Notice of Petition for Declaratory Order; Xcel Energy Services Inc., 72352-72353 [2019-28259]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
72352
Federal Register / Vol. 84, No. 250 / Tuesday, December 31, 2019 / Notices
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) An upper reservoir
having a total storage capacity of 13,900
acre feet with a crest elevation of 3,050
feet mean sea level (msl), a maximum
pool elevation of 3,040 feet msl, and a
surface area of 150 acres; (2) a lower
reservoir having a total storage capacity
of 13,900 acre feet with a crest elevation
1,080 feet msl, a maximum pool
elevation of 1,800 feet msl, and a surface
area of 290 acres; (3) two 19-footdiameter, 12,160-foot-long penstocks
and two 21-foot-diameter, 3,00-foot-long
tailraces; (4) a 750-foot-long, 175-foothigh, 70-foot-wide containing as many
as four advanced ternary pumped
storage single runner units with a total
capacity of 800 megawatts; (5) twin
circuit 500-kilovolt, 40-mile-long
transmission lines that would connect
to an existing transmission line owned
by the Arizona Public Service Company
or Salt River Project 1 or extend to an
interconnect at the Hassayampa or Palo
Verde substations; and (6) appurtenant
facilities. Initial fill and makeup water
would be acquired from the Colorado
River region and conveyed to the project
via the existing Central Arizona Project
aqueduct. The estimated annual
generation of the Project would be
311,000 megawatt hours.
Applicant Contact: Mr. Adam
Rousselle, Renewable Energy
Aggregators, 2113 Middle Street Suite
201, Sullivans Island, South Carolina
29482; phone: (267) 254–6107.
FERC Contact: Benjamin Mann;
Email: benjamin.mann@ferc.gov; phone:
(202) 502–8127.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
1 Salt
River Project is a not-for-profit water and
energy company that provides water and power to
more than 2 million people living in central
Arizona.
VerDate Sep<11>2014
17:30 Dec 30, 2019
Jkt 250001
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–15009–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–15009) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: December 23, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–28262 Filed 12–30–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14995–000]
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing
Applications; Pumped Hydro Storage,
LLC
On May 14, 2019, Pumped Hydro
Storage, LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the San
Francisco River Pumped Storage Project
to be located on the San Francisco River
in Greenlee County, Arizona and Catron
County, New Mexico. The sole purpose
of a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A new 180-foot-high,
3,000-foot-long upper dam impounding
a 200-acre reservoir; (2) a new 200-foothigh, 650-foot-long lower dam
impounding a 900-acre reservoir; (3)
two new 12,000-foot-long, 32-footdiameter penstocks; (4) a new reinforced
concrete powerhouse containing five
250-megawatt turbine-generator units,
for a total installed capacity of 1,250
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
megawatts; (5) a new 1-mile-long, 345
kilovolt transmission line; and (6)
appurtenant facilities. The proposed
project would have an average annual
generation of 3,400 gigawatt-hours.
Applicant Contact: Steve Irwin,
Pumped Hydro Storage, LLC, 6514 S
41st Lane, Phoenix, AZ 85041; phone:
(602) 696–3608.
FERC Contact: Tim Konnert; phone:
(202) 502–6359.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14995–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14995) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: December 23, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–28256 Filed 12–30–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL20–14–000]
Notice of Petition for Declaratory
Order; Xcel Energy Services Inc.
Take notice that on December 20,
2019, pursuant to Rule 207(a)(2) of the
E:\FR\FM\31DEN1.SGM
31DEN1
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 84, No. 250 / Tuesday, December 31, 2019 / Notices
Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR 385.207
(2019), Xcel Energy Services Inc., on
behalf of Public Service Company of
Colorado (PSCo or Petitioner), filed a
petition for a declaratory order
requesting that the Commission declare:
(1) Holy Cross Electric Association,
Inc.’s (Holy Cross) demand for firm
curtailment service for the Economy
Energy resources is inconsistent with
the Power Supply Agreement (PSA); (2)
Holy Cross’ demand for firm curtailment
service is inconsistent with the
Operating Agreement; (3) Holy Cross’
demand for firm curtailment service is
inconsistent with the Transmission
Integration and Equalization (TIE)
Agreement; and (4) PSCo is not
obligated to process Holy Cross’
requests for firm service under the TIE
Agreement, as more fully explained in
the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene, or protest must serve a
copy of that document on the
Petitioners.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on January 21, 2020.
VerDate Sep<11>2014
17:30 Dec 30, 2019
Jkt 250001
Dated: December 23, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–28259 Filed 12–30–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Number: PR20–6–001.
Applicants: Pelico Pipeline, LLC.
Description: Tariff filing per
284.123(b),(e)+(g): Pelico Pipeline, LLC
Revised SOC Effective February 1, 2020
to be effective 2/1/2020.
Filed Date: 12/20/19.
Accession Number: 201912205021.
Comments Due: 5 p.m. ET 1/10/20.
284.123(g) Protests Due: 5 p.m. ET 1/
10/20.
Docket Number: PR20–7–001.
Applicants: Regency Intrastate Gas
LP.
Description: Tariff filing per
284.123(b),(e)+(g): Regency Intrastate
Gas LP Revised SOC Effective February
1, 2020 to be effective 2/1/2020.
Filed Date: 12/20/19.
Accession Number: 201912205027.
Comments Due: 5 p.m. ET 1/10/20.
284.123(g) Protests Due: 5 p.m. ET 1/
10/20.
Docket Numbers: RP19–63–001.
Applicants: East Tennessee Natural
Gas, LLC.
Description: Report Filing: ETNG
RP19–63 Refund Report_Final.
Filed Date: 12/13/19.
Accession Number: 20191213–5221.
Comments Due: 5 p.m. ET 12/27/19.
Docket Numbers: RP19–423–002.
Applicants: Tallgrass Interstate Gas
Transmission, LLC.
Description: Compliance filing Rate
Case Settlement RP19–423 et al. to be
effective 6/1/2019.
Filed Date: 12/17/19.
Accession Number: 20191217–5134.
Comments Due: 5 p.m. ET 12/30/19.
Docket Numbers: RP18–369–003.
Applicants: Sea Robin Pipeline
Company, LLC.
Description: Compliance filing First
Annual Net Retrograde Filing on 12/19/
19.
Filed Date: 12/19/19.
Accession Number: 20191219–5095.
Comments Due: 5 p.m. ET 12/27/19.
Docket Numbers: RP20–315–001.
Applicants: Equitrans, L.P.
PO 00000
Frm 00062
Fmt 4703
Sfmt 4703
72353
Description: Tariff Amendment:
Equitrans Clean-Up Filing—December
2019 Clarification to be effective 1/5/
2020.
Filed Date: 12/19/19.
Accession Number: 20191219–5023.
Comments Due: 5 p.m. ET 12/27/19.
Docket Numbers: RP19–1340–002.
Applicants: Viking Gas Transmission
Company.
Description: Compliance filing Motion
to Place Suspended Revised Tariff
Record into Effect to be effective 1/1/
2020.
Filed Date: 12/20/19.
Accession Number: 20191220–5337.
Comments Due: 5 p.m. ET 1/2/20.
Docket Numbers: RP20–232–001.
Applicants: Dominion Energy Cove
Point LNG, LP.
Description: Compliance filing
DECP—RP20–232 Compliance Filing to
be effective 12/15/2019.
Filed Date: 12/20/19.
Accession Number: 20191220–5162.
Comments Due: 5 p.m. ET 1/2/20.
Docket Numbers: RP20–309–001.
Applicants: Northwest Pipeline LLC.
Description: Tariff Amendment:
Amended Miscellaneous and
Housekeeping Filing—Fall 2019 to be
effective 1/3/2020.
Filed Date: 12/20/19.
Accession Number: 20191220–5306.
Comments Due: 5 p.m. ET 1/2/20.
Docket Numbers: RP20–351–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rate—Chevron 911109
release eff 1–1–2020 to be effective 1/1/
2020.
Filed Date: 12/20/19.
Accession Number: 20191220–5001.
Comments Due: 5 p.m. ET 1/2/20.
Docket Numbers: RP20–352–000.
Applicants: WBI Energy
Transmission, Inc.
Description: § 4(d) Rate Filing: 2019
Negotiated & Non-Conforming SA—
Demick’s Lake II to be effective 2/1/
2020.
Filed Date: 12/20/19.
Accession Number: 20191220–5002.
Comments Due: 5 p.m. ET 1/2/20.
Docket Numbers: RP20–353–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 122019
Negotiated Rates—Castleton
Commodities Merchant Trading L.P. H–
4010–89 to be effective 12/19/2019.
Filed Date: 12/20/19.
Accession Number: 20191220–5004.
Comments Due: 5 p.m. ET 1/2/20.
Docket Numbers: RP20–354–000.
Applicants: Texas Eastern
Transmission, LP.
E:\FR\FM\31DEN1.SGM
31DEN1
Agencies
[Federal Register Volume 84, Number 250 (Tuesday, December 31, 2019)]
[Notices]
[Pages 72352-72353]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-28259]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL20-14-000]
Notice of Petition for Declaratory Order; Xcel Energy Services
Inc.
Take notice that on December 20, 2019, pursuant to Rule 207(a)(2)
of the
[[Page 72353]]
Federal Energy Regulatory Commission's (Commission) Rules of Practice
and Procedure, 18 CFR 385.207 (2019), Xcel Energy Services Inc., on
behalf of Public Service Company of Colorado (PSCo or Petitioner),
filed a petition for a declaratory order requesting that the Commission
declare: (1) Holy Cross Electric Association, Inc.'s (Holy Cross)
demand for firm curtailment service for the Economy Energy resources is
inconsistent with the Power Supply Agreement (PSA); (2) Holy Cross'
demand for firm curtailment service is inconsistent with the Operating
Agreement; (3) Holy Cross' demand for firm curtailment service is
inconsistent with the Transmission Integration and Equalization (TIE)
Agreement; and (4) PSCo is not obligated to process Holy Cross'
requests for firm service under the TIE Agreement, as more fully
explained in the petition.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene, or protest must serve a copy of
that document on the Petitioners.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the website that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
[email protected], or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern time on January 21, 2020.
Dated: December 23, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-28259 Filed 12-30-19; 8:45 am]
BILLING CODE 6717-01-P