Exelon Generation Company, LLC; Peach Bottom Atomic Power Station, Units 2 and 3, 5725 [2020-01769]
Download as PDF
Federal Register / Vol. 85, No. 21 / Friday, January 31, 2020 / Notices
1218–0266. The OMB is particularly
interested in comments that:
• Evaluate whether the proposed
collection of information is necessary
for the proper performance of the
functions of the agency, including
whether the information will have
practical utility:
• Evaluate the accuracy of the
agency’s estimate of the burden of the
proposed collection of information,
including the validity of the
methodology and assumptions used.
• Enhance the quality, utility, and
clarity of the information to be
collected; and
• Minimize the burden of the
collection of information on those who
are to respond, including through the
use of appropriate automated,
electronic, mechanical, or other
technological collection techniques or
other forms of information technology,
e.g., permitting electronic submission of
responses.
Agency: DOL–OSHA.
Title of Collection: Respirable
Crystalline Silica Standards for General
Industry, Maritime (29 CFR 1910.1053)
and Construction (29 CFR 1926.1053).
OMB Control Number: 1218–0266.
Affected Public: Private Sector:
Businesses or other for-profits.
Total Estimated Number of
Respondents: 682,581.
Total Estimated Number of
Responses: 17,858,154.
Total Estimated Annual Time Burden:
12,468,266 hours.
Total Estimated Annual Other Costs
Burden: $393,789,550.
Authority: 44 U.S.C. 3507(a)(1)(D).
Dated: January 22, 2020.
Frederick Licari,
Departmental Clearance Officer.
[FR Doc. 2020–01791 Filed 1–30–20; 8:45 am]
BILLING CODE 4510–26–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–277 and 50–278; NRC–
2018–0130]
Exelon Generation Company, LLC;
Peach Bottom Atomic Power Station,
Units 2 and 3
Nuclear Regulatory
Commission.
ACTION: Final supplemental
environmental impact statement.
jbell on DSKJLSW7X2PROD with NOTICES
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) has published a final
plant-specific supplement, Supplement
10, Second Renewal, to the Generic
Environmental Impact Statement (GEIS)
SUMMARY:
VerDate Sep<11>2014
17:16 Jan 30, 2020
Jkt 250001
for License Renewal of Nuclear Plants,
NUREG–1437, regarding the subsequent
renewal of Facility Operating License
Nos. DPR–44 and DPR–56 for an
additional 20 years of operation for
Peach Bottom Atomic Power Station,
Units 2 and 3, respectively (Peach
Bottom). Peach Bottom is located in
York County, Pennsylvania.
DATES: The final Supplement 10,
Second Renewal to the GEIS is available
as of January 24, 2020.
ADDRESSES: Please refer to Docket ID
NRC–2018–0130 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking website: Go to
https://www.regulations.gov/ and search
for Docket ID NRC–2018–0130. Address
questions about NRC docket IDs in
Regulations.gov to Jennifer Borges;
telephone: 301–287–9127; email:
Jennifer.Borges@nrc.gov. For technical
questions contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may access publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov. The final Supplement 10,
Second Renewal is available in ADAMS
under Accession No. ML20023A937.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
• Library: A copy of the final
Supplement 10, Second Renewal to the
GEIS for License Renewal of Nuclear
Plants, NUREG–1437, is available at the
Hartford County Public Library,
Whiteford Branch, 2407 Whiteford
Road, Whiteford, MD 21160.
FOR FURTHER INFORMATION CONTACT: Lois
M. James, Office of Nuclear Material
Safety and Safeguards, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
3306, email: Lois.James@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Background
In accordance with section 51.118 of
title 10 of the Code of Federal
Regulations (10 CFR), the NRC is
PO 00000
Frm 00115
Fmt 4703
Sfmt 4703
5725
making available final Supplement 10,
Second Renewal to NUREG–1437,
regarding the renewal of Exelon
Generation Company, LLC. (Exelon),
operating licenses DPR–44 and DPR–56
for an additional 20 years of operation
for Peach Bottom Atomic Power Station,
Units 2 and 3 (Peach Bottom). A Notice
of Availability of Draft Supplement 10,
Second Renewal to NUREG–1437 was
published in the Federal Register on
August 9, 2019 (84 FR 39296), by the
Environmental Protection Agency. The
public comment period on draft
Supplement 10, Second Renewal to
NUREG–1437 ended on September 23,
2019, and the comments received are
addressed in final Supplement 10,
Second Renewal to NUREG–1437.
II. Discussion
As discussed in Chapter 5 of final
Supplement 10, Second Renewal to
NUREG–1437, the NRC staff determined
that the adverse environmental impacts
of subsequent license renewal for Peach
Bottom are not so great that preserving
the option of subsequent license
renewal for energy-planning
decisionmakers would be unreasonable.
This recommendation is based on: (1)
The analysis and findings in the GEIS;
(2) information provided in the
environmental report and other
documents submitted by Exelon; (3)
consultation with Federal, State, local,
and Tribal agencies; (4) the NRC staff’s
independent environmental review; and
(5) consideration of public comments
received during the scoping process and
on the Draft Supplemental
Environmental Impact Statement.
Dated at Rockville, Maryland, this 27th day
of January, 2020.
For the Nuclear Regulatory Commission.
Robert B. Elliott,
Chief, Environmental Review License Renewal
Branch, Division of Rulemaking,
Environmental, and Financial Support, Office
of Nuclear Material Safety and Safeguards.
[FR Doc. 2020–01769 Filed 1–30–20; 8:45 am]
BILLING CODE 7590–01–P
OFFICE OF SPECIAL COUNSEL
[OMB Control No. 3255–0005]
Submission for Review: OSC Form-14
Office of Special Counsel (OSC)
30-Day notice and request for
comments.
AGENCY:
ACTION:
OSC is providing 30
additional days for individuals to
comment on OSC Form-14, the form
used to file complaints and disclosures
with OSC.
SUMMARY:
E:\FR\FM\31JAN1.SGM
31JAN1
Agencies
[Federal Register Volume 85, Number 21 (Friday, January 31, 2020)]
[Notices]
[Page 5725]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-01769]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-277 and 50-278; NRC-2018-0130]
Exelon Generation Company, LLC; Peach Bottom Atomic Power
Station, Units 2 and 3
AGENCY: Nuclear Regulatory Commission.
ACTION: Final supplemental environmental impact statement.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has published a
final plant-specific supplement, Supplement 10, Second Renewal, to the
Generic Environmental Impact Statement (GEIS) for License Renewal of
Nuclear Plants, NUREG-1437, regarding the subsequent renewal of
Facility Operating License Nos. DPR-44 and DPR-56 for an additional 20
years of operation for Peach Bottom Atomic Power Station, Units 2 and
3, respectively (Peach Bottom). Peach Bottom is located in York County,
Pennsylvania.
DATES: The final Supplement 10, Second Renewal to the GEIS is available
as of January 24, 2020.
ADDRESSES: Please refer to Docket ID NRC-2018-0130 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document
using any of the following methods:
Federal Rulemaking website: Go to https://www.regulations.gov/ and search for Docket ID NRC-2018-0130. Address
questions about NRC docket IDs in Regulations.gov to Jennifer Borges;
telephone: 301-287-9127; email: [email protected]. For technical
questions contact the individual listed in the FOR FURTHER INFORMATION
CONTACT section of this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may access publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The final Supplement 10, Second
Renewal is available in ADAMS under Accession No. ML20023A937.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
Library: A copy of the final Supplement 10, Second Renewal
to the GEIS for License Renewal of Nuclear Plants, NUREG-1437, is
available at the Hartford County Public Library, Whiteford Branch, 2407
Whiteford Road, Whiteford, MD 21160.
FOR FURTHER INFORMATION CONTACT: Lois M. James, Office of Nuclear
Material Safety and Safeguards, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001; telephone: 301-415-3306, email:
[email protected].
SUPPLEMENTARY INFORMATION:
I. Background
In accordance with section 51.118 of title 10 of the Code of
Federal Regulations (10 CFR), the NRC is making available final
Supplement 10, Second Renewal to NUREG-1437, regarding the renewal of
Exelon Generation Company, LLC. (Exelon), operating licenses DPR-44 and
DPR-56 for an additional 20 years of operation for Peach Bottom Atomic
Power Station, Units 2 and 3 (Peach Bottom). A Notice of Availability
of Draft Supplement 10, Second Renewal to NUREG-1437 was published in
the Federal Register on August 9, 2019 (84 FR 39296), by the
Environmental Protection Agency. The public comment period on draft
Supplement 10, Second Renewal to NUREG-1437 ended on September 23,
2019, and the comments received are addressed in final Supplement 10,
Second Renewal to NUREG-1437.
II. Discussion
As discussed in Chapter 5 of final Supplement 10, Second Renewal to
NUREG-1437, the NRC staff determined that the adverse environmental
impacts of subsequent license renewal for Peach Bottom are not so great
that preserving the option of subsequent license renewal for energy-
planning decisionmakers would be unreasonable. This recommendation is
based on: (1) The analysis and findings in the GEIS; (2) information
provided in the environmental report and other documents submitted by
Exelon; (3) consultation with Federal, State, local, and Tribal
agencies; (4) the NRC staff's independent environmental review; and (5)
consideration of public comments received during the scoping process
and on the Draft Supplemental Environmental Impact Statement.
Dated at Rockville, Maryland, this 27th day of January, 2020.
For the Nuclear Regulatory Commission.
Robert B. Elliott,
Chief, Environmental Review License Renewal Branch, Division of
Rulemaking, Environmental, and Financial Support, Office of Nuclear
Material Safety and Safeguards.
[FR Doc. 2020-01769 Filed 1-30-20; 8:45 am]