Download as PDF 64886 Federal Register / Vol. 84, No. 227 / Monday, November 25, 2019 / Notices You may submit comments (identified by Docket No. IC20–4–000) by either of the following methods: • eFiling at Commission’s Website: https://www.ferc.gov/docs-filing/ efiling.asp. • Mail/Hand Delivery/Courier: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE, Washington, DC 20426. Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: https:// www.ferc.gov/help/submissionguide.asp. For user assistance, contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208–3676 (toll-free), or (202) 502–8659 for TTY. Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at https://www.ferc.gov/docsfiling/docs-filing.asp. FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email ADDRESSES: at DataClearance@FERC.gov, telephone at (202) 502–8663, and fax at (202) 273– 0873. SUPPLEMENTARY INFORMATION: Title: FERC–725I (Mandatory Reliability Standards for the Northeast Power Coordinating Council). OMB Control No.: 1902–0258. Type of Request: Three-year extension of the FERC–725I with no changes to the current reporting and recordkeeping requirements. Abstract: The Regional Reliability standard PRC–006–NPCC–1 (Automatic Underfrequency Load Shedding) provides regional requirements for Automatic Underfrequency Load Shedding to applicable entities in NPCC. UFLS requirements have been in place at a continent-wide level and within NPCC for many years prior to the implementation of federally mandated reliability standards in 2007. NPCC and its members think that a region-wide, fully coordinated single set of UFLS requirements is necessary to create an effective and efficient UFLS program, and their experience has supported that belief. Information collection burden for Reliability Standard PRC–006–NPCC–01 is based on the time needed for planning coordinators and generator owners to incrementally gather data, run studies, and analyze study results to design or update the UFLS programs that are required in the regional Reliability Standard (in addition to the requirements of the NERC Reliability Standard PRC–006–3). There is also burden on the generator owners to maintain data. Type of Respondent: Generator Owners and Planning Coordinators Estimate of Annual Burden: 1 The number of respondents is based on NERC’s Registry as of July 26, 2019. Entities registered for more than one applicable function type have been accounted for in the figures below. The Commission estimates the annual public reporting burden and cost 2 for the information collection as: FERC–725I Information collection requirements PCs design and document automatic UFLS program. PCs update and maintain UFLS program database. GOs provide documentation and data to the planning coordinator. GOs: record retention ................... Total ....................................... Number of respondents Annual number of responses per respondent Total number of responses Average burden hours & cost ($) per response Total annual burden hours & total annual cost ($) Cost per respondent ($) (1) (2) (1) * (2) = (3) (4) (3) * (4) = (5) (5) ÷ (1) 6 1 6 8 hrs.; $640 ......................... 48 hrs.; $3,840 .................... $640 6 1 6 16 hrs.; $1,280 .................... 96 hrs.; $7,680 .................... 1,280 136 1 136 16 hrs.; $1,280 .................... 2,176 hrs.; $174,080 ........... 1,280 136 1 136 4 hrs.; $320 ......................... 544 hrs.; $43,520 ................ 320 ........................ ........................ 284 .............................................. 2,864 hrs.; $229,120 ........... ........................ Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimates of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. Dated: November 19, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. Take notice that on November 6, 2019, Columbia Gas Transmission, LLC (Columbia), 700 Louisiana Street Suite 700, Houston, Texas, 77002–2700, filed an application pursuant to section 7(c) of the Natural Gas Act, and Subpart A of the Commission’s regulations, for authorization to amend its existing authorizations of the Leach XPress Project (Leach Xpress). Specifically, Columbia proposes to: (1) Modify the full-load operation of the Ceredo compressor station (Ceredo CS) to limit the use of the seven existing vintage reciprocating units at the Ceredo CS to four units at a given time; (2) allow for the use of additional horsepower that is available from existing electric-driven compressor units located at the Ceredo CS; and (3) amend the noise level requirement for the Ceredo CS and the 1 ‘‘Burden’’ is the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation of what is included in the information collection burden, refer to Title 5 Code of Federal Regulations 1320.3. 2 Commission staff estimates that the industry’s skill set and cost (for wages and benefits) for FERC– 725I are approximately the same as the Commission’s average cost. The FERC 2019 average salary plus benefits for one FERC full-time equivalent (FTE) is $167,091/year (or $80.00/hour). VerDate Sep<11>2014 17:31 Nov 22, 2019 Jkt 250001 [FR Doc. 2019–25523 Filed 11–22–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP20–12–000] Columbia Gas Transmission, LLC; Notice of Application PO 00000 Frm 00067 Fmt 4703 Sfmt 4703 E:\FR\FM\25NON1.SGM 25NON1 Federal Register / Vol. 84, No. 227 / Monday, November 25, 2019 / Notices Crawford Compressor Station contained in Environmental Condition 31 of the Leach XPress Certificate Order. The proposed amended noise condition would allow Columbia to operate the Ceredo CS at the reduced maximum noise levels that result from the proposed amended full load operations, all as more fully described in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this application should be directed to Sorana Linder, Director, Modernization & Certificates, Columbia Gas Transmission, LLC, 700 Louisiana Street, Suite 700, Houston, Texas 77002–2700, Phone: 832–320–5209; or email: Sorana_linder@tcenergy.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list VerDate Sep<11>2014 17:31 Nov 22, 2019 Jkt 250001 maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 3 copies of filings made in the proceeding with the Commission and must provide a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, and will be notified of any meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission and will not have the right to seek court review of the Commission’s final order. As of the February 27, 2018 date of the Commission’s order in Docket No. CP16–4–001, the Commission will apply its revised practice concerning out-of-time motions to intervene in any new Natural Gas Act section 3 or section 7 proceeding.1 Persons desiring to become a party to a certificate proceeding are to intervene in a timely manner. If seeking to intervene out-oftime, the movant is required to ‘‘show good cause why the time limitation should be waived,’’ and should provide justification by reference to factors set forth in Rule 214(d)(1) of the Commission’s Rules and Regulations.2 The Commission strongly encourages electronic filings of comments, protests 1 Tennessee Gas Pipeline Company, L.L.C., 162 FERC ¶ 61,167 at ¶ 50 (2018). 2 18 CFR 385.214(d)(1). PO 00000 Frm 00068 Fmt 4703 Sfmt 4703 64887 and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 3 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE, Washington, DC 20426. Comment Date: 5:00 p.m. Eastern Time on December 10, 2019. Dated: November 19, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–25531 Filed 11–22–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER20–383–000] Maverick Wind Project, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced Maverick Wind Project, LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is December 9, 2019. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. E:\FR\FM\25NON1.SGM 25NON1

Agencies

[Federal Register Volume 84, Number 227 (Monday, November 25, 2019)]
[Notices]
[Pages 64886-64887]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-25531]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP20-12-000]


Columbia Gas Transmission, LLC; Notice of Application

    Take notice that on November 6, 2019, Columbia Gas Transmission, 
LLC (Columbia), 700 Louisiana Street Suite 700, Houston, Texas, 77002-
2700, filed an application pursuant to section 7(c) of the Natural Gas 
Act, and Subpart A of the Commission's regulations, for authorization 
to amend its existing authorizations of the Leach XPress Project (Leach 
Xpress). Specifically, Columbia proposes to: (1) Modify the full-load 
operation of the Ceredo compressor station (Ceredo CS) to limit the use 
of the seven existing vintage reciprocating units at the Ceredo CS to 
four units at a given time; (2) allow for the use of additional 
horsepower that is available from existing electric-driven compressor 
units located at the Ceredo CS; and (3) amend the noise level 
requirement for the Ceredo CS and the

[[Page 64887]]

Crawford Compressor Station contained in Environmental Condition 31 of 
the Leach XPress Certificate Order. The proposed amended noise 
condition would allow Columbia to operate the Ceredo CS at the reduced 
maximum noise levels that result from the proposed amended full load 
operations, all as more fully described in the application which is on 
file with the Commission and open to public inspection. The filing may 
also be viewed on the web at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC at [email protected] or call toll-free, (866) 208-3676 or 
TTY, (202) 502-8659.
    Any questions regarding this application should be directed to 
Sorana Linder, Director, Modernization & Certificates, Columbia Gas 
Transmission, LLC, 700 Louisiana Street, Suite 700, Houston, Texas 
77002-2700, Phone: 832-320-5209; or email: [email protected].
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the EA for this proposal. The filing of the EA in the Commission's 
public record for this proceeding or the issuance of a Notice of 
Schedule for Environmental Review will serve to notify federal and 
state agencies of the timing for the completion of all necessary 
reviews, and the subsequent need to complete all federal authorizations 
within 90 days of the date of issuance of the Commission staff's EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 3 copies of filings made in the proceeding with the Commission 
and must provide a copy to the applicant and to every other party. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, and will be 
notified of any meetings associated with the Commission's environmental 
review process. Environmental commentors will not be required to serve 
copies of filed documents on all other parties. However, the non-party 
commentors will not receive copies of all documents filed by other 
parties or issued by the Commission and will not have the right to seek 
court review of the Commission's final order.
    As of the February 27, 2018 date of the Commission's order in 
Docket No. CP16-4-001, the Commission will apply its revised practice 
concerning out-of-time motions to intervene in any new Natural Gas Act 
section 3 or section 7 proceeding.\1\ Persons desiring to become a 
party to a certificate proceeding are to intervene in a timely manner. 
If seeking to intervene out-of-time, the movant is required to ``show 
good cause why the time limitation should be waived,'' and should 
provide justification by reference to factors set forth in Rule 
214(d)(1) of the Commission's Rules and Regulations.\2\
---------------------------------------------------------------------------

    \1\ Tennessee Gas Pipeline Company, L.L.C., 162 FERC ] 61,167 at 
] 50 (2018).
    \2\ 18 CFR 385.214(d)(1).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 3 copies of the protest or intervention to the 
Federal Energy regulatory Commission, 888 First Street NE, Washington, 
DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on December 10, 2019.

    Dated: November 19, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-25531 Filed 11-22-19; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.