Combined Notice of Filings, 3363-3364 [2020-00793]
Download as PDF
Federal Register / Vol. 85, No. 13 / Tuesday, January 21, 2020 / Notices
molybdenum-99 (Mo-99) produced
without the use of HEU available to
satisfy the domestic U.S. market and
that the export of U.S.-origin HEU for
the purposes of medical isotope
production is the most effective
temporary means to increase the supply
of Mo-99 to the domestic U.S. market.
This certification is effective for no
more than two years from the effective
date of January 2, 2020.
FOR FURTHER INFORMATION CONTACT:
Requests for additional information may
be sent to: Joan Dix, Deputy Director,
Office of Conversion, Mo99@
nnsa.doe.gov, 202–586–2695.
SUPPLEMENTARY INFORMATION:
jbell on DSKJLSW7X2PROD with NOTICES
Authority and Background
The American Medical Isotopes
Production Act of 2012 (AMIPA)
(Subtitle F, Title XXXI of the National
Defense Authorization Act for Fiscal
Year 2013 (Pub. L. 112–239)), enacted
on January 2, 2013, amended Section
134 of the Atomic Energy Act of 1954
(42 U.S.C. 2160d) by striking subsection
c. and inserted language that prohibits
the Nuclear Regulatory Commission
(NRC) from issuing a license for the
export of HEU from the United States
for the purposes of medical isotope
production, effective seven years after
enactment of AMIPA, subject to a
certification regarding the sufficiency of
Mo-99 supply in the United States.
The law provides that the ban on HEU
exports would become effective seven
years after enactment of AMIPA only if
the Secretary of Energy jointly certifies,
with the Secretary of Health and Human
Services, that there is a sufficient supply
of Mo-99 produced without the use of
HEU available to meet U.S. patient
needs, and that it is not necessary to
export U.S.-origin HEU for the purposes
of medical isotope production. The law
further provides that the Secretary of
Energy can extend the deadline for the
joint certification if the Secretary
certifies that there is insufficient global
supply of Mo-99 produced without the
use of HEU available to satisfy the
domestic market and that the export of
U.S.-origin HEU for the purposes of
medical isotope production is the most
effective temporary means to increase
the supply of Mo-99 to the domestic
U.S. market, thereby delaying the
effective date of the export license ban
for up to six years.
In preparation for a Secretarial
certification regarding the sufficiency of
supply of non-HEU based Mo-99, the
Department of Energy (DOE) published
a notice and request for public comment
in the Federal Register (84 FR 65378) on
November 27, 2019 to collect input from
VerDate Sep<11>2014
18:20 Jan 17, 2020
Jkt 250001
the public on the state of the Mo-99
supply. DOE accepted comments, data,
and information through December 27,
2019.
Based on these submissions, along
with other publicly available healthcare
data, and in coordination with the
Department of Health and Human
Services’ Food and Drug
Administration, the Secretary of Energy
has certified that there is insufficient
global supply of non-HEU-based Mo-99
to meet U.S. market needs and that the
export of U.S.-origin HEU is the most
effective temporary means to increase
the supply of Mo-99 to the U.S. market.
While the statute provides that the
resulting delay in the effective date of
the HEU export licensing ban can be for
up to six years, the Secretary’s
certification is effective for a period of
no more than two years, following the
certification’s effective date of January
2, 2020. DOE will conduct periodic
reviews of the domestic U.S. and global
Mo-99 market and will work toward a
certification to Congress, regarding the
sufficiency of supply as soon as the
statutory conditions are satisfied.
Certification
I hereby certify, pursuant to 42 U.S.C.
2160d(d), that there is an insufficient
global supply of molybdenum-99
produced without the use of highly
enriched uranium available to satisfy
the domestic U.S. market and that the
export of U.S.-origin highly enriched
uranium for the purposes of medical
isotope production is the most effective
temporary means to increase the supply
of molybdenum-99 to the domestic U.S.
market. This certification shall be
effective on January 2, 2020, for a period
of no more than two years from the
effective date.
Dan Brouillette
JAN–2 2020
Dated: January 10, 2020.
For the Department of Energy.
Brent K. Park,
Deputy Administrator, Defense Nuclear
Nonproliferation.
[FR Doc. 2020–00902 Filed 1–17–20; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP20–423–000.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
3363
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: § 4(d) Rate Filing: DPEs—
Gateway Expansion to be effective 2/9/
2020.
Filed Date: 1/9/20.
Accession Number: 20200109–5061.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: RP20–424–000.
Applicants: East Tennessee Natural
Gas, LLC.
Description: § 4(d) Rate Filing: ETNG
Jan2020 Negotiated Rates Cleanup to be
effective 2/9/2020.
Filed Date: 1/9/20.
Accession Number: 20200109–5072.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: RP20–425–000.
Applicants: Dominion Energy
Carolina Gas Transmission LLC.
Description: Compliance filing
DECG—2019 Interruptible Revenue
Sharing Report.
Filed Date: 1/9/20.
Accession Number: 20200109–5123.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: RP20–426–000.
Applicants: Equitrans, L.P.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement—EQT
Energy OVC to be effective 1/9/2020.
Filed Date: 1/9/20.
Accession Number: 20200109–5219.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: RP20–427–000.
Applicants: Guardian Pipeline, L.L.C.
Description: § 4(d) Rate Filing: Update
to Guardian URL and Title Page to be
effective 2/10/2020.
Filed Date: 1/9/20.
Accession Number: 20200109–5220.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: RP20–428–000.
Applicants: Guardian Pipeline, L.L.C.
Description: § 4(d) Rate Filing: Update
Contact Information on Title Sheet—
2019 to be effective 2/10/2020.
Filed Date: 1/9/20.
Accession Number: 20200109–5221.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: RP20–429–000.
Applicants: Midwestern Gas
Transmission Company.
Description: § 4(d) Rate Filing: Update
to Midwestern URL and Title Page to be
effective 2/10/2020.
Filed Date: 1/9/20.
Accession Number: 20200109–5222.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: RP20–430–000.
Applicants: OkTex Pipeline
Company, L.L.C.
Description: § 4(d) Rate Filing: Update
to OkTex URL and Title Page to be
effective 2/10/2020.
Filed Date: 1/9/20.
Accession Number: 20200109–5223.
E:\FR\FM\21JAN1.SGM
21JAN1
3364
Federal Register / Vol. 85, No. 13 / Tuesday, January 21, 2020 / Notices
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: RP20–431–000.
Applicants: Viking Gas Transmission
Company.
Description: § 4(d) Rate Filing: Update
to Viking URL 2019 to be effective 2/10/
2020.
Filed Date: 1/9/20.
Accession Number: 20200109–5224.
Comments Due: 5 p.m. ET 1/21/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 13, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–00793 Filed 1–17–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12611–014]
jbell on DSKJLSW7X2PROD with NOTICES
Verdant Power, LLC; Notice of
Application Tendered for Filing With
the Commission and Soliciting
Additional Study Requests and
Establishing Procedural Schedule for
Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 12611–014.
c. Date Filed: December 30, 2019.
d. Applicant: Verdant Power, LLC.
e. Name of Project: Roosevelt Island
Tidal Energy Project.
f. Location: On the East River in New
York County, New York. The project
does not occupy federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825 (r).
VerDate Sep<11>2014
18:20 Jan 17, 2020
Jkt 250001
h. Applicant Contact: Mr. Ronald F.
Smith, President and Chief Operating
Officer, Verdant Power, LLC, P.O. Box
282, Roosevelt Island, New York, New
York 10044. Phone: (703) 328–6842.
Email: rsmith@verdantpower.com.
i. FERC Contact: Andy Bernick at
(202) 502–8660; or email at
andrew.bernick@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: February 28, 2020.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–12611–014.
m. This application is not ready for
environmental analysis at this time.
n. The existing pilot project license
authorizes the following project
facilities: (a) Thirty 35-kilowatt, 5meter-diameter axial flow turbinegenerator units; (b) ten triframe mounts,
each supporting three turbine-generator
units; (c) 480-volt underwater cables
from each triframe mount to five
shoreline switchgear vaults that
interconnect to a control room and
interconnection points; and (d)
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
appurtenant facilities for navigation
safety and operation.
Under the current pilot project
license, which expires on December 31,
2021, Verdant installed, tested, and then
removed a total of five turbine-generator
units. Verdant also proposes to install
three turbine-generator units attached to
one tri-frame mount in 2020, under the
existing pilot project license.
The proposed project would consist of
a maximum of fifteen 35-kilowatt, 5meter-diameter axial flow turbinegenerator units with a total installed
capacity of 0.525 megawatt, with
underwater cables connecting five
triframe mounts to two shoreline
switchgear vaults. The project would
operate using the natural tidal currents
of the East River, during both ebb and
flood tidal periods. As the direction of
tidal flow changes, each turbinegenerator unit would rotate (or yaw) to
align the rotor to the direction of flow,
through a passive system caused by
hydrodynamic forces on the turbinegenerator unit. The annual generation is
expected to be from 840 to 1,200
megawatt-hours.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)—
March 2020
Request Additional Information—2020
March
Issue Acceptance Letter—2020 June
Issue Scoping Document 1 for
comments—July 2020
Issue Scoping Document 2 (if
necessary)—2020 September
Issue notice of ready for environmental
analysis—2020 September
Issue Single EA—2021 March
Comments on EA—2021 April
Final amendments to the application
must be filed with the Commission no
E:\FR\FM\21JAN1.SGM
21JAN1
Agencies
[Federal Register Volume 85, Number 13 (Tuesday, January 21, 2020)]
[Notices]
[Pages 3363-3364]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-00793]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Docket Numbers: RP20-423-000.
Applicants: Transcontinental Gas Pipe Line Company, LLC.
Description: Sec. 4(d) Rate Filing: DPEs--Gateway Expansion to be
effective 2/9/2020.
Filed Date: 1/9/20.
Accession Number: 20200109-5061.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: RP20-424-000.
Applicants: East Tennessee Natural Gas, LLC.
Description: Sec. 4(d) Rate Filing: ETNG Jan2020 Negotiated Rates
Cleanup to be effective 2/9/2020.
Filed Date: 1/9/20.
Accession Number: 20200109-5072.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: RP20-425-000.
Applicants: Dominion Energy Carolina Gas Transmission LLC.
Description: Compliance filing DECG--2019 Interruptible Revenue
Sharing Report.
Filed Date: 1/9/20.
Accession Number: 20200109-5123.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: RP20-426-000.
Applicants: Equitrans, L.P.
Description: Sec. 4(d) Rate Filing: Negotiated Rate Agreement--EQT
Energy OVC to be effective 1/9/2020.
Filed Date: 1/9/20.
Accession Number: 20200109-5219.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: RP20-427-000.
Applicants: Guardian Pipeline, L.L.C.
Description: Sec. 4(d) Rate Filing: Update to Guardian URL and
Title Page to be effective 2/10/2020.
Filed Date: 1/9/20.
Accession Number: 20200109-5220.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: RP20-428-000.
Applicants: Guardian Pipeline, L.L.C.
Description: Sec. 4(d) Rate Filing: Update Contact Information on
Title Sheet--2019 to be effective 2/10/2020.
Filed Date: 1/9/20.
Accession Number: 20200109-5221.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: RP20-429-000.
Applicants: Midwestern Gas Transmission Company.
Description: Sec. 4(d) Rate Filing: Update to Midwestern URL and
Title Page to be effective 2/10/2020.
Filed Date: 1/9/20.
Accession Number: 20200109-5222.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: RP20-430-000.
Applicants: OkTex Pipeline Company, L.L.C.
Description: Sec. 4(d) Rate Filing: Update to OkTex URL and Title
Page to be effective 2/10/2020.
Filed Date: 1/9/20.
Accession Number: 20200109-5223.
[[Page 3364]]
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: RP20-431-000.
Applicants: Viking Gas Transmission Company.
Description: Sec. 4(d) Rate Filing: Update to Viking URL 2019 to
be effective 2/10/2020.
Filed Date: 1/9/20.
Accession Number: 20200109-5224.
Comments Due: 5 p.m. ET 1/21/20.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: January 13, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-00793 Filed 1-17-20; 8:45 am]
BILLING CODE 6717-01-P