Combined Notice of Filings #1, 706-707 [2020-00015]
Download as PDF
706
Federal Register / Vol. 85, No. 4 / Tuesday, January 7, 2020 / Notices
The refund effective date in Docket
No. EL20–12–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Any interested person desiring to be
heard in Docket No. EL20–12–000 must
file a notice of intervention or motion to
intervene, as appropriate, with the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426, in accordance with Rule 214 of
the Commission’s Rules of Practice and
Procedure, 18 CFR 385.214 (2019),
within 21 days of the date of issuance
of the order.
Dated: December 31, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–00014 Filed 1–6–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSKJM1Z7X2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–142–000.
Applicants: Energy Center Dover LLC,
DB Energy Assets, LLC.
Description: Response to December 4,
2019 Deficiency Letter of DB Energy
Assets, LLC.
Filed Date: 12/27/19.
Accession Number: 20191227–5115.
Comments Due: 5 p.m. ET 1/17/20.
Docket Numbers: EC20–28–000.
Applicants: Polaris Wind Energy LLC,
DTE Electric Company.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Polaris
Wind Energy LLC, et al.
Filed Date: 12/30/19.
Accession Number: 20191230–5256.
Comments Due: 5 p.m. ET 1/20/20.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2010–006.
Applicants: PPL Electric Utilities
Corporation.
Description: Triennial Market-Based
Rate Update of PPL Electric Utilities
Corporation.
Filed Date: 12/31/19.
Accession Number: 20191231–5007.
Comments Due: 5 p.m. ET 3/2/20.
Docket Numbers: ER13–434–006;
ER13–2100–004; ER13–2109–008;
ER16–1750–005; ER16–2601–003;
ER17–1604–002; ER17–2292–003;
ER17–2381–002; ER19–1656–002.
VerDate Sep<11>2014
16:15 Jan 06, 2020
Jkt 250001
Applicants: Dominion Energy
Generation Marketing, Inc., Dominion
Energy Nuclear Connecticut, Inc.,
Fowler Ridge Wind Farm LLC, Virginia
Electric and Power Company, Eastern
Shore Solar LLC, Summit Farms Solar,
LLC, Southampton Solar LLC, Scott-II
Solar LLC, Wilkinson Solar LLC.
Description: Updated Market Power
Analysis for the Northeast Region of the
Dominion Energy, Inc. subsidiaries.
Filed Date: 12/30/19.
Accession Number: 20191230–5259.
Comments Due: 5 p.m. ET 2/28/20.
Docket Numbers: ER17–2059–004;
ER10–3097–009.
Applicants: Puget Sound Energy, Inc.,
Bruce Power Inc.
Description: Supplement to July 1,
2019 Updated Market Power Analysis in
the Northwest Region for Puget Sound
Energy, Inc., et al.
Filed Date: 12/19/19.
Accession Number: 20191219–5142.
Comments Due: 5 p.m. ET 1/9/20.
Docket Numbers: ER18–2487–001.
Applicants: Rail Splitter Wind Farm,
LLC.
Description: Report Filing: Notice of
Effective Date to be effective N/A.
Filed Date: 12/31/19.
Accession Number: 20191231–5066.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: ER19–585–001.
Applicants: Quilt Block Wind Farm
LLC.
Description: Report Filing: Notice of
Effective Date to be effective N/A.
Filed Date: 12/31/19.
Accession Number: 20191231–5064.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: ER19–708–002.
Applicants: GSG, LLC.
Description: Compliance filing:
Compliance Filing Under Docket ER19–
708–002 to be effective 2/26/2019.
Filed Date: 12/31/19.
Accession Number: 20191231–5104.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: ER20–714–000.
Applicants: Whitetail Solar 1, LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Baseline
to be effective 2/29/2020.
Filed Date: 12/31/19.
Accession Number: 20191231–5047.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: ER20–715–000.
Applicants: Central Hudson Gas &
Electric Corporation, New York
Independent System Operator, Inc.
Description: § 205(d) Rate Filing: 205:
Central Hudson Highway Facilities
Charge Hurley Ave System to be
effective 3/2/2020.
Filed Date: 12/31/19.
Accession Number: 20191231–5055.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: ER20–716–000.
Applicants: LS Power Grid New York
Corporation I, New York Independent
System Operator, Inc.
Description: § 205(d) Rate Filing: 205:
LS Power Grid New York Corporation I
Transmission Formula Rate to be
effective 3/2/2020.
Filed Date: 12/31/19.
Accession Number: 20191231–5060.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: ER20–717–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to OATT, Sch. 12-Appendices
re: 2020 RTEP Annual Cost Allocations
to be effective 1/1/2020.
Filed Date: 12/31/19.
Accession Number: 20191231–5069.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: ER20–718–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Ameren Illinois Company.
Description: § 205(d) Rate Filing:
2019–12–31_SA 3410 AIC–SIPC
Exclusive As-Available Service
Agreement to be effective 3/1/2020.
Filed Date: 12/31/19.
Accession Number: 20191231–5073.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: ER20–719–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, SA No. 5552; Queue
No. AE1–013 to be effective 12/10/2019.
Filed Date: 12/30/19.
Accession Number: 20191230–5267.
Comments Due: 5 p.m. ET 1/20/20.
Docket Numbers: ER20–720–000.
Applicants: Plum Creek Wind, LLC.
Description: Baseline eTariff Filing:
Application for MBR Authority to be
effective 3/1/2020.
Filed Date: 12/31/19.
Accession Number: 20191231–5090.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: ER20–721–000.
Applicants: Willow Creek Wind
Power LLC.
Description: Baseline eTariff Filing:
Application for MBR Authority to be
effective 3/1/2020.
Filed Date: 12/31/19.
Accession Number: 20191231–5093.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: ER20–722–000.
Applicants: Baconton Power LLC.
Description: § 205(d) Rate Filing:
Baconton Power LLC Revised MBR
Tariff to be effective 12/21/2019.
Filed Date: 12/31/19.
Accession Number: 20191231–5106.
Comments Due: 5 p.m. ET 1/21/20.
E:\FR\FM\07JAN1.SGM
07JAN1
Federal Register / Vol. 85, No. 4 / Tuesday, January 7, 2020 / Notices
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 31, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020–00015 Filed 1–6–20; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–27–000]
khammond on DSKJM1Z7X2PROD with NOTICES
North Baja Pipeline, LLC; Notice of
Application
Take notice that on December 16,
2019, North Baja Pipeline, LLC (North
Baja) 700 Louisiana Street, Suite 700,
Houston, Texas 77002, filed in Docket
No. CP20–27–000, an application
pursuant to section 7(c) of the Natural
Gas Act (NGA) and Part 157 of the
Commission’s Regulations for
authorization to construct and maintain
its North Baja XPress Project.
Specifically, the Project consists of
installation of a new 31,900 ISO
horsepower Titan 250 compressor unit
at its existing Ehrenberg Compressor
Station located in La Paz County,
Arizona; and modifications to the
infrastructure at North Baja’s existing El
Paso Meter Station in La Paz County,
Arizona, and Ogilby Meter Station in
Imperial County, California. Upon
completion the proposed Project will
create approximately 495,000
dekatherms per day of incremental firm
delivery to the United States/Mexico
border. North Baja estimates the total
cost of the Project to be $127.2 million,
all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection.
VerDate Sep<11>2014
16:15 Jan 06, 2020
Jkt 250001
The filing may also be viewed on the
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Robert
Jackson, Manager, Certificates &
Regulatory Administration, North Baja
Pipeline, LLC, 700 Louisiana Street,
Suite 700, Houston, Texas 77002, at
(832) 320–5487, or email: robert_
jackson@tcenergy.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
3 copies of filings made with the
Commission and must provide a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
707
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commentors
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
As of the February 27, 2018 date of
the Commission’s order in Docket No.
CP16–4–001, the Commission will
apply its revised practice concerning
out-of-time motions to intervene in any
new Natural Gas Act section 3 or section
7 proceeding.1 Persons desiring to
become a party to a certificate
proceeding are to intervene in a timely
manner. If seeking to intervene out-oftime, the movant is required to show
good cause why the time limitation
should be waived, and should provide
justification by reference to factors set
forth in Rule 214(d)(1) of the
Commission’s Rules and Regulations.2
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 3 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
Comment Date: 5:00 p.m. Eastern
Time on January 21, 2020.
1 Tennessee Gas Pipeline Company, L.L.C., 162
FERC 61,167 at 50 (2018).
2 18 CFR 385.214(d)(1).
E:\FR\FM\07JAN1.SGM
07JAN1
Agencies
[Federal Register Volume 85, Number 4 (Tuesday, January 7, 2020)]
[Notices]
[Pages 706-707]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-00015]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC19-142-000.
Applicants: Energy Center Dover LLC, DB Energy Assets, LLC.
Description: Response to December 4, 2019 Deficiency Letter of DB
Energy Assets, LLC.
Filed Date: 12/27/19.
Accession Number: 20191227-5115.
Comments Due: 5 p.m. ET 1/17/20.
Docket Numbers: EC20-28-000.
Applicants: Polaris Wind Energy LLC, DTE Electric Company.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of Polaris Wind Energy LLC, et al.
Filed Date: 12/30/19.
Accession Number: 20191230-5256.
Comments Due: 5 p.m. ET 1/20/20.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2010-006.
Applicants: PPL Electric Utilities Corporation.
Description: Triennial Market-Based Rate Update of PPL Electric
Utilities Corporation.
Filed Date: 12/31/19.
Accession Number: 20191231-5007.
Comments Due: 5 p.m. ET 3/2/20.
Docket Numbers: ER13-434-006; ER13-2100-004; ER13-2109-008; ER16-
1750-005; ER16-2601-003; ER17-1604-002; ER17-2292-003; ER17-2381-002;
ER19-1656-002.
Applicants: Dominion Energy Generation Marketing, Inc., Dominion
Energy Nuclear Connecticut, Inc., Fowler Ridge Wind Farm LLC, Virginia
Electric and Power Company, Eastern Shore Solar LLC, Summit Farms
Solar, LLC, Southampton Solar LLC, Scott-II Solar LLC, Wilkinson Solar
LLC.
Description: Updated Market Power Analysis for the Northeast Region
of the Dominion Energy, Inc. subsidiaries.
Filed Date: 12/30/19.
Accession Number: 20191230-5259.
Comments Due: 5 p.m. ET 2/28/20.
Docket Numbers: ER17-2059-004; ER10-3097-009.
Applicants: Puget Sound Energy, Inc., Bruce Power Inc.
Description: Supplement to July 1, 2019 Updated Market Power
Analysis in the Northwest Region for Puget Sound Energy, Inc., et al.
Filed Date: 12/19/19.
Accession Number: 20191219-5142.
Comments Due: 5 p.m. ET 1/9/20.
Docket Numbers: ER18-2487-001.
Applicants: Rail Splitter Wind Farm, LLC.
Description: Report Filing: Notice of Effective Date to be
effective N/A.
Filed Date: 12/31/19.
Accession Number: 20191231-5066.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: ER19-585-001.
Applicants: Quilt Block Wind Farm LLC.
Description: Report Filing: Notice of Effective Date to be
effective N/A.
Filed Date: 12/31/19.
Accession Number: 20191231-5064.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: ER19-708-002.
Applicants: GSG, LLC.
Description: Compliance filing: Compliance Filing Under Docket
ER19-708-002 to be effective 2/26/2019.
Filed Date: 12/31/19.
Accession Number: 20191231-5104.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: ER20-714-000.
Applicants: Whitetail Solar 1, LLC.
Description: Baseline eTariff Filing: Reactive Power Compensation
Baseline to be effective 2/29/2020.
Filed Date: 12/31/19.
Accession Number: 20191231-5047.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: ER20-715-000.
Applicants: Central Hudson Gas & Electric Corporation, New York
Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 205: Central Hudson Highway
Facilities Charge Hurley Ave System to be effective 3/2/2020.
Filed Date: 12/31/19.
Accession Number: 20191231-5055.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: ER20-716-000.
Applicants: LS Power Grid New York Corporation I, New York
Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 205: LS Power Grid New York
Corporation I Transmission Formula Rate to be effective 3/2/2020.
Filed Date: 12/31/19.
Accession Number: 20191231-5060.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: ER20-717-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Revisions to OATT, Sch. 12-
Appendices re: 2020 RTEP Annual Cost Allocations to be effective 1/1/
2020.
Filed Date: 12/31/19.
Accession Number: 20191231-5069.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: ER20-718-000.
Applicants: Midcontinent Independent System Operator, Inc., Ameren
Illinois Company.
Description: Sec. 205(d) Rate Filing: 2019-12-31_SA 3410 AIC-SIPC
Exclusive As-Available Service Agreement to be effective 3/1/2020.
Filed Date: 12/31/19.
Accession Number: 20191231-5073.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: ER20-719-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original WMPA, SA No. 5552;
Queue No. AE1-013 to be effective 12/10/2019.
Filed Date: 12/30/19.
Accession Number: 20191230-5267.
Comments Due: 5 p.m. ET 1/20/20.
Docket Numbers: ER20-720-000.
Applicants: Plum Creek Wind, LLC.
Description: Baseline eTariff Filing: Application for MBR Authority
to be effective 3/1/2020.
Filed Date: 12/31/19.
Accession Number: 20191231-5090.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: ER20-721-000.
Applicants: Willow Creek Wind Power LLC.
Description: Baseline eTariff Filing: Application for MBR Authority
to be effective 3/1/2020.
Filed Date: 12/31/19.
Accession Number: 20191231-5093.
Comments Due: 5 p.m. ET 1/21/20.
Docket Numbers: ER20-722-000.
Applicants: Baconton Power LLC.
Description: Sec. 205(d) Rate Filing: Baconton Power LLC Revised
MBR Tariff to be effective 12/21/2019.
Filed Date: 12/31/19.
Accession Number: 20191231-5106.
Comments Due: 5 p.m. ET 1/21/20.
[[Page 707]]
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: December 31, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2020-00015 Filed 1-6-20; 8:45 am]