DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3273–024]
khammond on DSKJM1Z7X2PROD with NOTICES
Notice Soliciting Scoping Comments;
Chittenden Falls Hydropower, Inc.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 3273–024.
c. Date filed: May 31, 2019.
d. Applicant: Chittenden Falls
Hydropower, Inc. (Chittenden Falls
Hydro).
e. Name of Project: Chittenden Falls
Hydropower Project.
f. Location: On Kinderhook Creek,
near the Town of Stockport, Columbia
County, New York. The project does not
occupy federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Mark
Boumansour, Chief Operating Officer,
Gravity Renewables, Inc., 1401 Walnut
Street, Suite 420, Boulder, CO 80302;
(303) 440–3378; mark@
gravityrenewables.com and/or Celeste
N. Fay, Regulatory Manager, Gravity
Renewables, Inc., 5 Dartmouth Drive,
Suite 104, Auburn, NH 03032; (413)
262–9466; celeste@
gravityrenewables.com.
i. FERC Contact: Monir Chowdhury at
(202) 502–6736 or monir.chowdhury@
ferc.gov.
j. Deadline for filing scoping
comments: 30 days from the issuance
date of this notice.
The Commission strongly encourages
electronic filing. Please file scoping
comments using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
VerDate Sep<11>2014
17:30 Dec 30, 2019
Jkt 250001
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–3273–024.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application is not ready for
environmental analysis at this time.
l. Project Description:
The existing Chittenden Falls
Hydropower Project consists of: (1) An
approximately 4-foot-high, 320-foot-long
concrete gravity dam, topped with 2foot-high wooden flashboards, and
having a dam crest elevation of 59.6 feet
National Geodetic Vertical Datum of
1929 (NGVD29); (2) a reservoir with a
surface area of about 18 acres and a
storage capacity of 63 acre-feet at a
normal pool elevation of 61.6 feet
NGVD29; (3) an 8-foot-wide, 22-footlong intake structure on the east side of
the dam connecting to an 8-foot-wide,
118-foot-long concrete and wooden
power canal; (4) a 7.5-foot-diameter, 45foot-long steel penstock that conveys
water from the power canal to a
powerhouse on the east side of the dam
containing two turbine-generator units
with a total rated capacity of 453
kilowatts (kW); (5) an 8-foot-wide, 10foot-long intake structure on the west
side of the dam connecting to a 6-footdiameter, 62-foot-long steel penstock;
(6) a powerhouse on the west side of the
dam containing a single turbinegenerator unit with a rated capacity of
300 kW; (7) two 480-volt, 40-foot-long
generator leads connecting the east
powerhouse to a transformer yard and a
2,300-volt, 400-foot-long generator lead
connecting the west powerhouse to the
transformer yard; and (8) appurtenant
facilities.
The Chittenden Falls Project is
operated in a run-of-river mode with an
estimated average annual generation of
2,300 megawatt-hours between 2012
and 2018. Chittenden Falls Hydro
proposes to continue to operate the
project in run-of-river mode.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
PO 00000
Frm 00057
Fmt 4703
Sfmt 4703
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to address the
document. For assistance, contact FERC
Online Support. A copy is available for
inspection and reproduction at the
address in item h above.
n. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. Scoping Process:
The Commission staff intends to
prepare an Environmental Assessment
(EA) for the Chittenden Falls
Hydropower Project in accordance with
the National Environmental Policy Act.
The EA will consider both site-specific
and cumulative environmental impacts
and reasonable alternatives to the
proposed action.
Commission staff does not propose to
conduct any on-site scoping meetings at
this time. Instead, we are soliciting
comments, recommendations, and
information, on the Scoping Document
1 (SD1) issued December 23, 2019.
Copies of SD1 outlining the subject
areas to be addressed in the EA were
distributed to the parties on the
Commission’s mailing list. Copies of
SD1 may be viewed on the web at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call 1–866–
208–3676 or for TTY, (202) 502–8659.
Dated: December 23, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–28260 Filed 12–30–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP20–328–000.
Applicants: LA Storage, LLC.
Description: § 4(d) Rate Filing: Filing
of Negotiated Rate, Conforming IW
Agreement (Mansfield) to be effective
12/15/2019.
Filed Date: 12/13/19.
Accession Number: 20191213–5137.
Comments Due: 5 p.m. ET 12/26/19.
E:\FR\FM\31DEN1.SGM
31DEN1
Agencies
[Federal Register Volume 84, Number 250 (Tuesday, December 31, 2019)]
[Notices]
[Page 72348]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-28260]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 3273-024]
Notice Soliciting Scoping Comments; Chittenden Falls Hydropower,
Inc.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 3273-024.
c. Date filed: May 31, 2019.
d. Applicant: Chittenden Falls Hydropower, Inc. (Chittenden Falls
Hydro).
e. Name of Project: Chittenden Falls Hydropower Project.
f. Location: On Kinderhook Creek, near the Town of Stockport,
Columbia County, New York. The project does not occupy federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Mark Boumansour, Chief Operating Officer,
Gravity Renewables, Inc., 1401 Walnut Street, Suite 420, Boulder, CO
80302; (303) 440-3378; [email protected] and/or Celeste N.
Fay, Regulatory Manager, Gravity Renewables, Inc., 5 Dartmouth Drive,
Suite 104, Auburn, NH 03032; (413) 262-9466;
[email protected].
i. FERC Contact: Monir Chowdhury at (202) 502-6736 or
[email protected].
j. Deadline for filing scoping comments: 30 days from the issuance
date of this notice.
The Commission strongly encourages electronic filing. Please file
scoping comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-3273-024.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application is not ready for environmental analysis at this
time.
l. Project Description:
The existing Chittenden Falls Hydropower Project consists of: (1)
An approximately 4-foot-high, 320-foot-long concrete gravity dam,
topped with 2-foot-high wooden flashboards, and having a dam crest
elevation of 59.6 feet National Geodetic Vertical Datum of 1929
(NGVD29); (2) a reservoir with a surface area of about 18 acres and a
storage capacity of 63 acre-feet at a normal pool elevation of 61.6
feet NGVD29; (3) an 8-foot-wide, 22-foot-long intake structure on the
east side of the dam connecting to an 8-foot-wide, 118-foot-long
concrete and wooden power canal; (4) a 7.5-foot-diameter, 45-foot-long
steel penstock that conveys water from the power canal to a powerhouse
on the east side of the dam containing two turbine-generator units with
a total rated capacity of 453 kilowatts (kW); (5) an 8-foot-wide, 10-
foot-long intake structure on the west side of the dam connecting to a
6-foot-diameter, 62-foot-long steel penstock; (6) a powerhouse on the
west side of the dam containing a single turbine-generator unit with a
rated capacity of 300 kW; (7) two 480-volt, 40-foot-long generator
leads connecting the east powerhouse to a transformer yard and a 2,300-
volt, 400-foot-long generator lead connecting the west powerhouse to
the transformer yard; and (8) appurtenant facilities.
The Chittenden Falls Project is operated in a run-of-river mode
with an estimated average annual generation of 2,300 megawatt-hours
between 2012 and 2018. Chittenden Falls Hydro proposes to continue to
operate the project in run-of-river mode.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to address the document. For assistance, contact
FERC Online Support. A copy is available for inspection and
reproduction at the address in item h above.
n. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
o. Scoping Process:
The Commission staff intends to prepare an Environmental Assessment
(EA) for the Chittenden Falls Hydropower Project in accordance with the
National Environmental Policy Act. The EA will consider both site-
specific and cumulative environmental impacts and reasonable
alternatives to the proposed action.
Commission staff does not propose to conduct any on-site scoping
meetings at this time. Instead, we are soliciting comments,
recommendations, and information, on the Scoping Document 1 (SD1)
issued December 23, 2019.
Copies of SD1 outlining the subject areas to be addressed in the EA
were distributed to the parties on the Commission's mailing list.
Copies of SD1 may be viewed on the web at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, call 1-866-208-3676 or for TTY, (202) 502-8659.