Notice of Request Under Blanket Authorization: Southern Star Central Gas Pipeline, Inc., 71920 [2019-28073]

Download as PDF 71920 Federal Register / Vol. 84, No. 249 / Monday, December 30, 2019 / Notices (2) the accuracy of the agency’s estimates of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. Dated: December 17, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–28065 Filed 12–27–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP20–22–000] khammond on DSKJM1Z7X2PROD with NOTICES Notice of Request Under Blanket Authorization: Southern Star Central Gas Pipeline, Inc. Take notice that on December 9, 2019, Southern Star Central Gas Pipeline, Inc. (Southern Star), 4700 State Highway 56, Owensboro, Kentucky 42301, filed in Docket No. CP20–22–000 a prior notice request pursuant to sections 157.205, and 157.208 of the Commission’s regulations under the Natural Gas Act (NGA), and Southern Star’s blanket certificate issued in Docket No. CP82– 479–000, to increase the maximum allowable operating pressure on Southern Star’s Lines TLB (Hobart Ranch Lateral), TLB–001, TLB–002, TLB–004, and TLB–005 in Hemphill County, Texas, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Cindy C. Thompson, Manager, Regulatory, Southern Star Central Gas Pipeline, Inc., 4700 State Highway 56, Owensboro, Kentucky 42301, by telephone at (270) 852–4655, or by email at cindy.thompson@southernstar.com. Any person or the Commission’s staff may, within 60 days after issuance of VerDate Sep<11>2014 20:00 Dec 27, 2019 Jkt 250001 the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, and will be notified of any meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters, will not receive copies of all documents filed by other parties or issued by the Commission and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and two copies of the protest or intervention to PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Dated: December 17, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–28073 Filed 12–27–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P–2311–068] Great Lakes Hydro America, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Temporary variance of reservoir elevation. b. Project No.: 2311–068. c. Date Filed: November 26, 2019, and supplemented December 3, 2019. d. Applicant: Great Lakes Hydro America, LLC. e. Name of Project: Goreham Hydroelectric Project. f. Location: The project is located on the Androscoggin River in Coo¨s County, New Hampshire. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Mr. Kyle Murphy, 972 Main Street, Berlin, NH 03570, (207) 458–5861. i. FERC Contact: Mr. Steven Sachs, (202) 502–8666, Steven.Sachs@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests is 30 days from the issuance of this notice by the Commission. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/doc-sfiling/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–2311–068. E:\FR\FM\30DEN1.SGM 30DEN1

Agencies

[Federal Register Volume 84, Number 249 (Monday, December 30, 2019)]
[Notices]
[Page 71920]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-28073]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP20-22-000]


Notice of Request Under Blanket Authorization: Southern Star 
Central Gas Pipeline, Inc.

    Take notice that on December 9, 2019, Southern Star Central Gas 
Pipeline, Inc. (Southern Star), 4700 State Highway 56, Owensboro, 
Kentucky 42301, filed in Docket No. CP20-22-000 a prior notice request 
pursuant to sections 157.205, and 157.208 of the Commission's 
regulations under the Natural Gas Act (NGA), and Southern Star's 
blanket certificate issued in Docket No. CP82-479-000, to increase the 
maximum allowable operating pressure on Southern Star's Lines TLB 
(Hobart Ranch Lateral), TLB-001, TLB-002, TLB-004, and TLB-005 in 
Hemphill County, Texas, all as more fully set forth in the application 
which is on file with the Commission and open to public inspection.
    The filing may also be viewed on the web at https://www.ferc.gov 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or TTY, 
contact (202) 502-8659.
    Any questions concerning this application may be directed to Cindy 
C. Thompson, Manager, Regulatory, Southern Star Central Gas Pipeline, 
Inc., 4700 State Highway 56, Owensboro, Kentucky 42301, by telephone at 
(270) 852-4655, or by email at [email protected].
    Any person or the Commission's staff may, within 60 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and pursuant to section 157.205 of 
the regulations under the NGA (18 CFR 157.205), a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for filing a protest. If a protest is filed and 
not withdrawn within 30 days after the allowed time for filing a 
protest, the instant request shall be treated as an application for 
authorization pursuant to section 7 of the NGA.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, and will be 
notified of any meetings associated with the Commission's environmental 
review process. Environmental commenters will not be required to serve 
copies of filed documents on all other parties. However, the non-party 
commenters, will not receive copies of all documents filed by other 
parties or issued by the Commission and will not have the right to seek 
court review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the eFiling link at 
https://www.ferc.gov. Persons unable to file electronically should 
submit an original and two copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426.

    Dated: December 17, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-28073 Filed 12-27-19; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.