Public Hearing, 1189-1190 [2020-00159]
Download as PDF
Federal Register / Vol. 85, No. 6 / Thursday, January 9, 2020 / Notices
• Use the Commission’s internet
comment form (https://www.sec.gov/
rules/sro.shtml) or
• Send an email to rule-comments@
sec.gov. Please include File Number SR–
LCH SA–2019–012 on the subject line.
Paper Comments
lotter on DSKBCFDHB2PROD with NOTICES
• Send paper comments in triplicate
to Secretary, Securities and Exchange
Commission, 100 F Street NE,
Washington, DC 20549–1090.
All submissions should refer to File
Number SR–LCH SA–2019–012. This
file number should be included on the
subject line if email is used. To help the
Commission process and review your
comments more efficiently, please use
only one method. The Commission will
post all comments on the Commission’s
internet website (https://www.sec.gov/
rules/sro.shtml). Copies of the
submission, all subsequent
amendments, all written statements
with respect to the proposed rule
change that are filed with the
Commission, and all written
communications relating to the
proposed rule change between the
Commission and any person, other than
those that may be withheld from the
public in accordance with the
provisions of 5 U.S.C. 552, will be
available for website viewing and
printing in the Commission’s Public
Reference Room, 100 F Street NE,
Washington, DC 20549, on official
business days between the hours of
10:00 a.m. and 3:00 p.m. Copies of such
filings will also be available for
inspection and copying at the principal
office of LCH SA and on LCH SA’s
website at https://www.lch.com/
resources/rules-and-regulations/
proposed-rule-changes-0. All comments
received will be posted without change.
Persons submitting comments are
cautioned that we do not redact or edit
personal identifying information from
comment submissions. You should
submit only information that you wish
to make available publicly. All
submissions should refer to File
Number SR–LCH SA–2019–012 and
should be submitted on or before
January 30, 2020.
For the Commission, by the Division of
Trading and Markets, pursuant to delegated
authority.11
J. Matthew DeLesDernier,
Assistant Secretary.
[FR Doc. 2020–00118 Filed 1–8–20; 8:45 am]
BILLING CODE 8011–01–P
11 17
CFR 200.30–3(a)(12).
VerDate Sep<11>2014
20:20 Jan 08, 2020
Jkt 250001
SECURITIES AND EXCHANGE
COMMISSION
[Release No. 34–87885; SR–NYSEArca–
2019–78]
Self-Regulatory Organizations; NYSE
Arca, Inc.; Notice of Withdrawal of a
Proposed Rule Change, as Modified by
Amendment No. 1, To List and Trade
Shares of the Innovator PTAM Core
Bond Fund ETF Under NYSE Arca Rule
8.600–E
January 3, 2020.
On October 30, 2019, NYSE Arca, Inc.
(‘‘Exchange’’) filed with the Securities
and Exchange Commission
(‘‘Commission’’), pursuant to Section
19(b)(1) of the Securities Exchange Act
of 1934 (‘‘Act’’) 1 and Rule 19b–4
thereunder,2 a proposed rule change to
list and trade shares of the Innovator
PTAM Core Bond ETF, and on
November 8, 2019, the Exchange filed
Amendment No. 1 to the proposed rule
change, which amended and replaced
the proposed rule change in its entirety.
The proposed rule change was
published for comment in the Federal
Register on November 19, 2019.3 The
Commission did not receive any
comment letters on the proposed rule
change.
On December 18, 2019, the Exchange
withdrew the proposed rule change
(SR–NYSEArca–2019–78), as modified
by Amendment No. 1.
For the Commission, by the Division of
Trading and Markets, pursuant to delegated
authority.4
J. Matthew DeLesDernier,
Assistant Secretary.
[FR Doc. 2020–00117 Filed 1–8–20; 8:45 am]
BILLING CODE 8011–01–P
SMALL BUSINESS ADMINISTRATION
Reporting and Recordkeeping
Requirements Under OMB Review
1189
that the agency has made such a
submission. This notice also allows an
additional 30 days for public comments.
DATES: Submit comments on or before
February 10, 2020.
ADDRESSES: Comments should refer to
the information collection by name and/
or OMB Control Number and should be
sent to: Agency Clearance Officer, Curtis
Rich, Small Business Administration,
409 3rd Street SW, 5th Floor,
Washington, DC 20416; and SBA Desk
Officer, Office of Information and
Regulatory Affairs, Office of
Management and Budget, New
Executive Office Building, Washington,
DC 20503.
FOR FURTHER INFORMATION CONTACT:
Curtis Rich, Agency Clearance Officer,
(202) 205–7030 curtis.rich@sba.gov.
Copies: A copy of the Form OMB 83–
1, supporting statement, and other
documents submitted to OMB for
review may be obtained from the
Agency Clearance Officer.
SUPPLEMENTARY INFORMATION: Small
Business Administration (SBA)
regulations require that we determine
that a participating Certified
Development Company’s Non-Bank
Lender Institutions or Microlender’s
management, ownership, etc. is of
‘‘good character’’. To do so requires the
information requested on the Form
1081. This form also provides data used
to determine the qualifications and
capabilities of the lenders key
personnel.
Solicitation of Public Comments
Title: Statement of Personal History.
Description of Respondents: Small
Business Lending Companies.
Form Number: 1081.
Estimated Annual Responses: 151.
Estimated Annual Hour Burden: 108.
Curtis Rich,
Management Analyst.
[FR Doc. 2020–00175 Filed 1–8–20; 8:45 am]
BILLING CODE 8025–01–P
Small Business Administration.
ACTION: 30-Day notice.
AGENCY:
The Small Business
Administration (SBA) is publishing this
notice to comply with requirements of
the Paperwork Reduction Act (PRA)
requires agencies to submit proposed
reporting and recordkeeping
requirements to OMB for review and
approval, and to publish a notice in the
Federal Register notifying the public
SUMMARY:
1 15
U.S.C. 78s(b)(1).
CFR 240.19b–4.
3 See Securities Exchange Act Release No. 87514
(November 13, 2019), 84 FR 63929.
4 17 CFR 200.30–3(a)(12).
2 17
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
SUSQUEHANNA RIVER BASIN
COMMISSION
Public Hearing
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
The Susquehanna River Basin
Commission will hold a public hearing
on February 6, 2020, in Harrisburg,
Pennsylvania. At this public hearing,
the Commission will hear testimony on
the projects listed in the Supplementary
Information section of this notice. The
SUMMARY:
E:\FR\FM\09JAN1.SGM
09JAN1
1190
Federal Register / Vol. 85, No. 6 / Thursday, January 9, 2020 / Notices
lotter on DSKBCFDHB2PROD with NOTICES
Commission will also hear testimony on
a proposed policy—Guidance For The
Preparation Of A Metering Plan & A
Groundwater Elevation Monitoring Plan
For Water Withdrawals, Consumptive
Uses, And Diversions. Such projects and
proposals are intended to be scheduled
for Commission action at its next
business meeting, tentatively scheduled
for March 13, 2020, which will be
noticed separately. The public should
take note that this public hearing will be
the only opportunity to offer oral
comment to the Commission for the
listed projects and proposals. The
deadline for the submission of written
comments is February 17, 2020.
DATES: The public hearing will convene
on February 6, 2020, at 2:30 p.m. The
public hearing will end at 5:00 p.m. or
at the conclusion of public testimony,
whichever is sooner. The deadline for
the submission of written comments is
February 17, 2020.
ADDRESSES: The public hearing will be
conducted at the Susquehanna River
Basin Commission, 4423 N Front Street,
Harrisburg, Pennsylvania.
FOR FURTHER INFORMATION CONTACT:
Jason Oyler, General Counsel and
Secretary to the Commission, telephone:
(717) 238–0423; fax: (717) 238–2436.
Information concerning the applications
for these projects is available at the
Commission’s Water Application and
Approval Viewer at https://
www.srbc.net/waav. Additional
supporting documents are available to
inspect and copy in accordance with the
Commission’s Access to Records Policy
at www.srbc.net/regulatory/policiesguidance/docs/access-to-records-policy2009-02.pdf.
SUPPLEMENTARY INFORMATION: The
public hearing will cover a proposed
policy as posted on the SRBC Public
Hearing web page at https://
www.srbc.net/about/meetings-events/
public-hearing.html. The public hearing
will also cover the following projects.
Projects Scheduled for Action
1. Project Sponsor and Facility: ARD
Operating, LLC (Lycoming Creek), Lewis
Township, Lycoming County, Pa.
Application for renewal of surface water
withdrawal of up to 1.340 mgd (peak
day) (Docket No. 20160301).
2. Project Sponsor and Facility: EQT
Production Company (Wilson Creek),
Duncan Township, Tioga County, Pa.
Application for renewal of surface water
withdrawal of up to 0.720 mgd (peak
day) (Docket No. 20160305).
3. Project Sponsor and Facility: New
Holland Borough Authority, New
Holland Borough, Lancaster County, Pa.
Application for groundwater
VerDate Sep<11>2014
20:20 Jan 08, 2020
Jkt 250001
withdrawal of up to 0.860 mgd (30-day
average) from Well 5.
4. Project Sponsor and Facility: New
Morgan Borough Utilities Authority,
New Morgan Borough, Berks County,
Pa. Modification to remove expired Well
PW–3 and to recognize the
interconnection with Caernarvon
Township Authority. Well PW–3
automatically expired consistent with
Condition 25 of the approval due to lack
of commencement of withdrawal
(Docket No. 20141207).
5. Project Sponsor and Facility: SWN
Production Company, LLC
(Susquehanna River), Oakland
Township, Susquehanna County, Pa.
Application for renewal of surface water
withdrawal of up to 3.000 mgd (peak
day) (Docket No. 20160310).
6. Project Sponsor and Facility: SWN
Production Company, LLC
(Tunkhannock Creek), Lenox Township,
Susquehanna County, Pa. Application
for renewal of surface water withdrawal
of up to 1.218 mgd (peak day) (Docket
No. 20160311).
7. Project Sponsor and Facility:
Towanda Municipal Authority, Albany
Township, Bradford County, Pa.
Application for groundwater
withdrawal of up to 0.551 mgd (30-day
average) from the Eilenberger Spring.
8. Project Sponsor: York Haven Power
Company, LLC. Project Facility: York
Haven Hydroelectric Project,
Londonderry Township, Dauphin
County; Conoy Township, Lancaster
County; and York Haven Borough and
Newberry Township, York County, Pa.
Application for approval of an existing
hydroelectric facility.
Project Scheduled for Action Involving
a Diversion
9. Project Sponsor: Gas Field
Specialists, Inc. Project Facility: Wayne
Gravel Products Quarry, Ceres
Township, McKean County, Pa.
Application for renewal of an into-basin
diversion from the Ohio River Basin of
up to 1.170 mgd (peak day) (Docket No.
20160312).
Commission-Initiated Project Approval
Modification
10. Project Sponsor and Facility:
Susquehanna Valley Country Club,
Monroe Township, Snyder County, Pa.
Conforming the grandfathering amount
with the forthcoming determination for
a groundwater withdrawal up to 0.162
mgd (30-day average) from the Front
Nine Well (Docket No. 20020814).
Opportunity To Appear and Comment
Interested parties may appear at the
hearing to offer comments to the
Commission on any business listed
PO 00000
Frm 00054
Fmt 4703
Sfmt 4703
above required to be subject of a public
hearing. The presiding officer reserves
the right to limit oral statements in the
interest of time and to otherwise control
the course of the hearing. Access to the
hearing room will begin at 2:00 p.m. and
Commission staff will be available for
questions prior to the commencement of
the hearing. Guidelines for the public
hearing are posted on the Commission’s
website, www.srbc.net, prior to the
hearing for review. The presiding officer
reserves the right to modify or
supplement such guidelines at the
hearing. Written comments on any
business listed above required to be
subject of a public hearing may also be
mailed to Mr. Jason Oyler, Secretary to
the Commission, Susquehanna River
Basin Commission, 4423 North Front
Street, Harrisburg, Pa. 17110–1788, or
submitted electronically through
https://www.srbc.net/regulatory/publiccomment/. Comments mailed or
electronically submitted must be
received by the Commission on or
before February 17, 2020, to be
considered.
Authority: Pub. L. 91–575, 84 Stat. 1509
et seq., 18 CFR parts 806, 807, and 808.
Dated: January 6, 2020.
Jason E. Oyler,
General Counsel and Secretary to the
Commission.
[FR Doc. 2020–00159 Filed 1–8–20; 8:45 am]
BILLING CODE P
SUSQUEHANNA RIVER BASIN
COMMISSION
Grandfathering (GF) Registration
Notice
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
This notice lists
Grandfathering Registration for projects
by the Susquehanna River Basin
Commission during the period set forth
in DATES.
DATES: December 1–31, 2019.
ADDRESSES: Susquehanna River Basin
Commission, 4423 North Front Street,
Harrisburg, PA 17110–1788.
FOR FURTHER INFORMATION CONTACT:
Jason E. Oyler, General Counsel and
Secretary to the Commission, telephone:
(717) 238–0423, ext. 1312; fax: (717)
238–2436; email: joyler@srbc.net.
Regular mail inquiries May be sent to
the above address.
SUPPLEMENTARY INFORMATION: This
notice lists GF Registration for projects,
described below, pursuant to 18 CFR
806, Subpart E for the time period
SUMMARY:
E:\FR\FM\09JAN1.SGM
09JAN1
Agencies
[Federal Register Volume 85, Number 6 (Thursday, January 9, 2020)]
[Notices]
[Pages 1189-1190]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-00159]
=======================================================================
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Public Hearing
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Susquehanna River Basin Commission will hold a public
hearing on February 6, 2020, in Harrisburg, Pennsylvania. At this
public hearing, the Commission will hear testimony on the projects
listed in the Supplementary Information section of this notice. The
[[Page 1190]]
Commission will also hear testimony on a proposed policy--Guidance For
The Preparation Of A Metering Plan & A Groundwater Elevation Monitoring
Plan For Water Withdrawals, Consumptive Uses, And Diversions. Such
projects and proposals are intended to be scheduled for Commission
action at its next business meeting, tentatively scheduled for March
13, 2020, which will be noticed separately. The public should take note
that this public hearing will be the only opportunity to offer oral
comment to the Commission for the listed projects and proposals. The
deadline for the submission of written comments is February 17, 2020.
DATES: The public hearing will convene on February 6, 2020, at 2:30
p.m. The public hearing will end at 5:00 p.m. or at the conclusion of
public testimony, whichever is sooner. The deadline for the submission
of written comments is February 17, 2020.
ADDRESSES: The public hearing will be conducted at the Susquehanna
River Basin Commission, 4423 N Front Street, Harrisburg, Pennsylvania.
FOR FURTHER INFORMATION CONTACT: Jason Oyler, General Counsel and
Secretary to the Commission, telephone: (717) 238-0423; fax: (717) 238-
2436. Information concerning the applications for these projects is
available at the Commission's Water Application and Approval Viewer at
https://www.srbc.net/waav. Additional supporting documents are
available to inspect and copy in accordance with the Commission's
Access to Records Policy at www.srbc.net/regulatory/policies-guidance/docs/access-to-records-policy-2009-02.pdf.
SUPPLEMENTARY INFORMATION: The public hearing will cover a proposed
policy as posted on the SRBC Public Hearing web page at https://www.srbc.net/about/meetings-events/public-hearing.html. The public
hearing will also cover the following projects.
Projects Scheduled for Action
1. Project Sponsor and Facility: ARD Operating, LLC (Lycoming
Creek), Lewis Township, Lycoming County, Pa. Application for renewal of
surface water withdrawal of up to 1.340 mgd (peak day) (Docket No.
20160301).
2. Project Sponsor and Facility: EQT Production Company (Wilson
Creek), Duncan Township, Tioga County, Pa. Application for renewal of
surface water withdrawal of up to 0.720 mgd (peak day) (Docket No.
20160305).
3. Project Sponsor and Facility: New Holland Borough Authority, New
Holland Borough, Lancaster County, Pa. Application for groundwater
withdrawal of up to 0.860 mgd (30-day average) from Well 5.
4. Project Sponsor and Facility: New Morgan Borough Utilities
Authority, New Morgan Borough, Berks County, Pa. Modification to remove
expired Well PW-3 and to recognize the interconnection with Caernarvon
Township Authority. Well PW-3 automatically expired consistent with
Condition 25 of the approval due to lack of commencement of withdrawal
(Docket No. 20141207).
5. Project Sponsor and Facility: SWN Production Company, LLC
(Susquehanna River), Oakland Township, Susquehanna County, Pa.
Application for renewal of surface water withdrawal of up to 3.000 mgd
(peak day) (Docket No. 20160310).
6. Project Sponsor and Facility: SWN Production Company, LLC
(Tunkhannock Creek), Lenox Township, Susquehanna County, Pa.
Application for renewal of surface water withdrawal of up to 1.218 mgd
(peak day) (Docket No. 20160311).
7. Project Sponsor and Facility: Towanda Municipal Authority,
Albany Township, Bradford County, Pa. Application for groundwater
withdrawal of up to 0.551 mgd (30-day average) from the Eilenberger
Spring.
8. Project Sponsor: York Haven Power Company, LLC. Project
Facility: York Haven Hydroelectric Project, Londonderry Township,
Dauphin County; Conoy Township, Lancaster County; and York Haven
Borough and Newberry Township, York County, Pa. Application for
approval of an existing hydroelectric facility.
Project Scheduled for Action Involving a Diversion
9. Project Sponsor: Gas Field Specialists, Inc. Project Facility:
Wayne Gravel Products Quarry, Ceres Township, McKean County, Pa.
Application for renewal of an into-basin diversion from the Ohio River
Basin of up to 1.170 mgd (peak day) (Docket No. 20160312).
Commission-Initiated Project Approval Modification
10. Project Sponsor and Facility: Susquehanna Valley Country Club,
Monroe Township, Snyder County, Pa. Conforming the grandfathering
amount with the forthcoming determination for a groundwater withdrawal
up to 0.162 mgd (30-day average) from the Front Nine Well (Docket No.
20020814).
Opportunity To Appear and Comment
Interested parties may appear at the hearing to offer comments to
the Commission on any business listed above required to be subject of a
public hearing. The presiding officer reserves the right to limit oral
statements in the interest of time and to otherwise control the course
of the hearing. Access to the hearing room will begin at 2:00 p.m. and
Commission staff will be available for questions prior to the
commencement of the hearing. Guidelines for the public hearing are
posted on the Commission's website, www.srbc.net, prior to the hearing
for review. The presiding officer reserves the right to modify or
supplement such guidelines at the hearing. Written comments on any
business listed above required to be subject of a public hearing may
also be mailed to Mr. Jason Oyler, Secretary to the Commission,
Susquehanna River Basin Commission, 4423 North Front Street,
Harrisburg, Pa. 17110-1788, or submitted electronically through https://www.srbc.net/regulatory/public-comment/. Comments mailed or
electronically submitted must be received by the Commission on or
before February 17, 2020, to be considered.
Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts
806, 807, and 808.
Dated: January 6, 2020.
Jason E. Oyler,
General Counsel and Secretary to the Commission.
[FR Doc. 2020-00159 Filed 1-8-20; 8:45 am]
BILLING CODE P