Maverick Wind Project, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 64887-64888 [2019-25525]
Download as PDF
Federal Register / Vol. 84, No. 227 / Monday, November 25, 2019 / Notices
Crawford Compressor Station contained
in Environmental Condition 31 of the
Leach XPress Certificate Order. The
proposed amended noise condition
would allow Columbia to operate the
Ceredo CS at the reduced maximum
noise levels that result from the
proposed amended full load operations,
all as more fully described in the
application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Sorana
Linder, Director, Modernization &
Certificates, Columbia Gas
Transmission, LLC, 700 Louisiana
Street, Suite 700, Houston, Texas
77002–2700, Phone: 832–320–5209; or
email: Sorana_linder@tcenergy.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
VerDate Sep<11>2014
17:31 Nov 22, 2019
Jkt 250001
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
3 copies of filings made in the
proceeding with the Commission and
must provide a copy to the applicant
and to every other party. Only parties to
the proceeding can ask for court review
of Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commentors
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
As of the February 27, 2018 date of
the Commission’s order in Docket No.
CP16–4–001, the Commission will
apply its revised practice concerning
out-of-time motions to intervene in any
new Natural Gas Act section 3 or section
7 proceeding.1 Persons desiring to
become a party to a certificate
proceeding are to intervene in a timely
manner. If seeking to intervene out-oftime, the movant is required to ‘‘show
good cause why the time limitation
should be waived,’’ and should provide
justification by reference to factors set
forth in Rule 214(d)(1) of the
Commission’s Rules and Regulations.2
The Commission strongly encourages
electronic filings of comments, protests
1 Tennessee Gas Pipeline Company, L.L.C., 162
FERC ¶ 61,167 at ¶ 50 (2018).
2 18 CFR 385.214(d)(1).
PO 00000
Frm 00068
Fmt 4703
Sfmt 4703
64887
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 3 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on December 10, 2019.
Dated: November 19, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–25531 Filed 11–22–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER20–383–000]
Maverick Wind Project, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced Maverick Wind
Project, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is December 9,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
E:\FR\FM\25NON1.SGM
25NON1
64888
Federal Register / Vol. 84, No. 227 / Monday, November 25, 2019 / Notices
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: November 19, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–25525 Filed 11–22–19; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OECA–2012–0679; FRL–10002–
41–OMS]
Information Collection Request
Submitted to OMB for Review and
Approval; Comment Request; NESHAP
for Petroleum Refineries: Catalytic
Cracking Units, Catalytic Reforming
Units, and Sulfur Recovery Units
(Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) has submitted an
information collection request (ICR),
NESHAP for Petroleum Refineries:
Catalytic Cracking Units, Catalytic
Reforming Units, and Sulfur Recovery
Units (EPA ICR Number 1844.11, OMB
Control Number 2060–0554), to the
Office of Management and Budget
(OMB) for review and approval in
accordance with the Paperwork
Reduction Act. This is a proposed
extension of the ICR, which is currently
approved through January 31, 2020.
Public comments were previously
requested, via the Federal Register, on
May 6, 2019 during a 60-day comment
period. This notice allows for an
additional 30 days for public comments.
A fuller description of the ICR is given
below, including its estimated burden
and cost to the public. An agency may
SUMMARY:
VerDate Sep<11>2014
17:31 Nov 22, 2019
Jkt 250001
neither conduct nor sponsor, and a
person is not required to respond to, a
collection of information unless it
displays a currently valid OMB control
number.
DATES: Additional comments may be
submitted on or before December 26,
2019.
ADDRESSES: Submit your comments,
referencing Docket ID Number EPA–
HQ–OECA–2012–0679, to: (1) EPA
online using www.regulations.gov (our
preferred method), or by email to
docket.oeca@epa.gov, or by mail to: EPA
Docket Center, Environmental
Protection Agency, Mail Code 28221T,
1200 Pennsylvania Ave. NW,
Washington, DC 20460; and (2) OMB via
email to oira_submission@omb.eop.gov.
Address comments to OMB Desk Officer
for EPA.
EPA’s policy is that all comments
received will be included in the public
docket without change, including any
personal information provided, unless
the comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI), or other
information whose disclosure is
restricted by statute.
FOR FURTHER INFORMATION CONTACT:
Patrick Yellin, Monitoring, Assistance,
and Media Programs Division, Office of
Compliance, Mail Code 2227A,
Environmental Protection Agency, 1200
Pennsylvania Ave. NW, Washington, DC
20460; telephone number: (202) 564–
2970; fax number: (202) 564–0050;
email address: yellin.patrick@epa.gov.
SUPPLEMENTARY INFORMATION:
Supporting documents, which explain
in detail the information that the EPA
will be collecting, are available in the
public docket for this ICR. The docket
can be viewed online at
www.regulations.gov, or in person at the
EPA Docket Center, WJC West, Room
3334, 1301 Constitution Ave. NW,
Washington, DC. The telephone number
for the Docket Center is 202–566–1744.
For additional information about EPA’s
public docket, visit: https://
www.epa.gov/dockets.
Abstract: The National Emission
Standards for Hazardous Air Pollutants
(NESHAP) for the Petroleum Refineries:
Catalytic Cracking Units, Catalytic
Reforming Units, and Sulfur Recovery
Units apply to three types of affected
units at major source petroleum
refineries: Fluid catalytic cracking units
(FCCU) for catalyst regeneration,
catalytic reforming units (CRU), and
sulfur recovery units (SRU). The rule
also includes requirements for by-pass
lines associated with the three affected
units. Owners and operators of affected
units are required to comply with
PO 00000
Frm 00069
Fmt 4703
Sfmt 9990
reporting and record keeping
requirements for the General Provisions
(40 CFR part 63, subpart A), as well as
for the applicable standards in 40 CFR
part 63, subpart UUU. This includes
submitting initial notifications,
performance tests and periodic reports
and results, and maintaining records of
the operation of an affected facility.
These reports are used by EPA to
determine compliance with these
standards.
Form Numbers: None.
Respondents/affected entities:
Petroleum refineries that operate
catalytic cracking units, catalytic
reforming units, and sulfur recovery
units.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63).
Estimated number of respondents:
142 (total).
Frequency of response: Semiannually.
Total estimated burden: 17,500 hours
(per year). Burden is defined at 5 CFR
1320.3(b).
Total estimated cost: $10,800,000 (per
year), includes $8,780,000 annualized
capital or operation & maintenance
costs.
Changes in the estimates: There is a
moderate decrease in burden in this ICR
compared to the previous ICR. The
decrease in the burden and cost
estimates occurred because refineries
are assumed to have implemented the
initial 2015 rule compliance activities
since the standard has been in effect for
more than three years. The previous ICR
reflected those burdens and costs
associated with the initial activities for
subject facilities. This includes
conducting performance test(s) and
establishing or revising recordkeeping
systems. This ICR, by in large, reflects
the on-going burden and costs for
existing facilities. Activities for existing
sources include 5-year performance
tests, continuous monitoring of
pollutants, and the submission of
semiannual reports. This ICR also
corrects the Agency burden from the
prior ICR to account for burden for
review of submitted RATA for units
using CEMS.
Courtney Kerwin,
Director, Regulatory Support Division.
[FR Doc. 2019–25485 Filed 11–22–19; 8:45 am]
BILLING CODE 6560–50–P
E:\FR\FM\25NON1.SGM
25NON1
Agencies
[Federal Register Volume 84, Number 227 (Monday, November 25, 2019)]
[Notices]
[Pages 64887-64888]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-25525]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER20-383-000]
Maverick Wind Project, LLC; Supplemental Notice That Initial
Market-Based Rate Filing Includes Request for Blanket Section 204
Authorization
This is a supplemental notice in the above-referenced Maverick Wind
Project, LLC's application for market-based rate authority, with an
accompanying rate tariff, noting that such application includes a
request for blanket authorization, under 18 CFR part 34, of future
issuances of securities and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is December 9, 2019.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
[[Page 64888]]
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the website that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please email
[email protected]. or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Dated: November 19, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-25525 Filed 11-22-19; 8:45 am]
BILLING CODE 6717-01-P