Gulf South Pipeline Company, LP; Notice of Schedule for Environmental Review of the Lamar County Expansion Project, 65804 [2019-25914]
Download as PDF
65804
Federal Register / Vol. 84, No. 230 / Friday, November 29, 2019 / Notices
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: November 22, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–25910 Filed 11–27–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Background
[Docket No. CP19–517–000]
Gulf South Pipeline Company, LP;
Notice of Schedule for Environmental
Review of the Lamar County
Expansion Project
On September 30, 2019, Gulf South
Pipeline Company, LP (Gulf South) filed
an application in Docket No. CP19–517–
000 requesting a Certificate of Public
Convenience and Necessity pursuant to
Section 7(c) of the Natural Gas Act to
construct and operate certain natural gas
pipeline facilities. The proposed project
is known as the Lamar County
Expansion Project (Project) and would
provide about 200,000 dekatherms of
natural gas per day to Cooperative
Energy’s generation facility in Lamar
County, Mississippi.
On October 15, 2019, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
khammond on DSKJM1Z7X2PROD with NOTICES
Schedule for Environmental Review
Issuance of EA—February 18, 2020.
90-day Federal Authorization Decision
Deadline—May 18, 2020.
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
Gulf South proposes to construct and
operate 3.4 miles of 20-inch-diameter
pipeline, a new delivery meter station,
and a new 5,000 horsepower
VerDate Sep<11>2014
19:00 Nov 27, 2019
compressor station in Lamar and Forrest
Counties, Mississippi. The Project
would allow Gulf South to provide up
to 200,000 dekatherms per day of new
natural gas firm transportation service
from Gulf South’s existing Index 299
pipeline to Cooperative Energy. This
service would be primarily utilized for
Cooperative Energy’s new 550-megawatt
combined cycle gas turbine generation
facility. According to Gulf South, the
Project would allow Cooperative
Energy’s power plant to switch from
coal to natural gas as a power source.
Jkt 250001
On November 4, 2019, the
Commission issued a Notice of Intent to
Prepare an Environmental Assessment
for the Proposed Lamar County
Expansion Project and Request for
Comments on Environmental Issues
(NOI). The NOI was sent to affected
landowners; federal, state, and local
government agencies; elected officials;
environmental and public interest
groups; Native American tribes; other
interested parties; and local libraries
and newspapers. All substantive
comments will be addressed in the EA.
No comments have been received at this
time.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP19–517), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
Dated: November 22, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–25914 Filed 11–27–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14973–000]
Lock∂TM Hydro Friends Fund XX, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On March 1, 2019, Lock∂TM Hydro
Friends Fund XX, LLC, filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Blue Marsh Dam
Hydropower Project to be located at the
U.S. Army Corps of Engineers’ (Corps)
Blue Marsh Dam on the Tulpehocken
Creek in Berks County, Pennsylvania.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) A new 30-foot-long,
30-foot-wide, 160-foot-high Large Frame
Module; (2) two turbine-generator units
with a total rated capacity of 1.75
megawatts; (3) a new 4-foot-long, 4-footwide, 3-foot-high pad-mounted
transformer; (4) a new 1,650-foot-long,
13-kilovolt transmission line connecting
the new transformer to an existing
distribution line; and (5) appurtenant
facilities. The proposed project would
have an annual generation of 7,750
megawatt-hours.
Applicant Contact: Wayne Krouse,
Lock ∂TM Hydro Friends Fund XX, LLC,
P.O. Box 43796, Birmingham, AL 35243;
phone: 877–556–6566 ext. 709.
FERC Contact: Woohee Choi; phone:
(202) 502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.1
1 The Commission is issuing a second notice for
this project because some municipalities may not
have been notified by the first notice issued on
August 22, 2019. Any comments filed in response
to either notice will be considered in evaluating the
permit application.
E:\FR\FM\29NON1.SGM
29NON1
Agencies
[Federal Register Volume 84, Number 230 (Friday, November 29, 2019)]
[Notices]
[Page 65804]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-25914]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP19-517-000]
Gulf South Pipeline Company, LP; Notice of Schedule for
Environmental Review of the Lamar County Expansion Project
On September 30, 2019, Gulf South Pipeline Company, LP (Gulf South)
filed an application in Docket No. CP19-517-000 requesting a
Certificate of Public Convenience and Necessity pursuant to Section
7(c) of the Natural Gas Act to construct and operate certain natural
gas pipeline facilities. The proposed project is known as the Lamar
County Expansion Project (Project) and would provide about 200,000
dekatherms of natural gas per day to Cooperative Energy's generation
facility in Lamar County, Mississippi.
On October 15, 2019, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA--February 18, 2020.
90-day Federal Authorization Decision Deadline--May 18, 2020.
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
Gulf South proposes to construct and operate 3.4 miles of 20-inch-
diameter pipeline, a new delivery meter station, and a new 5,000
horsepower compressor station in Lamar and Forrest Counties,
Mississippi. The Project would allow Gulf South to provide up to
200,000 dekatherms per day of new natural gas firm transportation
service from Gulf South's existing Index 299 pipeline to Cooperative
Energy. This service would be primarily utilized for Cooperative
Energy's new 550-megawatt combined cycle gas turbine generation
facility. According to Gulf South, the Project would allow Cooperative
Energy's power plant to switch from coal to natural gas as a power
source.
Background
On November 4, 2019, the Commission issued a Notice of Intent to
Prepare an Environmental Assessment for the Proposed Lamar County
Expansion Project and Request for Comments on Environmental Issues
(NOI). The NOI was sent to affected landowners; federal, state, and
local government agencies; elected officials; environmental and public
interest groups; Native American tribes; other interested parties; and
local libraries and newspapers. All substantive comments will be
addressed in the EA. No comments have been received at this time.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' excluding the last three digits (i.e.,
CP19-517), and follow the instructions. For assistance with access to
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at [email protected]. The eLibrary link on the FERC
website also provides access to the texts of formal documents issued by
the Commission, such as orders, notices, and rule makings.
Dated: November 22, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-25914 Filed 11-27-19; 8:45 am]