Combined Notice of Filings #1, 1310 [2020-00240]
Download as PDF
1310
Federal Register / Vol. 85, No. 7 / Friday, January 10, 2020 / Notices
become a party to a certificate
proceeding are to intervene in a timely
manner. If seeking to intervene out-oftime, the movant is required to ‘‘show
good cause why the time limitation
should be waived,’’ and should provide
justification by reference to factors set
forth in Rule 214(d)(1) of the
Commission’s Rules and Regulations.2
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 3 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Comment Date: 5 p.m. Eastern time
on January 27, 2020.
Dated: January 6, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020–00219 Filed 1–9–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jbell on DSKJLSW7X2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG20–61–000.
Applicants: Wilderness Line
Holdings, LLC.
Description: Self-Certification of
Exempt Wholesale Generator Status of
Wilderness Line Holdings, LLC.
Filed Date: 1/2/20.
Accession Number: 20200102–5268.
Comments Due: 5 p.m. ET 1/23/20.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–2447–004.
Applicants: Pacific Northwest
Generating Cooperative.
Description: Updated Market Power
Analysis [Confidential and Confidential
Workpapers] of Pacific Northwest
Generating Cooperative.
Filed Date: 12/31/19.
Accession Number: 20191231–5329.
Comments Due: 5 p.m. ET 3/2/20.
Docket Numbers: ER14–225–007.
Applicants: New Brunswick Energy
Marketing Corporation.
Description: Updated Market Power
Analysis for the Northeast Region of
New Brunswick Energy Marketing
Corporation.
2 18
CFR 385.214(d)(1).
VerDate Sep<11>2014
16:39 Jan 09, 2020
Jkt 250001
Filed Date: 12/30/19.
Accession Number: 20191230–5282.
Comments Due: 5 p.m. ET 2/28/20.
Docket Numbers: ER17–1519–003.
Applicants: PECO Energy Company,
PJM Interconnection, L.L.C.
Description: Compliance filing: PECO
submits filing in compliance with the
Commission’s 12/5/2019 Order to be
effective 12/5/2019.
Filed Date: 1/2/20.
Accession Number: 20200102–5136.
Comments Due: 5 p.m. ET 1/23/20.
Docket Numbers: ER18–169–004.
Applicants: Southern California
Edison Company.
Description: Compliance filing: SCE
Revised TO Apdx IX Attach 1 Formula
Rate Protocols ER18–169, ER18–2440 to
be effective 11/16/2018.
Filed Date: 1/2/20.
Accession Number: 20200102–5290.
Comments Due: 5 p.m. ET 1/23/20.
Docket Numbers: ER19–1910–002.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing:
Compliance Filing—Oklahoma Gas and
Electric Company Settlement in EL18–
58–000 to be effective 1/1/2018.
Filed Date: 1/2/20.
Accession Number: 20200102–5256.
Comments Due: 5 p.m. ET 1/23/20.
Docket Numbers: ER19–2774–002.
Applicants: Public Service Company
of Colorado.
Description: Compliance filing:
OATT–Att–N–LGIP Reform-Compliance
to be effective 12/5/2019.
Filed Date: 1/3/20.
Accession Number: 20200103–5003.
Comments Due: 5 p.m. ET 1/24/20.
Docket Numbers: ER20–731–000.
Applicants: Deseret Generation &
Transmission Co-operative, Inc.
Description: Tariff Cancellation: RS 25
Termination of Concurrence to be
effective 12/31/2019.
Filed Date: 1/2/20.
Accession Number: 20200102–5278.
Comments Due: 5 p.m. ET 1/23/20.
Docket Numbers: ER20–732–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2020–01–02 Deliverability Assessment
Methodology Enhancements
Amendment to be effective 3/3/2020.
Filed Date: 1/2/20.
Accession Number: 20200102–5288.
Comments Due: 5 p.m. ET 1/23/20.
Docket Numbers: ER20–733–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to WMPA, SA No. 5374;
Queue Position AE1–027 (amend) to be
effective 3/29/2019.
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
Filed Date: 1/2/20.
Accession Number: 20200102–5265.
Comments Due: 5 p.m. ET 1/23/20.
Docket Numbers: ER20–734–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
County Line Solar LGIA Filing to be
effective 12/19/2019.
Filed Date: 1/3/20.
Accession Number: 20200103–5075.
Comments Due: 5 p.m. ET 1/24/20.
Docket Numbers: ER20–735–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Decatur Solar Energy Center LGIA Filing
to be effective 12/19/2019.
Filed Date: 1/3/20.
Accession Number: 20200103–5078.
Comments Due: 5 p.m. ET 1/24/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 3, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–00240 Filed 1–9–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AC20–45–000]
Williams Companies Inc; Notice of
Filing
Take notice that on December 26,
2019, Williams Companies Inc filed a
Request for Waiver of Corporate Officer
Certification Requirement for FERC
Form 6 and 6Q for the Fourth Quarter
2013 through the First Quarter 2019.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
E:\FR\FM\10JAN1.SGM
10JAN1
Agencies
[Federal Register Volume 85, Number 7 (Friday, January 10, 2020)]
[Notices]
[Page 1310]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-00240]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG20-61-000.
Applicants: Wilderness Line Holdings, LLC.
Description: Self-Certification of Exempt Wholesale Generator
Status of Wilderness Line Holdings, LLC.
Filed Date: 1/2/20.
Accession Number: 20200102-5268.
Comments Due: 5 p.m. ET 1/23/20.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER11-2447-004.
Applicants: Pacific Northwest Generating Cooperative.
Description: Updated Market Power Analysis [Confidential and
Confidential Workpapers] of Pacific Northwest Generating Cooperative.
Filed Date: 12/31/19.
Accession Number: 20191231-5329.
Comments Due: 5 p.m. ET 3/2/20.
Docket Numbers: ER14-225-007.
Applicants: New Brunswick Energy Marketing Corporation.
Description: Updated Market Power Analysis for the Northeast Region
of New Brunswick Energy Marketing Corporation.
Filed Date: 12/30/19.
Accession Number: 20191230-5282.
Comments Due: 5 p.m. ET 2/28/20.
Docket Numbers: ER17-1519-003.
Applicants: PECO Energy Company, PJM Interconnection, L.L.C.
Description: Compliance filing: PECO submits filing in compliance
with the Commission's 12/5/2019 Order to be effective 12/5/2019.
Filed Date: 1/2/20.
Accession Number: 20200102-5136.
Comments Due: 5 p.m. ET 1/23/20.
Docket Numbers: ER18-169-004.
Applicants: Southern California Edison Company.
Description: Compliance filing: SCE Revised TO Apdx IX Attach 1
Formula Rate Protocols ER18-169, ER18-2440 to be effective 11/16/2018.
Filed Date: 1/2/20.
Accession Number: 20200102-5290.
Comments Due: 5 p.m. ET 1/23/20.
Docket Numbers: ER19-1910-002.
Applicants: Southwest Power Pool, Inc.
Description: Compliance filing: Compliance Filing--Oklahoma Gas and
Electric Company Settlement in EL18-58-000 to be effective 1/1/2018.
Filed Date: 1/2/20.
Accession Number: 20200102-5256.
Comments Due: 5 p.m. ET 1/23/20.
Docket Numbers: ER19-2774-002.
Applicants: Public Service Company of Colorado.
Description: Compliance filing: OATT-Att-N-LGIP Reform-Compliance
to be effective 12/5/2019.
Filed Date: 1/3/20.
Accession Number: 20200103-5003.
Comments Due: 5 p.m. ET 1/24/20.
Docket Numbers: ER20-731-000.
Applicants: Deseret Generation & Transmission Co-operative, Inc.
Description: Tariff Cancellation: RS 25 Termination of Concurrence
to be effective 12/31/2019.
Filed Date: 1/2/20.
Accession Number: 20200102-5278.
Comments Due: 5 p.m. ET 1/23/20.
Docket Numbers: ER20-732-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2020-01-02 Deliverability
Assessment Methodology Enhancements Amendment to be effective 3/3/2020.
Filed Date: 1/2/20.
Accession Number: 20200102-5288.
Comments Due: 5 p.m. ET 1/23/20.
Docket Numbers: ER20-733-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to WMPA, SA No.
5374; Queue Position AE1-027 (amend) to be effective 3/29/2019.
Filed Date: 1/2/20.
Accession Number: 20200102-5265.
Comments Due: 5 p.m. ET 1/23/20.
Docket Numbers: ER20-734-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: County Line Solar LGIA
Filing to be effective 12/19/2019.
Filed Date: 1/3/20.
Accession Number: 20200103-5075.
Comments Due: 5 p.m. ET 1/24/20.
Docket Numbers: ER20-735-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: Decatur Solar Energy Center
LGIA Filing to be effective 12/19/2019.
Filed Date: 1/3/20.
Accession Number: 20200103-5078.
Comments Due: 5 p.m. ET 1/24/20.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: January 3, 2020.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-00240 Filed 1-9-20; 8:45 am]
BILLING CODE 6717-01-P