Combined Notice of Filings #1, 67440-67441 [2019-26524]
Download as PDF
67440
Federal Register / Vol. 84, No. 237 / Tuesday, December 10, 2019 / Notices
CFR parts 1500–1508 and 10 CFR part
1021, respectively.
Purpose and Need for Action
DOE’s purpose and need for action is
to analyze capabilities for alternative
treatment and disposal options for
DWPF recycle wastewater through the
use of existing, permitted, off-site
commercial facilities. When DOE
prepared the 1994 DWPF SEIS and the
Savannah River Site Salt Processing
Alternatives Final Supplemental
Environmental Impact Statement (DOE/
EIS–082–S2), DOE did not analyze the
potential environmental impacts
associated with potential commercial
treatment and disposal options for
DWPF recycle wastewater. DOE now
proposes to use commercial LLW
disposal facilities for up to 10,000
gallons of DWPF recycle wastewater to
inform planning activities on treatment
and disposal options for completion of
the tank closure program. Any proposal
to dispose of more than 10,000 gallons
of DWPF recycle wastewater would be
evaluated in a separate NEPA review.
Treatment and/or disposal of this waste
at a commercial LLW facility would
inform planning activities for the three
years between the completion of the Salt
Waste Processing Facility (SWPF)
mission (estimated 2031) and DWPF
mission completion (estimated 2034).
During this period, DOE will not have
the option of returning DWPF recycle
wastewater to SWPF for processing
because SWPF will have completed its
mission of treating salt waste from the
tank farms and will undergo closure.
jbell on DSKJLSW7X2PROD with NOTICES
Proposed Action and Alternatives
DOE’s proposed action is to dispose of
up to 10,000 gallons of stabilized (e.g.,
grouted 3) DWPF recycle wastewater
from the SRS H-Area Tank Farm at a
commercial LLW facility outside of
South Carolina, licensed by either the
NRC or an Agreement State under 10
CFR part 61. Prior to a disposal
decision, DOE would characterize the
3 Grout is a proven safe and effective technology
that continues to be used by DOE and other national
and international parties to stabilize radioactive
wastes, including certain tank wastes, for disposal.
Use of stabilization agents for this purpose is
consistent with the NRC’s Concentration Averaging
and Encapsulation Branch Technical Position,
Revision 1, Volume 1, February 2015 (https://
www.nrc.gov/docs/ML1225/ML12254B065.pdf),
which allows mixing of nonradioactive constituents
with radioactive waste (e.g., solidification,
encapsulation, or additives used in thermal
processing) provided the mixing has a purpose
other than reducing the waste classification, such
as waste stabilization or process control.
Furthermore, the addition of stabilization agents to
the waste prior to disposal is often necessary to
meet the NRC requirements in 10 CFR 61.56,
‘‘Waste Characteristics’’ (e.g., to ensure stability of
the waste form).
VerDate Sep<11>2014
17:08 Dec 09, 2019
Jkt 250001
DWPF recycle wastewater to determine
whether it meets DOE’s HLW
interpretation for disposal as non-HLW.
As part of this process, DOE would
determine and verify with the licensee
of the commercial LLW disposal facility
that the stabilized waste meets the
facility’s waste acceptance criteria and
all other requirements of the disposal
facility, including any applicable
regulatory requirements (e.g., the
Resource Conservation and Recovery
Act [42 U.S.C. 6901]) for treatment of
the waste prior to disposal and
applicable U.S. Department of
Transportation (USDOT) requirements
for packaging and transportation from
SRS to the commercial facility.
DOE has identified three action
alternatives for the proposed action:
• Alternative 1 would deploy a
treatment capability at SRS to stabilize
up to 10,000 gallons of DWPF recycle
wastewater and then transport the
grouted waste form to a licensed
commercial disposal facility, either the
Waste Control Specialists (WCS) site
near Andrews, Texas (if determined to
be Class A, B or C LLW) 4 and/or the
EnergySolutions site near Clive, Utah (if
determined to be Class A LLW),5
depending upon waste content and
facility waste acceptance criteria.
• Alternative 2 would transport up to
10,000 gallons of DWPF recycle
wastewater to a licensed commercial
disposal facility, either the WCS site
and/or the EnergySolutions site, with
the capability to stabilize and dispose of
the final waste form.
• Alternative 3 would transport up to
10,000 gallons of DWPF recycle
wastewater to a permitted and licensed
commercial treatment facility with the
capability to stabilize the liquid into a
stabilized waste form, and then
transport the final waste form to a
licensed commercial disposal facility,
either the WCS site and/or the
EnergySolutions site, depending upon
waste content and facility waste
acceptance criteria.
The Draft SRS DWPF Recycle
Wastewater EA also analyzed a no
action alternative under which the up to
10,000 gallons of DWPF recycle
4 WCS is licensed by the Texas Commission on
Environmental Quality for the disposal of Class A,
B, and C LLW that meets specified waste
acceptance criteria. Disposal of the stabilized waste
at the WCS site would be conducted in accordance
with the facility’s operating license (Radioactive
Material License No. CN600616890/RN101702439).
5 EnergySolutions is licensed by the Utah
Department of Environmental Quality for the
disposal of Class A LLW that meets specified waste
acceptance criteria. Disposal of the stabilized waste
at the EnergySolutions site would be conducted in
accordance with the facility’s operating license
(Radioactive Material License No. UT 2300249).
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
wastewater would remain in the SRS
liquid waste system.
NEPA Process
All comments on the Draft SRS DWPF
Recycle Wastewater EA received during
the public comment period will be
considered in preparation of the Final
SRS DWPF Recycle Wastewater EA.
Following the public comment period,
and based on the Final SRS DWPF
Recycle Wastewater EA and
consideration of all comments received,
DOE will either issue a Finding of No
Significant Impact (FONSI) or announce
its intent to prepare an environmental
impact statement (EIS). If DOE
determines that a FONSI is appropriate,
both the Final EA and FONSI will be
made available to the public. If DOE
determines that an EIS is needed, either
during preparation of the Final SRS
DWPF Recycle Wastewater EA or after
completing the EA, DOE would issue in
the Federal Register a Notice of Intent
to prepare an EIS. Consultations with
other agencies (e.g., State Historic
Preservation Officer, U.S. Fish and
Wildlife Service) were not required or
undertaken in connection with the Draft
SRS DWPF Recycle Wastewater EA. As
required under DOE’s NEPA
implementing procedures (10 CFR
1021.301(c)), the following agencies
were individually notified of the
preparation of this EA: U.S.
Environmental Protection Agency;
South Carolina Department of Health
and Environmental Control; Texas
Commission on Environmental Quality;
and Utah Department of Environmental
Quality.
Signed at Washington, DC, on December 4,
2019.
Elizabeth A. Connell,
Associate Principal Deputy Assistant
Secretary for Regulatory and Policy Affairs,
Office of Environmental Management, U.S.
Department of Energy.
[FR Doc. 2019–26555 Filed 12–9–19; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG20–56–000.
Applicants: Crooked Run Solar, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Crooked Run Solar,
LLC.
E:\FR\FM\10DEN1.SGM
10DEN1
jbell on DSKJLSW7X2PROD with NOTICES
Federal Register / Vol. 84, No. 237 / Tuesday, December 10, 2019 / Notices
Filed Date: 12/4/19.
Accession Number: 20191204–5119.
Comments Due: 5 p.m. ET 12/26/19.
Docket Numbers: EG20–57–000.
Applicants: Cubico Crooked Run
Lessee, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Cubico Crooked Run
Lessee, LLC.
Filed Date: 12/4/19.
Accession Number: 20191204–5137.
Comments Due: 5 p.m. ET 12/26/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2768–003.
Applicants: Empire Generating Co,
LLC.
Description: Notice of Non-Material
Change in Status of Empire Generating
Co, LLC.
Filed Date: 12/4/19.
Accession Number: 20191204–5136.
Comments Due: 5 p.m. ET 12/26/19.
Docket Numbers: ER20–57–001;
ER20–339–001; ER20–58–001; ER19–
115–001; ER20–59–001; ER20–27–001;
ER16–2019–002; ER17–1607–001;
ER17–1608–001; ER17–318–001; ER16–
2520–001; ER19–8–001; ER19–119–001;
ER19–2476–001; ER18–97–001; ER20–
422–001.
Applicants: GA Solar 3, LLC, Twiggs
County Solar, LLC, FL Solar 4, LLC, FL
Solar 5, LLC, AZ Solar 1, LLC, Wright
Solar Park LLC, Five Points Solar Park
LLC, Sunray Energy 2, LLC, Sunray
Energy 3 LLC, Three Peaks Power, LLC,
Grand View PV Solar Two LLC,
Sweetwater Solar, LLC, Techren Solar I
LLC, Techren Solar II LLC, MS Solar 3,
LLC, FL Solar 1, LLC.
Description: Notice of Non-Material
Change in Status of GA Solar 3, LLC, et
al.
Filed Date: 12/4/19.
Accession Number: 20191204–5151.
Comments Due: 5 p.m. ET 12/26/19.
Docket Numbers: ER20–509–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: ISA
and ICSA SA Nos. 5245 and 5250;
Queue No. AB2–067/AC1–044/AD2–189
to be effective 5/13/2019.
Filed Date: 12/3/19.
Accession Number: 20191203–5184.
Comments Due: 5 p.m. ET 12/24/19.
Docket Numbers: ER20–510–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–12–04_SA 3378 NIPSCO-Poplar
Wind Project GIA (J883) to be effective
11/19/2019.
Filed Date: 12/4/19.
VerDate Sep<11>2014
17:08 Dec 09, 2019
Jkt 250001
Accession Number: 20191204–5000.
Comments Due: 5 p.m. ET 12/26/19.
Docket Numbers: ER20–511–000.
Applicants: Wilderness Line
Holdings, LLC.
Description: Baseline eTariff Filing:
Open Access Transmission Tariff
Baseline Filing to be effective
12/5/2019.
Filed Date: 12/4/19.
Accession Number: 20191204–5099.
Comments Due: 5 p.m. ET 12/26/19.
Docket Numbers: ER20–512–000.
Applicants: Click Energy LLC.
Description: Baseline eTariff Filing:
Click Energy MBR Application Filing to
be effective 1/3/2020.
Filed Date: 12/4/19.
Accession Number: 20191204–5101.
Comments Due: 5 p.m. ET 12/26/19.
Docket Numbers: ER20–513–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
LGIA Aurora Solar LLC, Camino Solar
SA No. 237 to be effective 12/5/2019.
Filed Date: 12/4/19.
Accession Number: 20191204–5113.
Comments Due: 5 p.m. ET 12/26/19.
Docket Numbers: ER20–514–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Otter Tail Power Company.
Description: § 205(d) Rate Filing:
2019–12–04_SA 3384 OTP-Dakota
Range III FSA (J488) HankinsonWahpeton to be effective 2/3/2020.
Filed Date: 12/4/19.
Accession Number: 20191204–5150.
Comments Due: 5 p.m. ET 12/26/19.
Docket Numbers: ER20–515–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Otter Tail Power Company.
Description: § 205(d) Rate Filing:
2019–12–04_SA 3385 OTP-Deuel
Harvest FSA (J526) HankinsonWahpeton to be effective 2/3/2020.
Filed Date: 12/4/19.
Accession Number: 20191204–5152.
Comments Due: 5 p.m. ET 12/26/19.
Take notice that the Commission
received the following public utility
holding company filings:
Docket Numbers: PH20–4–000.
Applicants: Unison Energy, LLC, AIM
Universal Holdings, LLC, Hunt
Companies, Inc.
Description: Unison Energy, LLC, et
al. submits FERC–65A Notice of Change
in Fact to Exemption Notification.
Filed Date: 12/3/19.
Accession Number: 20191203–5264.
Comments Due: 5 p.m. ET 12/24/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
67441
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 4, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–26524 Filed 12–9–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–17–000]
Northern Natural Gas Company; Notice
of Request Under Blanket
Authorization
Take notice that on November 25,
2019, Northern Natural Gas Company
(Northern Natural), 1111 South 103rd
Street, Omaha, Nebraska 68124, filed in
the above referenced docket, a prior
notice request pursuant to sections
157.205 and 157.208 of the
Commission’s regulations under the
Natural Gas Act (NGA) and Northern
Natural’s blanket certificate issued in
Docket No. CP82–401–000, for
authorization to install and operate (1)
7.4-mile-long, 8-inch-diamter branch
line loop located in Juneau County,
Wisconsin; (2) an addition electric
motor-driven 800–HP reciprocating
compressor unit at its existing Spring
Green CS in Sauk County, Wisconsin;
and (3) branch line take-off regulation,
including appurtenances in Salk
County, Wisconsin (New Lisbon 2020
Expansion Project). The project will
allow Northern Natural to transport an
incremental 15,180 dekatherms per day
of service for Wisconsin Power and
Light Company, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection.
The filing may also be viewed on the
web at https://www.ferc.gov using the
eLibrary link. Enter the docket number
excluding the last three digits in the
E:\FR\FM\10DEN1.SGM
10DEN1
Agencies
[Federal Register Volume 84, Number 237 (Tuesday, December 10, 2019)]
[Notices]
[Pages 67440-67441]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-26524]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG20-56-000.
Applicants: Crooked Run Solar, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Crooked Run Solar, LLC.
[[Page 67441]]
Filed Date: 12/4/19.
Accession Number: 20191204-5119.
Comments Due: 5 p.m. ET 12/26/19.
Docket Numbers: EG20-57-000.
Applicants: Cubico Crooked Run Lessee, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Cubico Crooked Run Lessee, LLC.
Filed Date: 12/4/19.
Accession Number: 20191204-5137.
Comments Due: 5 p.m. ET 12/26/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2768-003.
Applicants: Empire Generating Co, LLC.
Description: Notice of Non-Material Change in Status of Empire
Generating Co, LLC.
Filed Date: 12/4/19.
Accession Number: 20191204-5136.
Comments Due: 5 p.m. ET 12/26/19.
Docket Numbers: ER20-57-001; ER20-339-001; ER20-58-001; ER19-115-
001; ER20-59-001; ER20-27-001; ER16-2019-002; ER17-1607-001; ER17-1608-
001; ER17-318-001; ER16-2520-001; ER19-8-001; ER19-119-001; ER19-2476-
001; ER18-97-001; ER20-422-001.
Applicants: GA Solar 3, LLC, Twiggs County Solar, LLC, FL Solar 4,
LLC, FL Solar 5, LLC, AZ Solar 1, LLC, Wright Solar Park LLC, Five
Points Solar Park LLC, Sunray Energy 2, LLC, Sunray Energy 3 LLC, Three
Peaks Power, LLC, Grand View PV Solar Two LLC, Sweetwater Solar, LLC,
Techren Solar I LLC, Techren Solar II LLC, MS Solar 3, LLC, FL Solar 1,
LLC.
Description: Notice of Non-Material Change in Status of GA Solar 3,
LLC, et al.
Filed Date: 12/4/19.
Accession Number: 20191204-5151.
Comments Due: 5 p.m. ET 12/26/19.
Docket Numbers: ER20-509-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: ISA and ICSA SA Nos. 5245
and 5250; Queue No. AB2-067/AC1-044/AD2-189 to be effective 5/13/2019.
Filed Date: 12/3/19.
Accession Number: 20191203-5184.
Comments Due: 5 p.m. ET 12/24/19.
Docket Numbers: ER20-510-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-12-04_SA 3378 NIPSCO-
Poplar Wind Project GIA (J883) to be effective 11/19/2019.
Filed Date: 12/4/19.
Accession Number: 20191204-5000.
Comments Due: 5 p.m. ET 12/26/19.
Docket Numbers: ER20-511-000.
Applicants: Wilderness Line Holdings, LLC.
Description: Baseline eTariff Filing: Open Access Transmission
Tariff Baseline Filing to be effective 12/5/2019.
Filed Date: 12/4/19.
Accession Number: 20191204-5099.
Comments Due: 5 p.m. ET 12/26/19.
Docket Numbers: ER20-512-000.
Applicants: Click Energy LLC.
Description: Baseline eTariff Filing: Click Energy MBR Application
Filing to be effective 1/3/2020.
Filed Date: 12/4/19.
Accession Number: 20191204-5101.
Comments Due: 5 p.m. ET 12/26/19.
Docket Numbers: ER20-513-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: LGIA Aurora Solar LLC,
Camino Solar SA No. 237 to be effective 12/5/2019.
Filed Date: 12/4/19.
Accession Number: 20191204-5113.
Comments Due: 5 p.m. ET 12/26/19.
Docket Numbers: ER20-514-000.
Applicants: Midcontinent Independent System Operator, Inc., Otter
Tail Power Company.
Description: Sec. 205(d) Rate Filing: 2019-12-04_SA 3384 OTP-
Dakota Range III FSA (J488) Hankinson-Wahpeton to be effective 2/3/
2020.
Filed Date: 12/4/19.
Accession Number: 20191204-5150.
Comments Due: 5 p.m. ET 12/26/19.
Docket Numbers: ER20-515-000.
Applicants: Midcontinent Independent System Operator, Inc., Otter
Tail Power Company.
Description: Sec. 205(d) Rate Filing: 2019-12-04_SA 3385 OTP-Deuel
Harvest FSA (J526) Hankinson-Wahpeton to be effective 2/3/2020.
Filed Date: 12/4/19.
Accession Number: 20191204-5152.
Comments Due: 5 p.m. ET 12/26/19.
Take notice that the Commission received the following public
utility holding company filings:
Docket Numbers: PH20-4-000.
Applicants: Unison Energy, LLC, AIM Universal Holdings, LLC, Hunt
Companies, Inc.
Description: Unison Energy, LLC, et al. submits FERC-65A Notice of
Change in Fact to Exemption Notification.
Filed Date: 12/3/19.
Accession Number: 20191203-5264.
Comments Due: 5 p.m. ET 12/24/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: December 4, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-26524 Filed 12-9-19; 8:45 am]
BILLING CODE 6717-01-P