Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications; Pumped Hydro Storage, LLC, 72352 [2019-28256]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
72352
Federal Register / Vol. 84, No. 250 / Tuesday, December 31, 2019 / Notices
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) An upper reservoir
having a total storage capacity of 13,900
acre feet with a crest elevation of 3,050
feet mean sea level (msl), a maximum
pool elevation of 3,040 feet msl, and a
surface area of 150 acres; (2) a lower
reservoir having a total storage capacity
of 13,900 acre feet with a crest elevation
1,080 feet msl, a maximum pool
elevation of 1,800 feet msl, and a surface
area of 290 acres; (3) two 19-footdiameter, 12,160-foot-long penstocks
and two 21-foot-diameter, 3,00-foot-long
tailraces; (4) a 750-foot-long, 175-foothigh, 70-foot-wide containing as many
as four advanced ternary pumped
storage single runner units with a total
capacity of 800 megawatts; (5) twin
circuit 500-kilovolt, 40-mile-long
transmission lines that would connect
to an existing transmission line owned
by the Arizona Public Service Company
or Salt River Project 1 or extend to an
interconnect at the Hassayampa or Palo
Verde substations; and (6) appurtenant
facilities. Initial fill and makeup water
would be acquired from the Colorado
River region and conveyed to the project
via the existing Central Arizona Project
aqueduct. The estimated annual
generation of the Project would be
311,000 megawatt hours.
Applicant Contact: Mr. Adam
Rousselle, Renewable Energy
Aggregators, 2113 Middle Street Suite
201, Sullivans Island, South Carolina
29482; phone: (267) 254–6107.
FERC Contact: Benjamin Mann;
Email: benjamin.mann@ferc.gov; phone:
(202) 502–8127.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
1 Salt
River Project is a not-for-profit water and
energy company that provides water and power to
more than 2 million people living in central
Arizona.
VerDate Sep<11>2014
17:30 Dec 30, 2019
Jkt 250001
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–15009–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–15009) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: December 23, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–28262 Filed 12–30–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14995–000]
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing
Applications; Pumped Hydro Storage,
LLC
On May 14, 2019, Pumped Hydro
Storage, LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the San
Francisco River Pumped Storage Project
to be located on the San Francisco River
in Greenlee County, Arizona and Catron
County, New Mexico. The sole purpose
of a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A new 180-foot-high,
3,000-foot-long upper dam impounding
a 200-acre reservoir; (2) a new 200-foothigh, 650-foot-long lower dam
impounding a 900-acre reservoir; (3)
two new 12,000-foot-long, 32-footdiameter penstocks; (4) a new reinforced
concrete powerhouse containing five
250-megawatt turbine-generator units,
for a total installed capacity of 1,250
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
megawatts; (5) a new 1-mile-long, 345
kilovolt transmission line; and (6)
appurtenant facilities. The proposed
project would have an average annual
generation of 3,400 gigawatt-hours.
Applicant Contact: Steve Irwin,
Pumped Hydro Storage, LLC, 6514 S
41st Lane, Phoenix, AZ 85041; phone:
(602) 696–3608.
FERC Contact: Tim Konnert; phone:
(202) 502–6359.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14995–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14995) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: December 23, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–28256 Filed 12–30–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL20–14–000]
Notice of Petition for Declaratory
Order; Xcel Energy Services Inc.
Take notice that on December 20,
2019, pursuant to Rule 207(a)(2) of the
E:\FR\FM\31DEN1.SGM
31DEN1
Agencies
[Federal Register Volume 84, Number 250 (Tuesday, December 31, 2019)]
[Notices]
[Page 72352]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-28256]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14995-000]
Notice of Preliminary Permit Application Accepted for Filing and
Soliciting Comments, Motions To Intervene, and Competing Applications;
Pumped Hydro Storage, LLC
On May 14, 2019, Pumped Hydro Storage, LLC, filed an application
for a preliminary permit, pursuant to section 4(f) of the Federal Power
Act, proposing to study the feasibility of the San Francisco River
Pumped Storage Project to be located on the San Francisco River in
Greenlee County, Arizona and Catron County, New Mexico. The sole
purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed project would consist of the following: (1) A new 180-
foot-high, 3,000-foot-long upper dam impounding a 200-acre reservoir;
(2) a new 200-foot-high, 650-foot-long lower dam impounding a 900-acre
reservoir; (3) two new 12,000-foot-long, 32-foot-diameter penstocks;
(4) a new reinforced concrete powerhouse containing five 250-megawatt
turbine-generator units, for a total installed capacity of 1,250
megawatts; (5) a new 1-mile-long, 345 kilovolt transmission line; and
(6) appurtenant facilities. The proposed project would have an average
annual generation of 3,400 gigawatt-hours.
Applicant Contact: Steve Irwin, Pumped Hydro Storage, LLC, 6514 S
41st Lane, Phoenix, AZ 85041; phone: (602) 696-3608.
FERC Contact: Tim Konnert; phone: (202) 502-6359.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-14995-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14995) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: December 23, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-28256 Filed 12-30-19; 8:45 am]