Idaho Irrigation District, New Sweden Irrigation District; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 71404-71405 [2019-27921]
Download as PDF
jbell on DSKJLSW7X2PROD with NOTICES
71404
Federal Register / Vol. 84, No. 248 / Friday, December 27, 2019 / Notices
(Uniper 46406, 46409) to be effective 1/
1/2020.
Filed Date: 12/17/19.
Accession Number: 20191217–5001.
Comments Due: 5 p.m. ET 12/30/19.
Docket Numbers: RP20–333–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing: Dec
2019 Cleanup Filing—Terminations and
Name Changes to be effective 1/17/2020.
Filed Date: 12/17/19.
Accession Number: 20191217–5067.
Comments Due: 5 p.m. ET 12/30/19.
Docket Numbers: RP20–334–000.
Applicants: Gulfstream Natural Gas
System, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate—Duke Energy Florida
912401 eff 12–1–19 contract ext to be
effective 1/1/2020.
Filed Date: 12/17/19.
Accession Number: 20191217–5096.
Comments Due: 5 p.m. ET 12/30/19.
Docket Numbers: RP20–335–000.
Applicants: Ruby Pipeline, L.L.C.
Description: § 4(d) Rate Filing:
Removal of Non-Conforming FTSA (El
Paso Marketing) to be effective 1/17/
2020.
Filed Date: 12/17/19.
Accession Number: 20191217–5104.
Comments Due: 5 p.m. ET 12/30/19.
Docket Numbers: RP20–336–000.
Applicants: Boardwalk Storage
Company, LLC.
Description: § 4(d) Rate Filing: Clean
ups and Clarifications related to new
Gas Management System to be effective
1/18/2020.
Filed Date: 12/18/19.
Accession Number: 20191218–5001.
Comments Due: 5 p.m. ET 12/30/19.
Docket Numbers: RP20–337–000.
Applicants: Sea Robin Pipeline
Company, LLC.
Description: Compliance filing
Annual Flowthrough Crediting
Mechanism filing on 12/18/19 to be
effective.
Filed Date: 12/18/19.
Accession Number: 20191218–5002.
Comments Due: 5 p.m. ET 12/30/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
VerDate Sep<11>2014
18:44 Dec 26, 2019
Jkt 250001
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 18, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary
[FR Doc. 2019–27877 Filed 12–26–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14513–002]
Idaho Irrigation District, New Sweden
Irrigation District; Notice of Application
Tendered for Filing With the
Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original Major
License.
b. Project No.: 14513–002.
c. Date Filed: December 18, 2019.
d. Applicant: Idaho Irrigation District,
New Sweden Irrigation District (the
Districts).
e. Name of Project: County Line Road
Hydroelectric Project.
f. Location: The proposed project
would be located on the Snake River in
Jefferson and Bonneville Counties,
Idaho. The project would not affect
federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Nicholas Josten,
2742 Saint Charles Ave., Idaho Falls,
Idaho 83404; (208) 528–6152.
i. FERC Contact: Matt Cutlip, (503)
552–2762 or matt.cutlip@ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. Project Description: The proposed
project would utilize water diverted
from the Snake River at an existing
diversion dam located 10 miles
upstream of Idaho Falls. Currently the
diversion dam diverts irrigation water
for agricultural purposes into the
existing Idaho Canal on the east side of
PO 00000
Frm 00057
Fmt 4703
Sfmt 4703
the river and Great Western Canal on
the west side of the river. Under the
proposed project, the Districts would
enlarge the canals by raising the banks
of each by an additional 1 to 3 feet to
increase their capacity and then divert
up to 1,000 cubic feet per second (cfs)
of additional flow into each canal for
power generation. On the east side of
the Snake River, flows for power
generation would be diverted into the
Idaho Canal and conveyed about 3.1
miles to a new East Side Powerhouse
and then discharged back to the Snake
River. On the west side of the Snake
River, flows for power generation would
be diverted into the Great Western Canal
and conveyed about 3.5 miles to a new
West Side Powerhouse and then
discharged back to the Snake River. The
Districts propose to maintain a 1,000-cfs
minimum flow in the 3.5-mile-long
segment of the Snake River bypassed by
the project whenever the project is
operating. The total capacity of both
powerhouses would be 2.5 megawatts
(MW), with a 1.2–MW capacity for the
single Kaplan turbine in the East Side
Powerhouse and a 1.3–MW capacity for
the single Kaplan turbine in the West
Side Powerhouse. The average annual
generation is expected to be 18.3
gigawatt-hours. The project would also
include two new 12.5-kilovolt
transmission lines, extending 2,500 feet
and 400 feet from the East Side and
West Side Powerhouses, respectively, to
the interconnection points with the
existing electrical distribution system.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website at https://
www.ferc.gov using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY).
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
E:\FR\FM\27DEN1.SGM
27DEN1
71405
Federal Register / Vol. 84, No. 248 / Friday, December 27, 2019 / Notices
Milestone
Target date
Notice of Acceptance/Notice of Ready for Environmental Analysis ................................................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ..............................................................
Commission issues Draft Environmental Assessment (EA) ............................................................................................................
Comments on Draft EA ....................................................................................................................................................................
Modified terms and conditions ..........................................................................................................................................................
Commission issues Final EA ............................................................................................................................................................
February 2020.
April 2020.
October 2020.
November 2020.
January 2021.
April 2021.
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: December 19, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–27921 Filed 12–26–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jbell on DSKJLSW7X2PROD with NOTICES
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: CP20–24–000.
Applicants: Sabine Pipe Line.
Description: Joint Application for
Certificate of Public Convenience and
Necessary for Application/Petition
Request/Certificate of Public
Convenience and Necessary.
Filed Date: 12/11/2019.
Accession Number: 20191211–5125.
Comments Due: 5 p.m. ET 1/2/20.
Docket Numbers: CP20–25–000.
Applicants: Bridgeline Holdings.
Description: Sabine Pipe Line LLC
and for a Limited Jurisdiction Certificate
of Bridgeline Holdings L/P under CP20–
24.
Filed Date: 12/11/2019.
Accession Number: 20191211–5125.
Comments Due: 5 p.m. ET 1/2/20.
Docket Numbers: RP19–1353–003.
Applicants: Northern Natural Gas
Company.
Description: Compliance filing
20191218 Motion Adjusted Base Case
Rates to be effective 1/1/2020.
Filed Date: 12/18/19.
Accession Number: 20191218–5032.
Comments Due: 5 p.m. ET 12/30/19.
Docket Numbers: RP19–1353–004.
Applicants: Northern Natural Gas
Company.
Description: Compliance filing
20191218 Interim Rates to be effective
1/1/2020.
Filed Date: 12/18/19.
Accession Number: 20191218–5138.
VerDate Sep<11>2014
18:44 Dec 26, 2019
Jkt 250001
Comments Due: 5 p.m. ET 12/30/19.
Docket Numbers: RP20–338–000.
Applicants: Midcontinent Express
Pipeline LLC.
Description: § 4(d) Rate Filing:
Removal of Expiring Chesapeake and
Total Agreements to be effective 2/1/
2020.
Filed Date: 12/18/19.
Accession Number: 20191218–5004.
Comments Due: 5 p.m. ET 12/30/19.
Docket Numbers: RP20–339–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: § 4(d) Rate Filing:
Changes to Rate Schedule NNS–A to be
effective 1/18/2020.
Filed Date: 12/18/19.
Accession Number: 20191218–5007.
Comments Due: 5 p.m. ET 12/30/19.
Docket Numbers: RP20–340–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: Neg
Rate 2019–12–18 Amend DTE E2W to
be effective 12/19/2019.
Filed Date: 12/18/19.
Accession Number: 20191218–5117.
Comments Due: 5 p.m. ET 12/30/19.
Docket Numbers: RP20–341–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement Update (Salt
Creek) to be effective 1/1/2020.
Filed Date: 12/18/19.
Accession Number: 20191218–5140.
Comments Due: 5 p.m. ET 12/30/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 19, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–27919 Filed 12–26–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2004–307]
Holyoke Gas & Electric Department;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-Capacity
Amendment.
b. Project No: 2004–307.
c. Date Filed: December 4, 2019.
d. Applicant: Holyoke Gas & Electric
Department (HG&E).
e. Name of Project: Holyoke
Hydroelectric Project.
f. Location: The project is located on
the Holyoke Canal System, off of the
Connecticut River in Hampden,
Massachusetts.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Paul S.
Ducheney, Superintendent—Electric
Production, 99 Holyoke Gas and Electric
Department, 99 Suffolk Street, Holyoke,
MA 01040, (413) 536–9340, ducheney@
hged.com.
i. FERC Contact: Kim Nguyen, (202)
502–6015, kim.nguyen@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
January 21, 2020.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
E:\FR\FM\27DEN1.SGM
27DEN1
Agencies
[Federal Register Volume 84, Number 248 (Friday, December 27, 2019)]
[Notices]
[Pages 71404-71405]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-27921]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14513-002]
Idaho Irrigation District, New Sweden Irrigation District; Notice
of Application Tendered for Filing With the Commission and Establishing
Procedural Schedule for Licensing and Deadline for Submission of Final
Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Original Major License.
b. Project No.: 14513-002.
c. Date Filed: December 18, 2019.
d. Applicant: Idaho Irrigation District, New Sweden Irrigation
District (the Districts).
e. Name of Project: County Line Road Hydroelectric Project.
f. Location: The proposed project would be located on the Snake
River in Jefferson and Bonneville Counties, Idaho. The project would
not affect federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Nicholas Josten, 2742 Saint Charles Ave.,
Idaho Falls, Idaho 83404; (208) 528-6152.
i. FERC Contact: Matt Cutlip, (503) 552-2762 or
[email protected].
j. This application is not ready for environmental analysis at this
time.
k. Project Description: The proposed project would utilize water
diverted from the Snake River at an existing diversion dam located 10
miles upstream of Idaho Falls. Currently the diversion dam diverts
irrigation water for agricultural purposes into the existing Idaho
Canal on the east side of the river and Great Western Canal on the west
side of the river. Under the proposed project, the Districts would
enlarge the canals by raising the banks of each by an additional 1 to 3
feet to increase their capacity and then divert up to 1,000 cubic feet
per second (cfs) of additional flow into each canal for power
generation. On the east side of the Snake River, flows for power
generation would be diverted into the Idaho Canal and conveyed about
3.1 miles to a new East Side Powerhouse and then discharged back to the
Snake River. On the west side of the Snake River, flows for power
generation would be diverted into the Great Western Canal and conveyed
about 3.5 miles to a new West Side Powerhouse and then discharged back
to the Snake River. The Districts propose to maintain a 1,000-cfs
minimum flow in the 3.5-mile-long segment of the Snake River bypassed
by the project whenever the project is operating. The total capacity of
both powerhouses would be 2.5 megawatts (MW), with a 1.2-MW capacity
for the single Kaplan turbine in the East Side Powerhouse and a 1.3-MW
capacity for the single Kaplan turbine in the West Side Powerhouse. The
average annual generation is expected to be 18.3 gigawatt-hours. The
project would also include two new 12.5-kilovolt transmission lines,
extending 2,500 feet and 400 feet from the East Side and West Side
Powerhouses, respectively, to the interconnection points with the
existing electrical distribution system.
l. Locations of the Application: A copy of the application is
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's website at https://www.ferc.gov using
the eLibrary link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY).
m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Procedural Schedule: The application will be processed according
to the following preliminary Hydro Licensing Schedule. Revisions to the
schedule may be made as appropriate.
[[Page 71405]]
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready February 2020.
for Environmental Analysis.
Filing of recommendations, preliminary April 2020.
terms and conditions, and fishway
prescriptions.
Commission issues Draft Environmental October 2020.
Assessment (EA).
Comments on Draft EA................... November 2020.
Modified terms and conditions.......... January 2021.
Commission issues Final EA............. April 2021.
------------------------------------------------------------------------
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: December 19, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-27921 Filed 12-26-19; 8:45 am]
BILLING CODE 6717-01-P