Notice of Intent To Prepare an Environmental Assessment for the Proposed Portland Natural Gas Transmission System Westbrook XPress Project and Request for Comments on Environmental Issues, 69735-69737 [2019-27320]
Download as PDF
lotter on DSKBCFDHB2PROD with NOTICES
Federal Register / Vol. 84, No. 244 / Thursday, December 19, 2019 / Notices
Department’s information collection
requirements and provide the requested
data in the desired format. ED is
soliciting comments on the proposed
information collection request (ICR) that
is described below. The Department of
Education is especially interested in
public comment addressing the
following issues: (1) Is this collection
necessary to the proper functions of the
Department; (2) will this information be
processed and used in a timely manner;
(3) is the estimate of burden accurate;
(4) how might the Department enhance
the quality, utility, and clarity of the
information to be collected; and (5) how
might the Department minimize the
burden of this collection on the
respondents, including through the use
of information technology. Please note
that written comments received in
response to this notice will be
considered public records.
Title of Collection: Credit
Enhancement for Charter School
Facilities Program Performance Report.
OMB Control Number: 1855–0010.
Type of Review: An extension of an
existing information collection.
Respondents/Affected Public: Private
Sector.
Total Estimated Number of Annual
Responses: 60.
Total Estimated Number of Annual
Burden Hours: 1,500.
Abstract: The purpose of the Credit
Enhancement program is to award
grants to eligible entities that
demonstrate innovative methods of
helping charter schools address the cost
of acquiring, constructing, and
renovating facilities by enhancing the
availability of loans and bond financing.
This program provides grants to eligible
entities to permit them to enhance the
credit of charter schools so that the
charter schools can access private-sector
and other non-Federal capital in order
to acquire, construct, and renovate
facilities at a reasonable cost. The Credit
Enhancement for Charter School
Facilities Program and the Charter
Schools Facilities Financing
Demonstration Program have a statutory
mandate for an annual report. This
reporting is a requirement in order to
obtain or retain benefits according to
section 4304 of the Elementary and
Secondary Education Act of 1965 as
amended by the Every Student Succeeds
Act (ESSA) of 2015. The information is
collected in order to adhere to statutory
requirements and to perform monitoring
and evaluation of grantees.
VerDate Sep<11>2014
19:13 Dec 18, 2019
Jkt 250001
Dated: December 16, 2019.
Kate Mullan,
PRA Coordinator, Strategic Collections and
Clearance. Governance and Strategy Division,
Office of Chief Data Officer.
[FR Doc. 2019–27381 Filed 12–18–19; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–16–000]
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Portland Natural Gas
Transmission System Westbrook
XPress Project and Request for
Comments on Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Westbrook XPress Project involving
construction and operation of facilities
by Portland Natural Gas Transmission
System (PNGTS) in Cumberland
County, Maine. The Commission will
use this EA in its decision-making
process to determine whether the
project is in the public convenience and
necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies about issues
regarding the project. The National
Environmental Policy Act (NEPA)
requires the Commission to take into
account the environmental impacts that
could result from its action whenever it
considers the issuance of a Certificate of
Public Convenience and Necessity.
NEPA also requires the Commission to
discover concerns the public may have
about proposals. This process is referred
to as ‘‘scoping.’’ The main goal of the
scoping process is to focus the analysis
in the EA on the important
environmental issues. By this notice, the
Commission requests public comments
on the scope of issues to address in the
EA. To ensure that your comments are
timely and properly recorded, please
submit your comments so that the
Commission receives them in
Washington, DC on or before 5:00 p.m.
Eastern Time on January 21, 2020.
You can make a difference by
submitting your specific comments or
concerns about the project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
69735
input will help the Commission staff
determine what issues they need to
evaluate in the EA. Commission staff
will consider all filed comments during
the preparation of the EA.
If you sent comments on this project
to the Commission before the opening of
this docket on November 18, 2019, you
will need to file those comments in
Docket No. CP20–16–000 to ensure they
are considered as part of this
proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
easement agreement. You are not
required to enter into an agreement.
However, if the Commission approves
the project, that approval conveys with
it the right of eminent domain.
Therefore, if you and the company do
not reach an easement agreement, the
pipeline company could initiate
condemnation proceedings in court. In
such instances, compensation would be
determined by a judge in accordance
with state law.
PNGTS provided landowners with a
fact sheet prepared by the FERC entitled
‘‘An Interstate Natural Gas Facility On
My Land? What Do I Need To Know?’’
This fact sheet addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is also available for
viewing on the FERC website
(www.ferc.gov) at https://www.ferc.gov/
resources/guides/gas/gas.pdf.
Public Participation
The Commission offers a free service
called eSubscription which makes it
easy to stay informed of all issuances
and submittals regarding the dockets/
projects to which you subscribe. These
instant email notifications are the fastest
way to receive notification and provide
a link to the document files which can
reduce the amount of time you spend
researching proceedings. To sign up go
to www.ferc.gov/docs-filing/
esubscription.asp.
For your convenience, there are three
methods you can use to submit your
comments to the Commission. The
Commission encourages electronic filing
of comments and has staff available to
E:\FR\FM\19DEN1.SGM
19DEN1
69736
Federal Register / Vol. 84, No. 244 / Thursday, December 19, 2019 / Notices
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. Using eComment is an easy
method for submitting brief, text-only
comments on a project;
(2) You can file your comments
electronically by using the eFiling
feature, which is also on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; a
comment on a particular project is
considered a ‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the project docket number (CP20–16–
000) with your submission: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
lotter on DSKBCFDHB2PROD with NOTICES
Summary of the Proposed Project
PNGTS proposes modifications and
additions to existing facilities in
Cumberland County, Maine. The
Westbrook XPress Project would
provide about 131 billion standard
cubic feet of natural gas per day to New
England. According to PNGTS, its
project would provide access to, and
allow for the transportation of, natural
gas supplies from North American
supply basins, such as Marcellus, Utica,
and others, via TransCanada PipeLines
Limited’s Canadian Mainline and TransQuebec & Maritimes Pipeline.
The Westbrook XPress Project would
consist of the following facilities:
• Installation of one new natural gas
fired turbine compressor unit and
appurtenant facilities in a greenfield
expansion area approximately 1,500 feet
southwest of the currently developed
Westbrook Compressor Station;
• approximately 1,500 feet of 30-inchdiameter suction and discharge lines to
connect the greenfield expansion area to
the existing station; and
• modifications at the existing
Westbrook Metering and Regulating
Station 30006, including replacement of
existing pipeline, filter separator, and
appurtenant facilities.
VerDate Sep<11>2014
19:13 Dec 18, 2019
Jkt 250001
The general location of the project
facilities is shown in appendix 1.1
Land Requirements for Construction
Construction of the proposed facilities
would disturb 20.8 acres of land for the
aboveground facilities and suction and
discharge lines. Following construction,
PNGTS would maintain 8.0 acres for
permanent operation of the project’s
facilities; the remaining acreage would
be restored and revert to former uses.
The EA Process
The EA will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils;
• water resources and wetlands;
• vegetation and wildlife;
• threatened and endangered species;
• cultural resources;
• land use;
• air quality and noise;
• public safety; and
• cumulative impacts.
Commission staff will also evaluate
reasonable alternatives to the proposed
project or portions of the project, and
make recommendations on how to
lessen or avoid impacts on the various
resource areas.
The EA will present Commission
staff’s independent analysis of the
issues. The EA will be available in
electronic format in the public record
through eLibrary 2 and the
Commission’s website (https://
www.ferc.gov/industries/gas/enviro/
eis.asp). If eSubscribed, you will receive
instant email notification when the EA
is issued. The EA may be issued for an
allotted public comment period.
Commission staff will consider all
comments on the EA before making
recommendations to the Commission.
To ensure Commission staff have the
opportunity to address your comments,
please carefully follow the instructions
in the Public Participation section,
beginning on page 2.
With this notice, the Commission is
asking agencies with jurisdiction by law
and/or special expertise with respect to
the environmental issues of this project
to formally cooperate in the preparation
1 The appendices referenced in this notice will
not appear in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE, Washington, DC 20426, or call (202) 502–
8371. For instructions on connecting to eLibrary,
refer to the last page of this notice.
2 For instructions on connecting to eLibrary, refer
to the last page of this notice.
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
of the EA.3 Agencies that would like to
request cooperating agency status
should follow the instructions for filing
comments provided under the Public
Participation section of this notice.
Consultation Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, the Commission is
using this notice to initiate consultation
with the applicable State Historic
Preservation Office, and to solicit their
views and those of other government
agencies, interested Indian tribes, and
the public on the project’s potential
effects on historic properties.4 The EA
for this project will document findings
on the impacts on historic properties
and summarize the status of
consultations under section 106.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. Commission
staff will update the environmental
mailing list as the analysis proceeds to
ensure that Commission notices related
to this environmental review are sent to
all individuals, organizations, and
government entities interested in and/or
potentially affected by the proposed
project.
If the Commission issues the EA for
an allotted public comment period, a
Notice of Availability of the EA will be
sent to the environmental mailing list
and will provide instructions to access
the electronic document on the FERC’s
website (www.ferc.gov). If you need to
make changes to your name/address, or
if you would like to remove your name
3 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
4 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
E:\FR\FM\19DEN1.SGM
19DEN1
Federal Register / Vol. 84, No. 244 / Thursday, December 19, 2019 / Notices
from the mailing list, please return the
attached ‘‘Mailing List Update Form’’
(appendix 2).
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number in the ‘‘Docket Number’’
field, excluding the last three digits (i.e.,
CP20–16). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or (866)
208–3676, or for TTY, contact (202)
502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Public sessions or site visits will be
posted on the Commission’s calendar
located at www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information.
Dated: December 12, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–27320 Filed 12–18–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–118–000]
lotter on DSKBCFDHB2PROD with NOTICES
Notice of Revised Schedule for
Environmental Review of the TransForeland Pipeline Company, LLC Kenai
LNG Cool Down Project
This notice identifies the Federal
Energy Regulatory Commission staff’s
revised schedule for the completion of
the environmental assessment (EA) for
Trans-Foreland Pipeline Company,
LLC’s (Trans-Foreland) Kenai LNG Cool
Down Project. The first notice of
schedule, issued on June 19, 2019,
identified December 13, 2019 as the EA
issuance date. In its October 2019
response to Commission staff’s data
requests, Trans-Foreland states that it
will not file certain information until
January 2020. Further, Commission staff
also issued a follow-up data request to
Trans-Foreland on December 9, 2019,
requiring Trans-Foreland to clarify
certain critical and complex information
and address data gaps that were not
addressed by Trans-Foreland in
previous responses to staff data
VerDate Sep<11>2014
19:13 Dec 18, 2019
Jkt 250001
requests. As a result of Trans-Foreland’s
representations that this critical data
will not be filed until sometime in
January and the need for Commission
staff and cooperating agencies to review
this information, Commission staff has
revised the schedule for issuance of the
EA. The revised schedule for the EA is
based upon Trans-Foreland providing
complete responses to outstanding data
requests in the timeframes it has
identified and as requested in the
December 9 data request.
Schedule for Environmental Review
Issuance of the EA April 24, 2020
90-day Federal Authorization Decision
Deadline July 23, 2020
If a schedule change becomes
necessary, an additional notice will be
provided so that the relevant agencies
are kept informed of the project’s
progress.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP19–118), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: December 12, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–27319 Filed 12–18–19; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
69737
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–18–000]
Notice of Request Under Blanket
Authorization; Southern Natural Gas
Company, L.L.C.
Take notice that on December 2, 2019,
Southern Natural Gas Company, L.L.C.,
569 Brookwood Village, Suite 749,
Birmingham, Alabama 35209, filed in
the above referenced docket a prior
notice request pursuant to section
157.216(b) of the Commission’s
regulations under the Natural Gas Act
(NGA) and its blanket certificate issued
in Docket No. CP82–406–000 for
authorization to abandon in place a
2,900 horsepower compressor unit
located at its Ellerslie Compressor
Station in Harris County, Georgia, all as
more fully set forth in the request which
is on file with the Commission and open
to public inspection.
The filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s website web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to Parker
Gargis, Analyst, Rates & Regulatory,
Southern Natural Gas Company, L.L.C.,
569 Brookwood Village, Suite 749,
Birmingham, Alabama 35209, by
telephone at (205) 325–7603, or by
email at parker_gargis@
kindermorgan.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
E:\FR\FM\19DEN1.SGM
19DEN1
Agencies
[Federal Register Volume 84, Number 244 (Thursday, December 19, 2019)]
[Notices]
[Pages 69735-69737]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-27320]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP20-16-000]
Notice of Intent To Prepare an Environmental Assessment for the
Proposed Portland Natural Gas Transmission System Westbrook XPress
Project and Request for Comments on Environmental Issues
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Westbrook XPress Project
involving construction and operation of facilities by Portland Natural
Gas Transmission System (PNGTS) in Cumberland County, Maine. The
Commission will use this EA in its decision-making process to determine
whether the project is in the public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies about issues regarding the project. The National Environmental
Policy Act (NEPA) requires the Commission to take into account the
environmental impacts that could result from its action whenever it
considers the issuance of a Certificate of Public Convenience and
Necessity. NEPA also requires the Commission to discover concerns the
public may have about proposals. This process is referred to as
``scoping.'' The main goal of the scoping process is to focus the
analysis in the EA on the important environmental issues. By this
notice, the Commission requests public comments on the scope of issues
to address in the EA. To ensure that your comments are timely and
properly recorded, please submit your comments so that the Commission
receives them in Washington, DC on or before 5:00 p.m. Eastern Time on
January 21, 2020.
You can make a difference by submitting your specific comments or
concerns about the project. Your comments should focus on the potential
environmental effects, reasonable alternatives, and measures to avoid
or lessen environmental impacts. Your input will help the Commission
staff determine what issues they need to evaluate in the EA. Commission
staff will consider all filed comments during the preparation of the
EA.
If you sent comments on this project to the Commission before the
opening of this docket on November 18, 2019, you will need to file
those comments in Docket No. CP20-16-000 to ensure they are considered
as part of this proceeding.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this proposed
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the proposed facilities. The company
would seek to negotiate a mutually acceptable easement agreement. You
are not required to enter into an agreement. However, if the Commission
approves the project, that approval conveys with it the right of
eminent domain. Therefore, if you and the company do not reach an
easement agreement, the pipeline company could initiate condemnation
proceedings in court. In such instances, compensation would be
determined by a judge in accordance with state law.
PNGTS provided landowners with a fact sheet prepared by the FERC
entitled ``An Interstate Natural Gas Facility On My Land? What Do I
Need To Know?'' This fact sheet addresses a number of typically asked
questions, including the use of eminent domain and how to participate
in the Commission's proceedings. It is also available for viewing on
the FERC website (www.ferc.gov) at https://www.ferc.gov/resources/guides/gas/gas.pdf.
Public Participation
The Commission offers a free service called eSubscription which
makes it easy to stay informed of all issuances and submittals
regarding the dockets/projects to which you subscribe. These instant
email notifications are the fastest way to receive notification and
provide a link to the document files which can reduce the amount of
time you spend researching proceedings. To sign up go to www.ferc.gov/docs-filing/esubscription.asp.
For your convenience, there are three methods you can use to submit
your comments to the Commission. The Commission encourages electronic
filing of comments and has staff available to
[[Page 69736]]
assist you at (866) 208-3676 or [email protected]. Please
carefully follow these instructions so that your comments are properly
recorded.
(1) You can file your comments electronically using the eComment
feature, which is located on the Commission's website (www.ferc.gov)
under the link to Documents and Filings. Using eComment is an easy
method for submitting brief, text-only comments on a project;
(2) You can file your comments electronically by using the eFiling
feature, which is also on the Commission's website (www.ferc.gov) under
the link to Documents and Filings. With eFiling, you can provide
comments in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You will be asked to select the type of filing you
are making; a comment on a particular project is considered a ``Comment
on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the following address. Be sure to reference the project docket number
(CP20-16-000) with your submission: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A,
Washington, DC 20426.
Summary of the Proposed Project
PNGTS proposes modifications and additions to existing facilities
in Cumberland County, Maine. The Westbrook XPress Project would provide
about 131 billion standard cubic feet of natural gas per day to New
England. According to PNGTS, its project would provide access to, and
allow for the transportation of, natural gas supplies from North
American supply basins, such as Marcellus, Utica, and others, via
TransCanada PipeLines Limited's Canadian Mainline and Trans-Quebec &
Maritimes Pipeline.
The Westbrook XPress Project would consist of the following
facilities:
Installation of one new natural gas fired turbine
compressor unit and appurtenant facilities in a greenfield expansion
area approximately 1,500 feet southwest of the currently developed
Westbrook Compressor Station;
approximately 1,500 feet of 30-inch-diameter suction and
discharge lines to connect the greenfield expansion area to the
existing station; and
modifications at the existing Westbrook Metering and
Regulating Station 30006, including replacement of existing pipeline,
filter separator, and appurtenant facilities.
The general location of the project facilities is shown in appendix
1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of appendices were sent to all those
receiving this notice in the mail and are available at www.ferc.gov
using the link called ``eLibrary'' or from the Commission's Public
Reference Room, 888 First Street NE, Washington, DC 20426, or call
(202) 502-8371. For instructions on connecting to eLibrary, refer to
the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would disturb 20.8 acres of
land for the aboveground facilities and suction and discharge lines.
Following construction, PNGTS would maintain 8.0 acres for permanent
operation of the project's facilities; the remaining acreage would be
restored and revert to former uses.
The EA Process
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
Geology and soils;
water resources and wetlands;
vegetation and wildlife;
threatened and endangered species;
cultural resources;
land use;
air quality and noise;
public safety; and
cumulative impacts.
Commission staff will also evaluate reasonable alternatives to the
proposed project or portions of the project, and make recommendations
on how to lessen or avoid impacts on the various resource areas.
The EA will present Commission staff's independent analysis of the
issues. The EA will be available in electronic format in the public
record through eLibrary \2\ and the Commission's website (https://www.ferc.gov/industries/gas/enviro/eis.asp). If eSubscribed, you will
receive instant email notification when the EA is issued. The EA may be
issued for an allotted public comment period. Commission staff will
consider all comments on the EA before making recommendations to the
Commission. To ensure Commission staff have the opportunity to address
your comments, please carefully follow the instructions in the Public
Participation section, beginning on page 2.
---------------------------------------------------------------------------
\2\ For instructions on connecting to eLibrary, refer to the
last page of this notice.
---------------------------------------------------------------------------
With this notice, the Commission is asking agencies with
jurisdiction by law and/or special expertise with respect to the
environmental issues of this project to formally cooperate in the
preparation of the EA.\3\ Agencies that would like to request
cooperating agency status should follow the instructions for filing
comments provided under the Public Participation section of this
notice.
---------------------------------------------------------------------------
\3\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
---------------------------------------------------------------------------
Consultation Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, the Commission is using this notice to initiate
consultation with the applicable State Historic Preservation Office,
and to solicit their views and those of other government agencies,
interested Indian tribes, and the public on the project's potential
effects on historic properties.\4\ The EA for this project will
document findings on the impacts on historic properties and summarize
the status of consultations under section 106.
---------------------------------------------------------------------------
\4\ The Advisory Council on Historic Preservation's regulations
are at Title 36, Code of Federal Regulations, Part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. Commission staff will update the environmental
mailing list as the analysis proceeds to ensure that Commission notices
related to this environmental review are sent to all individuals,
organizations, and government entities interested in and/or potentially
affected by the proposed project.
If the Commission issues the EA for an allotted public comment
period, a Notice of Availability of the EA will be sent to the
environmental mailing list and will provide instructions to access the
electronic document on the FERC's website (www.ferc.gov). If you need
to make changes to your name/address, or if you would like to remove
your name
[[Page 69737]]
from the mailing list, please return the attached ``Mailing List Update
Form'' (appendix 2).
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website at www.ferc.gov using the eLibrary link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number
in the ``Docket Number'' field, excluding the last three digits (i.e.,
CP20-16). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
[email protected] or (866) 208-3676, or for TTY, contact (202)
502-8659. The eLibrary link also provides access to the texts of all
formal documents issued by the Commission, such as orders, notices, and
rulemakings.
Public sessions or site visits will be posted on the Commission's
calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along
with other related information.
Dated: December 12, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-27320 Filed 12-18-19; 8:45 am]