Columbia Gas Transmission, LLC; Notice of Application, 64886-64887 [2019-25531]
Download as PDF
64886
Federal Register / Vol. 84, No. 227 / Monday, November 25, 2019 / Notices
You may submit comments
(identified by Docket No. IC20–4–000)
by either of the following methods:
• eFiling at Commission’s Website:
https://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE, Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: https://
www.ferc.gov/help/submissionguide.asp. For user assistance, contact
FERC Online Support by email at
ferconlinesupport@ferc.gov, or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
ADDRESSES:
at DataClearance@FERC.gov, telephone
at (202) 502–8663, and fax at (202) 273–
0873.
SUPPLEMENTARY INFORMATION:
Title: FERC–725I (Mandatory
Reliability Standards for the Northeast
Power Coordinating Council).
OMB Control No.: 1902–0258.
Type of Request: Three-year extension
of the FERC–725I with no changes to the
current reporting and recordkeeping
requirements.
Abstract: The Regional Reliability
standard PRC–006–NPCC–1 (Automatic
Underfrequency Load Shedding)
provides regional requirements for
Automatic Underfrequency Load
Shedding to applicable entities in
NPCC. UFLS requirements have been in
place at a continent-wide level and
within NPCC for many years prior to the
implementation of federally mandated
reliability standards in 2007. NPCC and
its members think that a region-wide,
fully coordinated single set of UFLS
requirements is necessary to create an
effective and efficient UFLS program,
and their experience has supported that
belief.
Information collection burden for
Reliability Standard PRC–006–NPCC–01
is based on the time needed for
planning coordinators and generator
owners to incrementally gather data, run
studies, and analyze study results to
design or update the UFLS programs
that are required in the regional
Reliability Standard (in addition to the
requirements of the NERC Reliability
Standard PRC–006–3). There is also
burden on the generator owners to
maintain data.
Type of Respondent: Generator
Owners and Planning Coordinators
Estimate of Annual Burden: 1 The
number of respondents is based on
NERC’s Registry as of July 26, 2019.
Entities registered for more than one
applicable function type have been
accounted for in the figures below. The
Commission estimates the annual public
reporting burden and cost 2 for the
information collection as:
FERC–725I
Information collection
requirements
PCs design and document automatic UFLS program.
PCs update and maintain UFLS
program database.
GOs provide documentation and
data to the planning coordinator.
GOs: record retention ...................
Total .......................................
Number of
respondents
Annual
number of
responses
per
respondent
Total number
of responses
Average
burden hours
& cost ($) per response
Total annual burden hours
& total annual cost
($)
Cost per
respondent
($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
6
1
6
8 hrs.; $640 .........................
48 hrs.; $3,840 ....................
$640
6
1
6
16 hrs.; $1,280 ....................
96 hrs.; $7,680 ....................
1,280
136
1
136
16 hrs.; $1,280 ....................
2,176 hrs.; $174,080 ...........
1,280
136
1
136
4 hrs.; $320 .........................
544 hrs.; $43,520 ................
320
........................
........................
284
..............................................
2,864 hrs.; $229,120 ...........
........................
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s
estimates of the burden and cost of the
collection of information, including the
validity of the methodology and
assumptions used; (3) ways to enhance
the quality, utility and clarity of the
information collection; and (4) ways to
minimize the burden of the collection of
information on those who are to
respond, including the use of automated
collection techniques or other forms of
information technology.
Dated: November 19, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Take notice that on November 6,
2019, Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street Suite
700, Houston, Texas, 77002–2700, filed
an application pursuant to section 7(c)
of the Natural Gas Act, and Subpart A
of the Commission’s regulations, for
authorization to amend its existing
authorizations of the Leach XPress
Project (Leach Xpress). Specifically,
Columbia proposes to: (1) Modify the
full-load operation of the Ceredo
compressor station (Ceredo CS) to limit
the use of the seven existing vintage
reciprocating units at the Ceredo CS to
four units at a given time; (2) allow for
the use of additional horsepower that is
available from existing electric-driven
compressor units located at the Ceredo
CS; and (3) amend the noise level
requirement for the Ceredo CS and the
1 ‘‘Burden’’ is the total time, effort, or financial
resources expended by persons to generate,
maintain, retain, or disclose or provide information
to or for a Federal agency. For further explanation
of what is included in the information collection
burden, refer to Title 5 Code of Federal Regulations
1320.3.
2 Commission staff estimates that the industry’s
skill set and cost (for wages and benefits) for FERC–
725I are approximately the same as the
Commission’s average cost. The FERC 2019 average
salary plus benefits for one FERC full-time
equivalent (FTE) is $167,091/year (or $80.00/hour).
VerDate Sep<11>2014
17:31 Nov 22, 2019
Jkt 250001
[FR Doc. 2019–25523 Filed 11–22–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–12–000]
Columbia Gas Transmission, LLC;
Notice of Application
PO 00000
Frm 00067
Fmt 4703
Sfmt 4703
E:\FR\FM\25NON1.SGM
25NON1
Federal Register / Vol. 84, No. 227 / Monday, November 25, 2019 / Notices
Crawford Compressor Station contained
in Environmental Condition 31 of the
Leach XPress Certificate Order. The
proposed amended noise condition
would allow Columbia to operate the
Ceredo CS at the reduced maximum
noise levels that result from the
proposed amended full load operations,
all as more fully described in the
application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Sorana
Linder, Director, Modernization &
Certificates, Columbia Gas
Transmission, LLC, 700 Louisiana
Street, Suite 700, Houston, Texas
77002–2700, Phone: 832–320–5209; or
email: Sorana_linder@tcenergy.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
VerDate Sep<11>2014
17:31 Nov 22, 2019
Jkt 250001
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
3 copies of filings made in the
proceeding with the Commission and
must provide a copy to the applicant
and to every other party. Only parties to
the proceeding can ask for court review
of Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commentors
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
As of the February 27, 2018 date of
the Commission’s order in Docket No.
CP16–4–001, the Commission will
apply its revised practice concerning
out-of-time motions to intervene in any
new Natural Gas Act section 3 or section
7 proceeding.1 Persons desiring to
become a party to a certificate
proceeding are to intervene in a timely
manner. If seeking to intervene out-oftime, the movant is required to ‘‘show
good cause why the time limitation
should be waived,’’ and should provide
justification by reference to factors set
forth in Rule 214(d)(1) of the
Commission’s Rules and Regulations.2
The Commission strongly encourages
electronic filings of comments, protests
1 Tennessee Gas Pipeline Company, L.L.C., 162
FERC ¶ 61,167 at ¶ 50 (2018).
2 18 CFR 385.214(d)(1).
PO 00000
Frm 00068
Fmt 4703
Sfmt 4703
64887
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 3 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on December 10, 2019.
Dated: November 19, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–25531 Filed 11–22–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER20–383–000]
Maverick Wind Project, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced Maverick Wind
Project, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is December 9,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
E:\FR\FM\25NON1.SGM
25NON1
Agencies
[Federal Register Volume 84, Number 227 (Monday, November 25, 2019)]
[Notices]
[Pages 64886-64887]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-25531]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP20-12-000]
Columbia Gas Transmission, LLC; Notice of Application
Take notice that on November 6, 2019, Columbia Gas Transmission,
LLC (Columbia), 700 Louisiana Street Suite 700, Houston, Texas, 77002-
2700, filed an application pursuant to section 7(c) of the Natural Gas
Act, and Subpart A of the Commission's regulations, for authorization
to amend its existing authorizations of the Leach XPress Project (Leach
Xpress). Specifically, Columbia proposes to: (1) Modify the full-load
operation of the Ceredo compressor station (Ceredo CS) to limit the use
of the seven existing vintage reciprocating units at the Ceredo CS to
four units at a given time; (2) allow for the use of additional
horsepower that is available from existing electric-driven compressor
units located at the Ceredo CS; and (3) amend the noise level
requirement for the Ceredo CS and the
[[Page 64887]]
Crawford Compressor Station contained in Environmental Condition 31 of
the Leach XPress Certificate Order. The proposed amended noise
condition would allow Columbia to operate the Ceredo CS at the reduced
maximum noise levels that result from the proposed amended full load
operations, all as more fully described in the application which is on
file with the Commission and open to public inspection. The filing may
also be viewed on the web at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC at [email protected] or call toll-free, (866) 208-3676 or
TTY, (202) 502-8659.
Any questions regarding this application should be directed to
Sorana Linder, Director, Modernization & Certificates, Columbia Gas
Transmission, LLC, 700 Louisiana Street, Suite 700, Houston, Texas
77002-2700, Phone: 832-320-5209; or email: [email protected].
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding, or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the EA for this proposal. The filing of the EA in the Commission's
public record for this proceeding or the issuance of a Notice of
Schedule for Environmental Review will serve to notify federal and
state agencies of the timing for the completion of all necessary
reviews, and the subsequent need to complete all federal authorizations
within 90 days of the date of issuance of the Commission staff's EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below file with the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit 3 copies of filings made in the proceeding with the Commission
and must provide a copy to the applicant and to every other party. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, and will be
notified of any meetings associated with the Commission's environmental
review process. Environmental commentors will not be required to serve
copies of filed documents on all other parties. However, the non-party
commentors will not receive copies of all documents filed by other
parties or issued by the Commission and will not have the right to seek
court review of the Commission's final order.
As of the February 27, 2018 date of the Commission's order in
Docket No. CP16-4-001, the Commission will apply its revised practice
concerning out-of-time motions to intervene in any new Natural Gas Act
section 3 or section 7 proceeding.\1\ Persons desiring to become a
party to a certificate proceeding are to intervene in a timely manner.
If seeking to intervene out-of-time, the movant is required to ``show
good cause why the time limitation should be waived,'' and should
provide justification by reference to factors set forth in Rule
214(d)(1) of the Commission's Rules and Regulations.\2\
---------------------------------------------------------------------------
\1\ Tennessee Gas Pipeline Company, L.L.C., 162 FERC ] 61,167 at
] 50 (2018).
\2\ 18 CFR 385.214(d)(1).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 3 copies of the protest or intervention to the
Federal Energy regulatory Commission, 888 First Street NE, Washington,
DC 20426.
Comment Date: 5:00 p.m. Eastern Time on December 10, 2019.
Dated: November 19, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-25531 Filed 11-22-19; 8:45 am]
BILLING CODE 6717-01-P