Combined Notice of Filings #1, 70178-70179 [2019-27496]
Download as PDF
70178
Federal Register / Vol. 84, No. 245 / Friday, December 20, 2019 / Notices
Energy U.S. Subsidiary No. 1, Inc.,
Emera Energy U.S. Subsidiary No. 2,
Inc., Emera Maine, NS Power Energy
Marketing Inc.
Description: Triennial Market Power
Update for Northeast Region of the
Emera Entities.
Filed Date: 12/16/19.
Accession Number: 20191216–5065.
Comments Due: 5 p.m. ET 2/14/20.
Docket Numbers: ER11–3376–005;
Dated: December 13, 2019.
ER11–3377–005; ER11–3378–005.
Nathaniel J. Davis, Sr.,
Applicants: North Hurlburt Wind,
Deputy Secretary.
LLC, Horseshoe Bend Wind, LLC, South
[FR Doc. 2019–27497 Filed 12–19–19; 8:45 am]
Hurlburt Wind, LLC.
BILLING CODE 6717–01–P
Description: Triennial Market Power
Analysis for Northwest Region of North
Hurlburt Wind, LLC, et al.
DEPARTMENT OF ENERGY
Filed Date: 12/13/19.
Federal Energy Regulatory
Accession Number: 20191213–5225.
Commission
Comments Due: 5 p.m. ET 2/11/20.
Docket Numbers: ER19–460–005.
Combined Notice of Filings #1
Applicants: Southwest Power Pool,
Inc.
Take notice that the Commission
Description: Compliance filing: Order
received the following electric rate
No. 841 Compliance Filing in Response
filings:
to October 2019 Order to be effective 12/
Docket Numbers: ER10–1982–015;
31/9998.
ER10–1246–014; ER10–1252–014;
Filed Date: 12/16/19.
ER10–1253–014.
Accession Number: 20191216–5060.
Applicants: Consolidated Edison
Comments Due: 5 p.m. ET 1/6/20.
Energy, Inc, Consolidated Edison
Solutions, Inc., Consolidated Edison
Docket Numbers: ER19–469–003.
Company of New York, Inc., Orange and
Applicants: PJM Interconnection,
Rockland Utilities, Inc.
L.L.C.
Description: Triennial Market Power
Description: Compliance filing:
Analysis of the Con Edison Companies.
Compliance Filing Pursuant October 17,
Filed Date: 12/16/19.
2019 Order re ESR to be effective 12/3/
Accession Number: 20191216–5098.
2019.
Comments Due: 5 p.m. ET 2/14/20.
Filed Date: 12/16/19.
Docket Numbers: ER10–2732–018;
Accession Number: 20191216–5080.
ER10–2733–018; ER10–2734–018;
Comments Due: 5 p.m. ET 1/6/20.
ER10–2736–018; ER10–2737–018;
Docket Numbers: ER20–270–002.
ER10–2741–018; ER10–2749–018;
Applicants: Dynegy Oakland, LLC.
ER10–2752–018; ER12–2492–014;
Description: Tariff Amendment:
ER12–2493–014; ER12–2494–014;
Deferral of Commission Action to
ER12–2495–014; ER12–2496–014;
Permit Ongoing Settlement Discussions
ER14–264–005; ER16–2455–008; ER16–
to be effective 12/31/9998.
2456–008; ER16–2457–008; ER16–2459–
Filed Date: 12/13/19.
008; ER18–1404–004; ER19–2096–001.
Accession Number: 20191213–5205.
Applicants: Emera Energy Services,
Comments Due: 5 p.m. ET 1/3/20.
Inc., Emera Energy LNG, LLC, Emera
Docket Numbers: ER20–599–000.
Energy Services Subsidiary No. 1 LLC,
Applicants: Northern Indiana Public
Emera Energy Services Subsidiary No. 2
Service Company.
LLC, Emera Energy Services Subsidiary
Description: § 205(d) Rate Filing:
No. 3 LLC, Emera Energy Services
Filing of a CIAC Agreement to be
Subsidiary No. 4 LLC, Emera Energy
effective 2/11/2020.
Services Subsidiary No. 5 LLC, Emera
Filed Date: 12/13/19.
Energy Services Subsidiary No. 6 LLC,
Accession Number: 20191213–5181.
Emera Energy Services Subsidiary No. 7
Comments Due: 5 p.m. ET 1/3/20.
LLC, Emera Energy Services Subsidiary
Docket Numbers: ER20–600–000.
No. 8 LLC, Emera Energy Services
Applicants: Florida Power & Light
Subsidiary No. 9 LLC, Emera Energy
Company.
Services Subsidiary No. 10 LLC, Emera
Description: § 205(d) Rate Filing:
Energy Services Subsidiary No. 11 LLC,
Emera Energy Services Subsidiary No.
FPL–TECO-Revisions to Rate Schedule
12 LLC, Emera Energy Services
No. 23 Contract for Interchange Service
Subsidiary No. 13 LLC, Emera Energy
to be effective 1/1/2020.
Services Subsidiary No. 15 LLC, Emera
Filed Date: 12/13/19.
jbell on DSKJLSW7X2PROD with NOTICES
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
VerDate Sep<11>2014
18:30 Dec 19, 2019
Jkt 250001
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Accession Number: 20191213–5187.
Comments Due: 5 p.m. ET 1/3/20.
Docket Numbers: ER20–601–000.
Applicants: Northern Indiana Public
Service Company.
Description: § 205(d) Rate Filing:
Filing of a CIAC Agreement to be
effective 2/11/2020.
Filed Date: 12/13/19.
Accession Number: 20191213–5206.
Comments Due: 5 p.m. ET 1/3/20.
Docket Numbers: ER20–602–000.
Applicants: Northern Indiana Public
Service Company.
Description: § 205(d) Rate Filing:
Filing of a CIAC Agreement to be
effective 1/15/2020.
Filed Date: 12/13/19.
Accession Number: 20191213–5207.
Comments Due: 5 p.m. ET 1/3/20.
Docket Numbers: ER20–603–000.
Applicants: Northern Indiana Public
Service Company.
Description: § 205(d) Rate Filing:
Filing of a CIAC Agreement to be
effective 1/15/2020.
Filed Date: 12/13/19.
Accession Number: 20191213–5209.
Comments Due: 5 p.m. ET 1/3/20.
Docket Numbers: ER20–604–000.
Applicants: PacifiCorp.
Description: Notice of Cancellation of
Rate Schedule No. 298 of PacifiCorp.
Filed Date: 12/13/19.
Accession Number: 20191213–5239.
Comments Due: 5 p.m. ET 1/3/20.
Docket Numbers: ER20–605–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–12–16_SA 3391 Ameren IL-Maple
Flats Solar Energy Center GIA (J813) to
be effective 12/2/2019.
Filed Date: 12/16/19.
Accession Number: 20191216–5071.
Comments Due: 5 p.m. ET 1/6/20.
Docket Numbers: ER20–606–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–12–16_SA 3390 MDU-EmmonsLogan Wind GIA (J302 J503) to be
effective 12/2/2019.
Filed Date: 12/16/19.
Accession Number: 20191216–5074.
Comments Due: 5 p.m. ET 1/6/20.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES20–11–000.
Applicants: ITC Midwest LLC.
Description: Application Under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of ITC
Midwest LLC.
Filed Date: 12/16/19.
Accession Number: 20191216–5105.
E:\FR\FM\20DEN1.SGM
20DEN1
Federal Register / Vol. 84, No. 245 / Friday, December 20, 2019 / Notices
Comments Due: 5 p.m. ET 1/6/20.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 16, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–27496 Filed 12–19–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3452–017]
jbell on DSKJLSW7X2PROD with NOTICES
Erie Boulevard Hydropower, L.P.;
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 3452–017.
c. Date Filed: June 28, 2019.
d. Applicant: Erie Boulevard
Hydropower, L.P.
e. Name of Project: Oak Orchard
Hydroelectric Project.
f. Location: The project is located
adjacent to the New York State Canal
Corporation’s barge canal in the Village
of Medina, Orleans County, New York.
The project does not occupy any federal
land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Steven P.
Murphy, Director, U.S. Licensing, Erie
Boulevard Hydropower, L.P., 33 West
1st Street South, Fulton, NY 13069;
(315) 598–6130; email—
steven.murphy@
brookfieldrenewable.com.
VerDate Sep<11>2014
18:30 Dec 19, 2019
Jkt 250001
i. FERC Contact: Laurie Bauer at (202)
502–6519; or email at laurie.bauer@
ferc.gov.
j. Deadline for filing motions to
intervene and protests: 60 days from the
issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and protests using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–3452–017.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted,
but is not ready for environmental
analysis at this time.
l. The Oak Orchard Project consists of
the following existing facilities: (1) A
concrete gravity dam containing a
spillway with a crest elevation of 507.6
feet mean sea level (msl) surmounted by
2-foot-high flashboards and two 5-foothigh, 5-foot-wide flood gates; (2) a
forebay with a surface area of 0.25 acre
and a storage capacity of 3 acre-feet at
the normal pool elevation of 509.6 feet
msl; (3) an intake structure with
trashracks; (4) a 7-foot-diameter, 85-footlong welded steel penstock from the
intake to the turbine; (5) a 20-foot-long,
43-foot-wide powerhouse containing a
single turbine-generator unit with a
rated capacity of 350 kilowatts; (6) a
tailrace located on the left (west) bank
of Oak Orchard Creek; (7) a 55-foot-long
underground generation lead; (8) three
single-phase 167 kilovolt-ampere polemounted power transformers; (9) a 400foot-long access road; and (10)
appurtenant facilities.
The Oak Orchard Project is operated
in a run-of-river mode with an average
annual generation of 1,147 megawatthours between 2009 and 2018.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
70179
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210, .211,
and .214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must: (1) Bear in all capital
letters the title PROTEST or MOTION
TO INTERVENE; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. Agencies
may obtain copies of the application
directly from the applicant. A copy of
any protest or motion to intervene must
be served upon each representative of
the applicant specified in the particular
application.
o. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made as appropriate.
Issue Scoping Document 1 for
comments—January 2020
Request Additional Information (if
necessary)—March 2020
Issue Scoping Document 2 (if
necessary)—April 2020
Issue notice of ready for environmental
analysis—April 2020
Commission issues EA—October 2020
Comments on EA—November 2020
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
E:\FR\FM\20DEN1.SGM
20DEN1
Agencies
[Federal Register Volume 84, Number 245 (Friday, December 20, 2019)]
[Notices]
[Pages 70178-70179]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-27496]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-1982-015; ER10-1246-014; ER10-1252-014; ER10-
1253-014.
Applicants: Consolidated Edison Energy, Inc, Consolidated Edison
Solutions, Inc., Consolidated Edison Company of New York, Inc., Orange
and Rockland Utilities, Inc.
Description: Triennial Market Power Analysis of the Con Edison
Companies.
Filed Date: 12/16/19.
Accession Number: 20191216-5098.
Comments Due: 5 p.m. ET 2/14/20.
Docket Numbers: ER10-2732-018; ER10-2733-018; ER10-2734-018; ER10-
2736-018; ER10-2737-018; ER10-2741-018; ER10-2749-018; ER10-2752-018;
ER12-2492-014; ER12-2493-014; ER12-2494-014; ER12-2495-014; ER12-2496-
014; ER14-264-005; ER16-2455-008; ER16-2456-008; ER16-2457-008; ER16-
2459-008; ER18-1404-004; ER19-2096-001.
Applicants: Emera Energy Services, Inc., Emera Energy LNG, LLC,
Emera Energy Services Subsidiary No. 1 LLC, Emera Energy Services
Subsidiary No. 2 LLC, Emera Energy Services Subsidiary No. 3 LLC, Emera
Energy Services Subsidiary No. 4 LLC, Emera Energy Services Subsidiary
No. 5 LLC, Emera Energy Services Subsidiary No. 6 LLC, Emera Energy
Services Subsidiary No. 7 LLC, Emera Energy Services Subsidiary No. 8
LLC, Emera Energy Services Subsidiary No. 9 LLC, Emera Energy Services
Subsidiary No. 10 LLC, Emera Energy Services Subsidiary No. 11 LLC,
Emera Energy Services Subsidiary No. 12 LLC, Emera Energy Services
Subsidiary No. 13 LLC, Emera Energy Services Subsidiary No. 15 LLC,
Emera Energy U.S. Subsidiary No. 1, Inc., Emera Energy U.S. Subsidiary
No. 2, Inc., Emera Maine, NS Power Energy Marketing Inc.
Description: Triennial Market Power Update for Northeast Region of
the Emera Entities.
Filed Date: 12/16/19.
Accession Number: 20191216-5065.
Comments Due: 5 p.m. ET 2/14/20.
Docket Numbers: ER11-3376-005; ER11-3377-005; ER11-3378-005.
Applicants: North Hurlburt Wind, LLC, Horseshoe Bend Wind, LLC,
South Hurlburt Wind, LLC.
Description: Triennial Market Power Analysis for Northwest Region
of North Hurlburt Wind, LLC, et al.
Filed Date: 12/13/19.
Accession Number: 20191213-5225.
Comments Due: 5 p.m. ET 2/11/20.
Docket Numbers: ER19-460-005.
Applicants: Southwest Power Pool, Inc.
Description: Compliance filing: Order No. 841 Compliance Filing in
Response to October 2019 Order to be effective 12/31/9998.
Filed Date: 12/16/19.
Accession Number: 20191216-5060.
Comments Due: 5 p.m. ET 1/6/20.
Docket Numbers: ER19-469-003.
Applicants: PJM Interconnection, L.L.C.
Description: Compliance filing: Compliance Filing Pursuant October
17, 2019 Order re ESR to be effective 12/3/2019.
Filed Date: 12/16/19.
Accession Number: 20191216-5080.
Comments Due: 5 p.m. ET 1/6/20.
Docket Numbers: ER20-270-002.
Applicants: Dynegy Oakland, LLC.
Description: Tariff Amendment: Deferral of Commission Action to
Permit Ongoing Settlement Discussions to be effective 12/31/9998.
Filed Date: 12/13/19.
Accession Number: 20191213-5205.
Comments Due: 5 p.m. ET 1/3/20.
Docket Numbers: ER20-599-000.
Applicants: Northern Indiana Public Service Company.
Description: Sec. 205(d) Rate Filing: Filing of a CIAC Agreement
to be effective 2/11/2020.
Filed Date: 12/13/19.
Accession Number: 20191213-5181.
Comments Due: 5 p.m. ET 1/3/20.
Docket Numbers: ER20-600-000.
Applicants: Florida Power & Light Company.
Description: Sec. 205(d) Rate Filing: FPL-TECO-Revisions to Rate
Schedule No. 23 Contract for Interchange Service to be effective 1/1/
2020.
Filed Date: 12/13/19.
Accession Number: 20191213-5187.
Comments Due: 5 p.m. ET 1/3/20.
Docket Numbers: ER20-601-000.
Applicants: Northern Indiana Public Service Company.
Description: Sec. 205(d) Rate Filing: Filing of a CIAC Agreement
to be effective 2/11/2020.
Filed Date: 12/13/19.
Accession Number: 20191213-5206.
Comments Due: 5 p.m. ET 1/3/20.
Docket Numbers: ER20-602-000.
Applicants: Northern Indiana Public Service Company.
Description: Sec. 205(d) Rate Filing: Filing of a CIAC Agreement
to be effective 1/15/2020.
Filed Date: 12/13/19.
Accession Number: 20191213-5207.
Comments Due: 5 p.m. ET 1/3/20.
Docket Numbers: ER20-603-000.
Applicants: Northern Indiana Public Service Company.
Description: Sec. 205(d) Rate Filing: Filing of a CIAC Agreement
to be effective 1/15/2020.
Filed Date: 12/13/19.
Accession Number: 20191213-5209.
Comments Due: 5 p.m. ET 1/3/20.
Docket Numbers: ER20-604-000.
Applicants: PacifiCorp.
Description: Notice of Cancellation of Rate Schedule No. 298 of
PacifiCorp.
Filed Date: 12/13/19.
Accession Number: 20191213-5239.
Comments Due: 5 p.m. ET 1/3/20.
Docket Numbers: ER20-605-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-12-16_SA 3391 Ameren
IL-Maple Flats Solar Energy Center GIA (J813) to be effective 12/2/
2019.
Filed Date: 12/16/19.
Accession Number: 20191216-5071.
Comments Due: 5 p.m. ET 1/6/20.
Docket Numbers: ER20-606-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-12-16_SA 3390 MDU-
Emmons-Logan Wind GIA (J302 J503) to be effective 12/2/2019.
Filed Date: 12/16/19.
Accession Number: 20191216-5074.
Comments Due: 5 p.m. ET 1/6/20.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES20-11-000.
Applicants: ITC Midwest LLC.
Description: Application Under Section 204 of the Federal Power Act
for Authorization to Issue Securities of ITC Midwest LLC.
Filed Date: 12/16/19.
Accession Number: 20191216-5105.
[[Page 70179]]
Comments Due: 5 p.m. ET 1/6/20.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: December 16, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-27496 Filed 12-19-19; 8:45 am]
BILLING CODE 6717-01-P