Actual Energy, Inc.; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 2124-2125 [2020-00436]

Download as PDF 2124 Federal Register / Vol. 85, No. 9 / Tuesday, January 14, 2020 / Notices comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, and will be notified of any meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 3 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Comment Date: 5:00 p.m. Eastern Time on January 28, 2020. Dated: January 7, 2020. Kimberly D. Bose, Secretary. [FR Doc. 2020–00346 Filed 1–13–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission lotter on DSKBCFDHB2PROD with NOTICES Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER20–420–001. Applicants: Midcontinent Independent System Operator, Inc. Description: Tariff Amendment: 2020–01–08_SA 3375 Entergy ArkansasSearcy Solar Substitute GIA (J893) to be effective 11/5/2019. Filed Date: 1/8/20. Accession Number: 20200108–5103. Comments Due: 5 p.m. ET 1/29/20. Docket Numbers: ER20–558–001. Applicants: Duke Energy Carolinas, LLC. Description: Tariff Amendment: DEC– NCEMC Amendment to NITSA Amendment (SA No. 210) to be effective 1/1/2020. VerDate Sep<11>2014 18:41 Jan 13, 2020 Jkt 250001 Filed Date: 1/8/20. Accession Number: 20200108–5119. Comments Due: 5 p.m. ET 1/29/20. Docket Numbers: ER20–573–001. Applicants: GridLiance Heartland LLC. Description: Tariff Amendment: Amended GLH Certificate of Concurrence Filing to be effective 12/ 31/9998. Filed Date: 1/8/20. Accession Number: 20200108–5083. Comments Due: 5 p.m. ET 1/29/20. Docket Numbers: ER20–752–000. Applicants: Emera Maine. Description: § 205(d) Rate Filing: Interconnection Agreement Houlton Water Company to be effective 12/31/ 9998. Filed Date: 1/8/20. Accession Number: 20200108–5075. Comments Due: 5 p.m. ET 1/29/20. Docket Numbers: ER20–753–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: Third Amendment Interconnection Agreement Wintec V WDT1014 SA No. 525 to be effective 1/9/2020. Filed Date: 1/8/20. Accession Number: 20200108–5082. Comments Due: 5 p.m. ET 1/29/20. Docket Numbers: ER20–754–000. Applicants: Public Service Company of Colorado. Description: § 205(d) Rate Filing: PSCNereo-NonConf-LGIA–555–0.0.0 to be effective 1/9/2020. Filed Date: 1/8/20. Accession Number: 20200108–5088. Comments Due: 5 p.m. ET 1/29/20. Docket Numbers: ER20–755–000. Applicants: Midcontinent Independent System Operator, Inc., ITC Midwest LLC. Description: § 205(d) Rate Filing: 2020–01–08_SA 3397 ITC–MEC FSA (J475) to be effective 3/9/2020. Filed Date: 1/8/20. Accession Number: 20200108–5090. Comments Due: 5 p.m. ET 1/29/20. Docket Numbers: ER20–756–000. Applicants: North Jersey Energy Associates, A Limited Partnership. Description: Compliance filing: Informational Filing Regarding Upstream Change in Control and Request for Waiver to be effective 3/9/ 2020. Filed Date: 1/8/20. Accession Number: 20200108–5101. Comments Due: 5 p.m. ET 1/29/20. Docket Numbers: ER20–757–000. Applicants: Pacific Gas and Electric Company. Description: § 205(d) Rate Filing: Amendment to Silicon Valley Power PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 Agreement (RS 248) to be effective 3/9/ 2020. Filed Date: 1/8/20. Accession Number: 20200108–5114. Comments Due: 5 p.m. ET 1/29/20. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 8, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–00435 Filed 1–13–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER20–744–000] Actual Energy, Inc.; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Actual Energy, Inc.’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of E:\FR\FM\14JAN1.SGM 14JAN1 Federal Register / Vol. 85, No. 9 / Tuesday, January 14, 2020 / Notices future issuances of securities and assumptions of liability, is January 28, 2020. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 8, 2020. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2020–00436 Filed 1–13–20; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 6841–005] lotter on DSKBCFDHB2PROD with NOTICES Rivanna Water and Sewer Authority; Notice of Application for Surrender of Exemption, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Application for surrender of exemption. b. Project No: 6841–005. c. Date Filed: December 6, 2019. d. Applicant: Rivanna Water and Sewer Authority. e. Name of Project: South Rivanna Hydroelectric Project. VerDate Sep<11>2014 18:41 Jan 13, 2020 Jkt 250001 f. Location: The 1,070-kilowatt project is located on the South Fork Rivanna River, near Charlottesville, Albemarle County, Virginia. The project does not occupy any federal lands. g. Filed Pursuant to: Public Utility Regulatory Policies Act of 1978, 16 U.S.C. 2705, 2708. h. Applicant Contact: Ms. Jennifer Whitaker, Rivanna Water and Sewer Authority, 695 Moores Creek Lane, Charlottesville, VA 22902–9016; phone (434) 977–2970, email jwhitaker@ rivanna.org. i. FERC Contact: Diana Shannon, (202) 502–6136, diana.shannon@ ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: February 7, 2020. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–6841–005. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: Upon determining that rehabilitation and continued operation is no longer economically viable, the applicant proposes to surrender its exemption. Due to flooding damage, the project has not operated since June 2013. The applicant proposes to disconnect and remove all electrical components, as well as drain, clean, and disconnect all mechanical components. Downstream PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 2125 flows would continue to be released from the gate at the south operating tower of the dam. The dam and crib intake structure would remain in place to be used for municipal water supply. The powerhouse would also remain in place. No ground disturbance is proposed as part of the surrender. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must E:\FR\FM\14JAN1.SGM 14JAN1

Agencies

[Federal Register Volume 85, Number 9 (Tuesday, January 14, 2020)]
[Notices]
[Pages 2124-2125]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-00436]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER20-744-000]


Actual Energy, Inc.; Supplemental Notice That Initial Market-
Based Rate Filing Includes Request for Blanket Section 204 
Authorization

    This is a supplemental notice in the above-referenced proceeding of 
Actual Energy, Inc.'s application for market-based rate authority, with 
an accompanying rate tariff, noting that such application includes a 
request for blanket authorization, under 18 CFR part 34, of future 
issuances of securities and assumptions of liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426, in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone 
filing a motion to intervene or protest must serve a copy of that 
document on the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of

[[Page 2125]]

future issuances of securities and assumptions of liability, is January 
28, 2020.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
5 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
    The filings in the above-referenced proceeding are accessible in 
the Commission's eLibrary system by clicking on the appropriate link in 
the above list. They are also available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
eSubscription link on the website that enables subscribers to receive 
email notification when a document is added to a subscribed docket(s). 
For assistance with any FERC Online service, please email 
[email protected], or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

    Dated: January 8, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-00436 Filed 1-13-20; 8:45 am]
BILLING CODE 6717-01-P