Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 56454-56455 [2019-23004]
Download as PDF
56454
Federal Register / Vol. 84, No. 204 / Tuesday, October 22, 2019 / Notices
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2206–089.
Comments emailed to Commission staff
are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The
licensee requests Commission approval
of a non-project use of project lands and
water for the construction and operation
of a municipal water treatment plant.
The proposed construction would affect
0.34 acres of project land. The Town of
Norwood and Union County, North
Carolina seek to withdrawal an
instantaneous maximum daily
withdrawal of 49.0 million gallons of
water per day (MGD), with an annual
average withdrawal of 19.6 MGD from
Lake Tillery. A maximum monthly
average of 23.3 MGD of the water
withdrawn from the proposed intake
would be transferred out of the Yadkin
River Basin into the Rocky River Basin.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call (866) 208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
VerDate Sep<11>2014
17:45 Oct 21, 2019
Jkt 250001
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’;
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests, must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: October 16, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–23002 Filed 10–21–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Intent To File License
Application, Filing of Pre-Application
Document, and Approving Use of the
Traditional Licensing Process
Project Nos.
Midwest Hydro, LLC .............
Midwest Hydro, LLC .............
Midwest Hydro, LLC .............
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
2347–051
2348–042
2373–012
Project Nos.
STS Hydropower, LLC .........
2446–051
a. Type of Filing: Notices of Intent to
File License Applications and Request
to Use the Traditional Licensing
Process.
b. Project Nos.: 2347–051, 2348–042,
2373–012, and 2446–051.
c. Date Filed: August 30, 2019.
d. Submitted By: Eagle Creek
Renewable Energy, LLC, on behalf of
Midwest Hydro, LLC (Midwest Hydro)
and STS Hydropower, LLC (STS
Hydropower).
e. Name of Projects: Janesville
Central, Beloit, Rockton, and Dixon
Hydroelectric Projects.
f. Location: The four existing projects
are located on the Rock River. The
Dixon Project is located at river mile
(RM) 87 in Lee and Ogle Counties,
Illinois. The Rockton Project is located
at RM 159 in Winnebago County,
Illinois. The Beloit Project is located at
RM 163 in Rock County, Wisconsin. The
Janesville Central Project is located at
RM 180 in Rock County, Wisconsin. No
federal lands are occupied by the project
works or located within the respective
project boundaries.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact:
Michael Scarzello, Regulatory Director,
Eagle Creek Renewable Energy, LLC,
116 N State Street, P.O. Box 167,
Neshkoro, WI 54960-0167; phone: 973–
998–8400; email—Michael.Scarzello@
eaglecreekre.com.
i. FERC Contact: Laura Washington at
(202) 502–6072; or email at Laura.
Washington@ferc.gov.
j. Midwest Hydro and STS
Hydropower filed separate requests to
use the Traditional Licensing Process on
August 30, 2019. Midwest Hydro and
STS Hydropower provided public
notice of their requests on August 30,
2019. In a letter dated October 16, 2019,
the Director of the Division of
Hydropower Licensing approved the
requests to use the Traditional Licensing
Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or National
Oceanic and Atmospheric
Administration (NOAA) Fisheries under
section 7 of the Endangered Species Act
and the joint agency regulations
thereunder at 50 CFR, part 402; and
NOAA Fisheries under section 305(b) of
the Magnuson-Stevens Fishery
Conservation and Management Act and
implementing regulations at 50 CFR
600.920. We are also initiating
consultation the Wisconsin and Illinois
E:\FR\FM\22OCN1.SGM
22OCN1
Federal Register / Vol. 84, No. 204 / Tuesday, October 22, 2019 / Notices
State Historic Preservation Officers, as
required by section 106, National
Historical Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Midwest Hydro and STS Hydropower as
the Commission’s non-federal
representatives for carrying out informal
consultation, pursuant to section 7 of
the Endangered Species Act and section
305(b) of the Magnuson-Stevens Fishery
Conservation and Management Act; and
consultation pursuant to section 106 of
the National Historic Preservation Act.
m. Midwest Hydro and STS
Hydropower filed Pre-Application
Documents (PAD); including a proposed
process plan and schedule for each
project with the Commission, pursuant
to 18 CFR 5.6 of the Commission’s
regulations.
n. A copy of the PADs are available
for review at the Commission in the
Public Reference Room or may be
viewed on the Commission’s website
(https://www.ferc.gov), using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field to access the
document. For assistance, contact FERC
Online Support at FERCONline
Support@ferc.gov, (866) 208–3676 (toll
free), or (202) 502–8659 (TTY). A copy
is also available for inspection and
reproduction at the address in
paragraph h.
o. The licensees state their
unequivocal intent to submit an
application for a new license for Project
Nos. 2347, 2348, 2373, and 2446.
Pursuant to 18 CFR 16.8, 16.9, and
16.10, each application for a new
license and any competing license
applications must be filed with the
Commission at least 24 months prior to
the expiration of the existing license.
All applications for license for these
projects must be filed by August 31,
2022.
p. Register online at https://www.ferc
.gov/docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to these or other
pending projects. For assistance, contact
FERC Online Support.
Dated: October 16, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–23004 Filed 10–21–19; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:45 Oct 21, 2019
Jkt 250001
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER20–122–000]
Crowned Ridge Interconnection, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of
Crowned Ridge Interconnection, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is November 5,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
56455
Dated: October 16, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–22970 Filed 10–21–19; 8:45 am]
BILLING CODE 6717–01–P
FEDERAL TRADE COMMISSION
Agency Information Collection
Activities; Submission to the Office of
Management and Budget for Review
and Approval; Comment Request
Federal Trade Commission.
Notice.
AGENCY:
ACTION:
The Federal Trade
Commission (‘‘FTC’’ or ‘‘Commission’’)
requests that the Office of Management
and Budget (‘‘OMB’’) extend for an
additional three years the current
Paperwork Reduction Act (‘‘PRA’’)
clearance for information collection
requirements in its Energy Labeling
Rule. The existing clearance expires on
November 30, 2019.
DATES: Comments must be submitted on
or before November 21, 2019.
ADDRESSES: Comments in response to
this notice should be submitted to the
OMB Desk Officer for the Federal Trade
Commission within 30 days of this
notice. You may submit comments
using any of the following methods:
Electronic: Write ‘‘Energy Labeling
Rule, PRA Comment, FTC File No.
R611004,’’ on your comment and file
your comment online at https://
www.regulations.gov, by following the
instructions on the web-based form.
Email: MBX.OMB.OIRA.Submission@
OMB.eop.gov.
Mail: Office of Information and
Regulatory Affairs, Office of
Management and Budget, Attention:
Desk Officer for the Federal Trade
Commission, New Executive Office
Building, Docket Library, Room 10102,
725 17th Street NW, Washington, DC
20503.
SUMMARY:
FOR FURTHER INFORMATION CONTACT:
Hampton Newsome, (202) 326–2889,
Attorney, Division of Enforcement,
Bureau of Consumer Protection, Federal
Trade Commission, 600 Pennsylvania
Avenue NW, Washington, DC 20580.
SUPPLEMENTARY INFORMATION: Pursuant
to the Paperwork Reduction Act of 1995
(44 U.S.C. 3501 et seq.), the FTC has
submitted to the Office of Management
and Budget (‘‘OMB’’) this request for
E:\FR\FM\22OCN1.SGM
22OCN1
Agencies
[Federal Register Volume 84, Number 204 (Tuesday, October 22, 2019)]
[Notices]
[Pages 56454-56455]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-23004]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Intent To File License Application, Filing of Pre-
Application Document, and Approving Use of the Traditional Licensing
Process
------------------------------------------------------------------------
Project Nos.
------------------------------------------------------------------------
Midwest Hydro, LLC...................................... 2347-051
Midwest Hydro, LLC...................................... 2348-042
Midwest Hydro, LLC...................................... 2373-012
STS Hydropower, LLC..................................... 2446-051
------------------------------------------------------------------------
a. Type of Filing: Notices of Intent to File License Applications
and Request to Use the Traditional Licensing Process.
b. Project Nos.: 2347-051, 2348-042, 2373-012, and 2446-051.
c. Date Filed: August 30, 2019.
d. Submitted By: Eagle Creek Renewable Energy, LLC, on behalf of
Midwest Hydro, LLC (Midwest Hydro) and STS Hydropower, LLC (STS
Hydropower).
e. Name of Projects: Janesville Central, Beloit, Rockton, and Dixon
Hydroelectric Projects.
f. Location: The four existing projects are located on the Rock
River. The Dixon Project is located at river mile (RM) 87 in Lee and
Ogle Counties, Illinois. The Rockton Project is located at RM 159 in
Winnebago County, Illinois. The Beloit Project is located at RM 163 in
Rock County, Wisconsin. The Janesville Central Project is located at RM
180 in Rock County, Wisconsin. No federal lands are occupied by the
project works or located within the respective project boundaries.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Michael Scarzello, Regulatory
Director, Eagle Creek Renewable Energy, LLC, 116 N State Street, P.O.
Box 167, Neshkoro, WI 54960[hyphen]0167; phone: 973-998-8400; email_
[email protected]
i. FERC Contact: Laura Washington at (202) 502-6072; or email at
[email protected].
j. Midwest Hydro and STS Hydropower filed separate requests to use
the Traditional Licensing Process on August 30, 2019. Midwest Hydro and
STS Hydropower provided public notice of their requests on August 30,
2019. In a letter dated October 16, 2019, the Director of the Division
of Hydropower Licensing approved the requests to use the Traditional
Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and/or National Oceanic and
Atmospheric Administration (NOAA) Fisheries under section 7 of the
Endangered Species Act and the joint agency regulations thereunder at
50 CFR, part 402; and NOAA Fisheries under section 305(b) of the
Magnuson-Stevens Fishery Conservation and Management Act and
implementing regulations at 50 CFR 600.920. We are also initiating
consultation the Wisconsin and Illinois
[[Page 56455]]
State Historic Preservation Officers, as required by section 106,
National Historical Preservation Act, and the implementing regulations
of the Advisory Council on Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating Midwest Hydro and STS
Hydropower as the Commission's non-federal representatives for carrying
out informal consultation, pursuant to section 7 of the Endangered
Species Act and section 305(b) of the Magnuson-Stevens Fishery
Conservation and Management Act; and consultation pursuant to section
106 of the National Historic Preservation Act.
m. Midwest Hydro and STS Hydropower filed Pre-Application Documents
(PAD); including a proposed process plan and schedule for each project
with the Commission, pursuant to 18 CFR 5.6 of the Commission's
regulations.
n. A copy of the PADs are available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's website
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
o. The licensees state their unequivocal intent to submit an
application for a new license for Project Nos. 2347, 2348, 2373, and
2446. Pursuant to 18 CFR 16.8, 16.9, and 16.10, each application for a
new license and any competing license applications must be filed with
the Commission at least 24 months prior to the expiration of the
existing license. All applications for license for these projects must
be filed by August 31, 2022.
p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to these or other pending projects. For assistance, contact
FERC Online Support.
Dated: October 16, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-23004 Filed 10-21-19; 8:45 am]