Verdant Power, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 3364-3365 [2020-00921]

Download as PDF 3364 Federal Register / Vol. 85, No. 13 / Tuesday, January 21, 2020 / Notices Comments Due: 5 p.m. ET 1/21/20. Docket Numbers: RP20–431–000. Applicants: Viking Gas Transmission Company. Description: § 4(d) Rate Filing: Update to Viking URL 2019 to be effective 2/10/ 2020. Filed Date: 1/9/20. Accession Number: 20200109–5224. Comments Due: 5 p.m. ET 1/21/20. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 13, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–00793 Filed 1–17–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12611–014] jbell on DSKJLSW7X2PROD with NOTICES Verdant Power, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Subsequent Minor License. b. Project No.: 12611–014. c. Date Filed: December 30, 2019. d. Applicant: Verdant Power, LLC. e. Name of Project: Roosevelt Island Tidal Energy Project. f. Location: On the East River in New York County, New York. The project does not occupy federal land. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)–825 (r). VerDate Sep<11>2014 18:20 Jan 17, 2020 Jkt 250001 h. Applicant Contact: Mr. Ronald F. Smith, President and Chief Operating Officer, Verdant Power, LLC, P.O. Box 282, Roosevelt Island, New York, New York 10044. Phone: (703) 328–6842. Email: rsmith@verdantpower.com. i. FERC Contact: Andy Bernick at (202) 502–8660; or email at andrew.bernick@ferc.gov. j. Cooperating agencies: Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues that wish to cooperate in the preparation of the environmental document should follow the instructions for filing such requests described in item l below. Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See, 94 FERC ¶ 61,076 (2001). k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission’s regulations, if any resource agency, Indian Tribe, or person believes that an additional scientific study should be conducted in order to form an adequate factual basis for a complete analysis of the application on its merit, the resource agency, Indian Tribe, or person must file a request for a study with the Commission not later than 60 days from the date of filing of the application, and serve a copy of the request on the applicant. l. Deadline for filing additional study requests and requests for cooperating agency status: February 28, 2020. The Commission strongly encourages electronic filing. Please file additional study requests and requests for cooperating agency status using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–12611–014. m. This application is not ready for environmental analysis at this time. n. The existing pilot project license authorizes the following project facilities: (a) Thirty 35-kilowatt, 5meter-diameter axial flow turbinegenerator units; (b) ten triframe mounts, each supporting three turbine-generator units; (c) 480-volt underwater cables from each triframe mount to five shoreline switchgear vaults that interconnect to a control room and interconnection points; and (d) PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 appurtenant facilities for navigation safety and operation. Under the current pilot project license, which expires on December 31, 2021, Verdant installed, tested, and then removed a total of five turbine-generator units. Verdant also proposes to install three turbine-generator units attached to one tri-frame mount in 2020, under the existing pilot project license. The proposed project would consist of a maximum of fifteen 35-kilowatt, 5meter-diameter axial flow turbinegenerator units with a total installed capacity of 0.525 megawatt, with underwater cables connecting five triframe mounts to two shoreline switchgear vaults. The project would operate using the natural tidal currents of the East River, during both ebb and flood tidal periods. As the direction of tidal flow changes, each turbinegenerator unit would rotate (or yaw) to align the rotor to the direction of flow, through a passive system caused by hydrodynamic forces on the turbinegenerator unit. The annual generation is expected to be from 840 to 1,200 megawatt-hours. o. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. p. Procedural schedule and final amendments: The application will be processed according to the following preliminary schedule. Revisions to the schedule will be made as appropriate. Issue Deficiency Letter (if necessary)— March 2020 Request Additional Information—2020 March Issue Acceptance Letter—2020 June Issue Scoping Document 1 for comments—July 2020 Issue Scoping Document 2 (if necessary)—2020 September Issue notice of ready for environmental analysis—2020 September Issue Single EA—2021 March Comments on EA—2021 April Final amendments to the application must be filed with the Commission no E:\FR\FM\21JAN1.SGM 21JAN1 Federal Register / Vol. 85, No. 13 / Tuesday, January 21, 2020 / Notices later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: January 14, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–00921 Filed 1–17–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission jbell on DSKJLSW7X2PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC20–31–000. Applicants: Refresh Wind, LLC, Refresh Wind 2, LLC, Tehachapi Plains Wind, LLC, Terra-Gen 251 Wind, LLC, Victory Garden Phase IV, LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act, et al. of Refresh Wind, LLC, et al. Filed Date: 1/13/20. Accession Number: 20200113–5214. Comments Due: 5 p.m. ET 2/3/20. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER14–758–000. Applicants: Exelon Generation Company, LLC. Description: Report Filing: Reactive Refund Report Filing—Exelon to be effective N/A. Filed Date: 1/13/20. Accession Number: 20200113–5173. Comments Due: 5 p.m. ET 2/3/20. Docket Numbers: ER17–580–001. Applicants: Axium Modesto Solar, LLC. Description: Notice of Change in Facts Axium Modesto Solar, LLC under ER17–580. Filed Date: 1/13/20. Accession Number: 20200113–5232. Comments Due: 5 p.m. ET 2/3/20. Docket Numbers: ER17–801–007. Applicants: Constellation Power Source Generation, LLC. Description: Report Filing: Reactive Refund Report Filing—Constellation to be effective N/A. Filed Date: 1/14/20. Accession Number: 20200114–5006. Comments Due: 5 p.m. ET 2/4/20. Docket Numbers: ER17–803–004. Applicants: Handsome Lake Energy, LLC. Description: Report Filing: Reactive Refund Report Filing—Handsome Lake Energy to be effective N/A. VerDate Sep<11>2014 18:20 Jan 17, 2020 Jkt 250001 Filed Date: 1/13/20. Accession Number: 20200113–5179. Comments Due: 5 p.m. ET 2/3/20. Docket Numbers: ER20–399–000. Applicants: Rhode Island Engine Genco, LLC. Description: Report Filing: Supplement to Notice of Change in Status Request to Cancel Tariff ID No. 364 to be effective N/A. Filed Date: 1/14/20. Accession Number: 20200114–5101. Comments Due: 5 p.m. ET 2/4/20. Docket Numbers: ER20–400–000; ER12–672–013. Applicants: Rhode Island LFG Genco, LLC, Brea Power II, LLC. Description: Report Filing: Supplement to Notice of Non-Material Change in Status, Change in Category Seller to be effective N/A. Filed Date: 1/14/20. Accession Number: 20200114–5098. Comments Due: 5 p.m. ET 2/4/20. Docket Numbers: ER20–531–001. Applicants: Midcontinent Independent System Operator, Inc. Description: Tariff Amendment: 2020–01–14 SA 3381 Duke-Greensboro Solar Center Substitute GIA (J903) to be effective 11/21/2019. Filed Date: 1/14/20. Accession Number: 20200114–5084. Comments Due: 5 p.m. ET 2/4/20. Docket Numbers: ER20–763–000. Applicants: ISO New England Inc. Description: § 205(d) Rate Filing: Filing to True Up Section III.13.2 of ISO–NE Tariff to be effective 12/18/ 2019. Filed Date: 1/9/20. Accession Number: 20200109–5276. Comments Due: 5 p.m. ET 1/30/20. Docket Numbers: ER20–777–000. Applicants: MidAmerican Energy Company. Description: § 205(d) Rate Filing: Interconnection Agt—MEC and La Porte City (eff. 11–1–19) to be effective 11/1/ 2019. Filed Date: 1/14/20. Accession Number: 20200114–5008. Comments Due: 5 p.m. ET 2/4/20. Docket Numbers: ER20–778–000. Applicants: Emera Maine. Description: Tariff Cancellation: Notice of Termination of Expired Service Agreement—Houlton Water Company to be effective 2/28/2014. Filed Date: 1/14/20. Accession Number: 20200114–5011. Comments Due: 5 p.m. ET 2/4/20. Docket Numbers: ER20–779–000. Applicants: Rush Springs Wind Energy, LLC. Description: Baseline eTariff Filing: Rush Springs and Rush Springs Storage SFA to be effective 1/14/2020. PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 3365 Filed Date: 1/14/20. Accession Number: 20200114–5015. Comments Due: 5 p.m. ET 2/4/20. Docket Numbers: ER20–780–000. Applicants: Sooner Wind, LLC. Description: Baseline eTariff Filing: Sooner Wind, LLC Application for Market-Based Rates to be effective 3/14/ 2020. Filed Date: 1/14/20. Accession Number: 20200114–5016. Comments Due: 5 p.m. ET 2/4/20. Docket Numbers: ER20–781–000. Applicants: Source Power & Gas LLC. Description: Tariff Cancellation: Cancellation of Source Power Gas LLC MBR Tariff to be effective 1/15/2020. Filed Date: 1/14/20. Accession Number: 20200114–5017. Comments Due: 5 p.m. ET 2/4/20. Docket Numbers: ER20–782–000. Applicants: Tri-State Generation and Transmission Association, Inc. Description: § 205(d) Rate Filing: Rate Schedule No. 130 between Tri-State and High West Energy, Inc. to be effective 3/ 23/2020. Filed Date: 1/14/20. Accession Number: 20200114–5026. Comments Due: 5 p.m. ET 1/24/20. Docket Numbers: ER20–783–000. Applicants: Rosewater Wind Farm LLC. Description: Compliance filing: Compliance Filing and Revised MarketBased Rate Tariff to be effective 12/16/ 2019. Filed Date: 1/14/20. Accession Number: 20200114–5063. Comments Due: 5 p.m. ET 2/4/20. Docket Numbers: ER20–784–000. Applicants: PacifiCorp. Description: § 205(d) Rate Filing: 3 Phases Renewables (OR D.A.) Rev 3 to be effective 1/1/2020. Filed Date: 1/14/20. Accession Number: 20200114–5080. Comments Due: 5 p.m. ET 2/4/20. Docket Numbers: ER20–785–000. Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: MAIT submits (3) ECSAs, Service Agreement Nos. 5278, 5510, and 5513 to be effective 3/14/2020. Filed Date: 1/14/20. Accession Number: 20200114–5082. Comments Due: 5 p.m. ET 2/4/20. Docket Numbers: ER20–786–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2020–01–14_SA 3408 Ameren IllinoisGlacier Sands Wind Power GIA (J1055) to be effective 12/20/2019. Filed Date: 1/14/20. E:\FR\FM\21JAN1.SGM 21JAN1

Agencies

[Federal Register Volume 85, Number 13 (Tuesday, January 21, 2020)]
[Notices]
[Pages 3364-3365]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-00921]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12611-014]


Verdant Power, LLC; Notice of Application Tendered for Filing 
With the Commission and Soliciting Additional Study Requests and 
Establishing Procedural Schedule for Relicensing and a Deadline for 
Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.

    a. Type of Application: Subsequent Minor License.
    b. Project No.: 12611-014.
    c. Date Filed: December 30, 2019.
    d. Applicant: Verdant Power, LLC.
    e. Name of Project: Roosevelt Island Tidal Energy Project.
    f. Location: On the East River in New York County, New York. The 
project does not occupy federal land.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825 (r).
    h. Applicant Contact: Mr. Ronald F. Smith, President and Chief 
Operating Officer, Verdant Power, LLC, P.O. Box 282, Roosevelt Island, 
New York, New York 10044. Phone: (703) 328-6842. Email: 
[email protected].
    i. FERC Contact: Andy Bernick at (202) 502-8660; or email at 
[email protected].
    j. Cooperating agencies: Federal, state, local, and tribal agencies 
with jurisdiction and/or special expertise with respect to 
environmental issues that wish to cooperate in the preparation of the 
environmental document should follow the instructions for filing such 
requests described in item l below. Cooperating agencies should note 
the Commission's policy that agencies that cooperate in the preparation 
of the environmental document cannot also intervene. See, 94 FERC ] 
61,076 (2001).
    k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's 
regulations, if any resource agency, Indian Tribe, or person believes 
that an additional scientific study should be conducted in order to 
form an adequate factual basis for a complete analysis of the 
application on its merit, the resource agency, Indian Tribe, or person 
must file a request for a study with the Commission not later than 60 
days from the date of filing of the application, and serve a copy of 
the request on the applicant.
    l. Deadline for filing additional study requests and requests for 
cooperating agency status: February 28, 2020.
    The Commission strongly encourages electronic filing. Please file 
additional study requests and requests for cooperating agency status 
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support 
at [email protected], (866) 208-3676 (toll free), or (202) 
502-8659 (TTY). In lieu of electronic filing, please send a paper copy 
to: Secretary, Federal Energy Regulatory Commission, 888 First Street 
NE, Washington, DC 20426. The first page of any filing should include 
docket number P-12611-014.
    m. This application is not ready for environmental analysis at this 
time.
    n. The existing pilot project license authorizes the following 
project facilities: (a) Thirty 35-kilowatt, 5-meter-diameter axial flow 
turbine-generator units; (b) ten triframe mounts, each supporting three 
turbine-generator units; (c) 480-volt underwater cables from each 
triframe mount to five shoreline switchgear vaults that interconnect to 
a control room and interconnection points; and (d) appurtenant 
facilities for navigation safety and operation.
    Under the current pilot project license, which expires on December 
31, 2021, Verdant installed, tested, and then removed a total of five 
turbine-generator units. Verdant also proposes to install three 
turbine-generator units attached to one tri-frame mount in 2020, under 
the existing pilot project license.
    The proposed project would consist of a maximum of fifteen 35-
kilowatt, 5-meter-diameter axial flow turbine-generator units with a 
total installed capacity of 0.525 megawatt, with underwater cables 
connecting five triframe mounts to two shoreline switchgear vaults. The 
project would operate using the natural tidal currents of the East 
River, during both ebb and flood tidal periods. As the direction of 
tidal flow changes, each turbine-generator unit would rotate (or yaw) 
to align the rotor to the direction of flow, through a passive system 
caused by hydrodynamic forces on the turbine-generator unit. The annual 
generation is expected to be from 840 to 1,200 megawatt-hours.
    o. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's website at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    p. Procedural schedule and final amendments: The application will 
be processed according to the following preliminary schedule. Revisions 
to the schedule will be made as appropriate.

Issue Deficiency Letter (if necessary)--March 2020
Request Additional Information--2020 March
Issue Acceptance Letter--2020 June
Issue Scoping Document 1 for comments--July 2020
Issue Scoping Document 2 (if necessary)--2020 September
Issue notice of ready for environmental analysis--2020 September
Issue Single EA--2021 March
Comments on EA--2021 April

    Final amendments to the application must be filed with the 
Commission no

[[Page 3365]]

later than 30 days from the issuance date of the notice of ready for 
environmental analysis.

    Dated: January 14, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-00921 Filed 1-17-20; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.