Combined Notice of Filings #1, 64061-64062 [2019-25145]
Download as PDF
Federal Register / Vol. 84, No. 224 / Wednesday, November 20, 2019 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD20–2–000]
Ute Mountain Ute Tribe Farm and
Ranch Enterprise; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On November 13, 2019, the Ute
Mountain Ute Tribe Farm and Ranch
Enterprise filed a notice of intent to
construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA). The
proposed UMUT–FRE Irrigation Hydro
Project would have an installed capacity
of 221 kilowatts (kW), and would be
located along the applicant’s existing
irrigation system near Towaoc,
Montezuma County, Colorado.
Applicant Contact: Tim Olsen, 1428 S
Humboldt St., Denver, CO 80210, Phone
No. (303) 777–3341, Email: tolsen@
windtechnology.com.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, Email:
christopher.chaney@ferc.gov.
64061
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) 10 turbinegenerators, each with a capacity
between 10–30 kW, with a total capacity
of 221 kW; (2) 10 powerhouse vaults;
and (3) appurtenant facilities. The
proposed project would have an
estimated annual generation of up to
636 megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A) .........................
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric power and
uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 40 megawatts ...................................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
FPA 30(a)(3)(C)(i) ......................
FPA 30(a)(3)(C)(ii) .....................
FPA 30(a)(3)(C)(iii) ....................
Preliminary Determination: The
proposed UMUT–FRE Irrigation Hydro
Project will not alter the primary
purpose of the conduits, which is to
transport water for irrigation. Therefore,
based upon the above criteria,
Commission staff preliminarily
determines that the proposal satisfies
the requirements for a qualifying
conduit hydropower facility, which is
not required to be licensed or exempted
from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 30 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
VerDate Sep<11>2014
17:21 Nov 19, 2019
Jkt 250001
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
1 18
PO 00000
CFR 385.2001–2005 (2019).
Frm 00024
Fmt 4703
Sfmt 4703
Y
Y
Y
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (i.e., CD20–2) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: November 14, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–25124 Filed 11–19–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–38–004.
Applicants: Fairless Energy, L.L.C.
Description: Compliance filing:
Settlement compliance filing to be
effective 12/12/2018.
E:\FR\FM\20NON1.SGM
20NON1
64062
Federal Register / Vol. 84, No. 224 / Wednesday, November 20, 2019 / Notices
Filed Date: 11/14/19.
Accession Number: 20191114–5061.
Comments Due: 5 p.m. ET 12/5/19.
Docket Numbers: ER20–372–000.
Applicants: Pennsylvania Electric
Company, Jersey Central Power & Light
Company, Metropolitan Edison
Company, PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
Penelec et al submit Revised WASPs,
Service Agreement Nos. 4221, 4222, and
4223 to be effective 1/12/2020.
Filed Date: 11/13/19.
Accession Number: 20191113–5146.
Comments Due: 5 p.m. ET 12/4/19.
Docket Numbers: ER20–373–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–11–14_SA 3369 Entergy
Mississippi (Choctaw) GIA to be
effective 10/31/2019.
Filed Date: 11/14/19.
Accession Number: 20191114–5005.
Comments Due: 5 p.m. ET 12/5/19.
Docket Numbers: ER20–374–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: § 205(d) Rate Filing: DECMidway Solar Green ASOA (SA No.
529) to be effective 11/1/2019.
Filed Date: 11/14/19.
Accession Number: 20191114–5017.
Comments Due: 5 p.m. ET 12/5/19.
Docket Numbers: ER20–375–000.
Applicants: ISO New England Inc.,
Emera Maine.
Description: § 205(d) Rate Filing:
Changes to ISO New England OATT
Schedule 20A–EM to be effective 11/1/
2020.
Filed Date: 11/14/19.
Accession Number: 20191114–5018.
Comments Due: 5 p.m. ET 12/5/19.
Docket Numbers: ER20–376–000.
Applicants: New York State Electric &
Gas Corporation, New York
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
Reimbursement Agreement (SA 2492)
between NYSEG and Greenidge
Generation to be effective 10/18/2019.
Filed Date: 11/14/19.
Accession Number: 20191114–5027.
Comments Due: 5 p.m. ET 12/5/19.
Docket Numbers: ER20–377–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: First
Revised ISA, SA No. 4807, Queue No.
AD2–035 to be effective 10/15/2019.
Filed Date: 11/14/19.
Accession Number: 20191114–5082.
Comments Due: 5 p.m. ET 12/5/19.
Docket Numbers: ER20–378–000.
Applicants: Pacific Gas and Electric
Company.
VerDate Sep<11>2014
17:21 Nov 19, 2019
Jkt 250001
Description: § 205(d) Rate Filing: 11–
14–19 Unexecuted Agreements, City
and County of San Francisco WDT SA
(SA 275) to be effective 1/13/2020.
Filed Date: 11/14/19.
Accession Number: 20191114–5093.
Comments Due: 5 p.m. ET 12/5/19.
Docket Numbers: ER20–379–000.
Applicants: Commonwealth Edison
Company, PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
ComEd submits revisions to OATT, Att.
H13A re: Materials and Supplies to be
effective 1/1/2020.
Filed Date: 11/14/19.
Accession Number: 20191114–5094.
Comments Due: 5 p.m. ET 12/5/19.
Docket Numbers: ER20–380–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–11–14_SA 3370 ATC-Red Barn
Energy GIA (J855) to be effective 10/30/
2019.
Filed Date: 11/14/19.
Accession Number: 20191114–5121.
Comments Due: 5 p.m. ET 12/5/19.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF20–280–000.
Applicants: Geisinger Wyoming
Valley.
Description: Form 556 of Geisinger
Wyoming Valley.
Filed Date: 11/14/19.
Accession Number: 20191114–5067.
Comments Due: None Applicable.
Docket Numbers: QF20–282–000.
Applicants: The Cooper Health
System.
Description: Form 556 of The Cooper
Health System.
Filed Date: 11/14/19.
Accession Number: 20191114–5104.
Comments Due: None Applicable.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
Dated: November 14, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–25145 Filed 11–19–19; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–10002–23–Region 6]
Underground Injection Control
Program; Hazardous Waste Injection
Restrictions; Petition for Exemption
Reissuance—Class I Hazardous Waste
Injection; ExxonMobil Corporation
Pasadena, Texas Facility
Environmental Protection
Agency (EPA).
ACTION: Notice of a final decision on a
UIC no migration petition reissuance.
AGENCY:
Notice is hereby given that a
reissuance of an exemption to the Land
Disposal Restrictions, under the 1984
Hazardous and Solid Waste
Amendments to the Resource
Conservation and Recovery Act, has
been granted to ExxonMobil for two
Class I hazardous waste injection wells
located at their Pasadena, Texas facility.
The company has adequately
demonstrated to the satisfaction of the
Environmental Protection Agency (EPA)
by the petition reissuance application
and supporting documentation that, to a
reasonable degree of certainty, there will
be no migration of hazardous
constituents from the injection zone for
as long as the waste remains hazardous.
This final decision allows the
underground injection by ExxonMobil
of the specific restricted hazardous
wastes identified in this exemption
reissuance request, into Class I
hazardous waste injection wells WDW–
397 and 398 until December 31, 2040,
unless the EPA moves to terminate this
exemption. Additional conditions
included in this final decision may be
reviewed by contacting the EPA Region
6 Ground Water/UIC Section. There
were two public comment periods for
this decision because the newspaper
failed to publish the first notice. They
were 6/12–7/29/19 and 8/21–10/7/19
and no comments were received. This
decision constitutes final Agency action
and there is no Administrative appeal.
DATES: This action is effective as of
October 29, 2019.
ADDRESSES: Copies of the petition
reissuance and all pertinent information
relating thereto are on file at the
following location: Environmental
Protection Agency, Region 6, Water
Division, Safe Drinking Water Branch
SUMMARY:
E:\FR\FM\20NON1.SGM
20NON1
Agencies
[Federal Register Volume 84, Number 224 (Wednesday, November 20, 2019)]
[Notices]
[Pages 64061-64062]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-25145]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER19-38-004.
Applicants: Fairless Energy, L.L.C.
Description: Compliance filing: Settlement compliance filing to be
effective 12/12/2018.
[[Page 64062]]
Filed Date: 11/14/19.
Accession Number: 20191114-5061.
Comments Due: 5 p.m. ET 12/5/19.
Docket Numbers: ER20-372-000.
Applicants: Pennsylvania Electric Company, Jersey Central Power &
Light Company, Metropolitan Edison Company, PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Penelec et al submit Revised
WASPs, Service Agreement Nos. 4221, 4222, and 4223 to be effective 1/
12/2020.
Filed Date: 11/13/19.
Accession Number: 20191113-5146.
Comments Due: 5 p.m. ET 12/4/19.
Docket Numbers: ER20-373-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-11-14_SA 3369 Entergy
Mississippi (Choctaw) GIA to be effective 10/31/2019.
Filed Date: 11/14/19.
Accession Number: 20191114-5005.
Comments Due: 5 p.m. ET 12/5/19.
Docket Numbers: ER20-374-000.
Applicants: Duke Energy Carolinas, LLC.
Description: Sec. 205(d) Rate Filing: DEC-Midway Solar Green ASOA
(SA No. 529) to be effective 11/1/2019.
Filed Date: 11/14/19.
Accession Number: 20191114-5017.
Comments Due: 5 p.m. ET 12/5/19.
Docket Numbers: ER20-375-000.
Applicants: ISO New England Inc., Emera Maine.
Description: Sec. 205(d) Rate Filing: Changes to ISO New England
OATT Schedule 20A-EM to be effective 11/1/2020.
Filed Date: 11/14/19.
Accession Number: 20191114-5018.
Comments Due: 5 p.m. ET 12/5/19.
Docket Numbers: ER20-376-000.
Applicants: New York State Electric & Gas Corporation, New York
Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: Reimbursement Agreement (SA
2492) between NYSEG and Greenidge Generation to be effective 10/18/
2019.
Filed Date: 11/14/19.
Accession Number: 20191114-5027.
Comments Due: 5 p.m. ET 12/5/19.
Docket Numbers: ER20-377-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: First Revised ISA, SA No.
4807, Queue No. AD2-035 to be effective 10/15/2019.
Filed Date: 11/14/19.
Accession Number: 20191114-5082.
Comments Due: 5 p.m. ET 12/5/19.
Docket Numbers: ER20-378-000.
Applicants: Pacific Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: 11-14-19 Unexecuted
Agreements, City and County of San Francisco WDT SA (SA 275) to be
effective 1/13/2020.
Filed Date: 11/14/19.
Accession Number: 20191114-5093.
Comments Due: 5 p.m. ET 12/5/19.
Docket Numbers: ER20-379-000.
Applicants: Commonwealth Edison Company, PJM Interconnection,
L.L.C.
Description: Sec. 205(d) Rate Filing: ComEd submits revisions to
OATT, Att. H13A re: Materials and Supplies to be effective 1/1/2020.
Filed Date: 11/14/19.
Accession Number: 20191114-5094.
Comments Due: 5 p.m. ET 12/5/19.
Docket Numbers: ER20-380-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-11-14_SA 3370 ATC-Red
Barn Energy GIA (J855) to be effective 10/30/2019.
Filed Date: 11/14/19.
Accession Number: 20191114-5121.
Comments Due: 5 p.m. ET 12/5/19.
Take notice that the Commission received the following qualifying
facility filings:
Docket Numbers: QF20-280-000.
Applicants: Geisinger Wyoming Valley.
Description: Form 556 of Geisinger Wyoming Valley.
Filed Date: 11/14/19.
Accession Number: 20191114-5067.
Comments Due: None Applicable.
Docket Numbers: QF20-282-000.
Applicants: The Cooper Health System.
Description: Form 556 of The Cooper Health System.
Filed Date: 11/14/19.
Accession Number: 20191114-5104.
Comments Due: None Applicable.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: November 14, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-25145 Filed 11-19-19; 8:45 am]
BILLING CODE 6717-01-P