Carthage Specialty Paperboard, Inc.; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 63872-63873 [2019-25028]
Download as PDF
63872
Federal Register / Vol. 84, No. 223 / Tuesday, November 19, 2019 / Notices
the Federal Power Act and have that
notice accepted before the agreement
can be terminated; and (3) that a
Transmission Provider may publicly
indicate on its Open Access Same-Time
Information System and in its Electric
Quarterly Report that an
interconnection request has been
canceled and LGIA terminated, as more
fully explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioners.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on December 9, 2019.
khammond on DSKJM1Z7X2PROD with NOTICES
Dated: November 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–25016 Filed 11–18–19; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:47 Nov 18, 2019
Jkt 250001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10887–030]
Carthage Specialty Paperboard, Inc.;
Notice of Application Tendered for
Filing With the Commission and
Soliciting Additional Study Requests
and Establishing Procedural Schedule
for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Minor
License.
b. Project No.: 10887–030.
c. Date Filed: October 31, 2019.
d. Applicant: Carthage Specialty
Paperboard, Inc.
e. Name of Project: Carthage Paper
Maker Mill Hydroelectric Project.
f. Location: On the Black River, near
the Village of Carthage, Jefferson and
Lewis Counties, New York. The project
does not occupy federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Martin Weller,
Corporate Project Engineer, Ox
Industries, Inc., 600 West Elm Avenue,
Hanover, PA 17331; (717) 698–3329;
and/or E. Steve O’Donnell, General
Counsel, Ox Industries, Inc., 600 West
Elm Avenue, Hanover, PA 17331; (717)
632–9580.
i. FERC Contact: Monir Chowdhury at
(202) 502–6736; or email at
monir.chowdhury@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: December 30, 2019.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–10887–030.
m. This application is not ready for
environmental analysis at this time.
n. The existing project consists of the
following: (1) An 829-foot-long concrete
gravity dam with a maximum height of
8 feet at a crest elevation of 726.4 feet
above mean sea level (msl); (2) an
impoundment with a surface area of
about 158 acres and a storage capacity
of 767 acre-feet at a normal pool
elevation of 726.4 feet msl; (3) a forebay
canal approximately 500 feet long, 58
feet wide, and 10 feet deep at the west
bank of the river; (4) a masonry and
concrete powerhouse 31 feet long, 25
feet wide, and approximately 45 feet
high, containing one open flume
turbine-generator unit with a rated
capacity of 800 kilowatts; (5) an
excavated 200-foot-long, 35-foot-wide
tailrace; (6) a 750-foot-long generator
lead that connects the powerhouse with
a substation; and (7) appurtenant
facilities.
The Carthage Paper Maker Mill
Project is operated in a run-of-river
mode with an estimated average annual
generation of 3,991 megawatt-hours
between 2014 and 2018.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
E:\FR\FM\19NON1.SGM
19NON1
Federal Register / Vol. 84, No. 223 / Tuesday, November 19, 2019 / Notices
Laurel Mountain, LLC, AES Ohio
Generation, LLC, AES Redondo Beach,
L.L.C., Indianapolis Power & Light
Company, Mountain View Power
Partners, LLC, Mountain View Power
Partners IV, LLC, The Dayton Power and
Light Company, 65HK 8me LLC, 67RK
8me LLC, 87RL 8me LLC, Antelope Big
Sky Ranch LLC, Antelope DSR 1, LLC,
Antelope DSR 2, LLC, Antelope DSR 3,
LLC, Antelope Expansion 2, LLC,
Bayshore Solar A, LLC, Bayshore Solar
B, LLC, Bayshore Solar C, LLC, Beacon
Solar 1, LLC, Beacon Solar 3, LLC,
Beacon Solar 4, LLC, Central Antelope
Dry Ranch C LLC, FTS Master Tenant 1,
LLC, FTS Master Tenant 2, LLC, ID
Solar 1, LLC, Latigo Wind Park, LLC,
North Lancaster Ranch LLC, Pioneer
Wind Park I LLC, Riverhead Solar Farm,
LLC, San Pablo Raceway, LLC,
Sandstone Solar LLC, Sierra Solar
Greenworks LLC, Solverde 1, LLC,
Summer Solar LLC, Western Antelope
Dated: November 12, 2019.
Blue Sky Ranch A LLC, Western
Nathaniel J. Davis, Sr.,
Antelope Blue Sky Ranch B LLC,
Deputy Secretary.
Elevation Solar C LLC, Western
Antelope Dry Ranch LLC.
[FR Doc. 2019–25028 Filed 11–18–19; 8:45 am]
Description: Supplement to June 25,
BILLING CODE 6717–01–P
2019 Triennial Market Power Analysis
of the AES MBR Affiliates for the
Southwest Region.
DEPARTMENT OF ENERGY
Filed Date: 11/12/19.
Accession Number: 20191112–5303.
Federal Energy Regulatory
Comments Due: 5 p.m. ET 12/3/19.
Commission
Docket Numbers: ER19–2473–000.
Combined Notice of Filings #1
Applicants: Basin Electric Power
Cooperative, Inc.
Take notice that the Commission
Description: Amendment to July 26,
received the following electric rate
2019 Request for One-Time Waiver of
filings:
certain requirements under Attachment
Docket Numbers: ER10–3145–012;
O to MISO’s Open Access Transmission,
ER10–1728–012; ER10–1800–013;
Energy and Operating Reserve Markets
ER10–3116–012; ER10–3120–012;
Tariff of Basin Electric Power
ER10–3128–012; ER10–3136–012;
Cooperative.
ER11–2036–012; ER11–2701–014;
Filed Date: 11/6/19.
ER13–1544–009; ER15–1579–014;
Accession Number: 20191106–5044.
ER15–1582–015; ER15–1914–016;
Comments Due: 5 p.m. ET 11/27/19.
ER15–2679–012; ER15–2680–012;
Docket Numbers: ER20–116–000.
ER15–760–015; ER15–762–016; ER16–
Applicants: Evergy Metro, Inc.
1255–013; ER16–1609–006; ER16–1738–
Description: Report Filing:
010; ER16–1901–010; ER16–1955–010;
Supplemental Filing to a Notice of
ER16–1956–010; ER16–1973–010;
Succession, Vol. No. 4 to be effective N/
ER16–2201–009; ER16–2224–009;
A.
ER16–2541–009; ER16–2578–010;
Filed Date: 11/12/19.
ER16–468–010; ER16–474–011; ER16–
Accession Number: 20191112–5260.
890–011; ER16–930–006; ER17–1864–
Comments Due: 5 p.m. ET 12/3/19.
008; ER17–1871–008; ER17–1909–008;
Docket Numbers: ER20–363–000.
ER17–306–009; ER17–544–009; ER18–
Applicants: Arizona Public Service
1667–003; ER18–2327–002; ER18–2492– Company.
004; ER19–1179–001; ER19–1473–001;
Description: § 205(d) Rate Filing:
ER19–1474–001; ER19–1597–001;
Service Agreement No. 373 to be
ER19–846–003; ER19–847–003.
effective 10/15/2019.
Applicants: AES Alamitos, LLC, AES
Filed Date: 11/12/19.
Accession Number: 20191112–5254.
Alamitos Energy, LLC, AES Energy
Comments Due: 5 p.m. ET 12/3/19.
Storage, LLC, AES ES Gilbert, LLC, AES
ES Tait, LLC, AES Huntington Beach,
Docket Numbers: ER20–364–000.
Applicants: Arizona Public Service
L.L.C., AES Huntington Beach Energy,
Company.
LLC, AES Integrated Energy, LLC, AES
khammond on DSKJM1Z7X2PROD with NOTICES
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)
December 2019
Request Additional Information
December 2019
Issue Acceptance Letter March 2020
Issue Scoping Document 1 for
comments April 2020
Request Additional Information (if
necessary) June 2020
Issue Scoping Document 2 July 2020
Issue notice of ready for environmental
analysis July 2020
Commission issues EA January 2021
Comments on EA February 2021
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
VerDate Sep<11>2014
16:47 Nov 18, 2019
Jkt 250001
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
63873
Description: § 205(d) Rate Filing: Rate
Schedule No. 301 to be effective 12/23/
2019.
Filed Date: 11/12/19.
Accession Number: 20191112–5258.
Comments Due: 5 p.m. ET 12/3/19.
Docket Numbers: ER20–365–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA SA No 5522; Queue No.
AE1–075 to be effective 10/14/2019.
Filed Date: 11/13/19.
Accession Number: 20191113–5011.
Comments Due: 5 p.m. ET 12/4/19.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES20–8–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Application Under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of PJM
Interconnection, L.L.C.
Filed Date: 11/12/19.
Accession Number: 20191112–5274.
Comments Due: 5 p.m. ET 12/3/19.
Docket Numbers: ES20–9–000.
Applicants: PJM Settlement, Inc.
Description: Application Under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of PJM
Settlement, Inc.
Filed Date: 11/12/19.
Accession Number: 20191112–5292.
Comments Due: 5 p.m. ET 12/3/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 13, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–25033 Filed 11–18–19; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\19NON1.SGM
19NON1
Agencies
[Federal Register Volume 84, Number 223 (Tuesday, November 19, 2019)]
[Notices]
[Pages 63872-63873]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-25028]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 10887-030]
Carthage Specialty Paperboard, Inc.; Notice of Application
Tendered for Filing With the Commission and Soliciting Additional Study
Requests and Establishing Procedural Schedule for Relicensing and a
Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Minor License.
b. Project No.: 10887-030.
c. Date Filed: October 31, 2019.
d. Applicant: Carthage Specialty Paperboard, Inc.
e. Name of Project: Carthage Paper Maker Mill Hydroelectric
Project.
f. Location: On the Black River, near the Village of Carthage,
Jefferson and Lewis Counties, New York. The project does not occupy
federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Martin Weller, Corporate Project Engineer, Ox
Industries, Inc., 600 West Elm Avenue, Hanover, PA 17331; (717) 698-
3329; and/or E. Steve O'Donnell, General Counsel, Ox Industries, Inc.,
600 West Elm Avenue, Hanover, PA 17331; (717) 632-9580.
i. FERC Contact: Monir Chowdhury at (202) 502-6736; or email at
[email protected].
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: December 30, 2019.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at [email protected], (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, please send a paper copy
to: Secretary, Federal Energy Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first page of any filing should include
docket number P-10887-030.
m. This application is not ready for environmental analysis at this
time.
n. The existing project consists of the following: (1) An 829-foot-
long concrete gravity dam with a maximum height of 8 feet at a crest
elevation of 726.4 feet above mean sea level (msl); (2) an impoundment
with a surface area of about 158 acres and a storage capacity of 767
acre-feet at a normal pool elevation of 726.4 feet msl; (3) a forebay
canal approximately 500 feet long, 58 feet wide, and 10 feet deep at
the west bank of the river; (4) a masonry and concrete powerhouse 31
feet long, 25 feet wide, and approximately 45 feet high, containing one
open flume turbine-generator unit with a rated capacity of 800
kilowatts; (5) an excavated 200-foot-long, 35-foot-wide tailrace; (6) a
750-foot-long generator lead that connects the powerhouse with a
substation; and (7) appurtenant facilities.
The Carthage Paper Maker Mill Project is operated in a run-of-river
mode with an estimated average annual generation of 3,991 megawatt-
hours between 2014 and 2018.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
[[Page 63873]]
p. Procedural schedule and final amendments: The application will
be processed according to the following preliminary schedule. Revisions
to the schedule will be made as appropriate.
Issue Deficiency Letter (if necessary) December 2019
Request Additional Information December 2019
Issue Acceptance Letter March 2020
Issue Scoping Document 1 for comments April 2020
Request Additional Information (if necessary) June 2020
Issue Scoping Document 2 July 2020
Issue notice of ready for environmental analysis July 2020
Commission issues EA January 2021
Comments on EA February 2021
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: November 12, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-25028 Filed 11-18-19; 8:45 am]
BILLING CODE 6717-01-P