DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14989–000]
lotter on DSKBCFDHB2PROD with NOTICES
Pumped Hydro Storage LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On October 8, 2019, Pumped Hydro
Storage LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Montezuma Pumped Storage Project
(Montezuma Project or project) to be
located near Maricopa, Pinal County,
Arizona. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A new rockfill,
concrete-face impoundment, 3,000 feet
by 110 feet creating an upper reservoir
with a maximum elevation of 3,000 feet
above mean sea level (MSL), and a
usable storage capacity of 9,500 acrefeet; (2) a new rockfill, concrete-face
impoundment, 4,000 feet by 130 feet
creating a lower reservoir with a
maximum elevation of 1,350 feet MSL,
and a usable storage capacity of 9,500
acre-feet; (3) two 32-foot-diameter,
7,000-foot-long reinforced concrete
penstocks; (4) a powerhouse constructed
of reinforced concrete with approximate
dimensions of 900 feet by 150 feet and
150 feet high, and containing six
turbine-generator units with a total
installed capacity of 2100 megawatts; (5)
a tailrace constructed of reinforced
concrete with approximate dimensions
of 1,200 feet by 50 feet by 50 feet; (6)
a 500-kilovolt substation; (7) a 500kilovolt, 11-mile-long transmission line;
(8) a 500-kilovolt, 8-mile-long
transmission line; (9) one 24-inchdiameter, ductile iron pipe pipeline
connecting the project to the existing
City of Phoenix 91st Avenue
Wastewater Treatment Plant; (10) one
24-inch-diameter, ductile iron pipe
VerDate Sep<11>2014
16:11 Dec 05, 2019
Jkt 250001
pipeline connecting the project to the
existing Salt River Project irrigation
canal; (11) one 24-inch-diameter, ductile
iron pipe pipeline connecting the
project to the existing Gila River Indian
Community irrigation canal; (12) one
24-inch-diameter, ductile iron pipe
pipeline connecting the project to a new
water supply well in Santa Cruz Wash;
(13) one steel casing water supply well
in Santa Cruz wash rated at 2,000
gallons-per-minute; (14) one 1-milliongallon steel overflow tank; (15) six
agricultural fields, 2-square-miles in
area, that would be irrigated with excess
water from the steel overflow tank; and
(16) appurtenant facilities. The
proposed project would produce about
9,600 megawatt hours of energy daily.
The estimated annual generation of the
Montezuma Project would be 3,504
gigawatt-hours.
Applicant Contact: Mr. Steve Irwin,
Pumped Hydro Storage LLC, 6514 41st
Lane, Phoenix, AZ 85041; phone: (602)
696–3608.
FERC Contact: Evan Williams; phone:
(202) 502–8462.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14804–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the eLibrary
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14989) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
66895
Dated: December 2, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–26343 Filed 12–5–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP20–278–000.
Applicants: Chandeleur Pipe Line,
LLC.
Description: Compliance filing
Chandeleur Annual Fuel and Gas Loss
Retention Adjustment Filing.
Filed Date: 11/27/19.
Accession Number: 20191127–5044.
Comments Due: 5 p.m. ET 12/9/19.
Docket Numbers: RP20–279–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: § 4(d) Rate Filing: TCO
December Negotiated Rate Agreements
to be effective 12/1/2019.
Filed Date: 11/27/19.
Accession Number: 20191127–5066.
Comments Due: 5 p.m. ET 12/9/19.
Docket Numbers: RP20–280–000.
Applicants: Dominion Energy Questar
Pipeline, LLC.
Description: § 4(d) Rate Filing: FGRP
for 2020 to be effective 1/1/2020.
Filed Date: 11/27/19.
Accession Number: 20191127–5069.
Comments Due: 5 p.m. ET 12/9/19.
Docket Numbers: RP20–281–000.
Applicants: Eastern Shore Natural Gas
Company.
Description: § 4(d) Rate Filing: Capital
Cost Surcharge to be effective 1/1/2020.
Filed Date: 11/27/19.
Accession Number: 20191127–5076.
Comments Due: 5 p.m. ET 12/9/19.
Docket Numbers: RP20–282–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 112719
Negotiated Rates—Mercuria Energy
America, Inc. R–7540–02 to be effective
12/1/2019.
Filed Date: 11/27/19.
Accession Number: 20191127–5081.
Comments Due: 5 p.m. ET 12/9/19.
Docket Numbers: RP20–283–000.
Applicants: Mojave Pipeline
Company, L.L.C.
Description: § 4(d) Rate Filing: Annual
Fuel and L&U Filing 2020 to be effective
1/1/2020.
Filed Date: 11/27/19.
E:\FR\FM\06DEN1.SGM
06DEN1
Agencies
[Federal Register Volume 84, Number 235 (Friday, December 6, 2019)]
[Notices]
[Page 66895]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-26343]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14989-000]
Pumped Hydro Storage LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On October 8, 2019, Pumped Hydro Storage LLC filed an application
for a preliminary permit, pursuant to section 4(f) of the Federal Power
Act (FPA), proposing to study the feasibility of the Montezuma Pumped
Storage Project (Montezuma Project or project) to be located near
Maricopa, Pinal County, Arizona. The sole purpose of a preliminary
permit, if issued, is to grant the permit holder priority to file a
license application during the permit term. A preliminary permit does
not authorize the permit holder to perform any land-disturbing
activities or otherwise enter upon lands or waters owned by others
without the owners' express permission.
The proposed project would consist of the following: (1) A new
rockfill, concrete-face impoundment, 3,000 feet by 110 feet creating an
upper reservoir with a maximum elevation of 3,000 feet above mean sea
level (MSL), and a usable storage capacity of 9,500 acre-feet; (2) a
new rockfill, concrete-face impoundment, 4,000 feet by 130 feet
creating a lower reservoir with a maximum elevation of 1,350 feet MSL,
and a usable storage capacity of 9,500 acre-feet; (3) two 32-foot-
diameter, 7,000-foot-long reinforced concrete penstocks; (4) a
powerhouse constructed of reinforced concrete with approximate
dimensions of 900 feet by 150 feet and 150 feet high, and containing
six turbine-generator units with a total installed capacity of 2100
megawatts; (5) a tailrace constructed of reinforced concrete with
approximate dimensions of 1,200 feet by 50 feet by 50 feet; (6) a 500-
kilovolt substation; (7) a 500-kilovolt, 11-mile-long transmission
line; (8) a 500-kilovolt, 8-mile-long transmission line; (9) one 24-
inch-diameter, ductile iron pipe pipeline connecting the project to the
existing City of Phoenix 91st Avenue Wastewater Treatment Plant; (10)
one 24-inch-diameter, ductile iron pipe pipeline connecting the project
to the existing Salt River Project irrigation canal; (11) one 24-inch-
diameter, ductile iron pipe pipeline connecting the project to the
existing Gila River Indian Community irrigation canal; (12) one 24-
inch-diameter, ductile iron pipe pipeline connecting the project to a
new water supply well in Santa Cruz Wash; (13) one steel casing water
supply well in Santa Cruz wash rated at 2,000 gallons-per-minute; (14)
one 1-million-gallon steel overflow tank; (15) six agricultural fields,
2-square-miles in area, that would be irrigated with excess water from
the steel overflow tank; and (16) appurtenant facilities. The proposed
project would produce about 9,600 megawatt hours of energy daily. The
estimated annual generation of the Montezuma Project would be 3,504
gigawatt-hours.
Applicant Contact: Mr. Steve Irwin, Pumped Hydro Storage LLC, 6514
41st Lane, Phoenix, AZ 85041; phone: (602) 696-3608.
FERC Contact: Evan Williams; phone: (202) 502-8462.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-14804-000.
More information about this project, including a copy of the
application, can be viewed or printed on the eLibrary link of
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14989) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: December 2, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-26343 Filed 12-5-19; 8:45 am]