Commission Information Collection Activities (FERC-577); Comment Request; Extension, 2126-2127 [2020-00385]
Download as PDF
2126
Federal Register / Vol. 85, No. 9 / Tuesday, January 14, 2020 / Notices
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: January 8, 2020.
Kimberly D. Bose,
Secretary.
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 7, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–00389 Filed 1–13–20; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2020–00349 Filed 1–13–20; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
lotter on DSKBCFDHB2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–120–000.
Applicants: El Paso Electric Company,
Sun Jupiter Holdings LLC.
Description: Response to December 5,
2019 Deficiency Letter of Sun Jupiter
Holdings LLC, et al.
Filed Date: 1/6/20.
Accession Number: 20200106–5152.
Comments Due: 5 p.m. ET 1/27/20.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER20–89–001.
Applicants: ISO New England Inc.
Description: Tariff Amendment: ISO–
NE & NEPOOL; Response to Deficiency
Notice re: Fuel Sec. Retention Limit to
be effective 12/11/2019.
Filed Date: 1/6/20.
Accession Number: 20200106–5113.
Comments Due: 5 p.m. ET 1/27/20.
Docket Numbers: ER20–742–000.
Applicants: New York State Electric &
Gas Corporation, New York
Independent System Operator, Inc.
Description: § 205(d) Rate Filing: 205
re: E&P Agreement (SA2501) between
NYSEG and Canisteo Wind Energy to be
effective 12/31/2019.
Filed Date: 1/7/20.
Accession Number: 20200107–5046.
Comments Due: 5 p.m. ET 1/28/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
VerDate Sep<11>2014
18:41 Jan 13, 2020
Jkt 250001
Dated: January 7, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Federal Energy Regulatory
Commission
[FR Doc. 2020–00351 Filed 1–13–20; 8:45 am]
Combined Notice of Filings
BILLING CODE 6717–01–P
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP20–396–000.
Applicants: Florida Gas Transmission
Company, LLC.
Description: Annual Accounting
Report of Florida Gas Transmission
Company, LLC under RP20–396.
Filed Date: 12/31/19.
Accession Number: 20191231–5315.
Comments Due: 5 p.m. ET 1/13/20.
Docket Numbers: RP20–411–000.
Applicants: Millennium Pipeline
Company, LLC.
Description: Compliance filing 2019
Penalty Revenue Crediting Report.
Filed Date: 1/6/20.
Accession Number: 20200106–5083.
Comments Due: 5 p.m. ET 1/20/20.
Docket Numbers: RP20–412–000.
Applicants: Enable Mississippi River
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate Filing—City of Potosi
RP18–923 & RP20–131 Settlement to be
effective 1/1/2019.
Filed Date: 1/6/20.
Accession Number: 20200106–5138.
Comments Due: 5 p.m. ET 1/20/20.
Docket Numbers: RP20–413–000.
Applicants: Enable Mississippi River
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate Filing—Village of Dupo
RP18–923 & RP20–131 Settlement to be
effective 1/1/2019.
Filed Date: 1/6/20.
Accession Number: 20200106–5140.
Comments Due: 5 p.m. ET 1/20/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC20–2–000]
Commission Information Collection
Activities (FERC–577); Comment
Request; Extension
Federal Energy Regulatory
Commission.
ACTION: Notice of information collection
and request for comments.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995 (PRA), the
Federal Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on the currently
approved information collection, FERC577 (Natural Gas Facilities:
Environmental Review and Compliance)
and submitting the information
collection to the Office of Management
and Budget (OMB) for review. Any
interested person may file comments
directly with OMB and should address
a copy of those comments to the
Commission as explained below.
DATES: Comments on the collection of
information are due February 13, 2020.
ADDRESSES: Comments filed with OMB,
identified by the OMB Control No.
1902–0128, should be sent via email to
the Office of Information and Regulatory
Affairs: oira_submission@omb.gov,
Attention: Federal Energy Regulatory
Commission Desk Officer.
A copy of the comments should also
be sent to the Commission, in Docket
SUMMARY:
E:\FR\FM\14JAN1.SGM
14JAN1
Federal Register / Vol. 85, No. 9 / Tuesday, January 14, 2020 / Notices
No. IC20–2–000, by either of the
following methods:
• eFiling at Commission’s Website:
https://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE, Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: https://
www.ferc.gov/help/submissionguide.asp. For user assistance, contact
FERC Online Support by email at
ferconlinesupport@ferc.gov, or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov, telephone
at (202) 502–8663, and fax at (202) 273–
0873.
SUPPLEMENTARY INFORMATION:
Title: FERC–577, Natural Gas
Facilities: Environmental Review and
Compliance.
OMB Control No.: 1902–0128.
Type of Request: Three-year extension
of the FERC–577 with no changes to the
current reporting requirements.
Abstract: The FERC–577 contains the
Commission’s information collection
pertaining to regulations which
implement the National Environmental
Policy Act (NEPA) as well as the
reporting requirements for landowner
notifications. These requirements are
contained in 18 CFR parts 2, 157, 284,
and 380. The information to be
submitted includes draft environmental
2127
material in accordance with the
provisions of Part 380 of FERC’s
regulations in order to implement the
Commission’s procedures under NEPA.
Without such information, the
Commission would be unable to fulfill
its statutory responsibilities under the
Natural Gas Act (NGA), NEPA, and the
Energy Policy Act of 2005. Specifically,
these responsibilities include ensuring
company activities remain consistent
with the public interest, which is
specified in the NGA and inherent in
the other statutes.
Type of Respondents: Companies
proposing Natural Gas Projects under
section 7 and Jurisdictional Gas Pipeline
and Storage Companies.
Estimate of Annual Burden.1 The
Commission estimates the annual public
reporting burden and cost 2 for the
information collection as follows.
FERC–577—NATURAL GAS FACILITIES: ENVIRONMENTAL REVIEW AND COMPLIANCE
Number of
respondents
Number of
responses per
respondent
Total number
of responses
Average burden hours &
average cost per
response
($) (rounded)
Total annual burden
hours & total annual cost
($) (rounded)
Cost per
respondent
($) (rounded)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1) = (6)
Gas Pipeline Certificates 3.
Landowners Notification 4.
Total .................
101
16
1,616
164
144
23,616
2 hours; $160 .................
........................
........................
25,232
........................................
lotter on DSKBCFDHB2PROD with NOTICES
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
1 Burden is defined as the total time, effort, or
financial resources expended by persons to
generate, maintain, retain, or disclose or provide
information to or for a federal agency. See 5 CFR
1320 for additional information on the definition of
information collection burden.
2 The Commission staff estimates that industry is
similarly situated in terms of hourly cost (for wages
plus benefits). Based on the Commission’s FY
(Fiscal Year) 2019 average cost (for wages plus
benefits), $80.00/hour is used.
3 Requirements are found in 18 CFR parts 2, 157,
and 380.
4 Requirements are found in 18 CFR 157(d),
157(f), 2.55(a), 2.55(b), 284.11, and 380.15.
VerDate Sep<11>2014
18:41 Jan 13, 2020
Jkt 250001
193,518 hours; $15,481
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: January 8, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–00385 Filed 1–13–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC20–29–000.
Applicants: Northeast Energy
Associates, A Limited Partnership,
North Jersey Energy Associates, A
Limited Partnership, Vistra Energy
Corp., NextEra Energy, Inc.
Description: Application for
Authorization Under Section 203 of the
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
312,725 hours;
$25,018,007.
47,232 hours;
$3,778,560.
$247,703
359,957 hours;
$28,796,567.
........................
23,040
Federal Power Act, et al. of Northeast
Energy Associates, A Limited
Partnership, et al.
Filed Date: 1/7/20.
Accession Number: 20200107–5110.
Comments Due: 5 p.m. ET 1/28/20.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–2100–005;
ER13–2109–009; ER13–434–007; ER16–
1750–006; ER16–2601–004; ER17–2292–
004; ER17–2381–003; ER19–1656–003.
Applicants: Virginia Electric and
Power Company, Dominion Energy
Generation Marketing, Inc., Fowler
Ridge Wind Farm LLC, Summit Farms
Solar, LLC, Southampton Solar, LLC,
Scott-II Solar LLC, Wilkinson Solar LLC.
Description: Notice of Non-Material
Change in Status of the Dominion
Energy PJM Companies.
Filed Date: 1/7/20.
Accession Number: 20200107–5122.
Comments Due: 5 p.m. ET 1/28/20.
Docket Numbers: ER19–1501–001.
Applicants: Appalachian Power
Company, PJM Interconnection, L.L.C.
E:\FR\FM\14JAN1.SGM
14JAN1
Agencies
[Federal Register Volume 85, Number 9 (Tuesday, January 14, 2020)]
[Notices]
[Pages 2126-2127]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-00385]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. IC20-2-000]
Commission Information Collection Activities (FERC-577); Comment
Request; Extension
AGENCY: Federal Energy Regulatory Commission.
ACTION: Notice of information collection and request for comments.
-----------------------------------------------------------------------
SUMMARY: In compliance with the requirements of the Paperwork Reduction
Act of 1995 (PRA), the Federal Energy Regulatory Commission (Commission
or FERC) is soliciting public comment on the currently approved
information collection, FERC- 577 (Natural Gas Facilities:
Environmental Review and Compliance) and submitting the information
collection to the Office of Management and Budget (OMB) for review. Any
interested person may file comments directly with OMB and should
address a copy of those comments to the Commission as explained below.
DATES: Comments on the collection of information are due February 13,
2020.
ADDRESSES: Comments filed with OMB, identified by the OMB Control No.
1902-0128, should be sent via email to the Office of Information and
Regulatory Affairs: [email protected], Attention: Federal Energy
Regulatory Commission Desk Officer.
A copy of the comments should also be sent to the Commission, in
Docket
[[Page 2127]]
No. IC20-2-000, by either of the following methods:
eFiling at Commission's Website: https://www.ferc.gov/docs-filing/efiling.asp.
Mail/Hand Delivery/Courier: Federal Energy Regulatory
Commission, Secretary of the Commission, 888 First Street NE,
Washington, DC 20426.
Instructions: All submissions must be formatted and filed in
accordance with submission guidelines at: https://www.ferc.gov/help/submission-guide.asp. For user assistance, contact FERC Online Support
by email at [email protected], or by phone at: (866) 208-3676
(toll-free), or (202) 502-8659 for TTY.
Docket: Users interested in receiving automatic notification of
activity in this docket or in viewing/downloading comments and
issuances in this docket may do so at https://www.ferc.gov/docs-filing/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at
[email protected], telephone at (202) 502-8663, and fax at (202)
273-0873.
SUPPLEMENTARY INFORMATION:
Title: FERC-577, Natural Gas Facilities: Environmental Review and
Compliance.
OMB Control No.: 1902-0128.
Type of Request: Three-year extension of the FERC-577 with no
changes to the current reporting requirements.
Abstract: The FERC-577 contains the Commission's information
collection pertaining to regulations which implement the National
Environmental Policy Act (NEPA) as well as the reporting requirements
for landowner notifications. These requirements are contained in 18 CFR
parts 2, 157, 284, and 380. The information to be submitted includes
draft environmental material in accordance with the provisions of Part
380 of FERC's regulations in order to implement the Commission's
procedures under NEPA.
Without such information, the Commission would be unable to fulfill
its statutory responsibilities under the Natural Gas Act (NGA), NEPA,
and the Energy Policy Act of 2005. Specifically, these responsibilities
include ensuring company activities remain consistent with the public
interest, which is specified in the NGA and inherent in the other
statutes.
Type of Respondents: Companies proposing Natural Gas Projects under
section 7 and Jurisdictional Gas Pipeline and Storage Companies.
Estimate of Annual Burden.\1\ The Commission estimates the annual
public reporting burden and cost \2\ for the information collection as
follows.
FERC-577--Natural Gas Facilities: Environmental Review and Compliance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Number of Cost per
Number of responses per Total number Average burden hours & average cost per Total annual burden hours & total annual respondent ($)
respondents respondent of responses response ($) (rounded) cost ($) (rounded) (rounded)
(1) (2) (1) * (2) = (4)....................................... (3) * (4) = (5)........................... (5) / (1) =
(3) (6)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Gas Pipeline Certificates \3\........... 101 16 1,616 193,518 hours; $15,481.................... 312,725 hours; $25,018,007................ $247,703
Landowners Notification \4\............. 164 144 23,616 2 hours; $160............................. 47,232 hours; $3,778,560.................. 23,040
-------------------------------------------------------------------------------------------------------------------------------------------------------
Total............................... .............. .............. 25,232 .......................................... 359,957 hours; $28,796,567................ ..............
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Comments: Comments are invited on: (1) Whether the collection of
information is necessary for the proper performance of the functions of
the Commission, including whether the information will have practical
utility; (2) the accuracy of the agency's estimate of the burden and
cost of the collection of information, including the validity of the
methodology and assumptions used; (3) ways to enhance the quality,
utility and clarity of the information collection; and (4) ways to
minimize the burden of the collection of information on those who are
to respond, including the use of automated collection techniques or
other forms of information technology.
---------------------------------------------------------------------------
\1\ Burden is defined as the total time, effort, or financial
resources expended by persons to generate, maintain, retain, or
disclose or provide information to or for a federal agency. See 5
CFR 1320 for additional information on the definition of information
collection burden.
\2\ The Commission staff estimates that industry is similarly
situated in terms of hourly cost (for wages plus benefits). Based on
the Commission's FY (Fiscal Year) 2019 average cost (for wages plus
benefits), $80.00/hour is used.
\3\ Requirements are found in 18 CFR parts 2, 157, and 380.
\4\ Requirements are found in 18 CFR 157(d), 157(f), 2.55(a),
2.55(b), 284.11, and 380.15.
Dated: January 8, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-00385 Filed 1-13-20; 8:45 am]
BILLING CODE 6717-01-P