Combined Notice of Filings, 71405 [2019-27919]
Download as PDF
71405
Federal Register / Vol. 84, No. 248 / Friday, December 27, 2019 / Notices
Milestone
Target date
Notice of Acceptance/Notice of Ready for Environmental Analysis ................................................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ..............................................................
Commission issues Draft Environmental Assessment (EA) ............................................................................................................
Comments on Draft EA ....................................................................................................................................................................
Modified terms and conditions ..........................................................................................................................................................
Commission issues Final EA ............................................................................................................................................................
February 2020.
April 2020.
October 2020.
November 2020.
January 2021.
April 2021.
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: December 19, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–27921 Filed 12–26–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jbell on DSKJLSW7X2PROD with NOTICES
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: CP20–24–000.
Applicants: Sabine Pipe Line.
Description: Joint Application for
Certificate of Public Convenience and
Necessary for Application/Petition
Request/Certificate of Public
Convenience and Necessary.
Filed Date: 12/11/2019.
Accession Number: 20191211–5125.
Comments Due: 5 p.m. ET 1/2/20.
Docket Numbers: CP20–25–000.
Applicants: Bridgeline Holdings.
Description: Sabine Pipe Line LLC
and for a Limited Jurisdiction Certificate
of Bridgeline Holdings L/P under CP20–
24.
Filed Date: 12/11/2019.
Accession Number: 20191211–5125.
Comments Due: 5 p.m. ET 1/2/20.
Docket Numbers: RP19–1353–003.
Applicants: Northern Natural Gas
Company.
Description: Compliance filing
20191218 Motion Adjusted Base Case
Rates to be effective 1/1/2020.
Filed Date: 12/18/19.
Accession Number: 20191218–5032.
Comments Due: 5 p.m. ET 12/30/19.
Docket Numbers: RP19–1353–004.
Applicants: Northern Natural Gas
Company.
Description: Compliance filing
20191218 Interim Rates to be effective
1/1/2020.
Filed Date: 12/18/19.
Accession Number: 20191218–5138.
VerDate Sep<11>2014
18:44 Dec 26, 2019
Jkt 250001
Comments Due: 5 p.m. ET 12/30/19.
Docket Numbers: RP20–338–000.
Applicants: Midcontinent Express
Pipeline LLC.
Description: § 4(d) Rate Filing:
Removal of Expiring Chesapeake and
Total Agreements to be effective 2/1/
2020.
Filed Date: 12/18/19.
Accession Number: 20191218–5004.
Comments Due: 5 p.m. ET 12/30/19.
Docket Numbers: RP20–339–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: § 4(d) Rate Filing:
Changes to Rate Schedule NNS–A to be
effective 1/18/2020.
Filed Date: 12/18/19.
Accession Number: 20191218–5007.
Comments Due: 5 p.m. ET 12/30/19.
Docket Numbers: RP20–340–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: Neg
Rate 2019–12–18 Amend DTE E2W to
be effective 12/19/2019.
Filed Date: 12/18/19.
Accession Number: 20191218–5117.
Comments Due: 5 p.m. ET 12/30/19.
Docket Numbers: RP20–341–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement Update (Salt
Creek) to be effective 1/1/2020.
Filed Date: 12/18/19.
Accession Number: 20191218–5140.
Comments Due: 5 p.m. ET 12/30/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 19, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–27919 Filed 12–26–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2004–307]
Holyoke Gas & Electric Department;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-Capacity
Amendment.
b. Project No: 2004–307.
c. Date Filed: December 4, 2019.
d. Applicant: Holyoke Gas & Electric
Department (HG&E).
e. Name of Project: Holyoke
Hydroelectric Project.
f. Location: The project is located on
the Holyoke Canal System, off of the
Connecticut River in Hampden,
Massachusetts.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Paul S.
Ducheney, Superintendent—Electric
Production, 99 Holyoke Gas and Electric
Department, 99 Suffolk Street, Holyoke,
MA 01040, (413) 536–9340, ducheney@
hged.com.
i. FERC Contact: Kim Nguyen, (202)
502–6015, kim.nguyen@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
January 21, 2020.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
E:\FR\FM\27DEN1.SGM
27DEN1
Agencies
[Federal Register Volume 84, Number 248 (Friday, December 27, 2019)]
[Notices]
[Page 71405]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-27919]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Docket Numbers: CP20-24-000.
Applicants: Sabine Pipe Line.
Description: Joint Application for Certificate of Public
Convenience and Necessary for Application/Petition Request/Certificate
of Public Convenience and Necessary.
Filed Date: 12/11/2019.
Accession Number: 20191211-5125.
Comments Due: 5 p.m. ET 1/2/20.
Docket Numbers: CP20-25-000.
Applicants: Bridgeline Holdings.
Description: Sabine Pipe Line LLC and for a Limited Jurisdiction
Certificate of Bridgeline Holdings L/P under CP20-24.
Filed Date: 12/11/2019.
Accession Number: 20191211-5125.
Comments Due: 5 p.m. ET 1/2/20.
Docket Numbers: RP19-1353-003.
Applicants: Northern Natural Gas Company.
Description: Compliance filing 20191218 Motion Adjusted Base Case
Rates to be effective 1/1/2020.
Filed Date: 12/18/19.
Accession Number: 20191218-5032.
Comments Due: 5 p.m. ET 12/30/19.
Docket Numbers: RP19-1353-004.
Applicants: Northern Natural Gas Company.
Description: Compliance filing 20191218 Interim Rates to be
effective 1/1/2020.
Filed Date: 12/18/19.
Accession Number: 20191218-5138.
Comments Due: 5 p.m. ET 12/30/19.
Docket Numbers: RP20-338-000.
Applicants: Midcontinent Express Pipeline LLC.
Description: Sec. 4(d) Rate Filing: Removal of Expiring Chesapeake
and Total Agreements to be effective 2/1/2020.
Filed Date: 12/18/19.
Accession Number: 20191218-5004.
Comments Due: 5 p.m. ET 12/30/19.
Docket Numbers: RP20-339-000.
Applicants: Gulf South Pipeline Company, LP.
Description: Sec. 4(d) Rate Filing: Changes to Rate Schedule NNS-A
to be effective 1/18/2020.
Filed Date: 12/18/19.
Accession Number: 20191218-5007.
Comments Due: 5 p.m. ET 12/30/19.
Docket Numbers: RP20-340-000.
Applicants: Rockies Express Pipeline LLC.
Description: Sec. 4(d) Rate Filing: Neg Rate 2019-12-18 Amend DTE
E2W to be effective 12/19/2019.
Filed Date: 12/18/19.
Accession Number: 20191218-5117.
Comments Due: 5 p.m. ET 12/30/19.
Docket Numbers: RP20-341-000.
Applicants: El Paso Natural Gas Company, L.L.C.
Description: Sec. 4(d) Rate Filing: Negotiated Rate Agreement
Update (Salt Creek) to be effective 1/1/2020.
Filed Date: 12/18/19.
Accession Number: 20191218-5140.
Comments Due: 5 p.m. ET 12/30/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: December 19, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-27919 Filed 12-26-19; 8:45 am]
BILLING CODE 6717-01-P