Green Mountain Power Corporation; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 71916 [2019-28122]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
71916
Federal Register / Vol. 84, No. 249 / Monday, December 30, 2019 / Notices
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1313R13 Oklahoma Gas and Electric
Company NITSA NOA to be effective
12/1/2019.
Filed Date: 12/20/19.
Accession Number: 20191220–5015.
Comments Due: 5 p.m. ET 1/10/20.
Docket Numbers: ER20–657–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1628R17 Western Farmers Electric
Cooperative NITSA NOA to be effective
12/1/2019.
Filed Date: 12/20/19.
Accession Number: 20191220–5019.
Comments Due: 5 p.m. ET 1/10/20.
Docket Numbers: ER20–658–000.
Applicants: Fortistar North
Tonawanda Inc.
Description: Compliance filing: Notice
of Succession and New eTariff Baseline
Tariff to be effective 12/21/2019.
Filed Date: 12/20/19.
Accession Number: 20191220–5020.
Comments Due: 5 p.m. ET 1/10/20.
Docket Numbers: ER20–659–000.
Applicants: New York Independent
System Operator, Inc.
Description: Compliance filing:
NYISO compliance filing re: Fast-Start
Resources to be effective 12/31/9998.
Filed Date: 12/20/19.
Accession Number: 20191220–5087.
Comments Due: 5 p.m. ET 1/10/20.
Docket Numbers: ER20–660–000.
Applicants: Bolt Energy Marketing,
LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization and Request for Waivers
to be effective. 1/1/2020.
Filed Date: 12/20/19.
Accession Number: 20191220–5107.
Comments Due: 5 p.m. ET 1/10/20.
Docket Numbers: ER20–661–000.
Applicants: Tucson Electric Power
Company.
Description: § 205(d) Rate Filing:
Concurrences to Navajo Project
Agreements to be effective 12/23/2019.
Filed Date: 12/20/19.
Accession Number: 20191220–5164.
Comments Due: 5 p.m. ET 1/10/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
VerDate Sep<11>2014
20:00 Dec 27, 2019
Jkt 250001
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 20, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–28123 Filed 12–27–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2489–048]
Green Mountain Power Corporation;
Notice of Intent To File License
Application, Filing of Pre-Application
Document, and Approving Use of the
Traditional Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process
b. Project No.: 2489–048
c. Date Filed: October 30, 2019
d. Submitted By: Green Mountain
Power Corporation (Green Mountain)
e. Name of Project: Cavendish
Hydroelectric Project
f. Location: On the Black River, in
Windsor County, Vermont. No federal
lands are occupied by the project works
or located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 and
5.5 of the Commission’s regulations.
h. Potential Applicant Contact: John
Greenan, Green Mountain Power
Corporation, 2152 Post Road, Rutland,
VT 05701; (802) 770–2195; email at
John.Greenan@
greenmountainpower.com.
i. FERC Contact: John Baummer at
(202) 502–6837; or email at
john.baummer@ferc.gov.
j. Green Mountain filed its request to
use the Traditional Licensing Process on
October 30, 2019 and provided public
notice of the request on October 23,
2019. In a letter dated December 20,
2019, the Director of the Division of
Hydropower Licensing approved Green
Mountain’s request to use the
Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
agency regulations thereunder at 50 CFR
part 402; and NOAA Fisheries under
section 305(b) of the Magnuson-Stevens
Fishery Conservation and Management
Act and implementing regulations at 50
CFR 600.920. We are also initiating
consultation with the Vermont State
Historic Preservation Officer, as
required by section 106 of the National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Green Mountain as the Commission’s
non-federal representative for carrying
out informal consultation pursuant to
section 7 of the Endangered Species Act
and section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act; and consultation
pursuant to section 106 of the National
Historic Preservation Act.
m. On October 30, 2019, Green
Mountain filed a Pre-Application
Document (PAD; including a proposed
process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of
the Commission’s regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the eLibrary link.
Enter the docket number, excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERConlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). A copy is also
available for inspection and
reproduction at the address in
paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
subsequent license for Project No. 2489.
Pursuant to 18 CFR 16.20, each
application for a subsequent license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by October 31, 2022.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: December 20, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–28122 Filed 12–27–19; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\30DEN1.SGM
30DEN1
Agencies
[Federal Register Volume 84, Number 249 (Monday, December 30, 2019)]
[Notices]
[Page 71916]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-28122]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2489-048]
Green Mountain Power Corporation; Notice of Intent To File
License Application, Filing of Pre-Application Document, and Approving
Use of the Traditional Licensing Process
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process
b. Project No.: 2489-048
c. Date Filed: October 30, 2019
d. Submitted By: Green Mountain Power Corporation (Green Mountain)
e. Name of Project: Cavendish Hydroelectric Project
f. Location: On the Black River, in Windsor County, Vermont. No
federal lands are occupied by the project works or located within the
project boundary.
g. Filed Pursuant to: 18 CFR 5.3 and 5.5 of the Commission's
regulations.
h. Potential Applicant Contact: John Greenan, Green Mountain Power
Corporation, 2152 Post Road, Rutland, VT 05701; (802) 770-2195; email
at [email protected].
i. FERC Contact: John Baummer at (202) 502-6837; or email at
[email protected].
j. Green Mountain filed its request to use the Traditional
Licensing Process on October 30, 2019 and provided public notice of the
request on October 23, 2019. In a letter dated December 20, 2019, the
Director of the Division of Hydropower Licensing approved Green
Mountain's request to use the Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7
of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR part 402; and NOAA Fisheries under section 305(b)
of the Magnuson-Stevens Fishery Conservation and Management Act and
implementing regulations at 50 CFR 600.920. We are also initiating
consultation with the Vermont State Historic Preservation Officer, as
required by section 106 of the National Historic Preservation Act, and
the implementing regulations of the Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating Green Mountain as the
Commission's non-federal representative for carrying out informal
consultation pursuant to section 7 of the Endangered Species Act and
section 305(b) of the Magnuson-Stevens Fishery Conservation and
Management Act; and consultation pursuant to section 106 of the
National Historic Preservation Act.
m. On October 30, 2019, Green Mountain filed a Pre-Application
Document (PAD; including a proposed process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's website
(https://www.ferc.gov), using the eLibrary link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
o. The licensee states its unequivocal intent to submit an
application for a subsequent license for Project No. 2489. Pursuant to
18 CFR 16.20, each application for a subsequent license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by October 31,
2022.
p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: December 20, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-28122 Filed 12-27-19; 8:45 am]
BILLING CODE 6717-01-P