Exelon Generation Company, LLC; Peach Bottom Atomic Power Station, Units 2 and 3, 5725 [2020-01769]

Download as PDF Federal Register / Vol. 85, No. 21 / Friday, January 31, 2020 / Notices 1218–0266. The OMB is particularly interested in comments that: • Evaluate whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information will have practical utility: • Evaluate the accuracy of the agency’s estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used. • Enhance the quality, utility, and clarity of the information to be collected; and • Minimize the burden of the collection of information on those who are to respond, including through the use of appropriate automated, electronic, mechanical, or other technological collection techniques or other forms of information technology, e.g., permitting electronic submission of responses. Agency: DOL–OSHA. Title of Collection: Respirable Crystalline Silica Standards for General Industry, Maritime (29 CFR 1910.1053) and Construction (29 CFR 1926.1053). OMB Control Number: 1218–0266. Affected Public: Private Sector: Businesses or other for-profits. Total Estimated Number of Respondents: 682,581. Total Estimated Number of Responses: 17,858,154. Total Estimated Annual Time Burden: 12,468,266 hours. Total Estimated Annual Other Costs Burden: $393,789,550. Authority: 44 U.S.C. 3507(a)(1)(D). Dated: January 22, 2020. Frederick Licari, Departmental Clearance Officer. [FR Doc. 2020–01791 Filed 1–30–20; 8:45 am] BILLING CODE 4510–26–P NUCLEAR REGULATORY COMMISSION [Docket Nos. 50–277 and 50–278; NRC– 2018–0130] Exelon Generation Company, LLC; Peach Bottom Atomic Power Station, Units 2 and 3 Nuclear Regulatory Commission. ACTION: Final supplemental environmental impact statement. jbell on DSKJLSW7X2PROD with NOTICES AGENCY: The U.S. Nuclear Regulatory Commission (NRC) has published a final plant-specific supplement, Supplement 10, Second Renewal, to the Generic Environmental Impact Statement (GEIS) SUMMARY: VerDate Sep<11>2014 17:16 Jan 30, 2020 Jkt 250001 for License Renewal of Nuclear Plants, NUREG–1437, regarding the subsequent renewal of Facility Operating License Nos. DPR–44 and DPR–56 for an additional 20 years of operation for Peach Bottom Atomic Power Station, Units 2 and 3, respectively (Peach Bottom). Peach Bottom is located in York County, Pennsylvania. DATES: The final Supplement 10, Second Renewal to the GEIS is available as of January 24, 2020. ADDRESSES: Please refer to Docket ID NRC–2018–0130 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods: • Federal Rulemaking website: Go to https://www.regulations.gov/ and search for Docket ID NRC–2018–0130. Address questions about NRC docket IDs in Regulations.gov to Jennifer Borges; telephone: 301–287–9127; email: Jennifer.Borges@nrc.gov. For technical questions contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may access publiclyavailable documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301– 415–4737, or by email to pdr.resource@ nrc.gov. The final Supplement 10, Second Renewal is available in ADAMS under Accession No. ML20023A937. • NRC’s PDR: You may examine and purchase copies of public documents at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. • Library: A copy of the final Supplement 10, Second Renewal to the GEIS for License Renewal of Nuclear Plants, NUREG–1437, is available at the Hartford County Public Library, Whiteford Branch, 2407 Whiteford Road, Whiteford, MD 21160. FOR FURTHER INFORMATION CONTACT: Lois M. James, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001; telephone: 301–415– 3306, email: Lois.James@nrc.gov. SUPPLEMENTARY INFORMATION: I. Background In accordance with section 51.118 of title 10 of the Code of Federal Regulations (10 CFR), the NRC is PO 00000 Frm 00115 Fmt 4703 Sfmt 4703 5725 making available final Supplement 10, Second Renewal to NUREG–1437, regarding the renewal of Exelon Generation Company, LLC. (Exelon), operating licenses DPR–44 and DPR–56 for an additional 20 years of operation for Peach Bottom Atomic Power Station, Units 2 and 3 (Peach Bottom). A Notice of Availability of Draft Supplement 10, Second Renewal to NUREG–1437 was published in the Federal Register on August 9, 2019 (84 FR 39296), by the Environmental Protection Agency. The public comment period on draft Supplement 10, Second Renewal to NUREG–1437 ended on September 23, 2019, and the comments received are addressed in final Supplement 10, Second Renewal to NUREG–1437. II. Discussion As discussed in Chapter 5 of final Supplement 10, Second Renewal to NUREG–1437, the NRC staff determined that the adverse environmental impacts of subsequent license renewal for Peach Bottom are not so great that preserving the option of subsequent license renewal for energy-planning decisionmakers would be unreasonable. This recommendation is based on: (1) The analysis and findings in the GEIS; (2) information provided in the environmental report and other documents submitted by Exelon; (3) consultation with Federal, State, local, and Tribal agencies; (4) the NRC staff’s independent environmental review; and (5) consideration of public comments received during the scoping process and on the Draft Supplemental Environmental Impact Statement. Dated at Rockville, Maryland, this 27th day of January, 2020. For the Nuclear Regulatory Commission. Robert B. Elliott, Chief, Environmental Review License Renewal Branch, Division of Rulemaking, Environmental, and Financial Support, Office of Nuclear Material Safety and Safeguards. [FR Doc. 2020–01769 Filed 1–30–20; 8:45 am] BILLING CODE 7590–01–P OFFICE OF SPECIAL COUNSEL [OMB Control No. 3255–0005] Submission for Review: OSC Form-14 Office of Special Counsel (OSC) 30-Day notice and request for comments. AGENCY: ACTION: OSC is providing 30 additional days for individuals to comment on OSC Form-14, the form used to file complaints and disclosures with OSC. SUMMARY: E:\FR\FM\31JAN1.SGM 31JAN1

Agencies

[Federal Register Volume 85, Number 21 (Friday, January 31, 2020)]
[Notices]
[Page 5725]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-01769]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-277 and 50-278; NRC-2018-0130]


Exelon Generation Company, LLC; Peach Bottom Atomic Power 
Station, Units 2 and 3

AGENCY: Nuclear Regulatory Commission.

ACTION: Final supplemental environmental impact statement.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has published a 
final plant-specific supplement, Supplement 10, Second Renewal, to the 
Generic Environmental Impact Statement (GEIS) for License Renewal of 
Nuclear Plants, NUREG-1437, regarding the subsequent renewal of 
Facility Operating License Nos. DPR-44 and DPR-56 for an additional 20 
years of operation for Peach Bottom Atomic Power Station, Units 2 and 
3, respectively (Peach Bottom). Peach Bottom is located in York County, 
Pennsylvania.

DATES: The final Supplement 10, Second Renewal to the GEIS is available 
as of January 24, 2020.

ADDRESSES: Please refer to Docket ID NRC-2018-0130 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking website: Go to https://www.regulations.gov/ and search for Docket ID NRC-2018-0130. Address 
questions about NRC docket IDs in Regulations.gov to Jennifer Borges; 
telephone: 301-287-9127; email: [email protected]. For technical 
questions contact the individual listed in the FOR FURTHER INFORMATION 
CONTACT section of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may access publicly-available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to [email protected]. The final Supplement 10, Second 
Renewal is available in ADAMS under Accession No. ML20023A937.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.
     Library: A copy of the final Supplement 10, Second Renewal 
to the GEIS for License Renewal of Nuclear Plants, NUREG-1437, is 
available at the Hartford County Public Library, Whiteford Branch, 2407 
Whiteford Road, Whiteford, MD 21160.

FOR FURTHER INFORMATION CONTACT: Lois M. James, Office of Nuclear 
Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001; telephone: 301-415-3306, email: 
[email protected].

SUPPLEMENTARY INFORMATION:

I. Background

    In accordance with section 51.118 of title 10 of the Code of 
Federal Regulations (10 CFR), the NRC is making available final 
Supplement 10, Second Renewal to NUREG-1437, regarding the renewal of 
Exelon Generation Company, LLC. (Exelon), operating licenses DPR-44 and 
DPR-56 for an additional 20 years of operation for Peach Bottom Atomic 
Power Station, Units 2 and 3 (Peach Bottom). A Notice of Availability 
of Draft Supplement 10, Second Renewal to NUREG-1437 was published in 
the Federal Register on August 9, 2019 (84 FR 39296), by the 
Environmental Protection Agency. The public comment period on draft 
Supplement 10, Second Renewal to NUREG-1437 ended on September 23, 
2019, and the comments received are addressed in final Supplement 10, 
Second Renewal to NUREG-1437.

II. Discussion

    As discussed in Chapter 5 of final Supplement 10, Second Renewal to 
NUREG-1437, the NRC staff determined that the adverse environmental 
impacts of subsequent license renewal for Peach Bottom are not so great 
that preserving the option of subsequent license renewal for energy-
planning decisionmakers would be unreasonable. This recommendation is 
based on: (1) The analysis and findings in the GEIS; (2) information 
provided in the environmental report and other documents submitted by 
Exelon; (3) consultation with Federal, State, local, and Tribal 
agencies; (4) the NRC staff's independent environmental review; and (5) 
consideration of public comments received during the scoping process 
and on the Draft Supplemental Environmental Impact Statement.

    Dated at Rockville, Maryland, this 27th day of January, 2020.

    For the Nuclear Regulatory Commission.
Robert B. Elliott,
Chief, Environmental Review License Renewal Branch, Division of 
Rulemaking, Environmental, and Financial Support, Office of Nuclear 
Material Safety and Safeguards.
[FR Doc. 2020-01769 Filed 1-30-20; 8:45 am]