Combined Notice of Filings #1, 71915-71916 [2019-28123]

Download as PDF Federal Register / Vol. 84, No. 249 / Monday, December 30, 2019 / Notices Dated: December 20, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–28124 Filed 12–27–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission khammond on DSKJM1Z7X2PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC20–26–000. Applicants: Krayn Wind LLC, Cambria Wind, LLC. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act, et al. of Krayn Wind LLC, et al. Filed Date: 12/19/19. Accession Number: 20191219–5337. Comments Due: 5 p.m. ET 1/9/20. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2806–004; ER10–2818–004; ER10–2847–004; ER14–963–004. Applicants: TransAlta Energy Marketing (U.S.) Inc., TransAlta Energy Marketing Corporation, TransAlta Centralia Generation, LLC, TransAlta Wyoming Wind LLC. Description: Triennial Market Power Update Analysis for Northwest Region of the TransAlta Northwest MBR Sellers, et al. Filed Date: 12/19/19. Accession Number: 20191219–5280. Comments Due: 5 p.m. ET 2/18/20. Docket Numbers: ER10–3079–016; ER11–2539–006; ER11–2540–006; ER11–2542–006. Applicants: Tyr Energy, LLC, Plains End, LLC, Plains End II, LLC, Rathdrum Power, LLC. Description: Updated Market Power Analysis for Northwest Region of Tyr Energy, LLC, et al. Filed Date: 12/20/19. Accession Number: 20191220–5104. Comments Due: 5 p.m. ET 2/18/20. Docket Numbers: ER11–2154–010. Applicants: Twin Eagle Resource Management, LLC. Description: Triennial Market Power Update for the Southwest Region of Twin Eagle Resource Management, LLC. Filed Date: 12/19/19. Accession Number: 20191219–5274. Comments Due: 5 p.m. ET 2/18/20. Docket Numbers: ER16–355–003; ER16–141–005; ER15–255–004; ER10– VerDate Sep<11>2014 20:00 Dec 27, 2019 Jkt 250001 2032–008; ER10–2033–008; ER15–190– 011; ER12–2313–005; ER10–1330–007; ER18–2465–001; ER18–2466–001; ER19–2343–002; ER17–2336–005. Applicants: Colonial Eagle Solar, LLC, Conetoe II Solar, LLC, Duke Energy Beckjord Storage, LLC, Duke Energy Kentucky, Inc., Duke Energy Ohio, Inc., Duke Energy Renewable Services, LLC, Laurel Hill Wind Energy, LLC, North Allegheny Wind, LLC, Federal Way Powerhouse LLC, Potter Road Powerhouse LLC, 2018 ESA Project Company, LLC, Shoreham Solar Commons LLC. Description: Triennial Market Power Update for the Northeast Region of Duke MBR Sellers. Filed Date: 12/20/19. Accession Number: 20191220–5165. Comments Due: 5 p.m. ET 2/18/20. Docket Numbers: ER19–2305–000. Applicants: Valencia Power, LLC. Description: Supplement to June 28, 2019 Valencia Power, LLC Updated Market Power Analysis for the SW Region. Filed Date: 12/20/19. Accession Number: 20191220–5148. Comments Due: 5 p.m. ET 1/10/20. Docket Numbers: ER19–2707–002; ER10–2822–016; ER16–1238–003; ER16–1250–008; ER17–1392–003; ER10–3158–009; ER12–308–009; ER10– 3162–009; ER10–3161–009; ER17–1242– 002. Applicants: Poseidon Wind, LLC, Atlantic Renewable Projects II LLC, Avangrid Arizona Renewables, LLC, Avangrid Renewables, LLC, El Cabo Wind LLC, Dillon Wind LLC, Manzana Wind LLC, Mountain View Power Partners III, LLC, Shiloh I Wind Project, LLC, Tule Wind LLC. Description: Notice of Change in Status of Poseidon Wind, LLC and the Avangrid Southwest MBR Sellers. Filed Date: 12/19/19. Accession Number: 20191219–5275. Comments Due: 5 p.m. ET 1/9/20. Docket Numbers: ER20–647–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–12–19_MISO–PJM JOA revisions on Constraint Relaxation to be effective 2/18/2020. Filed Date: 12/19/19. Accession Number: 20191219–5211. Comments Due: 5 p.m. ET 1/9/20. Docket Numbers: ER20–648–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Revisions to the MISO–PJM JOA re Constraint Relaxation to be effective 2/ 18/2020. Filed Date: 12/19/19. PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 71915 Accession Number: 20191219–5214. Comments Due: 5 p.m. ET 1/9/20. Docket Numbers: ER20–649–000. Applicants: AEP Energy Partners, Inc. Description: § 205(d) Rate Filing: MBR Tariff, FERC Electric Tariff for Market Based Sales to be effective 1/1/2020. Filed Date: 12/19/19. Accession Number: 20191219–5216. Comments Due: 5 p.m. ET 1/9/20. Docket Numbers: ER20–650–000. Applicants: El Paso Electric Company. Description: § 205(d) Rate Filing: Service Agreement No. 325, Large Generator Interconnection Agreement with EDF to be effective 12/31/9998. Filed Date: 12/19/19. Accession Number: 20191219–5220. Comments Due: 5 p.m. ET 1/9/20. Docket Numbers: ER20–651–000. Applicants: El Paso Electric Company. Description: § 205(d) Rate Filing: Service Agreement No. 326, Long-Term Conditional Firm PTP Agreement with EDF to be effective. 12/21/2019. Filed Date: 12/19/19. Accession Number: 20191219–5221. Comments Due: 5 p.m. ET 1/9/20. Docket Numbers: ER20–652–000. Applicants: Public Service Company of Oklahoma, Southwestern Electric Power Company. Description: § 205(d) Rate Filing: Market-Based Rates Tariff to be effective 1/1/2020. Filed Date: 12/19/19. Accession Number: 20191219–5231. Comments Due: 5 p.m. ET 1/9/20. Docket Numbers: ER20–653–000. Applicants: Great Bay Solar I, LLC. Description: § 205(d) Rate Filing: Shared Facilities Agreement to be effective 12/20/2019. Filed Date: 12/19/19. Accession Number: 20191219–5232. Comments Due: 5 p.m. ET 1/9/20. Docket Numbers: ER20–654–000. Applicants: MidAmerican Central California Transco, LLC. Description: § 205(d) Rate Filing: Annual TRBAA Update to be effective 1/1/2020. Filed Date: 12/20/19. Accession Number: 20191220–5003. Comments Due: 5 p.m. ET 1/10/20. Docket Numbers: ER20–655–000. Applicants: New York State Reliability Council, L.L.C. Description: Informational Filing of the Revised Installed Capacity Requirement for the New York Control Area by the New York State Reliability Council, L.L.C. Filed Date: 12/19/19. Accession Number: 20191219–5276. Comments Due: 5 p.m. ET 1/9/20. Docket Numbers: ER20–656–000. E:\FR\FM\30DEN1.SGM 30DEN1 khammond on DSKJM1Z7X2PROD with NOTICES 71916 Federal Register / Vol. 84, No. 249 / Monday, December 30, 2019 / Notices Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1313R13 Oklahoma Gas and Electric Company NITSA NOA to be effective 12/1/2019. Filed Date: 12/20/19. Accession Number: 20191220–5015. Comments Due: 5 p.m. ET 1/10/20. Docket Numbers: ER20–657–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1628R17 Western Farmers Electric Cooperative NITSA NOA to be effective 12/1/2019. Filed Date: 12/20/19. Accession Number: 20191220–5019. Comments Due: 5 p.m. ET 1/10/20. Docket Numbers: ER20–658–000. Applicants: Fortistar North Tonawanda Inc. Description: Compliance filing: Notice of Succession and New eTariff Baseline Tariff to be effective 12/21/2019. Filed Date: 12/20/19. Accession Number: 20191220–5020. Comments Due: 5 p.m. ET 1/10/20. Docket Numbers: ER20–659–000. Applicants: New York Independent System Operator, Inc. Description: Compliance filing: NYISO compliance filing re: Fast-Start Resources to be effective 12/31/9998. Filed Date: 12/20/19. Accession Number: 20191220–5087. Comments Due: 5 p.m. ET 1/10/20. Docket Numbers: ER20–660–000. Applicants: Bolt Energy Marketing, LLC. Description: Baseline eTariff Filing: Application for Market-Based Rate Authorization and Request for Waivers to be effective. 1/1/2020. Filed Date: 12/20/19. Accession Number: 20191220–5107. Comments Due: 5 p.m. ET 1/10/20. Docket Numbers: ER20–661–000. Applicants: Tucson Electric Power Company. Description: § 205(d) Rate Filing: Concurrences to Navajo Project Agreements to be effective 12/23/2019. Filed Date: 12/20/19. Accession Number: 20191220–5164. Comments Due: 5 p.m. ET 1/10/20. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. VerDate Sep<11>2014 20:00 Dec 27, 2019 Jkt 250001 Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 20, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–28123 Filed 12–27–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2489–048] Green Mountain Power Corporation; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process b. Project No.: 2489–048 c. Date Filed: October 30, 2019 d. Submitted By: Green Mountain Power Corporation (Green Mountain) e. Name of Project: Cavendish Hydroelectric Project f. Location: On the Black River, in Windsor County, Vermont. No federal lands are occupied by the project works or located within the project boundary. g. Filed Pursuant to: 18 CFR 5.3 and 5.5 of the Commission’s regulations. h. Potential Applicant Contact: John Greenan, Green Mountain Power Corporation, 2152 Post Road, Rutland, VT 05701; (802) 770–2195; email at John.Greenan@ greenmountainpower.com. i. FERC Contact: John Baummer at (202) 502–6837; or email at john.baummer@ferc.gov. j. Green Mountain filed its request to use the Traditional Licensing Process on October 30, 2019 and provided public notice of the request on October 23, 2019. In a letter dated December 20, 2019, the Director of the Division of Hydropower Licensing approved Green Mountain’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7 of the Endangered Species Act and the joint PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 agency regulations thereunder at 50 CFR part 402; and NOAA Fisheries under section 305(b) of the Magnuson-Stevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920. We are also initiating consultation with the Vermont State Historic Preservation Officer, as required by section 106 of the National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating Green Mountain as the Commission’s non-federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act and section 305(b) of the MagnusonStevens Fishery Conservation and Management Act; and consultation pursuant to section 106 of the National Historic Preservation Act. m. On October 30, 2019, Green Mountain filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website (https:// www.ferc.gov), using the eLibrary link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERConlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h. o. The licensee states its unequivocal intent to submit an application for a subsequent license for Project No. 2489. Pursuant to 18 CFR 16.20, each application for a subsequent license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by October 31, 2022. p. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: December 20, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–28122 Filed 12–27–19; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\30DEN1.SGM 30DEN1

Agencies

[Federal Register Volume 84, Number 249 (Monday, December 30, 2019)]
[Notices]
[Pages 71915-71916]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-28123]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC20-26-000.
    Applicants: Krayn Wind LLC, Cambria Wind, LLC.
    Description: Joint Application for Authorization Under Section 203 
of the Federal Power Act, et al. of Krayn Wind LLC, et al.
    Filed Date: 12/19/19.
    Accession Number: 20191219-5337.
    Comments Due: 5 p.m. ET 1/9/20.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-2806-004; ER10-2818-004; ER10-2847-004; ER14-
963-004.
    Applicants: TransAlta Energy Marketing (U.S.) Inc., TransAlta 
Energy Marketing Corporation, TransAlta Centralia Generation, LLC, 
TransAlta Wyoming Wind LLC.
    Description: Triennial Market Power Update Analysis for Northwest 
Region of the TransAlta Northwest MBR Sellers, et al.
    Filed Date: 12/19/19.
    Accession Number: 20191219-5280.
    Comments Due: 5 p.m. ET 2/18/20.

    Docket Numbers: ER10-3079-016; ER11-2539-006; ER11-2540-006; ER11-
2542-006.
    Applicants: Tyr Energy, LLC, Plains End, LLC, Plains End II, LLC, 
Rathdrum Power, LLC.
    Description: Updated Market Power Analysis for Northwest Region of 
Tyr Energy, LLC, et al.
    Filed Date: 12/20/19.
    Accession Number: 20191220-5104.
    Comments Due: 5 p.m. ET 2/18/20.

    Docket Numbers: ER11-2154-010.
    Applicants: Twin Eagle Resource Management, LLC.
    Description: Triennial Market Power Update for the Southwest Region 
of Twin Eagle Resource Management, LLC.
    Filed Date: 12/19/19.
    Accession Number: 20191219-5274.
    Comments Due: 5 p.m. ET 2/18/20.

    Docket Numbers: ER16-355-003; ER16-141-005; ER15-255-004; ER10-
2032-008; ER10-2033-008; ER15-190-011; ER12-2313-005; ER10-1330-007; 
ER18-2465-001; ER18-2466-001; ER19-2343-002; ER17-2336-005.
    Applicants: Colonial Eagle Solar, LLC, Conetoe II Solar, LLC, Duke 
Energy Beckjord Storage, LLC, Duke Energy Kentucky, Inc., Duke Energy 
Ohio, Inc., Duke Energy Renewable Services, LLC, Laurel Hill Wind 
Energy, LLC, North Allegheny Wind, LLC, Federal Way Powerhouse LLC, 
Potter Road Powerhouse LLC, 2018 ESA Project Company, LLC, Shoreham 
Solar Commons LLC.
    Description: Triennial Market Power Update for the Northeast Region 
of Duke MBR Sellers.
    Filed Date: 12/20/19.
    Accession Number: 20191220-5165.
    Comments Due: 5 p.m. ET 2/18/20.

    Docket Numbers: ER19-2305-000.
    Applicants: Valencia Power, LLC.
    Description: Supplement to June 28, 2019 Valencia Power, LLC 
Updated Market Power Analysis for the SW Region.
    Filed Date: 12/20/19.
    Accession Number: 20191220-5148.
    Comments Due: 5 p.m. ET 1/10/20.

    Docket Numbers: ER19-2707-002; ER10-2822-016; ER16-1238-003; ER16-
1250-008; ER17-1392-003; ER10-3158-009; ER12-308-009; ER10-3162-009; 
ER10-3161-009; ER17-1242-002.
    Applicants: Poseidon Wind, LLC, Atlantic Renewable Projects II LLC, 
Avangrid Arizona Renewables, LLC, Avangrid Renewables, LLC, El Cabo 
Wind LLC, Dillon Wind LLC, Manzana Wind LLC, Mountain View Power 
Partners III, LLC, Shiloh I Wind Project, LLC, Tule Wind LLC.
    Description: Notice of Change in Status of Poseidon Wind, LLC and 
the Avangrid Southwest MBR Sellers.
    Filed Date: 12/19/19.
    Accession Number: 20191219-5275.
    Comments Due: 5 p.m. ET 1/9/20.

    Docket Numbers: ER20-647-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2019-12-19_MISO-PJM JOA 
revisions on Constraint Relaxation to be effective 2/18/2020.
    Filed Date: 12/19/19.
    Accession Number: 20191219-5211.
    Comments Due: 5 p.m. ET 1/9/20.

    Docket Numbers: ER20-648-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Revisions to the MISO-PJM 
JOA re Constraint Relaxation to be effective 2/18/2020.
    Filed Date: 12/19/19.
    Accession Number: 20191219-5214.
    Comments Due: 5 p.m. ET 1/9/20.

    Docket Numbers: ER20-649-000.
    Applicants: AEP Energy Partners, Inc.
    Description: Sec.  205(d) Rate Filing: MBR Tariff, FERC Electric 
Tariff for Market Based Sales to be effective 1/1/2020.
    Filed Date: 12/19/19.
    Accession Number: 20191219-5216.
    Comments Due: 5 p.m. ET 1/9/20.

    Docket Numbers: ER20-650-000.
    Applicants: El Paso Electric Company.
    Description: Sec.  205(d) Rate Filing: Service Agreement No. 325, 
Large Generator Interconnection Agreement with EDF to be effective 12/
31/9998.
    Filed Date: 12/19/19.
    Accession Number: 20191219-5220.
    Comments Due: 5 p.m. ET 1/9/20.

    Docket Numbers: ER20-651-000.
    Applicants: El Paso Electric Company.
    Description: Sec.  205(d) Rate Filing: Service Agreement No. 326, 
Long-Term Conditional Firm PTP Agreement with EDF to be effective. 12/
21/2019.
    Filed Date: 12/19/19.
    Accession Number: 20191219-5221.
    Comments Due: 5 p.m. ET 1/9/20.

    Docket Numbers: ER20-652-000.
    Applicants: Public Service Company of Oklahoma, Southwestern 
Electric Power Company.
    Description: Sec.  205(d) Rate Filing: Market-Based Rates Tariff to 
be effective 1/1/2020.
    Filed Date: 12/19/19.
    Accession Number: 20191219-5231.
    Comments Due: 5 p.m. ET 1/9/20.

    Docket Numbers: ER20-653-000.
    Applicants: Great Bay Solar I, LLC.
    Description: Sec.  205(d) Rate Filing: Shared Facilities Agreement 
to be effective 12/20/2019.
    Filed Date: 12/19/19.
    Accession Number: 20191219-5232.
    Comments Due: 5 p.m. ET 1/9/20.

    Docket Numbers: ER20-654-000.
    Applicants: MidAmerican Central California Transco, LLC.
    Description: Sec.  205(d) Rate Filing: Annual TRBAA Update to be 
effective 1/1/2020.
    Filed Date: 12/20/19.
    Accession Number: 20191220-5003.
    Comments Due: 5 p.m. ET 1/10/20.

    Docket Numbers: ER20-655-000.
    Applicants: New York State Reliability Council, L.L.C.
    Description: Informational Filing of the Revised Installed Capacity 
Requirement for the New York Control Area by the New York State 
Reliability Council, L.L.C.
    Filed Date: 12/19/19.
    Accession Number: 20191219-5276.
    Comments Due: 5 p.m. ET 1/9/20.

    Docket Numbers: ER20-656-000.

[[Page 71916]]

    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 1313R13 Oklahoma Gas and 
Electric Company NITSA NOA to be effective 12/1/2019.
    Filed Date: 12/20/19.
    Accession Number: 20191220-5015.
    Comments Due: 5 p.m. ET 1/10/20.

    Docket Numbers: ER20-657-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 1628R17 Western Farmers 
Electric Cooperative NITSA NOA to be effective 12/1/2019.
    Filed Date: 12/20/19.
    Accession Number: 20191220-5019.
    Comments Due: 5 p.m. ET 1/10/20.

    Docket Numbers: ER20-658-000.
    Applicants: Fortistar North Tonawanda Inc.
    Description: Compliance filing: Notice of Succession and New 
eTariff Baseline Tariff to be effective 12/21/2019.
    Filed Date: 12/20/19.
    Accession Number: 20191220-5020.
    Comments Due: 5 p.m. ET 1/10/20.

    Docket Numbers: ER20-659-000.
    Applicants: New York Independent System Operator, Inc.
    Description: Compliance filing: NYISO compliance filing re: Fast-
Start Resources to be effective 12/31/9998.
    Filed Date: 12/20/19.
    Accession Number: 20191220-5087.
    Comments Due: 5 p.m. ET 1/10/20.

    Docket Numbers: ER20-660-000.
    Applicants: Bolt Energy Marketing, LLC.
    Description: Baseline eTariff Filing: Application for Market-Based 
Rate Authorization and Request for Waivers to be effective. 1/1/2020.
    Filed Date: 12/20/19.
    Accession Number: 20191220-5107.
    Comments Due: 5 p.m. ET 1/10/20.

    Docket Numbers: ER20-661-000.
    Applicants: Tucson Electric Power Company.
    Description: Sec.  205(d) Rate Filing: Concurrences to Navajo 
Project Agreements to be effective 12/23/2019.
    Filed Date: 12/20/19.
    Accession Number: 20191220-5164.
    Comments Due: 5 p.m. ET 1/10/20.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: December 20, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-28123 Filed 12-27-19; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.