Tallgrass Pony Express Pipeline, LLC; Notice of Petition for Declaratory Order, 61048-61049 [2019-24567]
Download as PDF
61048
Federal Register / Vol. 84, No. 218 / Tuesday, November 12, 2019 / Notices
b. Project No.: 2814–025.
c. Date Filed: February 28, 2019.
d. Applicants: Great Falls
Hydroelectric Company and the City of
Paterson, New Jersey, as co-licensees.
e. Name of Project: Great Falls
Hydroelectric Project.
f. Location: On the Passaic River, near
the City of Paterson, Passaic County,
New Jersey. The project does not occupy
federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Mr. Robert
Gates, Senior Vice President of
Operations, Eagle Creek Renewable
Energy, 65 Madison Avenue, Suite 500,
Morristown, NJ 07960; (973) 998–8400;
email—bob.gates@eaglecreekre.com
and/or Ben-David Seligman, 2nd
Assistant Corp. Counsel, City of
Paterson, 155 Market Street, Paterson,
NJ; (973) 321–1366; email—bseligman@
patersonnj.gov.
i. FERC Contact: Christopher Millard
at (202) 502–8256; or email at
christopher.millard@ferc.gov.
j. Deadline for filing scoping
comments: December 23, 2019.
The Commission strongly encourages
electronic filing. Please file scoping
comments using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2814–025.
k. This application is not ready for
environmental analysis at this time.
l. The existing project works consist
of: (1) The Society for the Establishment
of Useful Manufactures dam, an
overflow granite stone gravity structure
about 315 feet long, with a maximum
height of 15 feet and having a crest
elevation of 114.6 feet mean sea level
(msl); (2) a reservoir with a surface area
of 202 acres and a storage capacity of
1,415 acre-feet at elevation 114.6 feet
msl; (3) a forebay inlet structure; (4) a
headgate control structure containing
three trashracks and three steel gates; (5)
three penstocks, each 8.5 feet in
diameter and approximately 55 feet
long; (6) a powerhouse containing three
turbine-generator units with a total rated
VerDate Sep<11>2014
17:47 Nov 08, 2019
Jkt 250001
capacity of 10.95 megawatts; (7) a 37foot-long, 4.16-kilovolt (kV)
underground transmission line
connecting the powerhouse to a 4.16/
26.4-kV step-up transformer which in
turn is connected to a 26.4-kV
transmission grid via an approximately
30-foot-long, 26.4-kV underground
transmission line; (8) and appurtenant
facilities.
The Great Falls Project is operated in
a run-of-river mode. For the period 2010
through 2018, the average annual
generation at the Great Falls Project was
17,484 megawatt-hours.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Scoping Process
The Commission staff intends to
prepare an environmental assessment
(EA) for the Great Falls Project in
accordance with the National
Environmental Policy Act. The EA will
consider both site-specific and
cumulative environmental impacts and
reasonable alternatives to the proposed
action.
Scoping meetings were held on
October 23 and 24, 2019, near the
project site in Paterson, New Jersey to
receive input on the scope of the EA.
The meetings were noticed in the
Federal Register; however, it has come
to our attention that the meetings were
not noticed in a local newspaper. Thus,
we are extending the comment period to
December 23, 2019.
Copies of the scoping document (SD1)
outlining the subject areas to be
addressed in the EA were distributed to
the parties on the Commission’s mailing
list and the co-licensee’s distribution
list. Copies of SD1 may be viewed on
the web at https://www.ferc.gov using the
eLibrary link. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. For assistance, call 1–866–
208–3676 or for TTY, (202) 502–8659.
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
Dated: November 5, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–24569 Filed 11–8–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR20–3–000]
Tallgrass Pony Express Pipeline, LLC;
Notice of Petition for Declaratory Order
Take notice that on November 4,
2019, pursuant to Rule 207(a)(2) of the
Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR
385.207(a)(2) (2019), Tallgrass Pony
Express Pipeline, LLC, filed a
declaratory order petition seeking
approval of the proposed rate structure
and terms of service for its crude oil
expansion project’s transportation
services agreements and the terms for
the conversion of existing committed
shipper volume commitments into new
volume commitments under a new open
season, all as more fully explained in
the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the website that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
E:\FR\FM\12NON1.SGM
12NON1
Federal Register / Vol. 84, No. 218 / Tuesday, November 12, 2019 / Notices
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on December 4, 2019.
Dated: November 5, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–24567 Filed 11–8–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10624–026]
French Paper Company; Notice of
Application Accepted for Filing,
Soliciting Motions To Intervene and
Protests, Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Preliminary Terms
and Conditions, and Preliminary
Fishway Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 10624–026.
c. Date filed: February 27, 2019.
d. Applicant: French Paper Company
(French Paper).
e. Name of Project: French Paper
Company Hydroelectric Project (French
Paper Project).
f. Location: The French Paper Project
is located on the St. Joseph River in the
City of Niles, Berrien County, Michigan.
No federal lands are occupied by the
project works or located within the
project boundary.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Shane
Fenske, President, French Paper
Company, P.O. Box 398, 100 French
Street, Niles, MI 49120; (269) 683–1100
or fenske@frenchpaper.com.
i. FERC Contact: Jay Summers, (202)
502–8764 or jay.summers@ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments,
recommendations, preliminary terms
and conditions, and preliminary
prescriptions: 60 days from the issuance
date of this notice; reply comments are
due 105 days from the issuance date of
this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments,
recommendations, preliminary terms
VerDate Sep<11>2014
17:47 Nov 08, 2019
Jkt 250001
and conditions, and preliminary
fishway prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–10624–026.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
l. The French Paper Project consists of
the following existing facilities: (1) An
112 acre reservoir with a storage
capacity of 864 acre-feet at a water
surface elevation of 653.75 feet mean
sea level; (2) a 321-foot-long, 13-foothigh concrete spillway structure, topped
by 2.3-foot-high flashboards; (3) a 100foot-wide, 600-foot-long intake channel;
(4) a 115-foot-wide, 55-foot-long, 56foot-high powerhouse with an operating
head of 14 feet; (5) a floating debris
boom at the entrance to the intake
channel and two separate trash racks at
the entrance to the powerhouse; (6) two
vertical shaft propeller turbines each
coupled to a 400-kilowatt (kW)
generator, one vertical shaft propeller
turbine coupled to a 300-kW generator,
and one vertical shaft Francis turbine
coupled to a 200-kW generator, for a
total installed capacity of 1.3 megawatts;
(7) a 6-foot-wide, 220-foot-long
reinforced concrete fish ladder; (8) a
480-volt to 12-kilovolt (kV) transformer
adjacent to the powerhouse; (9) a 0.16mile-long, 3-phase, 3 wire 12-kV
overhead interconnection line, tying
into Indiana Michigan Power
Company’s transmission line adjacent to
French Paper’s property; and (10)
appurtenant facilities.
The French Paper Project is operated
in a run-of-river mode with an estimated
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
61049
annual energy production of
approximately 8,442.8 megawatt-hours.
French Paper proposes to continue
operating the project in a run-of-river
mode and does not propose any new
construction or modifications to the
project.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title PROTEST, MOTION TO
INTERVENE, COMMENTS, REPLY
COMMENTS, RECOMMENDATIONS,
PRELIMINARY TERMS AND
CONDITIONS, or PRELIMINARY
FISHWAY PRESCRIPTIONS; (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, recommendations, terms
and conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
E:\FR\FM\12NON1.SGM
12NON1
Agencies
[Federal Register Volume 84, Number 218 (Tuesday, November 12, 2019)]
[Notices]
[Pages 61048-61049]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-24567]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. OR20-3-000]
Tallgrass Pony Express Pipeline, LLC; Notice of Petition for
Declaratory Order
Take notice that on November 4, 2019, pursuant to Rule 207(a)(2) of
the Federal Energy Regulatory Commission's (Commission) Rules of
Practice and Procedure, 18 CFR 385.207(a)(2) (2019), Tallgrass Pony
Express Pipeline, LLC, filed a declaratory order petition seeking
approval of the proposed rate structure and terms of service for its
crude oil expansion project's transportation services agreements and
the terms for the conversion of existing committed shipper volume
commitments into new volume commitments under a new open season, all as
more fully explained in the petition.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Petitioner.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
eLibrary link and is available for review in the Commission's Public
Reference Room in Washington, DC. There is an eSubscription link on the
website that enables subscribers to receive email notification when a
document is added to a subscribed docket(s). For assistance
[[Page 61049]]
with any FERC Online service, please email [email protected],
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern time on December 4, 2019.
Dated: November 5, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-24567 Filed 11-8-19; 8:45 am]