Notice of Withdrawal of Existing Licensee's Notice of Intent To File a Subsequent License Application, and Soliciting Pre-Application Documents and Notices of Intent To File a License Application; N. Stanley Standal, Jr., 3676-3677 [2020-00959]
Download as PDF
3676
Federal Register / Vol. 85, No. 14 / Wednesday, January 22, 2020 / Notices
CP09–509). Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Public sessions or site visits will be
posted on the Commission’s calendar
located at www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information.
Dated: January 13, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–00966 Filed 1–21–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSKJM1Z7X2PROD with NOTICES
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP20–433–001.
Applicants: Adelphia Gateway, LLC.
Description: Tariff Amendment:
Adelphia NAESB amendment filing 1–
14–20 to be effective 1/13/2020.
Filed Date: 1/14/20.
Accession Number: 20200114–5164.
Comments Due: 5 p.m. ET 1/27/20.
Docket Numbers: RP20–434–000.
Applicants: Enable Mississippi River
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate Filing—Liberty Utilities
RP18–923 & RP20–131 Settlement to be
effective 1/1/2019.
Filed Date: 1/14/20.
Accession Number: 20200114–5081.
Comments Due: 5 p.m. ET 1/27/20.
Docket Numbers: RP20–435–000.
Applicants: Gulf South Pipeline
Company, LLC.
Description: § 4(d) Rate Filing: Cap
Rel Neg Rate Agmt (Calyx 51780 to BP
52119) to be effective 1/15/2020.
Filed Date: 1/14/20.
Accession Number: 20200114–5083.
Comments Due: 5 p.m. ET 1/27/20.
Docket Numbers: RP20–435–001.
Applicants: Gulf South Pipeline
Company, LLC.
Description: Tariff Amendment:
Amendment to Filing in Docket No.
RP20–435–000 to be effective 1/15/
2020.
Filed Date: 1/14/20.
Accession Number: 20200114–5093.
VerDate Sep<11>2014
16:42 Jan 21, 2020
Jkt 250001
Comments Due: 5 p.m. ET 1/27/20.
Docket Numbers: RP20–436–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: REX
2020–01–14 Non-Conforming
Negotiated Rate amendment to be
effective 1/15/2020.
Filed Date: 1/14/20.
Accession Number: 20200114–5179.
Comments Due: 5 p.m. ET 1/27/20.
Docket Numbers: RP20–437–000.
Applicants: East Tennessee Natural
Gas, LLC.
Description: § 4(d) Rate Filing: ETNG
Jan2020 NCF Cleanup to be effective 2/
14/2020.
Filed Date: 1/14/20.
Accession Number: 20200114–5184.
Comments Due: 5 p.m. ET 1/27/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 15, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–00956 Filed 1–21–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
1 Lynn
[Project No. 8865–008]
The current license for the Stevenson
No. 1 Hydroelectric Project No. 8865
(Stevenson No. 1 Project) was issued
with an effective date of July 1, 1984, for
a term of 40 years, ending June 30,
Frm 00073
Fmt 4703
E. Stevenson, 34 FERC 62,531 (1986).
CFR 16.6(c) (2019). At least five years before
the expiration of a license for a major water power
project, the licensee must file with the Commission
an NOI that contains an unequivocal statement of
the licensee’s intention to file or not to file an
application for a new license. See also 18 CFR 5.5
(2019).
3 18 CFR 16.7(d)(1) (2019). A licensee must, at the
time it files an NOI pursuant to sections 5.5 and
16.6, provide a copy of the PAD required by section
5.6 of the Commission’s regulations to the entities
specified in that paragraph. See 18 CFR 5.6 (2019).
4 18 CFR 16.23(b) (2019).
5 Pursuant to section 16.24(b)(1) of the
Commission’s regulations, the existing licensee is
prohibited from filing an application either
2 18
Notice of Withdrawal of Existing
Licensee’s Notice of Intent To File a
Subsequent License Application, and
Soliciting Pre-Application Documents
and Notices of Intent To File a License
Application; N. Stanley Standal, Jr.
PO 00000
2024.1 The 70 kilowatt (kW) project is
located on an unnamed tributary to the
Snake River. On June 28, 2019, N.
Stanley Standal, Jr. (Mr. Standal) filed
an incomplete Notice of Intent (NOI) to
file an application for a subsequent
license for the Stevenson No. 1 Project,
pursuant to section 16.6 of the
Commission’s regulations.2 Mr. Standal
failed to file an accompanying preapplication document (PAD), pursuant
to section 16.7 of the Commission’s
regulations.3
On July 17, 2019, Commission staff
waived the provision of section 5.6(a)(1)
that requires the filing of a PAD at the
same time that the NOI is filed and
extended the deadline for filing a
complete NOI and the PAD by 90 days.
On October 12, 2019, Joy Heller
contacted Commission staff on behalf of
Mr. Standal and stated that more
information would be filed before
October 31, 2019. On October 30, 2019,
Mr. Standal filed a revised NOI but
failed to file a PAD. On November 19,
2019, Commission staff informed Mr.
Standal that if a PAD was not filed
within 30 days, Commission staff would
consider the lack of response as an
indication that he is no longer interested
in seeking a subsequent license to
continue operating the project and a
withdrawal of his NOI to seek a
subsequent license. Despite repeated
efforts to contact Mr. Standal, he has not
returned staff calls or filed the requisite
PAD. Commission staff therefore
consider Mr. Standal’s NOI as
withdrawn.
Pursuant to section 16.23(b) of the
Commission’s regulations, when an
existing licensee fails to file a complete
NOI and PAD within five years of
expiration of the current license, the
Commission must solicit applications
from potential applicants other than the
existing licensee.4 Any party interested
in filing a license application or
exemption (i.e., a potential applicant)
for the project must file an NOI and
PAD within 90 days from the date of
this notice.5 While the integrated
Sfmt 4703
E:\FR\FM\22JAN1.SGM
22JAN1
Federal Register / Vol. 85, No. 14 / Wednesday, January 22, 2020 / Notices
licensing process is the default process
for preparing an application for a new
license, a potential applicant may
request to use alternative licensing
procedures when it files its NOI.6
Applications for a subsequent license
or exemption from potential applicants
for the Stevenson No. 1 Project must be
filed within 24 months prior to the
expiration of the existing license.7
Questions concerning the process for
filing an NOI should be directed to Julia
Kolberg at 202–502–8261 or
Julia.Kolberg@ferc.gov.
Dated: January 15, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–00959 Filed 1–21–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15008–000]
khammond on DSKJM1Z7X2PROD with NOTICES
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing
Applications; Gridflex Energy, LLC
On September 23, 2019, Gridflex
Energy, LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the
Sweetwater Pumped Storage Hydro
Project to be located in San Juan
County, New Mexico. Gridflex Energy,
LLC subsequently amended its
application on January 3, 2020, and
again on January 14, 2020. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed closed-loop pumped
hydropower project would consist of the
following new facilities: (1) A 9,000foot-long, 40-foot-high dam impounding
an upper reservoir with a total storage
capacity of 5,000 acre feet, a reservoir
surface elevation of 6,770 feet above
mean sea level (msl), and a reservoir
surface area of 120 acres; (2) 1,700-footlong, 130-foot-high dam impounding a
lower reservoir with a total storage
individually or in combination with other entities.
18 CFR 16.24(b)(1) (2019).
6 18 CFR 5.3(b) (2019).
7 18 CFR 16.20(c) (2019).
VerDate Sep<11>2014
16:42 Jan 21, 2020
Jkt 250001
capacity of 5,000 acre feet, a reservoir
surface elevation of 5,685 feet msl, and
a reservoir surface area of 163 acres; (3)
two primary conduits including one
concrete-lined vertical shaft 1,200 feet
long by 25 feet in diameter, two
concrete-and-steel-lined high pressure
tunnels 5,000 feet long by 14 feet in
diameter, and two concrete-lined
tailrace tunnels 3,300 feet long by 16
feet in diameter; (4) a 500-foot-long, 80foot-wide, 50-foot-high powerhouse
complex constructed of concrete and
metal formwork with three vertical
shafts, each housing 200-megawatt
variable-speed reversible pump-turbine
and motor-generators; and (5) a 9.3mile-long, 345-kilovolt transmission
line with a tentative point of
interconnection at the existing San Juan
Generating Station; and (6) appurtenant
facilities. Initial fill water, and make-up
water for evaporation loss would be
purchased from parties holding water
rights associated with the San Juan
Generating Station or otherwise
associated with the San Juan River. The
estimated annual generation of the
project would be 1,051,200 megawatt
hours.
Applicant Contact: Mr. Matthew
Shapiro, Gridflex energy, LLC, 424 W.
Pueblo St. #A, Boise, ID 83027; phone:
(208) 246–9925.
FERC Contact: Benjamin Mann;
Email: benjamin.mann@ferc.gov; phone:
(202) 502–8127.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–15008–000.
More information about this project,
including a copy of the application, can
PO 00000
Frm 00074
Fmt 4703
Sfmt 4703
3677
be viewed or printed on the eLibrary
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–15008) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: January 15, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–00960 Filed 1–21–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–34–000]
Notice of Request Under Blanket
Authorization; Columbia Gas
Transmission, LLC
Take notice that on January 6, 2020,
Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street,
Houston, Texas 77002–2700, filed in the
above referenced docket a prior notice
request pursuant to sections 157.205,
157.208, and 157.216 of the
Commission’s regulations under the
Natural Gas Act (NGA) and its blanket
certificate issued in Docket No. CP83–
76–000 for authorization to perform
installations and modifications enabling
the in-line inspection of its 20-inchdiameter Line D located in Licking,
Knox, Morrow, and Crawford Counties,
Ohio. Specifically, Columbia proposes
to: (i) Install, replace, or remove valves,
pipe, and other appurtenant facilities at
six locations; and (ii) install
bidirectional launcher/receiver devices
and appurtenant facilities at two
locations. Columbia estimates the cost
of the project to be approximately $13.0
million, all as more fully set forth in the
request which is on file with the
Commission and open to public
inspection.
The filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s website web at https://
www.ferc.gov using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to Sorana
Linder, Director, Modernization &
Certificates, Columbia Gas
Transmission, LLC, 700 Louisiana
E:\FR\FM\22JAN1.SGM
22JAN1
Agencies
[Federal Register Volume 85, Number 14 (Wednesday, January 22, 2020)]
[Notices]
[Pages 3676-3677]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-00959]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 8865-008]
Notice of Withdrawal of Existing Licensee's Notice of Intent To
File a Subsequent License Application, and Soliciting Pre-Application
Documents and Notices of Intent To File a License Application; N.
Stanley Standal, Jr.
The current license for the Stevenson No. 1 Hydroelectric Project
No. 8865 (Stevenson No. 1 Project) was issued with an effective date of
July 1, 1984, for a term of 40 years, ending June 30, 2024.\1\ The 70
kilowatt (kW) project is located on an unnamed tributary to the Snake
River. On June 28, 2019, N. Stanley Standal, Jr. (Mr. Standal) filed an
incomplete Notice of Intent (NOI) to file an application for a
subsequent license for the Stevenson No. 1 Project, pursuant to section
16.6 of the Commission's regulations.\2\ Mr. Standal failed to file an
accompanying pre-application document (PAD), pursuant to section 16.7
of the Commission's regulations.\3\
---------------------------------------------------------------------------
\1\ Lynn E. Stevenson, 34 FERC 62,531 (1986).
\2\ 18 CFR 16.6(c) (2019). At least five years before the
expiration of a license for a major water power project, the
licensee must file with the Commission an NOI that contains an
unequivocal statement of the licensee's intention to file or not to
file an application for a new license. See also 18 CFR 5.5 (2019).
\3\ 18 CFR 16.7(d)(1) (2019). A licensee must, at the time it
files an NOI pursuant to sections 5.5 and 16.6, provide a copy of
the PAD required by section 5.6 of the Commission's regulations to
the entities specified in that paragraph. See 18 CFR 5.6 (2019).
---------------------------------------------------------------------------
On July 17, 2019, Commission staff waived the provision of section
5.6(a)(1) that requires the filing of a PAD at the same time that the
NOI is filed and extended the deadline for filing a complete NOI and
the PAD by 90 days. On October 12, 2019, Joy Heller contacted
Commission staff on behalf of Mr. Standal and stated that more
information would be filed before October 31, 2019. On October 30,
2019, Mr. Standal filed a revised NOI but failed to file a PAD. On
November 19, 2019, Commission staff informed Mr. Standal that if a PAD
was not filed within 30 days, Commission staff would consider the lack
of response as an indication that he is no longer interested in seeking
a subsequent license to continue operating the project and a withdrawal
of his NOI to seek a subsequent license. Despite repeated efforts to
contact Mr. Standal, he has not returned staff calls or filed the
requisite PAD. Commission staff therefore consider Mr. Standal's NOI as
withdrawn.
Pursuant to section 16.23(b) of the Commission's regulations, when
an existing licensee fails to file a complete NOI and PAD within five
years of expiration of the current license, the Commission must solicit
applications from potential applicants other than the existing
licensee.\4\ Any party interested in filing a license application or
exemption (i.e., a potential applicant) for the project must file an
NOI and PAD within 90 days from the date of this notice.\5\ While the
integrated
[[Page 3677]]
licensing process is the default process for preparing an application
for a new license, a potential applicant may request to use alternative
licensing procedures when it files its NOI.\6\
---------------------------------------------------------------------------
\4\ 18 CFR 16.23(b) (2019).
\5\ Pursuant to section 16.24(b)(1) of the Commission's
regulations, the existing licensee is prohibited from filing an
application either individually or in combination with other
entities. 18 CFR 16.24(b)(1) (2019).
\6\ 18 CFR 5.3(b) (2019).
---------------------------------------------------------------------------
Applications for a subsequent license or exemption from potential
applicants for the Stevenson No. 1 Project must be filed within 24
months prior to the expiration of the existing license.\7\
---------------------------------------------------------------------------
\7\ 18 CFR 16.20(c) (2019).
---------------------------------------------------------------------------
Questions concerning the process for filing an NOI should be
directed to Julia Kolberg at 202-502-8261 or [email protected].
Dated: January 15, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-00959 Filed 1-21-20; 8:45 am]
BILLING CODE 6717-01-P