Download as PDF jbell on DSKJLSW7X2PROD with NOTICES Federal Register / Vol. 84, No. 237 / Tuesday, December 10, 2019 / Notices Filed Date: 12/4/19. Accession Number: 20191204–5119. Comments Due: 5 p.m. ET 12/26/19. Docket Numbers: EG20–57–000. Applicants: Cubico Crooked Run Lessee, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Cubico Crooked Run Lessee, LLC. Filed Date: 12/4/19. Accession Number: 20191204–5137. Comments Due: 5 p.m. ET 12/26/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2768–003. Applicants: Empire Generating Co, LLC. Description: Notice of Non-Material Change in Status of Empire Generating Co, LLC. Filed Date: 12/4/19. Accession Number: 20191204–5136. Comments Due: 5 p.m. ET 12/26/19. Docket Numbers: ER20–57–001; ER20–339–001; ER20–58–001; ER19– 115–001; ER20–59–001; ER20–27–001; ER16–2019–002; ER17–1607–001; ER17–1608–001; ER17–318–001; ER16– 2520–001; ER19–8–001; ER19–119–001; ER19–2476–001; ER18–97–001; ER20– 422–001. Applicants: GA Solar 3, LLC, Twiggs County Solar, LLC, FL Solar 4, LLC, FL Solar 5, LLC, AZ Solar 1, LLC, Wright Solar Park LLC, Five Points Solar Park LLC, Sunray Energy 2, LLC, Sunray Energy 3 LLC, Three Peaks Power, LLC, Grand View PV Solar Two LLC, Sweetwater Solar, LLC, Techren Solar I LLC, Techren Solar II LLC, MS Solar 3, LLC, FL Solar 1, LLC. Description: Notice of Non-Material Change in Status of GA Solar 3, LLC, et al. Filed Date: 12/4/19. Accession Number: 20191204–5151. Comments Due: 5 p.m. ET 12/26/19. Docket Numbers: ER20–509–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: ISA and ICSA SA Nos. 5245 and 5250; Queue No. AB2–067/AC1–044/AD2–189 to be effective 5/13/2019. Filed Date: 12/3/19. Accession Number: 20191203–5184. Comments Due: 5 p.m. ET 12/24/19. Docket Numbers: ER20–510–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–12–04_SA 3378 NIPSCO-Poplar Wind Project GIA (J883) to be effective 11/19/2019. Filed Date: 12/4/19. VerDate Sep<11>2014 17:08 Dec 09, 2019 Jkt 250001 Accession Number: 20191204–5000. Comments Due: 5 p.m. ET 12/26/19. Docket Numbers: ER20–511–000. Applicants: Wilderness Line Holdings, LLC. Description: Baseline eTariff Filing: Open Access Transmission Tariff Baseline Filing to be effective 12/5/2019. Filed Date: 12/4/19. Accession Number: 20191204–5099. Comments Due: 5 p.m. ET 12/26/19. Docket Numbers: ER20–512–000. Applicants: Click Energy LLC. Description: Baseline eTariff Filing: Click Energy MBR Application Filing to be effective 1/3/2020. Filed Date: 12/4/19. Accession Number: 20191204–5101. Comments Due: 5 p.m. ET 12/26/19. Docket Numbers: ER20–513–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: LGIA Aurora Solar LLC, Camino Solar SA No. 237 to be effective 12/5/2019. Filed Date: 12/4/19. Accession Number: 20191204–5113. Comments Due: 5 p.m. ET 12/26/19. Docket Numbers: ER20–514–000. Applicants: Midcontinent Independent System Operator, Inc., Otter Tail Power Company. Description: § 205(d) Rate Filing: 2019–12–04_SA 3384 OTP-Dakota Range III FSA (J488) HankinsonWahpeton to be effective 2/3/2020. Filed Date: 12/4/19. Accession Number: 20191204–5150. Comments Due: 5 p.m. ET 12/26/19. Docket Numbers: ER20–515–000. Applicants: Midcontinent Independent System Operator, Inc., Otter Tail Power Company. Description: § 205(d) Rate Filing: 2019–12–04_SA 3385 OTP-Deuel Harvest FSA (J526) HankinsonWahpeton to be effective 2/3/2020. Filed Date: 12/4/19. Accession Number: 20191204–5152. Comments Due: 5 p.m. ET 12/26/19. Take notice that the Commission received the following public utility holding company filings: Docket Numbers: PH20–4–000. Applicants: Unison Energy, LLC, AIM Universal Holdings, LLC, Hunt Companies, Inc. Description: Unison Energy, LLC, et al. submits FERC–65A Notice of Change in Fact to Exemption Notification. Filed Date: 12/3/19. Accession Number: 20191203–5264. Comments Due: 5 p.m. ET 12/24/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 67441 Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 4, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–26524 Filed 12–9–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP20–17–000] Northern Natural Gas Company; Notice of Request Under Blanket Authorization Take notice that on November 25, 2019, Northern Natural Gas Company (Northern Natural), 1111 South 103rd Street, Omaha, Nebraska 68124, filed in the above referenced docket, a prior notice request pursuant to sections 157.205 and 157.208 of the Commission’s regulations under the Natural Gas Act (NGA) and Northern Natural’s blanket certificate issued in Docket No. CP82–401–000, for authorization to install and operate (1) 7.4-mile-long, 8-inch-diamter branch line loop located in Juneau County, Wisconsin; (2) an addition electric motor-driven 800–HP reciprocating compressor unit at its existing Spring Green CS in Sauk County, Wisconsin; and (3) branch line take-off regulation, including appurtenances in Salk County, Wisconsin (New Lisbon 2020 Expansion Project). The project will allow Northern Natural to transport an incremental 15,180 dekatherms per day of service for Wisconsin Power and Light Company, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the E:\FR\FM\10DEN1.SGM 10DEN1 jbell on DSKJLSW7X2PROD with NOTICES 67442 Federal Register / Vol. 84, No. 237 / Tuesday, December 10, 2019 / Notices docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions regarding this prior notice request should be directed to Michael T. Loeffler, Senior Director, Certificates and External Affairs, Northern Natural Gas Company, 1111 South 103rd Street, Omaha, Nebraska 68124, at (402) 398–7103. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s EA. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s website (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. VerDate Sep<11>2014 17:08 Dec 09, 2019 Jkt 250001 Dated: December 4, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–26531 Filed 12–9–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP11–1591–000. Applicants: Golden Pass Pipeline LLC. Description: Report Filing: 2019 Penalty Revenue and Costs Report of Golden Pass Pipeline. Filed Date: 12/2/19. Accession Number: 20191202–5045. Comments Due: 5 p.m. ET 12/16/19. Docket Numbers: RP20–210–001. Applicants: Rockies Express Pipeline LLC. Description: Tariff Amendment: Amendment to RP20–210 to be effective 11/6/2019. Filed Date: 12/2/19. Accession Number: 20191202–5081. Comments Due: 5 p.m. ET 12/9/19. Docket Numbers: RP20–214–001. Applicants: Rockies Express Pipeline LLC. Description: Tariff Amendment: Amendment to RP20–214 to be effective 11/7/2019. Filed Date: 12/2/19. Accession Number: 20191202–5082. Comments Due: 5 p.m. ET 12/9/19. Docket Numbers: RP20–225–001. Applicants: Rockies Express Pipeline LLC. Description: Tariff Amendment: Amendment to RP20–225 to be effective 11/12/2019. Filed Date: 12/2/19. Accession Number: 20191202–5084. Comments Due: 5 p.m. ET 12/9/19. Docket Numbers: RP20–289–001. Applicants: NEXUS Gas Transmission, LLC. Description: Tariff Amendment: Negotiated Rates Amendment NJR and DTE—eff 12–1–19 to be effective 12/1/2019. Filed Date: 12/2/19. Accession Number: 20191202–5122. Comments Due: 5 p.m. ET 12/16/19. Docket Numbers: RP20–294–000. Applicants: Rover Pipeline LLC. Description: § 4(d) Rate Filing: Summary of Negotiated Rate Capacity Release Agreements on 12–2–19 to be effective 12/1/2019. PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 Filed Date: 12/2/19. Accession Number: 20191202–5001. Comments Due: 5 p.m. ET 12/16/19. Docket Numbers: RP20–295–000. Applicants: Equitrans, L.P. Description: § 4(d) Rate Filing: Negotiated Capacity Release Agreements—12/1/2019 to be effective 12/1/2019. Filed Date: 12/2/19. Accession Number: 20191202–5046. Comments Due: 5 p.m. ET 12/16/19. Docket Numbers: RP20–296–000. Applicants: Gulf South Pipeline Company, LP. Description: § 4(d) Rate Filing: Cap Rel Neg Rate Agmt (JERA 46435 to EDF 51808) to be effective 12/1/2019. Filed Date: 12/2/19. Accession Number: 20191202–5061. Comments Due: 5 p.m. ET 12/16/19. Docket Numbers: RP20–297–000. Applicants: Gulf South Pipeline Company, LP. Description: § 4(d) Rate Filing: Cap Rel Neg Rate Agmts (Atlanta Gas 8438 to various shippers eff 12–1–2019) to be effective 12/1/2019. Filed Date: 12/2/19. Accession Number: 20191202–5056. Comments Due: 5 p.m. ET 12/16/19. Docket Numbers: RP20–298–000. Applicants: Gulf South Pipeline Company, LP. Description: § 4(d) Rate Filing: Cap Rel Neg Rate Agmt (Constellation 51811 to Exelon 51846) to be effective 12/1/ 2019. Filed Date: 12/2/19. Accession Number: 20191202–5057. Comments Due: 5 p.m. ET 12/16/19. Docket Numbers: RP20–299–000. Applicants: UGI Sunbury, LLC. Description: Operational Purchases and Sales Report of UGI Sunbury, LLC under RP20–299. Filed Date: 12/2/19. Accession Number: 20191202–5058. Comments Due: 5 p.m. ET 12/16/19. Docket Numbers: RP20–300–000. Applicants: Gulf South Pipeline Company, LP. Description: § 4(d) Rate Filing: Amendment to Neg Rate Agmt (Colorado Bend 46280) to be effective 12/1/2019. Filed Date: 12/2/19. Accession Number: 20191202–5059. Comments Due: 5 p.m. ET 12/16/19. Docket Numbers: RP20–301–000. Applicants: Gulf South Pipeline Company, LP. Description: § 4(d) Rate Filing: Cap Rel Neg Rate Agmts (Aethon 50488, 37657 to Scona 51862, 51868) to be effective 12/1/2019. Filed Date: 12/2/19. E:\FR\FM\10DEN1.SGM 10DEN1

Agencies

[Federal Register Volume 84, Number 237 (Tuesday, December 10, 2019)]
[Notices]
[Pages 67441-67442]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-26531]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP20-17-000]


Northern Natural Gas Company; Notice of Request Under Blanket 
Authorization

    Take notice that on November 25, 2019, Northern Natural Gas Company 
(Northern Natural), 1111 South 103rd Street, Omaha, Nebraska 68124, 
filed in the above referenced docket, a prior notice request pursuant 
to sections 157.205 and 157.208 of the Commission's regulations under 
the Natural Gas Act (NGA) and Northern Natural's blanket certificate 
issued in Docket No. CP82-401-000, for authorization to install and 
operate (1) 7.4-mile-long, 8-inch-diamter branch line loop located in 
Juneau County, Wisconsin; (2) an addition electric motor-driven 800-HP 
reciprocating compressor unit at its existing Spring Green CS in Sauk 
County, Wisconsin; and (3) branch line take-off regulation, including 
appurtenances in Salk County, Wisconsin (New Lisbon 2020 Expansion 
Project). The project will allow Northern Natural to transport an 
incremental 15,180 dekatherms per day of service for Wisconsin Power 
and Light Company, all as more fully set forth in the application which 
is on file with the Commission and open to public inspection.
    The filing may also be viewed on the web at https://www.ferc.gov 
using the eLibrary link. Enter the docket number excluding the last 
three digits in the

[[Page 67442]]

docket number field to access the document. For assistance, please 
contact FERC Online Support at [email protected] or toll free 
at (866) 208-3676, or TTY, contact (202) 502-8659.
    Any questions regarding this prior notice request should be 
directed to Michael T. Loeffler, Senior Director, Certificates and 
External Affairs, Northern Natural Gas Company, 1111 South 103rd 
Street, Omaha, Nebraska 68124, at (402) 398-7103.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the EA for this proposal. The filing of the EA in the Commission's 
public record for this proceeding or the issuance of a Notice of 
Schedule for Environmental Review will serve to notify federal and 
state agencies of the timing for the completion of all necessary 
reviews, and the subsequent need to complete all federal authorizations 
within 90 days of the date of issuance of the Commission staff's EA.
    Any person may, within 60 days after the issuance of the instant 
notice by the Commission, file pursuant to Rule 214 of the Commission's 
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of 
intervention. Any person filing to intervene or the Commission's staff 
may, pursuant to section 157.205 of the Commission's Regulations under 
the NGA (18 CFR 157.205) file a protest to the request. If no protest 
is filed within the time allowed therefore, the proposed activity shall 
be deemed to be authorized effective the day after the time allowed for 
protest. If a protest is filed and not withdrawn within 30 days after 
the time allowed for filing a protest, the instant request shall be 
treated as an application for authorization pursuant to section 7 of 
the NGA.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
website (https://www.ferc.gov) under the ``e-Filing'' link.

    Dated: December 4, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-26531 Filed 12-9-19; 8:45 am]
 BILLING CODE 6717-01-P