Wisconsin Public Service Corporation; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 63867 [2019-25015]
Download as PDF
Federal Register / Vol. 84, No. 223 / Tuesday, November 19, 2019 / Notices
Issued: November 14, 2019.
Kimberly D. Bose,
Secretary.
A free webcast of this event is
available through https://
ferc.capitolconnection.org/. Anyone
with internet access who desires to view
this event can do so by navigating to
www.ferc.gov’s Calendar of Events and
locating this event in the Calendar. The
event will contain a link to its webcast.
The Capitol Connection provides
technical support for the free webcasts.
It also offers access to this event via
television in the DC area and via phone
bridge for a fee. If you have any
questions, visit https://
ferc.capitolconnection.org/ or contact
Shirley Al-Jarani at 703–993–3104.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
[FR Doc. 2019–25127 Filed 11–15–19; 11:15 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1999–076]
khammond on DSKJM1Z7X2PROD with NOTICES
Wisconsin Public Service Corporation;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Amendment of
license to change project boundary.
b. Project No.: 1999–076.
c. Date Filed: October 29, 2019.
d. Applicant: Wisconsin Public
Service Corporation.
e. Name of Project: Wausau Project.
f. Location: The project is located on
the Wisconsin River, in the city of
Wausau, Marathon County, Wisconsin.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Todd
Jastremski, todd.jastremski@weenergies.com, 906–779–4099, WE
Energies, 800 Industrial Park Drive, Iron
Mountain, MI 49801.
i. FERC Contact: Hillary Berlin, 202–
502–8915, hillary.berlin@ferc.gov.
VerDate Sep<11>2014
16:47 Nov 18, 2019
Jkt 250001
j. Deadline for filing comments,
motions to intervene, and protests:
December 16, 2019.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests and comments using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–1999–076.
Comments emailed to Commission staff
are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: Wisconsin
Public Service Corporation (licensee)
filed an application to add two parcels
totaling 0.5 acres (0.2 acres immediately
upstream of the project dam on the
western shoreline and 0.3 acres on the
project’s eastern shoreline) to the project
boundary because they contain project
works and a powerhouse access road.
The licensee also proposes to remove
116 acres it states are not needed for any
project purpose, detailed as follows:
Barker-Stewart Island (10.9 acres); a 0.6acre parcel on the west side of the
impoundment just upstream of the dam;
and approximately 104.5 acres of land
and water downstream of the project
tailrace channel, including Picnic Island
and Stack’s Island.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov using the
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
63867
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .212
and .214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person commenting,
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, motions to intervene, or
protests must set forth their evidentiary
basis. Any filing made by an intervenor
must be accompanied by proof of
service on all persons listed in the
service list prepared by the Commission
in this proceeding, in accordance with
18 CFR 385.2010.
Dated: November 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–25015 Filed 11–18–19; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\19NON1.SGM
19NON1
Agencies
[Federal Register Volume 84, Number 223 (Tuesday, November 19, 2019)]
[Notices]
[Page 63867]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-25015]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1999-076]
Wisconsin Public Service Corporation; Notice of Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Amendment of license to change project
boundary.
b. Project No.: 1999-076.
c. Date Filed: October 29, 2019.
d. Applicant: Wisconsin Public Service Corporation.
e. Name of Project: Wausau Project.
f. Location: The project is located on the Wisconsin River, in the
city of Wausau, Marathon County, Wisconsin.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Todd Jastremski, energies.com">[email protected]energies.com, 906-779-4099, WE Energies, 800 Industrial Park Drive,
Iron Mountain, MI 49801.
i. FERC Contact: Hillary Berlin, 202-502-8915,
[email protected].
j. Deadline for filing comments, motions to intervene, and
protests: December 16, 2019.
The Commission strongly encourages electronic filing. Please file
motions to intervene, protests and comments using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426. The first page of any filing
should include docket number P-1999-076. Comments emailed to Commission
staff are not considered part of the Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: Wisconsin Public Service Corporation
(licensee) filed an application to add two parcels totaling 0.5 acres
(0.2 acres immediately upstream of the project dam on the western
shoreline and 0.3 acres on the project's eastern shoreline) to the
project boundary because they contain project works and a powerhouse
access road. The licensee also proposes to remove 116 acres it states
are not needed for any project purpose, detailed as follows: Barker-
Stewart Island (10.9 acres); a 0.6-acre parcel on the west side of the
impoundment just upstream of the dam; and approximately 104.5 acres of
land and water downstream of the project tailrace channel, including
Picnic Island and Stack's Island.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC
20426, or by calling (202) 502-8371. This filing may also be viewed on
the Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above. Agencies may obtain copies of the application directly from
the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.212 and .214. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person commenting, protesting or intervening; and (4)
otherwise comply with the requirements of 18 CFR 385.2001 through
385.2005. All comments, motions to intervene, or protests must set
forth their evidentiary basis. Any filing made by an intervenor must be
accompanied by proof of service on all persons listed in the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 385.2010.
Dated: November 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-25015 Filed 11-18-19; 8:45 am]
BILLING CODE 6717-01-P