Notice of Request Under Blanket Authorization; Southern Star Central Gas Pipeline, Inc., 59369 [2019-23983]
Download as PDF
Federal Register / Vol. 84, No. 213 / Monday, November 4, 2019 / Notices
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: October 28, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–23985 Filed 11–1–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. Cp20–5–000]
Notice of Request Under Blanket
Authorization; Southern Star Central
Gas Pipeline, Inc.
Take notice that on October 17, 2019,
Southern Star Central Gas Pipeline, Inc.
(Southern Star), 4700 Highway 56,
Owensboro, Kentucky 42301, filed a
prior notice application pursuant to
sections 157.205, and 157.216(b) of the
Federal Energy Regulatory
Commission’s (Commission) regulations
under the Natural Gas Act (NGA), and
Southern Star’s blanket certificate
issued in Docket No. CP82–479–000.
Southern Star requests authorization to
abandon two wells, and approximately
855 feet of 4.5-inch diameter lateral
pipeline in Southern Star’s South Welda
Storage Field in Anderson County,
Kansas, all as more fully set forth in the
application, which is open to the public
for inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Specifically, Southern Star proposes
to abandon one well, SW #70, which is
an injection/withdrawal, another well,
SWB #21, which is a recovery well,
approximately 855 feet of 4.5-inch
diameter lateral pipeline, all located in
Anderson County, Kansas.
Any questions regarding this
application should be directed to Cindy
Thompson Manager, Regulatory,
Southern Star Central Gas Pipeline, Inc.,
4700 Highway 56, Owensboro,
Kentucky 42301 or phone (270) 852–
4655, or by email at cindy.thompson@
southernstar.com
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
VerDate Sep<11>2014
20:48 Nov 01, 2019
Jkt 250001
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenter will
not receive copies of all documents filed
by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 3 copies of the protest or
intervention to the Federal Energy
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
59369
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Dated: October 28, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–23983 Filed 11–1–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12796–010]
City of Wadsworth, Ohio; Notice of
Application for Surrender of License,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Proceeding: Application for
surrender of license.
b. Project No.: 12796–010.
c. Date Filed: October 21, 2019.
d. Licensee: City of Wadsworth, OH.
e. Name of Project: Robert C Byrd
Project.
f. Location: The project is located on
the U.S. Army Corps of Engineers RC
Byrd Locks and Dam on the Ohio River
in Gallia County, Ohio, and Mason
County, West Virginia.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Licensee Contact: Mr. Robert
Patrick, The City of Wadsworth, OH,
120 Maple Street, Wadsworth, OH, (330)
335–2777, rpatrick@wadsworthcity.org
i. FERC Contact: Ms. Rebecca Martin,
(202) 502–6012, Rebecca.martin@
ferc.gov
j. Deadline for filing comments,
interventions, and protests is November
18, 2019. The Commission strongly
encourages electronic filing. Please file
motions to intervene, protests and
comments using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–12796–010.
E:\FR\FM\04NON1.SGM
04NON1
Agencies
[Federal Register Volume 84, Number 213 (Monday, November 4, 2019)]
[Notices]
[Page 59369]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-23983]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. Cp20-5-000]
Notice of Request Under Blanket Authorization; Southern Star
Central Gas Pipeline, Inc.
Take notice that on October 17, 2019, Southern Star Central Gas
Pipeline, Inc. (Southern Star), 4700 Highway 56, Owensboro, Kentucky
42301, filed a prior notice application pursuant to sections 157.205,
and 157.216(b) of the Federal Energy Regulatory Commission's
(Commission) regulations under the Natural Gas Act (NGA), and Southern
Star's blanket certificate issued in Docket No. CP82-479-000. Southern
Star requests authorization to abandon two wells, and approximately 855
feet of 4.5-inch diameter lateral pipeline in Southern Star's South
Welda Storage Field in Anderson County, Kansas, all as more fully set
forth in the application, which is open to the public for inspection.
The filing may also be viewed on the web at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC at [email protected] or call toll-
free, (866) 208-3676 or TTY, (202) 502-8659.
Specifically, Southern Star proposes to abandon one well, SW #70,
which is an injection/withdrawal, another well, SWB #21, which is a
recovery well, approximately 855 feet of 4.5-inch diameter lateral
pipeline, all located in Anderson County, Kansas.
Any questions regarding this application should be directed to
Cindy Thompson Manager, Regulatory, Southern Star Central Gas Pipeline,
Inc., 4700 Highway 56, Owensboro, Kentucky 42301 or phone (270) 852-
4655, or by email at [email protected]
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding, or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list, and will be
notified of any meetings associated with the Commission's environmental
review process. Environmental commenters will not be required to serve
copies of filed documents on all other parties. However, the non-party
commenter will not receive copies of all documents filed by other
parties or issued by the Commission and will not have the right to seek
court review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 3 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426.
Dated: October 28, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-23983 Filed 11-1-19; 8:45 am]
BILLING CODE 6717-01-P