FreedomWorks, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 64059-64060 [2019-25126]

Download as PDF Federal Register / Vol. 84, No. 224 / Wednesday, November 20, 2019 / Notices Filed Date: 11/12/19. Accession Number: 20191112–5017. Comments Due: 5 p.m. ET 11/25/19. Docket Numbers: RP20–224–000. Applicants: Southern Natural Gas Company, L.L.C. Description: Compliance filing Annual Report on Operational Transactions 2019 to be effective N/A. Filed Date: 11/12/19. Accession Number: 20191112–5130. Comments Due: 5 p.m. ET 11/25/19. Docket Numbers: RP20–225–000. Applicants: Rockies Express Pipeline LLC. Description: § 4(d) Rate Filing: Neg Rate 2019–11–11 CP, BP and EOG to be effective 11/12/2019. Filed Date: 11/12/19. Accession Number: 20191112–5234. Comments Due: 5 p.m. ET 11/25/19. Docket Numbers: RP20–226–000. Applicants: NEXUS Gas Transmission, LLC. Description: § 4(d) Rate Filing: Negotiated Rates—NJR, Equinor, Twin Eagle eff 10–13–19 to be effective 11/13/ 2019. Filed Date: 11/12/19. Accession Number: 20191112–5256. Comments Due: 5 p.m. ET 11/25/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified date(s). Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: November 14, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–25142 Filed 11–19–19; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:21 Nov 19, 2019 Jkt 250001 FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER20–370–000] City Power & Gas, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of City Power & Gas, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is December 4, 2019. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 64059 Dated: November 14, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–25146 Filed 11–19–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 15012–000] FreedomWorks, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On October 16, 2019,1 FreedomWorks, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Ulysses Pumped Storage Hydropower Project to be located in Grant County, West Virginia. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any landdisturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A new upper reservoir with a surface area of 1,042 acres and a storage capacity of 141,000 acre-feet at a surface elevation of approximately 2,960 feet above mean sea level (msl) created by constructing new dams with roller compacted concrete or earth and rock excavated from nearby mine site reclamation; (2) a new lower reservoir with a surface area of 1,139 acres and a storage capacity of 141,000 acre-feet at a surface elevation of 1,280 feet msl created by constructing new dams with roller compacted concrete or earth and rock excavated from nearby mine site reclamation; (3) three new 36,960-footlong, 24-foot-diameter penstocks connecting the upper reservoir and lower reservoir; (4) a new 800-foot-long, 50-foot-wide, 25-foot-high powerhouse containing eight turbine-generator units with a total rated capacity of 4,000 megawatts; (5) a new transmission line connecting the powerhouse to a nearby electric grid interconnection point with options to evaluate multiple grid 1 FreedomWorks, LLC, revised its application on October 17, 2019. E:\FR\FM\20NON1.SGM 20NON1 64060 Federal Register / Vol. 84, No. 224 / Wednesday, November 20, 2019 / Notices interconnection locations; and (6) appurtenant facilities. Initial fill and make-up water for the upper reservoir would come from groundwater inputs and the Stoney River, and the water for the lower reservoir would come from groundwater inputs and North Fork Patterson Creek. The proposed project would have an annual generation of approximately 17,520,000 megawatthours. Applicant Contact: Tim Williamson, FreedomWorks, LLC, 525 Wren Lane, Harpers Ferry, WV 25425; phone: 202– 369–6324. FERC Contact: Monir Chowdhury; phone: (202) 502–6736. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–15012–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s website at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–15012) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: November 14, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–25126 Filed 11–19–19; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:21 Nov 19, 2019 Jkt 250001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP20–11–000] Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization Take notice that on November 4, 2019, Southern Star Central Gas Pipeline, Inc. (Southern Star), 4700 State Highway 56, Owensboro, Kentucky 42301, filed in the above referenced docket a prior notice request pursuant to sections 157.205(b), 157.208(c), and 157.210 of the Commission’s regulations under the Natural Gas Act and its blanket certificate issued in Docket No. CP82– 479–000 for authorization to make modifications and replacements at its Grabham Compressor Station in Montgomery County, Kansas. Specifically, Southern Star plans to modify the Grabham yard piping to allow Unit #13 to discharge gas into the southern trunk loop. Southern Star states that the proposed project would create up to 40,000 dekatherms per day of additional firm transportation capacity. Southern Star estimates the cost of the project to be approximately $3.0 million, all as more fully set forth in the request which is on file with the Commission and open to public inspection. The filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding this application should be directed to Cindy Thompson, Manager, Regulatory, Southern Star Central Gas Pipeline, Inc., 4700 Highway 56, Owensboro, Kentucky 42301, by telephone at (270) 852–4655, or by email at cindy.thompson@southernstar.com. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed PO 00000 Frm 00023 Fmt 4703 Sfmt 9990 activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list and will be notified of any meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 3 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Dated: November 14, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–25125 Filed 11–19–19; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\20NON1.SGM 20NON1

Agencies

[Federal Register Volume 84, Number 224 (Wednesday, November 20, 2019)]
[Notices]
[Pages 64059-64060]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-25126]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 15012-000]


FreedomWorks, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On October 16, 2019,\1\ FreedomWorks, LLC, filed an application for 
a preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of the Ulysses Pumped Storage 
Hydropower Project to be located in Grant County, West Virginia. The 
sole purpose of a preliminary permit, if issued, is to grant the permit 
holder priority to file a license application during the permit term. A 
preliminary permit does not authorize the permit holder to perform any 
land-disturbing activities or otherwise enter upon lands or waters 
owned by others without the owners' express permission.
---------------------------------------------------------------------------

    \1\ FreedomWorks, LLC, revised its application on October 17, 
2019.
---------------------------------------------------------------------------

    The proposed project would consist of the following: (1) A new 
upper reservoir with a surface area of 1,042 acres and a storage 
capacity of 141,000 acre-feet at a surface elevation of approximately 
2,960 feet above mean sea level (msl) created by constructing new dams 
with roller compacted concrete or earth and rock excavated from nearby 
mine site reclamation; (2) a new lower reservoir with a surface area of 
1,139 acres and a storage capacity of 141,000 acre-feet at a surface 
elevation of 1,280 feet msl created by constructing new dams with 
roller compacted concrete or earth and rock excavated from nearby mine 
site reclamation; (3) three new 36,960-foot-long, 24-foot-diameter 
penstocks connecting the upper reservoir and lower reservoir; (4) a new 
800-foot-long, 50-foot-wide, 25-foot-high powerhouse containing eight 
turbine-generator units with a total rated capacity of 4,000 megawatts; 
(5) a new transmission line connecting the powerhouse to a nearby 
electric grid interconnection point with options to evaluate multiple 
grid

[[Page 64060]]

interconnection locations; and (6) appurtenant facilities. Initial fill 
and make-up water for the upper reservoir would come from groundwater 
inputs and the Stoney River, and the water for the lower reservoir 
would come from groundwater inputs and North Fork Patterson Creek. The 
proposed project would have an annual generation of approximately 
17,520,000 megawatt-hours.
    Applicant Contact: Tim Williamson, FreedomWorks, LLC, 525 Wren 
Lane, Harpers Ferry, WV 25425; phone: 202-369-6324.
    FERC Contact: Monir Chowdhury; phone: (202) 502-6736.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-15012-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-15012) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: November 14, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-25126 Filed 11-19-19; 8:45 am]