Bear Swamp Power Company, LLC; Notice of Availability of Draft Environmental Assessment, 59799 [2019-24205]

Download as PDF Federal Register / Vol. 84, No. 215 / Wednesday, November 6, 2019 / Notices intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on November 27, 2019. Dated: October 31, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–24206 Filed 11–5–19; 8:45 am] BILLING CODE 6717–01–P Dated: October 30, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. DEPARTMENT OF ENERGY [FR Doc. 2019–24163 Filed 11–5–19; 8:45 am] Federal Energy Regulatory Commission BILLING CODE 6717–01–P [Project No. 14795–002] DEPARTMENT OF ENERGY Notice of Availability of Final Environmental Assessment; Shell Energy North America (US), L.P. Federal Energy Regulatory Commission In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380, the Office of Energy Projects has reviewed the application for license for the Hydro Battery Pearl Hill Pumped Storage Project, which would be located on Rufus Woods Lake, near Bridgeport, Douglas County, Washington and has prepared a Final Environmental Assessment (FEA) for the project. The project would be located on state lands except for the lower reservoir and power generation and pumping equipment which would be located on Rufus Woods Lake, a reservoir operated by the U.S. Army Corps of Engineers (Corps). VerDate Sep<11>2014 17:43 Nov 05, 2019 The Corps, a cooperating agency for the preparation of this environmental assessment, is reviewing Shell’s project for permits it would issue under sections 10 and 14 of the Rivers and Harbors act of 1899 and Section 404 of the Clean Water Act. The FEA contains staff’s analysis of the potential environmental impacts of the project and concludes that licensing the project, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the FEA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. For further information, contact Ryan Hansen at (202) 502–8074 or at ryan.hansen@ferc.gov. Jkt 250001 [Project No. 2669–089] 59799 the project and concludes that licensing the project, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the DEA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Any comments should be filed within 45 days from the date of this notice. The Commission strongly encourages electronic filing. Please file comments using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–2669–089. For further information, contact Amy Chang at (202) 502–8250, or at amy.chang@ferc.gov mail to: nicholas.palso@ferc.gov. Bear Swamp Power Company, LLC; Notice of Availability of Draft Environmental Assessment Dated: October 31, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380, the Office of Energy Projects has reviewed the application for the relicensing of the Bear Swamp Project, located on the Deerfield River, in Berkshire and Franklin Counties, Massachusetts, and has prepared a Draft Environmental Assessment (DEA) for the project. The DEA contains staff’s analysis of the potential environmental impacts of [FR Doc. 2019–24205 Filed 11–5–19; 8:45 am] PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG20–21–000. E:\FR\FM\06NON1.SGM 06NON1

Agencies

[Federal Register Volume 84, Number 215 (Wednesday, November 6, 2019)]
[Notices]
[Page 59799]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-24205]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2669-089]


Bear Swamp Power Company, LLC; Notice of Availability of Draft 
Environmental Assessment

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's (Commission) 
regulations, 18 CFR part 380, the Office of Energy Projects has 
reviewed the application for the relicensing of the Bear Swamp Project, 
located on the Deerfield River, in Berkshire and Franklin Counties, 
Massachusetts, and has prepared a Draft Environmental Assessment (DEA) 
for the project.
    The DEA contains staff's analysis of the potential environmental 
impacts of the project and concludes that licensing the project, with 
appropriate environmental protective measures, would not constitute a 
major federal action that would significantly affect the quality of the 
human environment.
    A copy of the DEA is available for review at the Commission in the 
Public Reference Room or may be viewed on the Commission's website at 
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY).
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    Any comments should be filed within 45 days from the date of this 
notice.
    The Commission strongly encourages electronic filing. Please file 
comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 
6,000 characters, without prior registration, using the eComment system 
at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support. In lieu of electronic 
filing, please send a paper copy to: Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426. The 
first page of any filing should include docket number P-2669-089.
    For further information, contact Amy Chang at (202) 502-8250, or at 
[email protected] mail to: [email protected].

    Dated: October 31, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-24205 Filed 11-5-19; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.