Verdant Power, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 3364-3365 [2020-00921]
Download as PDF
3364
Federal Register / Vol. 85, No. 13 / Tuesday, January 21, 2020 / Notices
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: RP20–431–000.
Applicants: Viking Gas Transmission
Company.
Description: § 4(d) Rate Filing: Update
to Viking URL 2019 to be effective 2/10/
2020.
Filed Date: 1/9/20.
Accession Number: 20200109–5224.
Comments Due: 5 p.m. ET 1/21/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 13, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–00793 Filed 1–17–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12611–014]
jbell on DSKJLSW7X2PROD with NOTICES
Verdant Power, LLC; Notice of
Application Tendered for Filing With
the Commission and Soliciting
Additional Study Requests and
Establishing Procedural Schedule for
Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 12611–014.
c. Date Filed: December 30, 2019.
d. Applicant: Verdant Power, LLC.
e. Name of Project: Roosevelt Island
Tidal Energy Project.
f. Location: On the East River in New
York County, New York. The project
does not occupy federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825 (r).
VerDate Sep<11>2014
18:20 Jan 17, 2020
Jkt 250001
h. Applicant Contact: Mr. Ronald F.
Smith, President and Chief Operating
Officer, Verdant Power, LLC, P.O. Box
282, Roosevelt Island, New York, New
York 10044. Phone: (703) 328–6842.
Email: rsmith@verdantpower.com.
i. FERC Contact: Andy Bernick at
(202) 502–8660; or email at
andrew.bernick@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: February 28, 2020.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–12611–014.
m. This application is not ready for
environmental analysis at this time.
n. The existing pilot project license
authorizes the following project
facilities: (a) Thirty 35-kilowatt, 5meter-diameter axial flow turbinegenerator units; (b) ten triframe mounts,
each supporting three turbine-generator
units; (c) 480-volt underwater cables
from each triframe mount to five
shoreline switchgear vaults that
interconnect to a control room and
interconnection points; and (d)
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
appurtenant facilities for navigation
safety and operation.
Under the current pilot project
license, which expires on December 31,
2021, Verdant installed, tested, and then
removed a total of five turbine-generator
units. Verdant also proposes to install
three turbine-generator units attached to
one tri-frame mount in 2020, under the
existing pilot project license.
The proposed project would consist of
a maximum of fifteen 35-kilowatt, 5meter-diameter axial flow turbinegenerator units with a total installed
capacity of 0.525 megawatt, with
underwater cables connecting five
triframe mounts to two shoreline
switchgear vaults. The project would
operate using the natural tidal currents
of the East River, during both ebb and
flood tidal periods. As the direction of
tidal flow changes, each turbinegenerator unit would rotate (or yaw) to
align the rotor to the direction of flow,
through a passive system caused by
hydrodynamic forces on the turbinegenerator unit. The annual generation is
expected to be from 840 to 1,200
megawatt-hours.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)—
March 2020
Request Additional Information—2020
March
Issue Acceptance Letter—2020 June
Issue Scoping Document 1 for
comments—July 2020
Issue Scoping Document 2 (if
necessary)—2020 September
Issue notice of ready for environmental
analysis—2020 September
Issue Single EA—2021 March
Comments on EA—2021 April
Final amendments to the application
must be filed with the Commission no
E:\FR\FM\21JAN1.SGM
21JAN1
Federal Register / Vol. 85, No. 13 / Tuesday, January 21, 2020 / Notices
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: January 14, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–00921 Filed 1–17–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jbell on DSKJLSW7X2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC20–31–000.
Applicants: Refresh Wind, LLC,
Refresh Wind 2, LLC, Tehachapi Plains
Wind, LLC, Terra-Gen 251 Wind, LLC,
Victory Garden Phase IV, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Refresh
Wind, LLC, et al.
Filed Date: 1/13/20.
Accession Number: 20200113–5214.
Comments Due: 5 p.m. ET 2/3/20.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER14–758–000.
Applicants: Exelon Generation
Company, LLC.
Description: Report Filing: Reactive
Refund Report Filing—Exelon to be
effective N/A.
Filed Date: 1/13/20.
Accession Number: 20200113–5173.
Comments Due: 5 p.m. ET 2/3/20.
Docket Numbers: ER17–580–001.
Applicants: Axium Modesto Solar,
LLC.
Description: Notice of Change in Facts
Axium Modesto Solar, LLC under
ER17–580.
Filed Date: 1/13/20.
Accession Number: 20200113–5232.
Comments Due: 5 p.m. ET 2/3/20.
Docket Numbers: ER17–801–007.
Applicants: Constellation Power
Source Generation, LLC.
Description: Report Filing: Reactive
Refund Report Filing—Constellation to
be effective N/A.
Filed Date: 1/14/20.
Accession Number: 20200114–5006.
Comments Due: 5 p.m. ET 2/4/20.
Docket Numbers: ER17–803–004.
Applicants: Handsome Lake Energy,
LLC.
Description: Report Filing: Reactive
Refund Report Filing—Handsome Lake
Energy to be effective N/A.
VerDate Sep<11>2014
18:20 Jan 17, 2020
Jkt 250001
Filed Date: 1/13/20.
Accession Number: 20200113–5179.
Comments Due: 5 p.m. ET 2/3/20.
Docket Numbers: ER20–399–000.
Applicants: Rhode Island Engine
Genco, LLC.
Description: Report Filing:
Supplement to Notice of Change in
Status Request to Cancel Tariff ID No.
364 to be effective N/A.
Filed Date: 1/14/20.
Accession Number: 20200114–5101.
Comments Due: 5 p.m. ET 2/4/20.
Docket Numbers: ER20–400–000;
ER12–672–013.
Applicants: Rhode Island LFG Genco,
LLC, Brea Power II, LLC.
Description: Report Filing:
Supplement to Notice of Non-Material
Change in Status, Change in Category
Seller to be effective N/A.
Filed Date: 1/14/20.
Accession Number: 20200114–5098.
Comments Due: 5 p.m. ET 2/4/20.
Docket Numbers: ER20–531–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2020–01–14 SA 3381 Duke-Greensboro
Solar Center Substitute GIA (J903) to be
effective 11/21/2019.
Filed Date: 1/14/20.
Accession Number: 20200114–5084.
Comments Due: 5 p.m. ET 2/4/20.
Docket Numbers: ER20–763–000.
Applicants: ISO New England Inc.
Description: § 205(d) Rate Filing:
Filing to True Up Section III.13.2 of
ISO–NE Tariff to be effective 12/18/
2019.
Filed Date: 1/9/20.
Accession Number: 20200109–5276.
Comments Due: 5 p.m. ET 1/30/20.
Docket Numbers: ER20–777–000.
Applicants: MidAmerican Energy
Company.
Description: § 205(d) Rate Filing:
Interconnection Agt—MEC and La Porte
City (eff. 11–1–19) to be effective 11/1/
2019.
Filed Date: 1/14/20.
Accession Number: 20200114–5008.
Comments Due: 5 p.m. ET 2/4/20.
Docket Numbers: ER20–778–000.
Applicants: Emera Maine.
Description: Tariff Cancellation:
Notice of Termination of Expired
Service Agreement—Houlton Water
Company to be effective 2/28/2014.
Filed Date: 1/14/20.
Accession Number: 20200114–5011.
Comments Due: 5 p.m. ET 2/4/20.
Docket Numbers: ER20–779–000.
Applicants: Rush Springs Wind
Energy, LLC.
Description: Baseline eTariff Filing:
Rush Springs and Rush Springs Storage
SFA to be effective 1/14/2020.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
3365
Filed Date: 1/14/20.
Accession Number: 20200114–5015.
Comments Due: 5 p.m. ET 2/4/20.
Docket Numbers: ER20–780–000.
Applicants: Sooner Wind, LLC.
Description: Baseline eTariff Filing:
Sooner Wind, LLC Application for
Market-Based Rates to be effective 3/14/
2020.
Filed Date: 1/14/20.
Accession Number: 20200114–5016.
Comments Due: 5 p.m. ET 2/4/20.
Docket Numbers: ER20–781–000.
Applicants: Source Power & Gas LLC.
Description: Tariff Cancellation:
Cancellation of Source Power Gas LLC
MBR Tariff to be effective 1/15/2020.
Filed Date: 1/14/20.
Accession Number: 20200114–5017.
Comments Due: 5 p.m. ET 2/4/20.
Docket Numbers: ER20–782–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing: Rate
Schedule No. 130 between Tri-State and
High West Energy, Inc. to be effective 3/
23/2020.
Filed Date: 1/14/20.
Accession Number: 20200114–5026.
Comments Due: 5 p.m. ET 1/24/20.
Docket Numbers: ER20–783–000.
Applicants: Rosewater Wind Farm
LLC.
Description: Compliance filing:
Compliance Filing and Revised MarketBased Rate Tariff to be effective 12/16/
2019.
Filed Date: 1/14/20.
Accession Number: 20200114–5063.
Comments Due: 5 p.m. ET 2/4/20.
Docket Numbers: ER20–784–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing: 3
Phases Renewables (OR D.A.) Rev 3 to
be effective 1/1/2020.
Filed Date: 1/14/20.
Accession Number: 20200114–5080.
Comments Due: 5 p.m. ET 2/4/20.
Docket Numbers: ER20–785–000.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
MAIT submits (3) ECSAs, Service
Agreement Nos. 5278, 5510, and 5513 to
be effective 3/14/2020.
Filed Date: 1/14/20.
Accession Number: 20200114–5082.
Comments Due: 5 p.m. ET 2/4/20.
Docket Numbers: ER20–786–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2020–01–14_SA 3408 Ameren IllinoisGlacier Sands Wind Power GIA (J1055)
to be effective 12/20/2019.
Filed Date: 1/14/20.
E:\FR\FM\21JAN1.SGM
21JAN1
Agencies
[Federal Register Volume 85, Number 13 (Tuesday, January 21, 2020)]
[Notices]
[Pages 3364-3365]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-00921]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12611-014]
Verdant Power, LLC; Notice of Application Tendered for Filing
With the Commission and Soliciting Additional Study Requests and
Establishing Procedural Schedule for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 12611-014.
c. Date Filed: December 30, 2019.
d. Applicant: Verdant Power, LLC.
e. Name of Project: Roosevelt Island Tidal Energy Project.
f. Location: On the East River in New York County, New York. The
project does not occupy federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825 (r).
h. Applicant Contact: Mr. Ronald F. Smith, President and Chief
Operating Officer, Verdant Power, LLC, P.O. Box 282, Roosevelt Island,
New York, New York 10044. Phone: (703) 328-6842. Email:
[email protected].
i. FERC Contact: Andy Bernick at (202) 502-8660; or email at
[email protected].
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: February 28, 2020.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at [email protected], (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, please send a paper copy
to: Secretary, Federal Energy Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first page of any filing should include
docket number P-12611-014.
m. This application is not ready for environmental analysis at this
time.
n. The existing pilot project license authorizes the following
project facilities: (a) Thirty 35-kilowatt, 5-meter-diameter axial flow
turbine-generator units; (b) ten triframe mounts, each supporting three
turbine-generator units; (c) 480-volt underwater cables from each
triframe mount to five shoreline switchgear vaults that interconnect to
a control room and interconnection points; and (d) appurtenant
facilities for navigation safety and operation.
Under the current pilot project license, which expires on December
31, 2021, Verdant installed, tested, and then removed a total of five
turbine-generator units. Verdant also proposes to install three
turbine-generator units attached to one tri-frame mount in 2020, under
the existing pilot project license.
The proposed project would consist of a maximum of fifteen 35-
kilowatt, 5-meter-diameter axial flow turbine-generator units with a
total installed capacity of 0.525 megawatt, with underwater cables
connecting five triframe mounts to two shoreline switchgear vaults. The
project would operate using the natural tidal currents of the East
River, during both ebb and flood tidal periods. As the direction of
tidal flow changes, each turbine-generator unit would rotate (or yaw)
to align the rotor to the direction of flow, through a passive system
caused by hydrodynamic forces on the turbine-generator unit. The annual
generation is expected to be from 840 to 1,200 megawatt-hours.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural schedule and final amendments: The application will
be processed according to the following preliminary schedule. Revisions
to the schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)--March 2020
Request Additional Information--2020 March
Issue Acceptance Letter--2020 June
Issue Scoping Document 1 for comments--July 2020
Issue Scoping Document 2 (if necessary)--2020 September
Issue notice of ready for environmental analysis--2020 September
Issue Single EA--2021 March
Comments on EA--2021 April
Final amendments to the application must be filed with the
Commission no
[[Page 3365]]
later than 30 days from the issuance date of the notice of ready for
environmental analysis.
Dated: January 14, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-00921 Filed 1-17-20; 8:45 am]
BILLING CODE 6717-01-P