Bear Swamp Power Company, LLC; Notice of Availability of Draft Environmental Assessment, 59799 [2019-24205]
Download as PDF
Federal Register / Vol. 84, No. 215 / Wednesday, November 6, 2019 / Notices
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on November 27, 2019.
Dated: October 31, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–24206 Filed 11–5–19; 8:45 am]
BILLING CODE 6717–01–P
Dated: October 30, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
[FR Doc. 2019–24163 Filed 11–5–19; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Project No. 14795–002]
DEPARTMENT OF ENERGY
Notice of Availability of Final
Environmental Assessment; Shell
Energy North America (US), L.P.
Federal Energy Regulatory
Commission
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380, the Office
of Energy Projects has reviewed the
application for license for the Hydro
Battery Pearl Hill Pumped Storage
Project, which would be located on
Rufus Woods Lake, near Bridgeport,
Douglas County, Washington and has
prepared a Final Environmental
Assessment (FEA) for the project. The
project would be located on state lands
except for the lower reservoir and power
generation and pumping equipment
which would be located on Rufus
Woods Lake, a reservoir operated by the
U.S. Army Corps of Engineers (Corps).
VerDate Sep<11>2014
17:43 Nov 05, 2019
The Corps, a cooperating agency for the
preparation of this environmental
assessment, is reviewing Shell’s project
for permits it would issue under
sections 10 and 14 of the Rivers and
Harbors act of 1899 and Section 404 of
the Clean Water Act.
The FEA contains staff’s analysis of
the potential environmental impacts of
the project and concludes that licensing
the project, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the FEA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY).
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
For further information, contact Ryan
Hansen at (202) 502–8074 or at
ryan.hansen@ferc.gov.
Jkt 250001
[Project No. 2669–089]
59799
the project and concludes that licensing
the project, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the DEA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY).
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
45 days from the date of this notice.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support. In
lieu of electronic filing, please send a
paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–2669–089.
For further information, contact Amy
Chang at (202) 502–8250, or at
amy.chang@ferc.gov mail to:
nicholas.palso@ferc.gov.
Bear Swamp Power Company, LLC;
Notice of Availability of Draft
Environmental Assessment
Dated: October 31, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380, the Office
of Energy Projects has reviewed the
application for the relicensing of the
Bear Swamp Project, located on the
Deerfield River, in Berkshire and
Franklin Counties, Massachusetts, and
has prepared a Draft Environmental
Assessment (DEA) for the project.
The DEA contains staff’s analysis of
the potential environmental impacts of
[FR Doc. 2019–24205 Filed 11–5–19; 8:45 am]
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG20–21–000.
E:\FR\FM\06NON1.SGM
06NON1
Agencies
[Federal Register Volume 84, Number 215 (Wednesday, November 6, 2019)]
[Notices]
[Page 59799]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-24205]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2669-089]
Bear Swamp Power Company, LLC; Notice of Availability of Draft
Environmental Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380, the Office of Energy Projects has
reviewed the application for the relicensing of the Bear Swamp Project,
located on the Deerfield River, in Berkshire and Franklin Counties,
Massachusetts, and has prepared a Draft Environmental Assessment (DEA)
for the project.
The DEA contains staff's analysis of the potential environmental
impacts of the project and concludes that licensing the project, with
appropriate environmental protective measures, would not constitute a
major federal action that would significantly affect the quality of the
human environment.
A copy of the DEA is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's website at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY).
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Any comments should be filed within 45 days from the date of this
notice.
The Commission strongly encourages electronic filing. Please file
comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to
6,000 characters, without prior registration, using the eComment system
at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support. In lieu of electronic
filing, please send a paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426. The
first page of any filing should include docket number P-2669-089.
For further information, contact Amy Chang at (202) 502-8250, or at
[email protected] mail to: [email protected].
Dated: October 31, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-24205 Filed 11-5-19; 8:45 am]
BILLING CODE 6717-01-P