance to 122 to be effective 12/9/
2019.
Filed Date: 1/28/20.
Accession Number: 20200128–5161.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER20–888–000.
Applicants: Puget Sound Energy, Inc.
Description: § 205(d) Rate Filing:
Revised Attachment K Northern Grid
Filing to be effective 4/1/2020.
Filed Date: 1/28/20.
Accession Number: 20200128–5155.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER20–889–000.
Applicants: CPV Fairview, LLC.
Description: Compliance filing:
Compliance to 122 to be effective
12/9/2019.
Filed Date: 1/28/20.
Accession Number: 20200128–5156.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER20–890–000.
Applicants: Idaho Power Company.
Description: § 205(d) Rate Filing:
Attachment K—NorthernGrid Per FERC
12/27/19 Order to be effective 4/1/2020.
Filed Date: 1/28/20.
Accession Number: 20200128–5162.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER20–891–000.
Applicants: MATL LLP.
Description: § 205(d) Rate Filing:
NorthernGrid Attachment K 28 Jan 2020
to be effective 4/1/2020.
Filed Date: 1/28/20.
Accession Number: 20200128–5163.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER20–892–000.
Applicants: Portland General Electric
Company.
Description: § 205(d) Rate Filing: Att
K Revision Filing to be effective
4/1/2020.
Filed Date: 1/28/20.
Accession Number: 20200128–5164.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER20–893–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3158R1 Basin Electric and
MidAmerican Energy Attachment AO to
be effective 1/1/2020.
Filed Date: 1/29/20.
Accession Number: 20200129–5001.
PO 00000
Frm 00010
Fmt 4703
Sfmt 4703
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20–894–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: 4th
Quarterly 2019 Revisions to OA, Sch. 12
and RAA, Sch. 17 Members List to be
effective 12/31/2019.
Filed Date: 1/29/20.
Accession Number: 20200129–5029.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20–895–000.
Applicants: NC 102 Project LLC.
Description: § 205(d) Rate Filing:
Notice of Non-Material Change in Status
to be effective 1/30/2020.
Filed Date: 1/29/20.
Accession Number: 20200129–5034.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20–896–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3126R5 WAPA NITSA NOA to be
effective 1/1/2020.
Filed Date: 1/29/20.
Accession Number: 20200129–5039.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20–897–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3161R1 Basin Electric and
MidAmerican Energy Attachment AO to
be effective 1/1/2020.
Filed Date: 1/29/20.
Accession Number: 20200129–5040.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20–898–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1630R10 The Empire District Electric
Company NITSA NOA to be effective
1/1/2020.
Filed Date: 1/29/20.
Accession Number: 20200129–5050.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20–899–000.
Applicants: Wheelabrator Frackville
Energy Company Inc.
Description: Petition for Limited
Waiver, et al. of Wheelabrator Frackville
Energy Company Inc.
Filed Date: 1/28/20.
Accession Number: 20200128–5201.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER20–900–000.
Applicants: Northern States Power
Company, a Minnesota corporation.
Description: Tariff Cancellation:
CHAK—West Crk SS Const Agrmt 283–
NSP–NOC to be effective 3/29/2020.
Filed Date: 1/29/20.
Accession Number: 20200129–5065.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20–901–000.
E:\FR\FM\04FEN1.SGM
04FEN1
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 85, No. 23 / Tuesday, February 4, 2020 / Notices
Applicants: West Penn Power
Company, PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing: West
Penn Power Company submits OIA Sa
No. 5504 to be effective 3/29/2020.
Filed Date: 1/29/20.
Accession Number: 20200129–5071.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20–902–000.
Applicants: sPower Energy Marketing.
Description: Baseline eTariff Filing:
sPower Energy Marketing, LLC MBR
Tariff to be effective 1/30/2020.
Filed Date: 1/29/20.
Accession Number: 20200129–5072.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20–903–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Ministerial Clean Up of OATT and OA
Sections Due to Overlapping Dates to be
effective 12/3/2019.
Filed Date: 1/29/20.
Accession Number: 20200129–5078.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20–904–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
SPP–MISO JOA Revisions to Enhance
Pseudo-Tie Coordination to be effective
3/30/2020.
Filed Date: 1/29/20.
Accession Number: 20200129–5130.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20–905–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2020–01–29_SPP and MISO JOA
Pseudo-Tie Revisions to be effective
3/30/2020.
Filed Date: 1/29/20.
Accession Number: 20200129–5145.
Comments Due: 5 p.m. ET 2/19/20.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF18–452–002.
Applicants: North American Natural
Resources, Inc.
Description: Pre-Arranged/Pre-Agreed
(Settlement and Settlement Agreement)
Filing, et al. of North American Natural
Resources, Inc.
Filed Date: 1/28/20.
Accession Number: 20200128–5192.
Comments Due: 5 p.m. ET 2/3/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
VerDate Sep<11>2014
17:48 Feb 03, 2020
Jkt 250001
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 29, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–02109 Filed 2–3–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3011–017]
NATCO Products Corporation; Notice
of Application for Surrender of
License, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Application for
surrender of minor license.
b. Project No: 3011–017.
c. Date Filed: December 31, 2019.
d. Applicant: NATCO Products
Corporation.
e. Name of Project: Arctic
Hydroelectric Project.
f. Location: The 478-kilowatt project
is located on the South Branch of the
Pawtuxet River, in West Warwick, Kent
County, Rhode Island. The project does
not occupy any federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Steve
Burke, NATCO Products Corporation,
155 Brookside Avenue, West Warwick,
RI 02893; phone (401) 828–0300, email
sburke@natcohome.com.
i. FERC Contact: Diana Shannon,
(202) 502–6136, diana.shannon@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
February 28, 2020.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
6151
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–3011–017.
Comments emailed to Commission staff
are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: In 2017, the
applicant filed a Notice of Intent to file
an application for a subsequent license.
Upon evaluation of costs associated
with study requirements, expected new
license requirements, and repairs to the
turbine, the applicant has decided to
surrender the project. The applicant
proposes to decommission the project
by installing a steel/concrete bulkhead
to prevent flow through the turbine,
close and lock the two turbine gate
control arms; and remove all fuses to
isolate the generating equipment from
the power grid. The dam and
powerhouse would remain in place.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
E:\FR\FM\04FEN1.SGM
04FEN1
Agencies
[Federal Register Volume 85, Number 23 (Tuesday, February 4, 2020)]
[Notices]
[Pages 6149-6151]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-02109]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC20-29-000.
Applicants: Northeast Energy Associates, A Limited Partnership,
North Jersey Energy Associates, A Limited Partnership, Vistra Energy
Corp., NextEra Energy, Inc.
Description: Errata to January 7, 2020 Application for
Authorization Under Section 203 of the Federal Power Act, et al. of
Northeast Energy Associates, A Limited Partnership, et al.
Filed Date: 1/28/20.
Accession Number: 20200128-5202.
Comments Due: 5 p.m. ET 2/11/20.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG20-71-000.
Applicants: Blooming Grove Wind Energy Center LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Blooming Grove Wind Energy Center LLC.
Filed Date: 1/29/20.
Accession Number: 20200129-5053.
Comments Due: 5 p.m. ET 2/19/20.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-1910-019; ER10-1911-019.
Applicants: Duquesne Light Company, Duquesne Power, LLC.
Description: Notice of Change in Status of the Duquesne MBR
Sellers.
Filed Date: 1/28/20.
Accession Number: 20200128-5191.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER12-162-027; ER11-2044-032; ER11-3876-023.
ER13-1266-028; ER15-2211-025; ER18-1419-001.
Applicants: MidAmerican Energy Company, Bishop Hill Energy II LLC,
CalEnergy, LLC, Cordova Energy Company LLC, MidAmerican Energy
Services, LLC, Walnut Ridge Wind, LLC.
Description: Notice of Non-Material Change in Status of the
Berkshire Hathaway Filing Parties.
Filed Date: 1/28/20.
Accession Number: 20200128-5198.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER16-902-005.
Applicants: Voyager Wind I, LLC.
Description: Notice of Non-Material Change in Status of Voyager
Wind I, LLC.
Filed Date: 1/29/20.
Accession Number: 20200129-5097.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER19-1073-002; ER10-2460-015; ER10-2461-016; ER10-
2463-015; ER10-2466-016; ER10-2917-019; ER10-2918-020; ER10-2920-019;
ER10-2921-019; ER10-2922-019; ER10-2966-019; ER10-3167-011; ER11-2201-
019; ER11-2383-014; ER11-3941-017; ER11-3942-020; ER11-4029-015; ER12-
1311-015; ER12-161-019; ER12-2068-015; ER12-645-020; ER12-682-016;
ER13-1139-019; ER13-1346-011; ER13-1613-012; ER13-17-013; ER13-203-011;
ER13-2143-012; ER14-1964-010; ER14-25-015; ER14-2630-012; ER16-287-005;
ER17-482-004; ER19-1074-002; ER19-1075-002; ER19-1076-002; ER19-2429-
001; ER19-529-002.
[[Page 6150]]
Applicants: Alta Wind VIII, LLC, Bear Swamp Power Company LLC, BIF
II Safe Harbor Holdings LLC, BIF III Holtwood LLC, Black Bear
Development Holdings, LLC, Black Bear Hydro Partners, LLC, Black Bear
SO, LLC, BREG Aggregator LLC, Brookfield Energy Marketing Inc.,
Brookfield Energy Marketing LP, Brookfield Energy Marketing US LLC,
Brookfield Power Piney & Deep Creek LLC, Brookfield Renewable Energy
Marketing US, Brookfield Renewable Trading and Marketi, Brookfield
Smoky Mountain Hydropower LP, Brookfield White Pine Hydro LLC, Carr
Street Generating Station, L.P., Erie Boulevard Hydropower, L.P.,
Granite Reliable Power, LLC, Great Lakes Hydro America, LLC, Hawks Nest
Hydro LLC, Mesa Wind Power Corporation, Rumford Falls Hydro LLC, Safe
Harbor Water Power Corporation, Windstar Energy, LLC, Bishop Hill
Energy LLC, Blue Sky East, LLC, California Ridge Wind Energy LLC,
Canadaigua Power Partners, LLC, Canadaigua Power Partners II, LLC, Erie
Wind, LLC, Evergreen Wind Power, LLC, Evergreen Wind Power III, LLC,
Imperial Valley Solar 1, LLC, Niagara Wind Power, LLC, Prairie Breeze
Wind Energy LLC, Regulus Solar, LLC, Stetson Wind II, LLC, Vermont
Wind, LLC, Stetson Holdings, LLC.
Description: Amendment to October 30, 2019 Notice of Change in
Status of the Brookfield Companies and TerraForm Companies.
Filed Date: 1/29/20.
Accession Number: 20200129-5103.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER19-1639-002.
Applicants: South Peak Wind LLC.
Description: Notice of Non-Material Change in Status of South Peak
Wind LLC.
Filed Date: 1/28/20.
Accession Number: 20200128-5187.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER19-1778-001.
Applicants: Glen Ullin Energy Center, LLC.
Description: Notice of Non-Material Change in Status of Glen Ullin
Energy Center, LLC.
Filed Date: 1/28/20.
Accession Number: 20200128-5189.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER20-276-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment: 2020-01-29_Deficiency Response
Prairie Power Attachment O to be effective 1/1/2020.
Filed Date: 1/29/20.
Accession Number: 20200129-5148.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20-884-000.
Applicants: Hanwha Q CELLS USA Corp.
Description: Request for Waiver of Hanwha Q CELLS USA Corp.
Filed Date: 1/27/20.
Accession Number: 20200127-5208.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER20-287-001.
Applicants: CPV Fairview, LLC.
Description: Compliance filing: Compliance to 122 to be effective
12/9/2019.
Filed Date: 1/28/20.
Accession Number: 20200128-5161.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER20-888-000.
Applicants: Puget Sound Energy, Inc.
Description: Sec. 205(d) Rate Filing: Revised Attachment K
Northern Grid Filing to be effective 4/1/2020.
Filed Date: 1/28/20.
Accession Number: 20200128-5155.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER20-889-000.
Applicants: CPV Fairview, LLC.
Description: Compliance filing: Compliance to 122 to be effective
12/9/2019.
Filed Date: 1/28/20.
Accession Number: 20200128-5156.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER20-890-000.
Applicants: Idaho Power Company.
Description: Sec. 205(d) Rate Filing: Attachment K--NorthernGrid
Per FERC 12/27/19 Order to be effective 4/1/2020.
Filed Date: 1/28/20.
Accession Number: 20200128-5162.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER20-891-000.
Applicants: MATL LLP.
Description: Sec. 205(d) Rate Filing: NorthernGrid Attachment K 28
Jan 2020 to be effective 4/1/2020.
Filed Date: 1/28/20.
Accession Number: 20200128-5163.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER20-892-000.
Applicants: Portland General Electric Company.
Description: Sec. 205(d) Rate Filing: Att K Revision Filing to be
effective 4/1/2020.
Filed Date: 1/28/20.
Accession Number: 20200128-5164.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER20-893-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3158R1 Basin Electric and
MidAmerican Energy Attachment AO to be effective 1/1/2020.
Filed Date: 1/29/20.
Accession Number: 20200129-5001.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20-894-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: 4th Quarterly 2019 Revisions
to OA, Sch. 12 and RAA, Sch. 17 Members List to be effective 12/31/
2019.
Filed Date: 1/29/20.
Accession Number: 20200129-5029.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20-895-000.
Applicants: NC 102 Project LLC.
Description: Sec. 205(d) Rate Filing: Notice of Non-Material
Change in Status to be effective 1/30/2020.
Filed Date: 1/29/20.
Accession Number: 20200129-5034.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20-896-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3126R5 WAPA NITSA NOA to be
effective 1/1/2020.
Filed Date: 1/29/20.
Accession Number: 20200129-5039.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20-897-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3161R1 Basin Electric and
MidAmerican Energy Attachment AO to be effective 1/1/2020.
Filed Date: 1/29/20.
Accession Number: 20200129-5040.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20-898-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 1630R10 The Empire District
Electric Company NITSA NOA to be effective 1/1/2020.
Filed Date: 1/29/20.
Accession Number: 20200129-5050.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20-899-000.
Applicants: Wheelabrator Frackville Energy Company Inc.
Description: Petition for Limited Waiver, et al. of Wheelabrator
Frackville Energy Company Inc.
Filed Date: 1/28/20.
Accession Number: 20200128-5201.
Comments Due: 5 p.m. ET 2/18/20.
Docket Numbers: ER20-900-000.
Applicants: Northern States Power Company, a Minnesota corporation.
Description: Tariff Cancellation: CHAK--West Crk SS Const Agrmt
283-NSP-NOC to be effective 3/29/2020.
Filed Date: 1/29/20.
Accession Number: 20200129-5065.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20-901-000.
[[Page 6151]]
Applicants: West Penn Power Company, PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: West Penn Power Company
submits OIA Sa No. 5504 to be effective 3/29/2020.
Filed Date: 1/29/20.
Accession Number: 20200129-5071.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20-902-000.
Applicants: sPower Energy Marketing.
Description: Baseline eTariff Filing: sPower Energy Marketing, LLC
MBR Tariff to be effective 1/30/2020.
Filed Date: 1/29/20.
Accession Number: 20200129-5072.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20-903-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Ministerial Clean Up of OATT
and OA Sections Due to Overlapping Dates to be effective 12/3/2019.
Filed Date: 1/29/20.
Accession Number: 20200129-5078.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20-904-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: SPP-MISO JOA Revisions to
Enhance Pseudo-Tie Coordination to be effective 3/30/2020.
Filed Date: 1/29/20.
Accession Number: 20200129-5130.
Comments Due: 5 p.m. ET 2/19/20.
Docket Numbers: ER20-905-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2020-01-29_SPP and MISO JOA
Pseudo-Tie Revisions to be effective 3/30/2020.
Filed Date: 1/29/20.
Accession Number: 20200129-5145.
Comments Due: 5 p.m. ET 2/19/20.
Take notice that the Commission received the following qualifying
facility filings:
Docket Numbers: QF18-452-002.
Applicants: North American Natural Resources, Inc.
Description: Pre-Arranged/Pre-Agreed (Settlement and Settlement
Agreement) Filing, et al. of North American Natural Resources, Inc.
Filed Date: 1/28/20.
Accession Number: 20200128-5192.
Comments Due: 5 p.m. ET 2/3/20.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: January 29, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-02109 Filed 2-3-20; 8:45 am]
BILLING CODE 6717-01-P