Notice of Request Under Blanket Authorization: Southern Star Central Gas Pipeline, Inc., 71920 [2019-28073]
Download as PDF
71920
Federal Register / Vol. 84, No. 249 / Monday, December 30, 2019 / Notices
(2) the accuracy of the agency’s
estimates of the burden and cost of the
collection of information, including the
validity of the methodology and
assumptions used; (3) ways to enhance
the quality, utility and clarity of the
information collection; and (4) ways to
minimize the burden of the collection of
information on those who are to
respond, including the use of automated
collection techniques or other forms of
information technology.
Dated: December 17, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–28065 Filed 12–27–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–22–000]
khammond on DSKJM1Z7X2PROD with NOTICES
Notice of Request Under Blanket
Authorization: Southern Star Central
Gas Pipeline, Inc.
Take notice that on December 9, 2019,
Southern Star Central Gas Pipeline, Inc.
(Southern Star), 4700 State Highway 56,
Owensboro, Kentucky 42301, filed in
Docket No. CP20–22–000 a prior notice
request pursuant to sections 157.205,
and 157.208 of the Commission’s
regulations under the Natural Gas Act
(NGA), and Southern Star’s blanket
certificate issued in Docket No. CP82–
479–000, to increase the maximum
allowable operating pressure on
Southern Star’s Lines TLB (Hobart
Ranch Lateral), TLB–001, TLB–002,
TLB–004, and TLB–005 in Hemphill
County, Texas, all as more fully set forth
in the application which is on file with
the Commission and open to public
inspection.
The filing may also be viewed on the
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Any questions concerning this
application may be directed to Cindy C.
Thompson, Manager, Regulatory,
Southern Star Central Gas Pipeline, Inc.,
4700 State Highway 56, Owensboro,
Kentucky 42301, by telephone at (270)
852–4655, or by email at
cindy.thompson@southernstar.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
VerDate Sep<11>2014
20:00 Dec 27, 2019
Jkt 250001
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenters,
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and two
copies of the protest or intervention to
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
the Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426.
Dated: December 17, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–28073 Filed 12–27–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[P–2311–068]
Great Lakes Hydro America, LLC;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Temporary
variance of reservoir elevation.
b. Project No.: 2311–068.
c. Date Filed: November 26, 2019, and
supplemented December 3, 2019.
d. Applicant: Great Lakes Hydro
America, LLC.
e. Name of Project: Goreham
Hydroelectric Project.
f. Location: The project is located on
the Androscoggin River in Coo¨s County,
New Hampshire.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Mr. Kyle
Murphy, 972 Main Street, Berlin, NH
03570, (207) 458–5861.
i. FERC Contact: Mr. Steven Sachs,
(202) 502–8666, Steven.Sachs@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance of this notice by
the Commission. The Commission
strongly encourages electronic filing.
Please file comments, motions to
intervene, and protests using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/doc-sfiling/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2311–068.
E:\FR\FM\30DEN1.SGM
30DEN1
Agencies
[Federal Register Volume 84, Number 249 (Monday, December 30, 2019)]
[Notices]
[Page 71920]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-28073]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP20-22-000]
Notice of Request Under Blanket Authorization: Southern Star
Central Gas Pipeline, Inc.
Take notice that on December 9, 2019, Southern Star Central Gas
Pipeline, Inc. (Southern Star), 4700 State Highway 56, Owensboro,
Kentucky 42301, filed in Docket No. CP20-22-000 a prior notice request
pursuant to sections 157.205, and 157.208 of the Commission's
regulations under the Natural Gas Act (NGA), and Southern Star's
blanket certificate issued in Docket No. CP82-479-000, to increase the
maximum allowable operating pressure on Southern Star's Lines TLB
(Hobart Ranch Lateral), TLB-001, TLB-002, TLB-004, and TLB-005 in
Hemphill County, Texas, all as more fully set forth in the application
which is on file with the Commission and open to public inspection.
The filing may also be viewed on the web at https://www.ferc.gov
using the ``eLibrary'' link. Enter the docket number excluding the last
three digits in the docket number field to access the document. For
assistance, please contact FERC Online Support at
[email protected] or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
Any questions concerning this application may be directed to Cindy
C. Thompson, Manager, Regulatory, Southern Star Central Gas Pipeline,
Inc., 4700 State Highway 56, Owensboro, Kentucky 42301, by telephone at
(270) 852-4655, or by email at [email protected].
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding, or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list, and will be
notified of any meetings associated with the Commission's environmental
review process. Environmental commenters will not be required to serve
copies of filed documents on all other parties. However, the non-party
commenters, will not receive copies of all documents filed by other
parties or issued by the Commission and will not have the right to seek
court review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the eFiling link at
https://www.ferc.gov. Persons unable to file electronically should
submit an original and two copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426.
Dated: December 17, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-28073 Filed 12-27-19; 8:45 am]
BILLING CODE 6717-01-P