Notice of Availability of Final Supplement Analysis of the Complex Transformation Supplemental Programmatic Environmental Impact Statement, 887-888 [2020-00102]
Download as PDF
Federal Register / Vol. 85, No. 5 / Wednesday, January 8, 2020 / Notices
recreational measures for Gulf of Maine
cod and Gulf of Maine haddock. They
will also discuss Amendment 23:
Groundfish Monitoring to review the
draft Environmental Impact Statement
(DEIS) and recommend preliminary
preferred alternatives to the Groundfish
Committee. The committee will receive
an overview of the Council’s 2020
priorities. Other business will be
discussed as necessary.
Although non-emergency issues not
contained in this agenda may come
before this group for discussion, those
issues may not be the subject of formal
action during these meetings. Action
will be restricted to those issues
specifically listed in this notice and any
issues arising after publication of this
notice that require emergency action
under section 305(c) of the MagnusonStevens Act, provided the public has
been notified of the Council’s intent to
take final action to address the
emergency.
Special Accommodations
This meeting is physically accessible
to people with disabilities. Requests for
sign language interpretation or other
auxiliary aids should be directed to
Thomas A. Nies, Executive Director, at
(978) 465–0492, at least 5 days prior to
the meeting date.
This meeting will be recorded.
Consistent with 16 U.S.C. 1852, a copy
of the recording is available upon
request.
Authority: 16 U.S.C. 1801 et seq.
Dated: January 3, 2020.
Tracey L. Thompson,
Acting Deputy Director, Office of Sustainable
Fisheries, National Marine Fisheries Service.
[FR Doc. 2020–00096 Filed 1–7–20; 8:45 am]
BILLING CODE 3510–22–P
DEPARTMENT OF ENERGY
National Nuclear Security
Administration
Notice of Availability of Final
Supplement Analysis of the Complex
Transformation Supplemental
Programmatic Environmental Impact
Statement
National Nuclear Security
Administration, Department of Energy.
ACTION: Notice of availability.
jbell on DSKJLSW7X2PROD with NOTICES
AGENCY:
The National Nuclear
Security Administration (NNSA), a
semi-autonomous agency within the
United States (U.S.) Department of
Energy (DOE), announces the
availability of a Final Supplement
Analysis (SA) of the Complex
SUMMARY:
VerDate Sep<11>2014
17:18 Jan 07, 2020
Jkt 250001
Transformation Supplemental
Programmatic Environmental Impact
Statement (SPEIS) (DOE/EIS–0236–SA–
02). NNSA prepared the Final SA to
determine whether, prior to
implementing a Modified Distributed
Center of Excellence (DCE) Alternative
for plutonium operations to enable
producing plutonium pits at a rate of no
fewer than 80 pits per year by 2030, the
existing Complex Transformation SPEIS
should be supplemented, a new
environmental impact statement be
prepared, or that no further National
Environmental Policy Act (NEPA)
analysis is required. NNSA published
the Draft Supplement Analysis of the
Complex Transformation Supplemental
Programmatic Environmental Impact
Statement on June 28, 2019, and
announced a 45-day comment period.
After considering all comments
received, NNSA prepared the Final SA
and concluded that no further NEPA
documentation at a programmatic level
is required.
DATES: This notice will be published on
January 8, 2020.
ADDRESSES: The Final SA, which
includes an Appendix which contains
NNSA’s responses to comments
received on the Draft SA, is available on
the internet at https://www.energy.gov/
nnsa/nnsa-nepa-reading-room and
https://www.energy.gov/nepa/listings/
supplement-analyses-sa.
FOR FURTHER INFORMATION CONTACT: For
further information about this Notice,
please contact Mr. James R. Sanderson,
Office of NEPA Policy and Compliance,
U.S. Department of Energy, 1000
Independence Avenue SW, Washington,
DC 20585–0119; phone: 202–586–1402;
email to: NEPA-SRS@srs.gov.
SUPPLEMENTARY INFORMATION: NNSA
prepared the Final SA to determine
whether, prior to implementing a
Modified Distributed Center of
Excellence (DCE) Alternative for
plutonium operations to enable
producing plutonium pits at a rate of no
fewer than 80 pits per year by 2030, the
existing Complex Transformation SPEIS
should be supplemented, a new
environmental impact statement be
prepared, or that no further National
Environmental Policy Act (NEPA)
analysis is required. Implementing a
Modified DCE Alternative would enable
NNSA to meet federal law and national
policy by producing a minimum of 50
pits per year at a repurposed MixedOxide Fuel Fabrication Facility (MFFF)
at the Savannah River Site (SRS) and a
minimum of 30 pits per year at the Los
Alamos National Laboratory (LANL). An
additional surge capacity would be
available at each site, if needed, to meet
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
887
the requirements of producing pits at a
rate of no fewer than 80 pits per year by
2030 for the nuclear weapons stockpile.
The Final SA includes NNSA’s
determination that no further NEPA
documentation at a programmatic level
is required. The SA of the Complex
Transformation SPEIS is an important
element of the overall NEPA strategy
related to fulfilling national
requirements for pit production. DOE
announced this NEPA strategy on June
10, 2019 (84 FR 26849).
National security policies require
DOE, through NNSA, to maintain the
United States’ nuclear weapons
stockpile, as well as the nation’s core
competencies in nuclear weapons.
NNSA has the mission to maintain and
enhance the safety, security, and
effectiveness of the nuclear weapons
stockpile. Plutonium pits are critical
components of every nuclear weapon,
with nearly all current stockpile pits
having been produced from 1978–1989.
Today, the United States’ capability to
produce plutonium pits is limited.
Since 2008, the United States has
emphasized the need to eventually
produce 80 pits per year. Since 2014,
federal law has required the Secretary of
Energy to produce no less than 30 war
reserve plutonium pits by 2026 and
thereafter demonstrate the capability to
produce war reserve plutonium pits at
a rate sufficient to produce 80 pits per
year (50 U.S.C. 2538a). On January 27,
2017, the President directed the
Department of Defense (DoD) to conduct
an updated Nuclear Posture Review
(NPR) to ensure a safe, secure, and
effective nuclear deterrent that protects
the homeland, assures allies, and above
all, deters adversaries. The 2018 NPR
echoed the need for pit production and
confirmed that the United States will
pursue initiatives to ensure the
necessary capability, capacity, and
responsiveness of the nuclear weapons
infrastructure and the needed skill of
the workforce, including providing the
enduring capability and capacity to
produce plutonium pits at a rate of no
fewer than 80 pits per year by 2030. In
2018, Congress enacted as formal policy
of the United States that LANL will
produce a minimum of 30 pits per year
for the national production mission and
will implement surge efforts to exceed
30 pits per year to meet NPR and
national policy (Pub. L. 115–232,
Section 3120).
To these ends, the DoD Under
Secretary of Defense for Acquisition and
Sustainment and the NNSA
Administrator issued a Joint Statement
on May 10, 2018, identifying their
recommended alternative to meet the pit
production requirement based on the
E:\FR\FM\08JAN1.SGM
08JAN1
jbell on DSKJLSW7X2PROD with NOTICES
888
Federal Register / Vol. 85, No. 5 / Wednesday, January 8, 2020 / Notices
completion of an Analysis of
Alternatives, an Engineering
Assessment, and a Workforce Analysis.
Implementing a Modified DCE
Alternative would enable NNSA to
continue to transform the nuclear
weapons complex (Complex) in a
manner that meets federal law and
national policy. Under the Modified
DCE Alternative, NNSA would
repurpose the MFFF at SRS in South
Carolina to produce plutonium pits
while also maximizing pit production
activities at LANL. This two-prong
approach—with no fewer than 50 pits
per year produced at SRS and no fewer
than 30 pits per year at LANL—is the
best way to manage the cost, schedule,
and risk of such a vital undertaking. In
addition to improving the resiliency,
flexibility, and redundancy of our
Nuclear Security Enterprise by reducing
reliance on a single production site, this
approach enables the capability to allow
for enhanced warhead safety and
security to meet DoD and NNSA
requirements; deliberate, methodical
replacement of older existing plutonium
pits with newly manufactured pits as
risk mitigation against plutonium aging;
and response to changes in deterrent
requirements driven by renewed great
power competition.
On June 10, 2019, DOE announced the
overall NEPA strategy related to
fulfilling national requirements for pit
production (84 FR 26849). DOE
announced that it would prepare at least
three documents including this Final
SA, a site-specific EIS for the proposal
to produce pits at SRS (also announced
in that notice), and site-specific
documentation for the proposal to
authorize expanding pit production
beyond 20 pits per year at LANL.
In 2008, NNSA prepared the Complex
Transformation SPEIS, which evaluated,
among other things, alternatives for
producing 10–200 plutonium pits per
year at different sites including LANL
and SRS. In the Complex
Transformation SPEIS ROD, NNSA did
not make any new decisions related to
pit production capacity and did not
foresee an imminent need to produce
more than 20 pits per year to meet
national security requirements. NNSA
now foresees an imminent need to
provide the enduring capability and
capacity to produce plutonium pits at a
rate of no fewer than 80 pits per year by
2030 for the nuclear weapons stockpile.
NNSA’s preferred alternative is now to
implement a Modified DCE Alternative.
NNSA has prepared the SA to determine
whether, prior to implementing a
Modified DCE Alternative, the existing
Complex Transformation SPEIS should
be supplemented, a new EIS be
VerDate Sep<11>2014
17:18 Jan 07, 2020
Jkt 250001
prepared, or no further NEPA analysis
be required.
Although pertinent regulations do not
require public review and comment on
an SA, NNSA decided, in its discretion,
that public comment in this instance
would be helpful. NNSA issued the
Draft Supplement Analysis of the
Complex Transformation Supplemental
Programmatic Environmental Impact
Statement on June 28, 2019 for a 45-day
public review (84 FR 31055). The
comments received on the Draft SA
generally centered on the following
topic areas: (1) Validity of the Draft SA
determination; (2) the purpose and need
for NNSA’s proposal; (3) requests for an
extension to the comment period; (4) the
two-prong approach to pit production;
(5) new information or changed
circumstances related to NNSA
operations and/or environmental
conditions; (6) questions about the
technical aspects of the impact analyses;
(7) general opposition to, or support for
the proposal; and (8) comments about
nuclear weapon policies or new weapon
designs. NNSA considered all
comments during the preparation of the
Final SA and determination and has
modified the SA as appropriate. NNSA’s
responses to the comments received on
the Draft SA are included in Appendix
A to the Final SA.
Signed in Washington, DC, this 19th day of
December 2019, for the United States
Department of Energy.
Lisa E. Gordon-Hagerty,
Under Secretary for Nuclear Security,
Administrator, NNSA.
[FR Doc. 2020–00102 Filed 1–7–20; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP20–380–000.
Applicants: MarkWest Pioneer, L.L.C.
Description: § 4(d) Rate Filing:
Amendment to Negotiated Rate Service
Agreement to be effective 1/1/2020.
Filed Date: 12/31/19.
Accession Number: 20191231–5088.
Comments Due: 5 p.m. ET 1/13/20.
Docket Numbers: RP20–381–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Diversified Negotiated Rate
Amendments to be effective 1/1/2020.
Filed Date: 12/31/19.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
Accession Number: 20191231–5046.
Comments Due: 5 p.m. ET 1/13/20.
Docket Numbers: RP20–382–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: § 4(d) Rate Filing: CCRM
2020 to be effective 2/1/2020.
Filed Date: 12/31/19.
Accession Number: 20191231–5049.
Comments Due: 5 p.m. ET 1/13/20.
Docket Numbers: RP20–383–000.
Applicants: Enable Gas Transmission,
LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate Filing—January 1 2020
Continental 1011192 to be effective 1/1/
2020.
Filed Date: 12/31/19.
Accession Number: 20191231–5053.
Comments Due: 5 p.m. ET 1/13/20.
Docket Numbers: RP20–384–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Amended Negotiated Rates—Total eff 1–
1–20 to be effective 1/1/2020.
Filed Date: 12/31/19.
Accession Number: 20191231–5054.
Comments Due: 5 p.m. ET 1/13/20.
Docket Numbers: RP20–385–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: 2019–
12–31 Negotiated Rate Agreements to be
effective 1/1/2020.
Filed Date: 12/31/19.
Accession Number: 20191231–5056.
Comments Due: 5 p.m. ET 1/13/20.
Docket Numbers: RP20–386–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: § 4(d) Rate Filing:
Company Name Change Filing to be
effective 1/1/2020.
Filed Date: 12/31/19.
Accession Number: 20191231–5058.
Comments Due: 5 p.m. ET 1/13/20.
Docket Numbers: RP20–387–000.
Applicants: Trailblazer Pipeline
Company LLC.
Description: § 4(d) Rate Filing: Neg
Rate 2020–01–01 Castleton, Koch to be
effective 1/1/2020.
Filed Date: 12/31/19.
Accession Number: 20191231–5065.
Comments Due: 5 p.m. ET 1/13/20.
Docket Numbers: RP20–388–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Amended Negotiated Rate—EAP
contract 911572 eff 1–1–20 to be
effective 1/1/2020.
Filed Date: 12/31/19.
Accession Number: 20191231–5081.
Comments Due: 5 p.m. ET 1/13/20.
Docket Numbers: RP20–389–000.
E:\FR\FM\08JAN1.SGM
08JAN1
Agencies
[Federal Register Volume 85, Number 5 (Wednesday, January 8, 2020)]
[Notices]
[Pages 887-888]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-00102]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
National Nuclear Security Administration
Notice of Availability of Final Supplement Analysis of the
Complex Transformation Supplemental Programmatic Environmental Impact
Statement
AGENCY: National Nuclear Security Administration, Department of Energy.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: The National Nuclear Security Administration (NNSA), a semi-
autonomous agency within the United States (U.S.) Department of Energy
(DOE), announces the availability of a Final Supplement Analysis (SA)
of the Complex Transformation Supplemental Programmatic Environmental
Impact Statement (SPEIS) (DOE/EIS-0236-SA-02). NNSA prepared the Final
SA to determine whether, prior to implementing a Modified Distributed
Center of Excellence (DCE) Alternative for plutonium operations to
enable producing plutonium pits at a rate of no fewer than 80 pits per
year by 2030, the existing Complex Transformation SPEIS should be
supplemented, a new environmental impact statement be prepared, or that
no further National Environmental Policy Act (NEPA) analysis is
required. NNSA published the Draft Supplement Analysis of the Complex
Transformation Supplemental Programmatic Environmental Impact Statement
on June 28, 2019, and announced a 45-day comment period. After
considering all comments received, NNSA prepared the Final SA and
concluded that no further NEPA documentation at a programmatic level is
required.
DATES: This notice will be published on January 8, 2020.
ADDRESSES: The Final SA, which includes an Appendix which contains
NNSA's responses to comments received on the Draft SA, is available on
the internet at https://www.energy.gov/nnsa/nnsa-nepa-reading-room and
https://www.energy.gov/nepa/listings/supplement-analyses-sa.
FOR FURTHER INFORMATION CONTACT: For further information about this
Notice, please contact Mr. James R. Sanderson, Office of NEPA Policy
and Compliance, U.S. Department of Energy, 1000 Independence Avenue SW,
Washington, DC 20585-0119; phone: 202-586-1402; email to: [email protected].
SUPPLEMENTARY INFORMATION: NNSA prepared the Final SA to determine
whether, prior to implementing a Modified Distributed Center of
Excellence (DCE) Alternative for plutonium operations to enable
producing plutonium pits at a rate of no fewer than 80 pits per year by
2030, the existing Complex Transformation SPEIS should be supplemented,
a new environmental impact statement be prepared, or that no further
National Environmental Policy Act (NEPA) analysis is required.
Implementing a Modified DCE Alternative would enable NNSA to meet
federal law and national policy by producing a minimum of 50 pits per
year at a repurposed Mixed-Oxide Fuel Fabrication Facility (MFFF) at
the Savannah River Site (SRS) and a minimum of 30 pits per year at the
Los Alamos National Laboratory (LANL). An additional surge capacity
would be available at each site, if needed, to meet the requirements of
producing pits at a rate of no fewer than 80 pits per year by 2030 for
the nuclear weapons stockpile. The Final SA includes NNSA's
determination that no further NEPA documentation at a programmatic
level is required. The SA of the Complex Transformation SPEIS is an
important element of the overall NEPA strategy related to fulfilling
national requirements for pit production. DOE announced this NEPA
strategy on June 10, 2019 (84 FR 26849).
National security policies require DOE, through NNSA, to maintain
the United States' nuclear weapons stockpile, as well as the nation's
core competencies in nuclear weapons. NNSA has the mission to maintain
and enhance the safety, security, and effectiveness of the nuclear
weapons stockpile. Plutonium pits are critical components of every
nuclear weapon, with nearly all current stockpile pits having been
produced from 1978-1989. Today, the United States' capability to
produce plutonium pits is limited.
Since 2008, the United States has emphasized the need to eventually
produce 80 pits per year. Since 2014, federal law has required the
Secretary of Energy to produce no less than 30 war reserve plutonium
pits by 2026 and thereafter demonstrate the capability to produce war
reserve plutonium pits at a rate sufficient to produce 80 pits per year
(50 U.S.C. 2538a). On January 27, 2017, the President directed the
Department of Defense (DoD) to conduct an updated Nuclear Posture
Review (NPR) to ensure a safe, secure, and effective nuclear deterrent
that protects the homeland, assures allies, and above all, deters
adversaries. The 2018 NPR echoed the need for pit production and
confirmed that the United States will pursue initiatives to ensure the
necessary capability, capacity, and responsiveness of the nuclear
weapons infrastructure and the needed skill of the workforce, including
providing the enduring capability and capacity to produce plutonium
pits at a rate of no fewer than 80 pits per year by 2030. In 2018,
Congress enacted as formal policy of the United States that LANL will
produce a minimum of 30 pits per year for the national production
mission and will implement surge efforts to exceed 30 pits per year to
meet NPR and national policy (Pub. L. 115-232, Section 3120).
To these ends, the DoD Under Secretary of Defense for Acquisition
and Sustainment and the NNSA Administrator issued a Joint Statement on
May 10, 2018, identifying their recommended alternative to meet the pit
production requirement based on the
[[Page 888]]
completion of an Analysis of Alternatives, an Engineering Assessment,
and a Workforce Analysis. Implementing a Modified DCE Alternative would
enable NNSA to continue to transform the nuclear weapons complex
(Complex) in a manner that meets federal law and national policy. Under
the Modified DCE Alternative, NNSA would repurpose the MFFF at SRS in
South Carolina to produce plutonium pits while also maximizing pit
production activities at LANL. This two-prong approach--with no fewer
than 50 pits per year produced at SRS and no fewer than 30 pits per
year at LANL--is the best way to manage the cost, schedule, and risk of
such a vital undertaking. In addition to improving the resiliency,
flexibility, and redundancy of our Nuclear Security Enterprise by
reducing reliance on a single production site, this approach enables
the capability to allow for enhanced warhead safety and security to
meet DoD and NNSA requirements; deliberate, methodical replacement of
older existing plutonium pits with newly manufactured pits as risk
mitigation against plutonium aging; and response to changes in
deterrent requirements driven by renewed great power competition.
On June 10, 2019, DOE announced the overall NEPA strategy related
to fulfilling national requirements for pit production (84 FR 26849).
DOE announced that it would prepare at least three documents including
this Final SA, a site-specific EIS for the proposal to produce pits at
SRS (also announced in that notice), and site-specific documentation
for the proposal to authorize expanding pit production beyond 20 pits
per year at LANL.
In 2008, NNSA prepared the Complex Transformation SPEIS, which
evaluated, among other things, alternatives for producing 10-200
plutonium pits per year at different sites including LANL and SRS. In
the Complex Transformation SPEIS ROD, NNSA did not make any new
decisions related to pit production capacity and did not foresee an
imminent need to produce more than 20 pits per year to meet national
security requirements. NNSA now foresees an imminent need to provide
the enduring capability and capacity to produce plutonium pits at a
rate of no fewer than 80 pits per year by 2030 for the nuclear weapons
stockpile. NNSA's preferred alternative is now to implement a Modified
DCE Alternative. NNSA has prepared the SA to determine whether, prior
to implementing a Modified DCE Alternative, the existing Complex
Transformation SPEIS should be supplemented, a new EIS be prepared, or
no further NEPA analysis be required.
Although pertinent regulations do not require public review and
comment on an SA, NNSA decided, in its discretion, that public comment
in this instance would be helpful. NNSA issued the Draft Supplement
Analysis of the Complex Transformation Supplemental Programmatic
Environmental Impact Statement on June 28, 2019 for a 45-day public
review (84 FR 31055). The comments received on the Draft SA generally
centered on the following topic areas: (1) Validity of the Draft SA
determination; (2) the purpose and need for NNSA's proposal; (3)
requests for an extension to the comment period; (4) the two-prong
approach to pit production; (5) new information or changed
circumstances related to NNSA operations and/or environmental
conditions; (6) questions about the technical aspects of the impact
analyses; (7) general opposition to, or support for the proposal; and
(8) comments about nuclear weapon policies or new weapon designs. NNSA
considered all comments during the preparation of the Final SA and
determination and has modified the SA as appropriate. NNSA's responses
to the comments received on the Draft SA are included in Appendix A to
the Final SA.
Signed in Washington, DC, this 19th day of December 2019, for
the United States Department of Energy.
Lisa E. Gordon-Hagerty,
Under Secretary for Nuclear Security, Administrator, NNSA.
[FR Doc. 2020-00102 Filed 1-7-20; 8:45 am]
BILLING CODE 6450-01-P