Southwest Power Pool, Inc.; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 57720 [2019-23495]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
57720
Federal Register / Vol. 84, No. 208 / Monday, October 28, 2019 / Notices
Description: § 205(d) Rate Filing:
2019–10–22_SA 2328 California RidgeAmeren 3rd Rev GIA (H100 J196) to be
effective 10/23/2019.
Filed Date: 10/22/19.
Accession Number: 20191022–5095.
Comments Due: 5 p.m. ET 11/12/19.
Docket Numbers: ER20–164–000.
Applicants: Northern Indiana Public
Service Company.
Description: § 205(d) Rate Filing:
Filing of a CIAC Agreement to be
effective 12/21/2019.
Filed Date: 10/22/19.
Accession Number: 20191022–5115.
Comments Due: 5 p.m. ET 11/12/19.
Docket Numbers: ER20–165–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
UAMPS Construction Agmt—Morgan
Temp Tap Rev 1 to be effective 12/22/
2019.
Filed Date: 10/22/19.
Accession Number: 20191022–5116.
Comments Due: 5 p.m. ET 11/12/19.
Docket Numbers: ER20–166–000.
Applicants: Florida Power & Light
Company.
Description: § 205(d) Rate Filing: FPL
and LCEC Revisions to Rate Schedule
FERC No. 317 to be effective 1/1/2018.
Filed Date: 10/22/19.
Accession Number: 20191022–5153.
Comments Due: 5 p.m. ET 11/12/19.
Docket Numbers: ER20–167–000.
Applicants: Florida Power & Light
Company.
Description: § 205(d) Rate Filing: FPL
and FKEC Revisions to Rate Schedule
FERC No. 322 to be effective 1/1/2018.
Filed Date: 10/22/19.
Accession Number: 20191022–5155.
Comments Due: 5 p.m. ET 11/12/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
VerDate Sep<11>2014
16:58 Oct 25, 2019
Jkt 250001
Dated: October 22, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–23518 Filed 10–25–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. El19–101–000]
Southwest Power Pool, Inc.; Notice of
Institution of Section 206 Proceeding
and Refund Effective Date
On October 17, 2019, the Commission
issued an order in Docket No. EL19–
101–000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e (2018), instituting a proceeding
concerning the justness and
reasonableness of Southwest Power
Pool, Inc.’s resource adequacy minimum
run-time requirement. Southwest Power
Pool, Inc., 169 FERC 61,048 (2019).
The refund effective date in Docket
No. EL19–101–000, established
pursuant to section 206(b) of the FPA,
will be the date of publication of this
notice in the Federal Register.
Any interested person desiring to be
heard in Docket No. EL19–101–000
must file a notice of intervention or
motion to intervene, as appropriate,
with the Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426, in accordance
with Rule 214 of the Commission’s
Rules of Practice and Procedure, 18 CFR
385.214 (2019), within 21 days of the
date of issuance of the order.
Dated: October 18, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–23495 Filed 10–25–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14985–001]
Cherokee Rivers Company, LLC;
Notice of Intent To File License
Application, Filing of Pre-Application
Document, and Approving Use of The
Traditional Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 14985–001.
c. Date Filed: August 22, 2019.
d. Submitted By: Cherokee Rivers
Company, LLC (Cherokee Rivers).
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
e. Name of Project: Lower
Coosawattee Hydroelectric Project.
f. Location: Located at the U.S. Army
Corps of Engineers’ (Corps) existing
Carters Reregulation Dam, located on
the Coosawattee River in Murray
County, Georgia. The project would
occupy 1.35 acres of federal land
administered by the Corps.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Robert
Davis, 390 Timber Laurel Lane,
Lawrenceville, GA 30043; phone: (470)
331–8238.
i. FERC Contact: Dustin Wilson at
(202) 502–6528; or email at
dustin.wilson@ferc.gov.
j. Cherokee Rivers filed its request to
use the Traditional Licensing Process on
August 22, 2019. Cherokee Rivers
provided public notice of its request on
August 14, 2019. In a letter dated
October 18, 2019, the Director of the
Division of Hydropower Licensing
approved Cherokee Rivers’ request to
use the Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or the
National Marine Fisheries Service under
section 7 of the Endangered Species Act
and the joint agency regulations
thereunder at 50 CFR, Part 402. We are
also initiating consultation with the
Georgia State Historic Preservation
Officer, as required by section 106,
National Historic Preservation Act, and
the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Cherokee Rivers as the Commission’s
non-federal representative for carrying
out informal consultation pursuant to
section 7 of the Endangered Species Act;
and consultation pursuant to section
106 of the National Historic
Preservation Act.
m. Cherokee Rivers filed a PreApplication Document (PAD); including
a proposed process plan and schedule
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room, or may be viewed on
the Commission’s website (https://
www.ferc.gov) using the eLibrary link.
Enter the docket number, excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). A copy is also
available for inspection and
E:\FR\FM\28OCN1.SGM
28OCN1
Agencies
[Federal Register Volume 84, Number 208 (Monday, October 28, 2019)]
[Notices]
[Page 57720]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-23495]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. El19-101-000]
Southwest Power Pool, Inc.; Notice of Institution of Section 206
Proceeding and Refund Effective Date
On October 17, 2019, the Commission issued an order in Docket No.
EL19-101-000, pursuant to section 206 of the Federal Power Act (FPA),
16 U.S.C. 824e (2018), instituting a proceeding concerning the justness
and reasonableness of Southwest Power Pool, Inc.'s resource adequacy
minimum run-time requirement. Southwest Power Pool, Inc., 169 FERC
61,048 (2019).
The refund effective date in Docket No. EL19-101-000, established
pursuant to section 206(b) of the FPA, will be the date of publication
of this notice in the Federal Register.
Any interested person desiring to be heard in Docket No. EL19-101-
000 must file a notice of intervention or motion to intervene, as
appropriate, with the Federal Energy Regulatory Commission, 888 First
Street NE, Washington, DC 20426, in accordance with Rule 214 of the
Commission's Rules of Practice and Procedure, 18 CFR 385.214 (2019),
within 21 days of the date of issuance of the order.
Dated: October 18, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-23495 Filed 10-25-19; 8:45 am]
BILLING CODE 6717-01-P