Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant, Units 3 and 4; Consolidation of Structural Building Inspections, Tests, Analyses, and Acceptance Criteria, 69784-69786 [2019-27392]
Download as PDF
69784
Federal Register / Vol. 84, No. 244 / Thursday, December 19, 2019 / Notices
Affected Public: Individuals and
Households, Businesses and
Organizations, State, Local or Tribal
Government.
Average Expected Annual Number of
Activities: 50.
Respondents: 500 per activity.
Annual Responses: 7,500.
Frequency of Response: Once per
request.
Average Minutes per Response: 30.
Burden Hours: 12,500.
Comments: Comments are invited on
(a) whether the proposed collection of
information is necessary for the proper
performance of the functions of the
Agency, including whether the
information shall have practical utility;
(b) the accuracy of the Agency’s
estimate of the burden of the proposed
collection of information; (c) ways to
enhance the quality, utility, and clarity
of the information on respondents,
including through the use of automated
collection techniques or other forms of
information technology; and (d) ways to
minimize the burden of the collection of
information on those who are to
respond, including through the use of
appropriate automated, electronic,
mechanical, or other technological
collection techniques or other forms of
information technology.
Dated: December 16, 2019.
Suzanne H. Plimpton,
Reports Clearance Officer, National Science
Foundation.
[FR Doc. 2019–27412 Filed 12–18–19; 8:45 am]
BILLING CODE 7555–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2019–0001]
Sunshine Act Meetings
TIME AND DATE:
Weeks of December 16,
2019.
Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS: Public.
MATTERS TO BE CONSIDERED:
PLACE:
Week of December 16, 2019
lotter on DSKBCFDHB2PROD with NOTICES
Tuesday, December 17, 2019
1:25 p.m.—Affirmation Session (Public
Meeting) (Tentative)
a. Tennessee Valley Authority (Clinch
River Nuclear Site Early Site Permit
Application), Docket No. 52–047–
ESP, Mandatory Hearing Decision
(Tentative)
b. Entergy Nuclear Operations, Inc.,
Entergy Nuclear Generation Co.,
VerDate Sep<11>2014
19:13 Dec 18, 2019
Jkt 250001
Holtec International, and Holtec
Decommissioning International,
LLC, (Pilgrim Nuclear Power
Station)—License Transfer
(Tentative)
Additional Information: By a vote of
4–0 on December 16, 2019, the
Commission determined pursuant to
U.S.C. 552b(e) and ’9.107(a) of the
Commission’s rules that the above
referenced Affirmation Session be held
with less than one week notice to the
public. The meeting is scheduled on
December 17, 2019.
CONTACT PERSON FOR MORE INFORMATION:
For more information or to verify the
status of meetings, contact Denise
McGovern at 301–415–0681 or via email
at Denise.McGovern@nrc.gov. The
schedule for Commission meetings is
subject to change on short notice.
The NRC Commission Meeting
Schedule can be found on the internet
at: https://www.nrc.gov/public-involve/
public-meetings/schedule.html.
The NRC provides reasonable
accommodation to individuals with
disabilities where appropriate. If you
need a reasonable accommodation to
participate in these public meetings or
need this meeting notice or the
transcript or other information from the
public meetings in another format (e.g.,
braille, large print), please notify Anne
Silk, NRC Disability Program Specialist,
at 301–287–0745, by videophone at
240–428–3217, or by email at
Anne.Silk@nrc.gov. Determinations on
requests for reasonable accommodation
will be made on a case-by-case basis.
Members of the public may request to
receive this information electronically.
If you would like to be added to the
distribution, please contact the Nuclear
Regulatory Commission, Office of the
Secretary, Washington, DC 20555 (301–
415–1969), or by email at
Wendy.Moore@nrc.gov or Tyesha.Bush@
nrc.gov.
The NRC is holding the meetings
under the authority of the Government
in the Sunshine Act, 5 U.S.C. 552b.
Dated at Rockville, Maryland, this 16th day
of December 2019.
For the Nuclear Regulatory Commission.
Denise L. McGovern,
Policy Coordinator, Office of the Secretary.
[FR Doc. 2019–27443 Filed 12–17–19; 11:15 am]
BILLING CODE 7590–01–P
PO 00000
Frm 00065
Fmt 4703
Sfmt 4703
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 52–025 and 52–026; NRC–
2008–0252]
Southern Nuclear Operating Company,
Inc. Vogtle Electric Generating Plant,
Units 3 and 4; Consolidation of
Structural Building Inspections, Tests,
Analyses, and Acceptance Criteria
Nuclear Regulatory
Commission.
ACTION: Exemption and combined
license amendment; issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is granting an
exemption to allow a departure from the
certification information of Tier 1 of the
generic design control document (DCD)
and is issuing License Amendment No.
167 for Unit 3 and No. 165 for Unit 4
to Combined Licenses (COLs), NPF–91
and NPF–92. The COLs were issued to
Southern Nuclear Operating Company,
Inc., Georgia Power Company,
Oglethorpe Power Corporation, MEAG
Power SPVM, LLC, MEAG Power SPVJ,
LLC, MEAG Power SPVP, LLC, and the
City of Dalton, Georgia (collectively
SNC); for construction and operation of
the Vogtle Electric Generating Plant
(VEGP) Units 3 and 4, located in Burke
County, Georgia.
The granting of the exemption allows
the changes to Tier 1 information asked
for in the amendment. Because the
acceptability of the exemption was
determined in part by the acceptability
of the amendment, the exemption and
amendment are being issued
concurrently.
SUMMARY:
The exemption and amendment
were issued on November 15, 2019.
ADDRESSES: Please refer to Docket ID
NRC–2008–0252 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2008–0252. Address
questions about NRC Docket IDs in
Regulations.gov to Jennifer Borges;
telephone: 301–287–9127; email:
Jennifer.Borges@nrc.gov. For technical
questions, contact the individual listed
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
DATES:
E:\FR\FM\19DEN1.SGM
19DEN1
Federal Register / Vol. 84, No. 244 / Thursday, December 19, 2019 / Notices
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov. The ADAMS accession number
for each document referenced (if it is
available in ADAMS) is provided the
first time that it is mentioned in this
document. The request for the
amendment and exemption was
submitted by letter dated March 29,
2019, revised by letter dated October 10,
2019, and available in ADAMS under
Accession No. ML19088A274.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
Billy Gleaves, Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001; telephone: 301–415–5848; email:
Bill.Gleaves@nrc.gov.
SUPPLEMENTARY INFORMATION:
lotter on DSKBCFDHB2PROD with NOTICES
I. Introduction
The NRC is issuing VEGP Units 3 and
4 License Amendment Nos. 167 and 165
to COLs NPF 91 and NPF–92 and is
granting an exemption from Tier 1
information in the generic DCD for the
AP1000 design. The AP1000 design is
incorporated by reference in appendix
D, ‘‘Design Certification Rule for the
AP1000,’’ to part 52 of title 10 of the
Code of Federal Regulations (10 CFR).
The exemption, granted pursuant to
Paragraph A.4 of Section VIII,
‘‘Processes for Changes and
Departures,’’ of 10 CFR part 52,
appendix D, allows the licensee to
depart from the Tier 1 information. With
the requested amendment, SNC sought
proposed changes that would revise the
COLs to address certain duplicative
building- and structure-related
Inspections, Tests, Analyses, and
Acceptance Criteria (ITAAC) and to
include certain as-built thickness
deviations in the reconciliation and
thickness reports described in ITAAC
acceptance criteria of the VEGP Units 3
and 4 COL Appendix C (and plantspecific Tier 1 information). The
requested amendment proposes changes
in the form of departures from the
current VEGP Units 3 and 4 to plantspecific Tier 1 and corresponding
changes to COL Appendix C.
Part of the justification for granting
the exemption was provided by the
review of the amendment. Because the
exemption is necessary in order to issue
the requested license amendment, the
VerDate Sep<11>2014
19:13 Dec 18, 2019
Jkt 250001
NRC granted the exemption and issued
the amendment concurrently, rather
than in sequence. This included issuing
a combined safety evaluation containing
the NRC staff’s review of both the
exemption request and the license
amendment. The exemption met all
applicable regulatory criteria set forth in
§§ 50.12, 52.7, and section VIII.A.4 of
appendix D to 10 CFR part 52. The
license amendment was found to be
acceptable as well. The safety
evaluation is available in ADAMS under
Accession No. ML19164A271.
Identical exemption documents
(except for referenced unit numbers and
license numbers) were issued to SNC for
VEGP Units 3 and 4 (COLs NPF–91 and
NPF–92). The exemption documents for
VEGP Units 3 and 4 can be found in
ADAMS under Accession Nos.
ML19164A265 and ML19164A266,
respectively. The exemption is
reproduced (with the exception of
abbreviated titles and additional
citations) in Section II of this document.
The amendment documents for COLs
NPF–91 and NPF–92 are available in
ADAMS under Accession Nos.
ML19164A267 and ML19164A269,
respectively. A summary of the
amendment documents is provided in
Section III of this document.
II. Exemption
Reproduced below is the exemption
document issued to VEGP Units 3 and
4. It makes reference to the combined
safety evaluation that provides the
reasoning for the findings made by the
NRC (and listed under Item 1) in order
to grant the exemption:
1. In an application dated March 29,
2019, revised October 10, 2019, SNC
requested from the Commission an
exemption to allow departures from Tier
1 information in the certified DCD
incorporated by reference in 10 CFR
part 52, appendix D, as part of license
amendment request 19–005,
‘‘Consolidation of Structural Building
ITAAC.’’
For the reasons set forth in Section 3.2
of the NRC staff’s Safety Evaluation,
which can be found in ADAMS under
Accession No. ML19164A271, the
Commission finds that:
A. The exemption is authorized by
law;
B. the exemption presents no undue
risk to public health and safety;
C. the exemption is consistent with
the common defense and security;
D. special circumstances are present
in that the application of the rule in this
circumstance is not necessary to serve
the underlying purpose of the rule;
E. the special circumstances outweigh
any decrease in safety that may result
PO 00000
Frm 00066
Fmt 4703
Sfmt 4703
69785
from the reduction in standardization
caused by the exemption; and
F. the exemption will not result in a
significant decrease in the level of safety
otherwise provided by the design.
2. Accordingly, the licensee is granted
an exemption from the certified DCD
Tier 1 information as described in the
licensee’s request dated March 29, 2019,
revised October 10, 2019. This
exemption is related to, and necessary
for the granting of License Amendment
No. 167 [for Unit 3 and No. 165 for Unit
4] which is being issued concurrently
with this exemption.
3. As explained in Section 3.2 of the
NRC staff’s Safety Evaluation (ADAMS
Accession No. ML19164A271), this
exemption meets the eligibility criteria
for categorical exclusion set forth in 10
CFR 51.22(c)(9). Therefore, pursuant to
10 CFR 51.22(b), no environmental
impact statement or environmental
assessment needs to be prepared in
connection with the issuance of the
exemption.
4. This exemption is effective as of the
date of its issuance.
III. License Amendment Request
By letter dated March 29, 2019,
revised October 10, 2019 (ADAMS
Accession Nos. ML19088A274 and
ML19284C424), SNC requested that the
NRC amend the COLs for VEGP, Units
3 and 4, COLs NPF–91 and NPF–92. The
proposed amendment is described in
Section I of this Federal Register notice.
The Commission has determined for
these amendments that the application
complies with the standards and
requirements of the Atomic Energy Act
of 1954, as amended (the Act), and the
Commission’s rules and regulations.
The Commission has made appropriate
findings as required by the Act and the
Commission’s rules and regulations in
10 CFR chapter I, which are set forth in
the license amendment.
A notice of consideration of issuance
of amendment to facility operating
license or COL, as applicable, proposed
no significant hazards consideration
determination, and opportunity for a
hearing in connection with these
actions, was published in the Federal
Register on May 20, 2019 (84 FR 22907).
No comments were received during the
30-day comment period.
The Commission has determined that
these amendments satisfy the criteria for
categorical exclusion in accordance
with 10 CFR 51.22. Therefore, pursuant
to 10 CFR 51.22(b), no environmental
impact statement or environmental
assessment need be prepared for these
amendments.
E:\FR\FM\19DEN1.SGM
19DEN1
69786
Federal Register / Vol. 84, No. 244 / Thursday, December 19, 2019 / Notices
IV. Conclusion
Using the reasons set forth in the
safety evaluation, the staff granted the
exemption and issued the amendment
that SNC requested on March 29, 2019
and revised October 10, 2019.
The exemption and amendment were
issued to SNC on November 15, 2019, as
part of a combined package (ADAMS
Package Accession No. ML19164A263).
Dated at Rockville, Maryland, this 16th day
of December 2019.
For the Nuclear Regulatory Commission.
Victor E. Hall,
Branch Chief, Vogtle Project Office, Office
of Nuclear Reactor Regulation.
[FR Doc. 2019–27392 Filed 12–18–19; 8:45 am]
BILLING CODE 7590–01–P
POSTAL REGULATORY COMMISSION
[Docket Nos. MC2020–70 and CP2020–69;
Docket Nos. MC2020–71 and CP2020–70]
New Postal Products
Postal Regulatory Commission.
Notice.
AGENCY:
ACTION:
The Commission is noticing a
recent Postal Service filing for the
Commission’s consideration concerning
negotiated service agreements. This
notice informs the public of the filing,
invites public comment, and takes other
administrative steps.
DATES: Comments are due: December
20, 2019.
ADDRESSES: Submit comments
electronically via the Commission’s
Filing Online system at https://
www.prc.gov. Those who cannot submit
comments electronically should contact
the person identified in the FOR FURTHER
INFORMATION CONTACT section by
telephone for advice on filing
alternatives.
SUMMARY:
FOR FURTHER INFORMATION CONTACT:
David A. Trissell, General Counsel, at
202–789–6820.
SUPPLEMENTARY INFORMATION:
Table of Contents
I. Introduction
II. Docketed Proceeding(s)
lotter on DSKBCFDHB2PROD with NOTICES
I. Introduction
The Commission gives notice that the
Postal Service filed request(s) for the
Commission to consider matters related
to negotiated service agreement(s). The
request(s) may propose the addition or
removal of a negotiated service
agreement from the market dominant or
the competitive product list, or the
modification of an existing product
currently appearing on the market
VerDate Sep<11>2014
19:13 Dec 18, 2019
Jkt 250001
dominant or the competitive product
list.
Section II identifies the docket
number(s) associated with each Postal
Service request, the title of each Postal
Service request, the request’s acceptance
date, and the authority cited by the
Postal Service for each request. For each
request, the Commission appoints an
officer of the Commission to represent
the interests of the general public in the
proceeding, pursuant to 39 U.S.C. 505
(Public Representative). Section II also
establishes comment deadline(s)
pertaining to each request.
The public portions of the Postal
Service’s request(s) can be accessed via
the Commission’s website (https://
www.prc.gov). Non-public portions of
the Postal Service’s request(s), if any,
can be accessed through compliance
with the requirements of 39 CFR
3007.301.1
The Commission invites comments on
whether the Postal Service’s request(s)
in the captioned docket(s) are consistent
with the policies of title 39. For
request(s) that the Postal Service states
concern market dominant product(s),
applicable statutory and regulatory
requirements include 39 U.S.C. 3622, 39
U.S.C. 3642, 39 CFR part 3010, and 39
CFR part 3020, subpart B. For request(s)
that the Postal Service states concern
competitive product(s), applicable
statutory and regulatory requirements
include 39 U.S.C. 3632, 39 U.S.C. 3633,
39 U.S.C. 3642, 39 CFR part 3015, and
39 CFR part 3020, subpart B. Comment
deadline(s) for each request appear in
section II.
II. Docketed Proceeding(s)
1. Docket No(s).: MC2020–70 and
CP2020–69; Filing Title: USPS Request
to Add Priority Mail Contract 583 to
Competitive Product List and Notice of
Filing Materials Under Seal; Filing
Acceptance Date: December 12, 2019;
Filing Authority: 39 U.S.C. 3642, 39 CFR
3020.30 et seq., and 39 CFR 3015.5;
Public Representative: Gregory Stanton;
Comments Due: December 20, 2019.
2. Docket No(s).: MC2020–71 and
CP2020–70; Filing Title: USPS Request
to Add Priority Mail Contract 584 to
Competitive Product List and Notice of
Filing Materials Under Seal; Filing
Acceptance Date: December 12, 2019;
Filing Authority: 39 U.S.C. 3642, 39 CFR
3020.30 et seq., and 39 CFR 3015.5;
Public Representative: Gregory Stanton;
Comments Due: December 20, 2019.
1 See Docket No. RM2018–3, Order Adopting
Final Rules Relating to Non-Public Information,
June 27, 2018, Attachment A at 19–22 (Order No.
4679).
PO 00000
Frm 00067
Fmt 4703
Sfmt 4703
This Notice will be published in the
Federal Register.
Ruth Ann Abrams,
Acting Secretary.
[FR Doc. 2019–27299 Filed 12–18–19; 8:45 am]
BILLING CODE 7710–FW–P
POSTAL REGULATORY COMMISSION
[Docket Nos. MC2020–72 and CP2020–71;
Docket No. CP2020–72; Docket Nos.
MC2020–74 and CP2020–73; Docket Nos.
MC2020–75 and CP2020–74; Docket Nos.
MC2020–76 and CP2020–75]
New Postal Products
Postal Regulatory Commission.
Notice.
AGENCY:
ACTION:
The Commission is noticing a
recent Postal Service filing for the
Commission’s consideration concerning
negotiated service agreements. This
notice informs the public of the filing,
invites public comment, and takes other
administrative steps.
DATES: Comments are due: December
23, 2019.
ADDRESSES: Submit comments
electronically via the Commission’s
Filing Online system at https://
www.prc.gov. Those who cannot submit
comments electronically should contact
the person identified in the FOR FURTHER
INFORMATION CONTACT section by
telephone for advice on filing
alternatives.
SUMMARY:
FOR FURTHER INFORMATION CONTACT:
David A. Trissell, General Counsel, at
202–789–6820.
SUPPLEMENTARY INFORMATION:
Table of Contents
I. Introduction
II. Docketed Proceeding(s)
I. Introduction
The Commission gives notice that the
Postal Service filed request(s) for the
Commission to consider matters related
to negotiated service agreement(s). The
request(s) may propose the addition or
removal of a negotiated service
agreement from the market dominant or
the competitive product list, or the
modification of an existing product
currently appearing on the market
dominant or the competitive product
list.
Section II identifies the docket
number(s) associated with each Postal
Service request, the title of each Postal
Service request, the request’s acceptance
date, and the authority cited by the
Postal Service for each request. For each
request, the Commission appoints an
officer of the Commission to represent
E:\FR\FM\19DEN1.SGM
19DEN1
Agencies
[Federal Register Volume 84, Number 244 (Thursday, December 19, 2019)]
[Notices]
[Pages 69784-69786]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-27392]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 52-025 and 52-026; NRC-2008-0252]
Southern Nuclear Operating Company, Inc. Vogtle Electric
Generating Plant, Units 3 and 4; Consolidation of Structural Building
Inspections, Tests, Analyses, and Acceptance Criteria
AGENCY: Nuclear Regulatory Commission.
ACTION: Exemption and combined license amendment; issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is granting an
exemption to allow a departure from the certification information of
Tier 1 of the generic design control document (DCD) and is issuing
License Amendment No. 167 for Unit 3 and No. 165 for Unit 4 to Combined
Licenses (COLs), NPF-91 and NPF-92. The COLs were issued to Southern
Nuclear Operating Company, Inc., Georgia Power Company, Oglethorpe
Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG
Power SPVP, LLC, and the City of Dalton, Georgia (collectively SNC);
for construction and operation of the Vogtle Electric Generating Plant
(VEGP) Units 3 and 4, located in Burke County, Georgia.
The granting of the exemption allows the changes to Tier 1
information asked for in the amendment. Because the acceptability of
the exemption was determined in part by the acceptability of the
amendment, the exemption and amendment are being issued concurrently.
DATES: The exemption and amendment were issued on November 15, 2019.
ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly-available information related to this document
using any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0252. Address
questions about NRC Docket IDs in Regulations.gov to Jennifer Borges;
telephone: 301-287-9127; email: [email protected]. For technical
questions, contact the individual listed in the FOR FURTHER INFORMATION
CONTACT section of this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/
[[Page 69785]]
adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The ADAMS accession number for each
document referenced (if it is available in ADAMS) is provided the first
time that it is mentioned in this document. The request for the
amendment and exemption was submitted by letter dated March 29, 2019,
revised by letter dated October 10, 2019, and available in ADAMS under
Accession No. ML19088A274.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Billy Gleaves, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-5848; email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Introduction
The NRC is issuing VEGP Units 3 and 4 License Amendment Nos. 167
and 165 to COLs NPF 91 and NPF-92 and is granting an exemption from
Tier 1 information in the generic DCD for the AP1000 design. The AP1000
design is incorporated by reference in appendix D, ``Design
Certification Rule for the AP1000,'' to part 52 of title 10 of the Code
of Federal Regulations (10 CFR). The exemption, granted pursuant to
Paragraph A.4 of Section VIII, ``Processes for Changes and
Departures,'' of 10 CFR part 52, appendix D, allows the licensee to
depart from the Tier 1 information. With the requested amendment, SNC
sought proposed changes that would revise the COLs to address certain
duplicative building- and structure-related Inspections, Tests,
Analyses, and Acceptance Criteria (ITAAC) and to include certain as-
built thickness deviations in the reconciliation and thickness reports
described in ITAAC acceptance criteria of the VEGP Units 3 and 4 COL
Appendix C (and plant-specific Tier 1 information). The requested
amendment proposes changes in the form of departures from the current
VEGP Units 3 and 4 to plant-specific Tier 1 and corresponding changes
to COL Appendix C.
Part of the justification for granting the exemption was provided
by the review of the amendment. Because the exemption is necessary in
order to issue the requested license amendment, the NRC granted the
exemption and issued the amendment concurrently, rather than in
sequence. This included issuing a combined safety evaluation containing
the NRC staff's review of both the exemption request and the license
amendment. The exemption met all applicable regulatory criteria set
forth in Sec. Sec. 50.12, 52.7, and section VIII.A.4 of appendix D to
10 CFR part 52. The license amendment was found to be acceptable as
well. The safety evaluation is available in ADAMS under Accession No.
ML19164A271.
Identical exemption documents (except for referenced unit numbers
and license numbers) were issued to SNC for VEGP Units 3 and 4 (COLs
NPF-91 and NPF-92). The exemption documents for VEGP Units 3 and 4 can
be found in ADAMS under Accession Nos. ML19164A265 and ML19164A266,
respectively. The exemption is reproduced (with the exception of
abbreviated titles and additional citations) in Section II of this
document. The amendment documents for COLs NPF-91 and NPF-92 are
available in ADAMS under Accession Nos. ML19164A267 and ML19164A269,
respectively. A summary of the amendment documents is provided in
Section III of this document.
II. Exemption
Reproduced below is the exemption document issued to VEGP Units 3
and 4. It makes reference to the combined safety evaluation that
provides the reasoning for the findings made by the NRC (and listed
under Item 1) in order to grant the exemption:
1. In an application dated March 29, 2019, revised October 10,
2019, SNC requested from the Commission an exemption to allow
departures from Tier 1 information in the certified DCD incorporated by
reference in 10 CFR part 52, appendix D, as part of license amendment
request 19-005, ``Consolidation of Structural Building ITAAC.''
For the reasons set forth in Section 3.2 of the NRC staff's Safety
Evaluation, which can be found in ADAMS under Accession No.
ML19164A271, the Commission finds that:
A. The exemption is authorized by law;
B. the exemption presents no undue risk to public health and
safety;
C. the exemption is consistent with the common defense and
security;
D. special circumstances are present in that the application of the
rule in this circumstance is not necessary to serve the underlying
purpose of the rule;
E. the special circumstances outweigh any decrease in safety that
may result from the reduction in standardization caused by the
exemption; and
F. the exemption will not result in a significant decrease in the
level of safety otherwise provided by the design.
2. Accordingly, the licensee is granted an exemption from the
certified DCD Tier 1 information as described in the licensee's request
dated March 29, 2019, revised October 10, 2019. This exemption is
related to, and necessary for the granting of License Amendment No. 167
[for Unit 3 and No. 165 for Unit 4] which is being issued concurrently
with this exemption.
3. As explained in Section 3.2 of the NRC staff's Safety Evaluation
(ADAMS Accession No. ML19164A271), this exemption meets the eligibility
criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact
statement or environmental assessment needs to be prepared in
connection with the issuance of the exemption.
4. This exemption is effective as of the date of its issuance.
III. License Amendment Request
By letter dated March 29, 2019, revised October 10, 2019 (ADAMS
Accession Nos. ML19088A274 and ML19284C424), SNC requested that the NRC
amend the COLs for VEGP, Units 3 and 4, COLs NPF-91 and NPF-92. The
proposed amendment is described in Section I of this Federal Register
notice.
The Commission has determined for these amendments that the
application complies with the standards and requirements of the Atomic
Energy Act of 1954, as amended (the Act), and the Commission's rules
and regulations. The Commission has made appropriate findings as
required by the Act and the Commission's rules and regulations in 10
CFR chapter I, which are set forth in the license amendment.
A notice of consideration of issuance of amendment to facility
operating license or COL, as applicable, proposed no significant
hazards consideration determination, and opportunity for a hearing in
connection with these actions, was published in the Federal Register on
May 20, 2019 (84 FR 22907). No comments were received during the 30-day
comment period.
The Commission has determined that these amendments satisfy the
criteria for categorical exclusion in accordance with 10 CFR 51.22.
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact
statement or environmental assessment need be prepared for these
amendments.
[[Page 69786]]
IV. Conclusion
Using the reasons set forth in the safety evaluation, the staff
granted the exemption and issued the amendment that SNC requested on
March 29, 2019 and revised October 10, 2019.
The exemption and amendment were issued to SNC on November 15,
2019, as part of a combined package (ADAMS Package Accession No.
ML19164A263).
Dated at Rockville, Maryland, this 16th day of December 2019.
For the Nuclear Regulatory Commission.
Victor E. Hall,
Branch Chief, Vogtle Project Office, Office of Nuclear Reactor
Regulation.
[FR Doc. 2019-27392 Filed 12-18-19; 8:45 am]