Airworthiness Directives; Bombardier, Inc., Airplanes, 4614-4616 [2020-01235]

Download as PDF 4614 Federal Register / Vol. 85, No. 17 / Monday, January 27, 2020 / Proposed Rules FOR FURTHER INFORMATION CONTACT: PART 202—FEDERAL SEED ACT ADMINISTRATIVE PROCEDURES 53. The authority citation for part 202 continues to read as follows: ■ Authority: 302, 305, 402, 408, 409, 413, 414, 53 Stat. 1275, as amended; 7 U.S.C. 1582, 1585, 1592, 1598, 1599, 1603, and 1604. 54. In part 202, the heading is revised to read as set forth above. ■ Subpart C—Provisions Applicable to Other Proceedings 55. In subpart C, revise the heading to read as set forth above. ■ Dated: January 9, 2020. Bruce Summers, Administrator, Agricultural Marketing Service. [FR Doc. 2020–00400 Filed 1–24–20; 8:45 am] BILLING CODE 3410–02–P FEDERAL DEPOSIT INSURANCE CORPORATION 12 CFR Parts 303 and 308 RIN 3064–AF19 Incorporation of Existing Statement of Policy Regarding Requests for Participation in the Affairs of an Insured Depository Institution by Convicted Individuals; Extension of Comment Period Federal Deposit Insurance Corporation. ACTION: Notice of proposed rulemaking; extension of comment period. AGENCY: On December 16, 2019, the Federal Deposit Insurance Corporation (FDIC) published in the Federal Register a Notice of Proposed Rulemaking (Notice) that proposed to revise the existing regulations requiring persons convicted of certain criminal offenses to obtain prior written consent before participating in the conduct of the affairs of any depository institution to incorporate the FDIC’s existing Statement of Policy, and to amend the regulations setting forth the FDIC’s procedures and standards applicable to an application to obtain the FDIC’s prior written consent. The FDIC has determined that an extension of the comment period until March 16, 2020, is appropriate. DATES: The comment period for the Notice published on December 16, 2019 (84 FR 68353), is extended from February 14, 2020, to March 16, 2020. ADDRESSES: You may submit comments by any of the methods identified in the proposal. khammond on DSKJM1Z7X2PROD with PROPOSALS SUMMARY: VerDate Sep<11>2014 16:11 Jan 24, 2020 Jkt 250001 Brian Zeller, Review Examiner, (319) 395–7394 x4125, or Larisa Collado, Section Chief, (202) 898–8509, in the Division of Risk Management Supervision; or Graham N. Rehrig, Senior Attorney, (202) 898–3829, John Dorsey, Acting Supervisory Counsel, (202) 898–3807, or Andrea Winkler, Acting Assistant General Counsel, (202) 898–3727 in the Legal Division. SUPPLEMENTARY INFORMATION: On December 16, 2019, the FDIC published in the Federal Register a Notice that proposed to revise the existing regulations requiring persons convicted of certain criminal offenses to obtain prior written consent before participating in the conduct of the affairs of any depository institution to incorporate the FDIC’s existing Statement of Policy, and to amend the regulations setting forth the FDIC’s procedures and standards applicable to an application to obtain the FDIC’s prior written consent. The Notice sought comment from the public regarding ‘‘the scope of Section 19, possible amendments to the relief process, the scope of the de minimis offense exemption, and the treatment of expunged criminal records,’’ as well as comments related to the expected effects of the proposed rule. The Notice stated that the comment period would close on February 14, 2020. The FDIC has received a request to extend the comment period. An extension of the comment period would provide additional opportunity for the public to prepare comments to address questions posed by the FDIC. Therefore, the FDIC is extending the end of the comment period for the Notice from February 14, 2020, to March 16, 2020. Federal Deposit Insurance Corporation. Dated at Washington, DC, on January 22, 2020. Annmarie H. Boyd, Assistant Executive Secretary. [FR Doc. 2020–01298 Filed 1–24–20; 8:45 am] BILLING CODE 6714–01–P DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 39 [Docket No. FAA–2019–1081; Product Identifier 2019–NM–153–AD] RIN 2120–AA64 Airworthiness Directives; Bombardier, Inc., Airplanes Federal Aviation Administration (FAA), DOT. AGENCY: PO 00000 Frm 00012 Fmt 4702 Sfmt 4702 Notice of proposed rulemaking (NPRM). ACTION: The FAA proposes to adopt a new airworthiness directive (AD) for certain Bombardier, Inc., Model BD– 100–1A10 airplanes. This proposed AD was prompted by reports of the loss of all air data system information provided to the flightcrew, which was caused by icing at high altitudes. This proposed AD would require revising the existing airplane flight manual (AFM) to provide the flightcrew with procedures to stabilize the airplane’s airspeed and attitude. The FAA is proposing this AD to address the unsafe condition on these products. DATES: The FAA must receive comments on this proposed AD by March 12, 2020. ADDRESSES: You may send comments, using the procedures found in 14 CFR 11.43 and 11.45, by any of the following methods: • Federal eRulemaking Portal: Go to https://www.regulations.gov. Follow the instructions for submitting comments. • Fax: 202–493–2251. • Mail: U.S. Department of Transportation, Docket Operations, M– 30, West Building Ground Floor, Room W12–140, 1200 New Jersey Avenue SE, Washington, DC 20590. • Hand Delivery: Deliver to Mail address above between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. For service information identified in this NPRM, contact Bombardier, Inc., 200 Coˆte-Vertu Road West, Dorval, Que´bec H4S 2A3, Canada; North America toll-free telephone 1–866–538– 1247 or direct-dial telephone 1–514– 855–2999; email ac.yul@ aero.bombardier.com; internet https:// www.bombardier.com. You may view this service information at the FAA, Transport Standards Branch, 2200 South 216th St., Des Moines, WA. For information on the availability of this material at the FAA, call 206–231–3195. SUMMARY: Examining the AD Docket You may examine the AD docket on the internet at https:// www.regulations.gov by searching for and locating Docket No. FAA–2019– 1081; or in person at Docket Operations between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. The AD docket contains this NPRM, the regulatory evaluation, any comments received, and other information. The street address for Docket Operations is listed above. Comments will be available in the AD docket shortly after receipt. FOR FURTHER INFORMATION CONTACT: Darren Gassetto, Aerospace Engineer, E:\FR\FM\27JAP1.SGM 27JAP1 4615 Federal Register / Vol. 85, No. 17 / Monday, January 27, 2020 / Proposed Rules Mechanical Systems and Admin Services Section, FAA, New York ACO Branch, 1600 Stewart Avenue, Suite 410, Westbury, NY 11590; telephone 516–228–7323; fax 516–794–5531; email 9-avs-nyaco-cos@faa.gov. SUPPLEMENTARY INFORMATION: Comments Invited The FAA invites you to send any written relevant data, views, or arguments about this proposal. Send your comments to an address listed under the ADDRESSES section. Include ‘‘Docket No. FAA–2019–1081; Product Identifier 2019–NM–153–AD’’ at the beginning of your comments. The FAA specifically invite comments on the overall regulatory, economic, environmental, and energy aspects of this NPRM. The FAA will consider all comments received by the closing date and may amend this NPRM because of those comments. The FAA will post all comments, without change, to https:// www.regulations.gov, including any personal information you provide. The FAA will also post a report summarizing each substantive verbal contact the agency receives about this NPRM. Discussion Transport Canada Civil Aviation (TCCA), which is the aviation authority for Canada, has issued Canadian AD CF–2019–24, dated July 5, 2019 (referred to after this as the Mandatory Continuing Airworthiness Information, or ‘‘the MCAI’’), to correct an unsafe condition for certain Bombardier, Inc., Model BD–100–1A10 airplanes. You may examine the MCAI in the AD docket on the internet at https:// www.regulations.gov by searching for and locating Docket No. FAA–2019– 1081. This proposed AD was prompted by reports of the loss of all air data system information provided to the flightcrew, which was caused by icing at high altitudes. The FAA is proposing this AD to address the loss of all air data system information provided to the flightcrew. If not addressed, this condition may adversely affect continued safe flight and landing. See the MCAI for additional background information. Related Service Information Under 1 CFR Part 51 Bombardier has issued the following service information, which provides a procedure for ‘‘Unreliable Airspeed’’ in the Emergency Procedures section, and also provides a procedure for ‘‘GoAround’’ in the Normal Procedures section of the applicable AFM. These documents are distinct since they apply to different airplane models. • Bombardier Challenger 300 AFM, Publication No. CSP 100–1, Revision 56, dated July 8, 2019. • Bombardier Challenger 350 AFM, Publication No. CH 350 AFM, Revision 22, dated July 8, 2019. This service information is reasonably available because the interested parties have access to it through their normal course of business or by the means identified in the ADDRESSES section. FAA’s Determination This product has been approved by the aviation authority of another country, and is approved for operation in the United States. Pursuant to the FAA’s bilateral agreement with the State of Design Authority, the FAA has been notified of the unsafe condition described in the MCAI and service information referenced above. The FAA is proposing this AD because the FAA evaluated all the relevant information and determined the unsafe condition described previously is likely to exist or develop on other products of the same type design. Proposed Requirements of This NPRM This proposed AD would require revising the existing AFM with procedures for ‘‘Unreliable Airspeed’’ in the Emergency Procedures section of the applicable AFM and with procedures for ‘‘Go-Around’’ in the Normal Procedures section of the applicable AFM, as described previously. Costs of Compliance The FAA estimates that this proposed AD affects 560 airplanes of U.S. registry. The FAA estimates the following costs to comply with this proposed AD: ESTIMATED COSTS FOR REQUIRED ACTIONS Labor cost Parts cost Cost per product Cost on U.S. operators 1 work-hour × $85 per hour = $85 .............................................................................................. $0 $85 $47,600 khammond on DSKJM1Z7X2PROD with PROPOSALS Authority for This Rulemaking Title 49 of the United States Code specifies the FAA’s authority to issue rules on aviation safety. Subtitle I, section 106, describes the authority of the FAA Administrator. Subtitle VII: Aviation Programs, describes in more detail the scope of the Agency’s authority. The FAA is issuing this rulemaking under the authority described in Subtitle VII, Part A, Subpart III, Section 44701: ‘‘General requirements.’’ Under that section, Congress charges the FAA with promoting safe flight of civil aircraft in air commerce by prescribing regulations for practices, methods, and procedures the Administrator finds necessary for safety in air commerce. This regulation is within the scope of that authority because it addresses an VerDate Sep<11>2014 16:11 Jan 24, 2020 Jkt 250001 unsafe condition that is likely to exist or develop on products identified in this rulemaking action. Regulatory Findings The FAA determined that this proposed AD would not have federalism implications under Executive Order 13132. This proposed AD would not have a substantial direct effect on the States, on the relationship between the national Government and the States, or on the distribution of power and responsibilities among the various levels of government. For the reasons discussed above, I certify this proposed regulation: (1) Is not a ‘‘significant regulatory action’’ under Executive Order 12866, (2) Will not affect intrastate aviation in Alaska, and PO 00000 Frm 00013 Fmt 4702 Sfmt 4702 (3) Will not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act. List of Subjects in 14 CFR Part 39 Air transportation, Aircraft, Aviation safety, Incorporation by reference, Safety. The Proposed Amendment Accordingly, under the authority delegated to me by the Administrator, the FAA proposes to amend 14 CFR part 39 as follows: PART 39—AIRWORTHINESS DIRECTIVES 1. The authority citation for part 39 continues to read as follows: ■ E:\FR\FM\27JAP1.SGM 27JAP1 4616 Federal Register / Vol. 85, No. 17 / Monday, January 27, 2020 / Proposed Rules § 39.13 [Amended] 2. The FAA amends § 39.13 by adding the following new airworthiness directive (AD): ■ Bombardier, Inc.: Docket No. FAA–2019– 1081; Product Identifier 2019–NM–153– AD. (a) Comments Due Date The FAA must receive comments by March 12, 2020. (b) Affected ADs None. khammond on DSKJM1Z7X2PROD with PROPOSALS (h) Other FAA AD Provisions The following provisions also apply to this AD: (1) Alternative Methods of Compliance (AMOCs): The Manager, New York ACO Branch, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request to your principal inspector or local Flight Standards District Office, as appropriate. If sending information directly to the manager of the certification office, send it to ATTN: Program Manager, Continuing Operational Safety, FAA, New York ACO Branch, 1600 Stewart Avenue, Suite 410, Westbury, NY 11590; telephone 516–228–7300; fax 516–794–5531. Before using any approved AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the local flight standards district office/certificate holding district office. (2) Contacting the Manufacturer: For any requirement in this AD to obtain instructions from a manufacturer, the instructions must be accomplished using a method approved by the Manager, New York ACO Branch, FAA; or Transport Canada Civil Aviation (TCCA); or Bombardier Inc.’s TCCA Design Approval Organization (DAO). If approved by the DAO, the approval must include the DAO-authorized signature. VerDate Sep<11>2014 16:11 Jan 24, 2020 Jkt 250001 (c) Applicability This AD applies to Bombardier, Inc., Model BD–100–1A10 airplanes, certificated in any category, serial numbers 20001 through 20688 inclusive. (d) Subject Air Transport Association (ATA) of America Code 34, Navigation. (e) Reason This AD was prompted by reports of the loss of all air data system information provided to the flightcrew, which was caused by icing at high altitudes. The FAA is issuing this AD to address the loss of all air data system information provided to the flightcrew. If not addressed, this condition may adversely affect continued safe flight and landing. (i) Related Information (1) Refer to Mandatory Continuing Airworthiness Information (MCAI) Canadian AD CF–2019–24, dated July 5, 2019, for related information. This MCAI may be found in the AD docket on the internet at https://www.regulations.gov by searching for and locating Docket No. FAA–2019–1081. (2) For more information about this AD, contact Darren Gassetto, Aerospace Engineer, Mechanical Systems and Admin Services Section, FAA, New York ACO Branch, 1600 Stewart Avenue, Suite 410, Westbury, NY 11590; telephone 516–228–7323; fax 516– 794–5531; email 9-avs-nyaco-cos@faa.gov. (3) For service information identified in this AD, contact Bombardier, Inc., 200 CoˆteVertu Road West, Dorval, Que´bec H4S 2A3, Canada; North America toll-free telephone 1– 866–538–1247 or direct-dial telephone 1– 514–855–2999; email ac.yul@ aero.bombardier.com; internet https:// www.bombardier.com. You may view this service information at the FAA, Transport Standards Branch, 2200 South 216th St., Des Moines, WA. For information on the availability of this material at the FAA, call 206–231–3195. Issued on January 21, 2020. Gaetano A. Sciortino, Deputy Director for Strategic Initiatives, Compliance & Airworthiness Division, Aircraft Certification Service. [FR Doc. 2020–01235 Filed 1–24–20; 8:45 am] BILLING CODE 4910–13–P PO 00000 Frm 00014 Fmt 4702 Sfmt 4702 (f) Compliance Comply with this AD within the compliance times specified, unless already done. (g) Revision of the Airplane Flight Manual (AFM) Within 30 days after the effective date of this AD: Revise the Emergency Procedures— Avionics (section 03–17) of the existing AFM to include the information in the ‘‘Unreliable Airspeed’’ procedure of the applicable AFM specified in figure 1 to paragraph (g) of this AD, and revise the Normal Procedures—After Take-off (section 04–04) of the existing AFM to include the information in the ‘‘GoAround’’ procedure of the applicable AFM specified in figure 1 to paragraph (g) of this AD. DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 39 [Docket No. FAA–2019–1079; Product Identifier 2019–NM–194–AD] RIN 2120–AA64 Airworthiness Directives; ATR—GIE Avions de Transport Re´gional Airplanes Federal Aviation Administration (FAA), DOT. ACTION: Notice of proposed rulemaking (NPRM). AGENCY: The FAA proposes to adopt a new airworthiness directive (AD) for certain ATR—GIE Avions de Transport Re´gional Model ATR72 airplanes. This proposed AD was prompted by occurrences of smoke in the flight deck and flap extension difficulties due to wire chafing on the electrical harness under a certain panel. This proposed AD would require modifying the clamp installation of the electrical routing on a certain rib of the left- and right-hand side of the wing rear spars, as specified in a European Union Aviation Safety SUMMARY: E:\FR\FM\27JAP1.SGM 27JAP1 EP27JA20.036</GPH> Authority: 49 U.S.C. 106(g), 40113, 44701.

Agencies

[Federal Register Volume 85, Number 17 (Monday, January 27, 2020)]
[Proposed Rules]
[Pages 4614-4616]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-01235]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. FAA-2019-1081; Product Identifier 2019-NM-153-AD]
RIN 2120-AA64


Airworthiness Directives; Bombardier, Inc., Airplanes

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Notice of proposed rulemaking (NPRM).

-----------------------------------------------------------------------

SUMMARY: The FAA proposes to adopt a new airworthiness directive (AD) 
for certain Bombardier, Inc., Model BD-100-1A10 airplanes. This 
proposed AD was prompted by reports of the loss of all air data system 
information provided to the flightcrew, which was caused by icing at 
high altitudes. This proposed AD would require revising the existing 
airplane flight manual (AFM) to provide the flightcrew with procedures 
to stabilize the airplane's airspeed and attitude. The FAA is proposing 
this AD to address the unsafe condition on these products.

DATES: The FAA must receive comments on this proposed AD by March 12, 
2020.

ADDRESSES: You may send comments, using the procedures found in 14 CFR 
11.43 and 11.45, by any of the following methods:
     Federal eRulemaking Portal: Go to https://www.regulations.gov. Follow the instructions for submitting comments.
     Fax: 202-493-2251.
     Mail: U.S. Department of Transportation, Docket 
Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New 
Jersey Avenue SE, Washington, DC 20590.
     Hand Delivery: Deliver to Mail address above between 9 
a.m. and 5 p.m., Monday through Friday, except Federal holidays.
    For service information identified in this NPRM, contact 
Bombardier, Inc., 200 C[ocirc]te-Vertu Road West, Dorval, Qu[eacute]bec 
H4S 2A3, Canada; North America toll-free telephone 1-866-538-1247 or 
direct-dial telephone 1-514-855-2999; email [email protected]; 
internet https://www.bombardier.com. You may view this service 
information at the FAA, Transport Standards Branch, 2200 South 216th 
St., Des Moines, WA. For information on the availability of this 
material at the FAA, call 206-231-3195.

Examining the AD Docket

    You may examine the AD docket on the internet at https://www.regulations.gov by searching for and locating Docket No. FAA-2019-
1081; or in person at Docket Operations between 9 a.m. and 5 p.m., 
Monday through Friday, except Federal holidays. The AD docket contains 
this NPRM, the regulatory evaluation, any comments received, and other 
information. The street address for Docket Operations is listed above. 
Comments will be available in the AD docket shortly after receipt.

FOR FURTHER INFORMATION CONTACT: Darren Gassetto, Aerospace Engineer,

[[Page 4615]]

Mechanical Systems and Admin Services Section, FAA, New York ACO 
Branch, 1600 Stewart Avenue, Suite 410, Westbury, NY 11590; telephone 
516-228-7323; fax 516-794-5531; email [email protected].

SUPPLEMENTARY INFORMATION: 

Comments Invited

    The FAA invites you to send any written relevant data, views, or 
arguments about this proposal. Send your comments to an address listed 
under the ADDRESSES section. Include ``Docket No. FAA-2019-1081; 
Product Identifier 2019-NM-153-AD'' at the beginning of your comments. 
The FAA specifically invite comments on the overall regulatory, 
economic, environmental, and energy aspects of this NPRM. The FAA will 
consider all comments received by the closing date and may amend this 
NPRM because of those comments.
    The FAA will post all comments, without change, to https://www.regulations.gov, including any personal information you provide. 
The FAA will also post a report summarizing each substantive verbal 
contact the agency receives about this NPRM.

Discussion

    Transport Canada Civil Aviation (TCCA), which is the aviation 
authority for Canada, has issued Canadian AD CF-2019-24, dated July 5, 
2019 (referred to after this as the Mandatory Continuing Airworthiness 
Information, or ``the MCAI''), to correct an unsafe condition for 
certain Bombardier, Inc., Model BD-100-1A10 airplanes. You may examine 
the MCAI in the AD docket on the internet at https://www.regulations.gov by searching for and locating Docket No. FAA-2019-
1081.
    This proposed AD was prompted by reports of the loss of all air 
data system information provided to the flightcrew, which was caused by 
icing at high altitudes. The FAA is proposing this AD to address the 
loss of all air data system information provided to the flightcrew. If 
not addressed, this condition may adversely affect continued safe 
flight and landing. See the MCAI for additional background information.

Related Service Information Under 1 CFR Part 51

    Bombardier has issued the following service information, which 
provides a procedure for ``Unreliable Airspeed'' in the Emergency 
Procedures section, and also provides a procedure for ``Go-Around'' in 
the Normal Procedures section of the applicable AFM. These documents 
are distinct since they apply to different airplane models.
     Bombardier Challenger 300 AFM, Publication No. CSP 100-1, 
Revision 56, dated July 8, 2019.
     Bombardier Challenger 350 AFM, Publication No. CH 350 AFM, 
Revision 22, dated July 8, 2019.
    This service information is reasonably available because the 
interested parties have access to it through their normal course of 
business or by the means identified in the ADDRESSES section.

FAA's Determination

    This product has been approved by the aviation authority of another 
country, and is approved for operation in the United States. Pursuant 
to the FAA's bilateral agreement with the State of Design Authority, 
the FAA has been notified of the unsafe condition described in the MCAI 
and service information referenced above. The FAA is proposing this AD 
because the FAA evaluated all the relevant information and determined 
the unsafe condition described previously is likely to exist or develop 
on other products of the same type design.

Proposed Requirements of This NPRM

    This proposed AD would require revising the existing AFM with 
procedures for ``Unreliable Airspeed'' in the Emergency Procedures 
section of the applicable AFM and with procedures for ``Go-Around'' in 
the Normal Procedures section of the applicable AFM, as described 
previously.

Costs of Compliance

    The FAA estimates that this proposed AD affects 560 airplanes of 
U.S. registry. The FAA estimates the following costs to comply with 
this proposed AD:

                                      Estimated Costs for Required Actions
----------------------------------------------------------------------------------------------------------------
                                                                                    Cost per       Cost on U.S.
                          Labor cost                              Parts cost        product         operators
----------------------------------------------------------------------------------------------------------------
1 work-hour x $85 per hour = $85.............................              $0              $85          $47,600
----------------------------------------------------------------------------------------------------------------

Authority for This Rulemaking

    Title 49 of the United States Code specifies the FAA's authority to 
issue rules on aviation safety. Subtitle I, section 106, describes the 
authority of the FAA Administrator. Subtitle VII: Aviation Programs, 
describes in more detail the scope of the Agency's authority.
    The FAA is issuing this rulemaking under the authority described in 
Subtitle VII, Part A, Subpart III, Section 44701: ``General 
requirements.'' Under that section, Congress charges the FAA with 
promoting safe flight of civil aircraft in air commerce by prescribing 
regulations for practices, methods, and procedures the Administrator 
finds necessary for safety in air commerce. This regulation is within 
the scope of that authority because it addresses an unsafe condition 
that is likely to exist or develop on products identified in this 
rulemaking action.

Regulatory Findings

    The FAA determined that this proposed AD would not have federalism 
implications under Executive Order 13132. This proposed AD would not 
have a substantial direct effect on the States, on the relationship 
between the national Government and the States, or on the distribution 
of power and responsibilities among the various levels of government.
    For the reasons discussed above, I certify this proposed 
regulation:
    (1) Is not a ``significant regulatory action'' under Executive 
Order 12866,
    (2) Will not affect intrastate aviation in Alaska, and
    (3) Will not have a significant economic impact, positive or 
negative, on a substantial number of small entities under the criteria 
of the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

The Proposed Amendment

    Accordingly, under the authority delegated to me by the 
Administrator, the FAA proposes to amend 14 CFR part 39 as follows:

PART 39--AIRWORTHINESS DIRECTIVES

0
1. The authority citation for part 39 continues to read as follows:


[[Page 4616]]


    Authority:  49 U.S.C. 106(g), 40113, 44701.


Sec.  39.13   [Amended]

0
2. The FAA amends Sec.  39.13 by adding the following new airworthiness 
directive (AD):

Bombardier, Inc.: Docket No. FAA-2019-1081; Product Identifier 2019-
NM-153-AD.

(a) Comments Due Date

    The FAA must receive comments by March 12, 2020.

(b) Affected ADs

    None.

(c) Applicability

    This AD applies to Bombardier, Inc., Model BD-100-1A10 
airplanes, certificated in any category, serial numbers 20001 
through 20688 inclusive.

(d) Subject

    Air Transport Association (ATA) of America Code 34, Navigation.

(e) Reason

    This AD was prompted by reports of the loss of all air data 
system information provided to the flightcrew, which was caused by 
icing at high altitudes. The FAA is issuing this AD to address the 
loss of all air data system information provided to the flightcrew. 
If not addressed, this condition may adversely affect continued safe 
flight and landing.

(f) Compliance

    Comply with this AD within the compliance times specified, 
unless already done.

(g) Revision of the Airplane Flight Manual (AFM)

    Within 30 days after the effective date of this AD: Revise the 
Emergency Procedures--Avionics (section 03-17) of the existing AFM 
to include the information in the ``Unreliable Airspeed'' procedure 
of the applicable AFM specified in figure 1 to paragraph (g) of this 
AD, and revise the Normal Procedures--After Take-off (section 04-04) 
of the existing AFM to include the information in the ``Go-Around'' 
procedure of the applicable AFM specified in figure 1 to paragraph 
(g) of this AD.
[GRAPHIC] [TIFF OMITTED] TP27JA20.036

(h) Other FAA AD Provisions

    The following provisions also apply to this AD:
    (1) Alternative Methods of Compliance (AMOCs): The Manager, New 
York ACO Branch, FAA, has the authority to approve AMOCs for this 
AD, if requested using the procedures found in 14 CFR 39.19. In 
accordance with 14 CFR 39.19, send your request to your principal 
inspector or local Flight Standards District Office, as appropriate. 
If sending information directly to the manager of the certification 
office, send it to ATTN: Program Manager, Continuing Operational 
Safety, FAA, New York ACO Branch, 1600 Stewart Avenue, Suite 410, 
Westbury, NY 11590; telephone 516-228-7300; fax 516-794-5531. Before 
using any approved AMOC, notify your appropriate principal 
inspector, or lacking a principal inspector, the manager of the 
local flight standards district office/certificate holding district 
office.
    (2) Contacting the Manufacturer: For any requirement in this AD 
to obtain instructions from a manufacturer, the instructions must be 
accomplished using a method approved by the Manager, New York ACO 
Branch, FAA; or Transport Canada Civil Aviation (TCCA); or 
Bombardier Inc.'s TCCA Design Approval Organization (DAO). If 
approved by the DAO, the approval must include the DAO-authorized 
signature.

(i) Related Information

    (1) Refer to Mandatory Continuing Airworthiness Information 
(MCAI) Canadian AD CF-2019-24, dated July 5, 2019, for related 
information. This MCAI may be found in the AD docket on the internet 
at https://www.regulations.gov by searching for and locating Docket 
No. FAA-2019-1081.
    (2) For more information about this AD, contact Darren Gassetto, 
Aerospace Engineer, Mechanical Systems and Admin Services Section, 
FAA, New York ACO Branch, 1600 Stewart Avenue, Suite 410, Westbury, 
NY 11590; telephone 516-228-7323; fax 516-794-5531; email [email protected].
    (3) For service information identified in this AD, contact 
Bombardier, Inc., 200 C[ocirc]te-Vertu Road West, Dorval, 
Qu[eacute]bec H4S 2A3, Canada; North America toll-free telephone 1-
866-538-1247 or direct-dial telephone 1-514-855-2999; email 
[email protected]; internet https://www.bombardier.com. You 
may view this service information at the FAA, Transport Standards 
Branch, 2200 South 216th St., Des Moines, WA. For information on the 
availability of this material at the FAA, call 206-231-3195.

    Issued on January 21, 2020.
Gaetano A. Sciortino,
Deputy Director for Strategic Initiatives, Compliance & Airworthiness 
Division, Aircraft Certification Service.
[FR Doc. 2020-01235 Filed 1-24-20; 8:45 am]
 BILLING CODE 4910-13-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.