Duke Energy Carolinas, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 56453-56454 [2019-23002]

Download as PDF Federal Register / Vol. 84, No. 204 / Tuesday, October 22, 2019 / Notices Docket Numbers: QF20–57–000. Applicants: Eco Green Generation LLC. Description: Form 556 of Eco Green Generation LLC [Clean Power #5] under QF20–56, et al. Filed Date: 10/15/19. Accession Number: 20191015–5400. Comments Due: Non Applicable. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 16, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–22968 Filed 10–21–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP20–59–000. Applicants: Dominion Energy Transmission, Inc. Description: § 4(d) Rate Filing: DETI— Modifications to GT&C Section 42 to be effective 11/12/2019. Filed Date: 10/10/19. Accession Number: 20191010–5102. Comments Due: 5 p.m. ET 10/22/19. Docket Numbers: RP20–60–000. Applicants: TOTAL E&P USA, INC.,Murphy Exploration & Production Company. Description: Joint Petition for Limited Waiver of Commission Policies, Capacity Release Regulations and Policies, et al. of TOTAL E&P USA, Inc., et al. under RP20–60. Filed Date: 10/11/19. VerDate Sep<11>2014 17:02 Oct 21, 2019 Jkt 250001 Accession Number: 20191011–5107. Comments Due: 5 p.m. ET 10/18/19. Docket Numbers: RP20–61–000. Applicants: Rockies Express Pipeline LLC. Description: § 4(d) Rate Filing: NonConforming 2019–10–11 GPS to be effective 12/1/2019. Filed Date: 10/11/19. Accession Number: 20191011–5120. Comments Due: 5 p.m. ET 10/23/19. Docket Numbers: RP19–1582–001. Applicants: Gulf South Pipeline Company, LP. Description: Tariff Amendment: Amendment to Filing in Docket No. RP19–1582–000 to be effective 9/23/ 2019. Filed Date: 10/15/19. Accession Number: 20191015–5004. Comments Due: 5 p.m. ET 10/28/19. Docket Numbers: RP20–62–000. Applicants: LA Storage, LLC. Description: § 4(d) Rate Filing: Filing of Negotiated Rate, Conforming IW Agreement (Sequent) to be effective 10/ 15/2019. Filed Date: 10/15/19. Accession Number: 20191015–5005. Comments Due: 5 p.m. ET 10/28/19. Docket Numbers: RP20–63–000. Applicants: Gulf South Pipeline Company, LP. Description: § 4(d) Rate Filing: Filing to Incorporate Approved Changes (RP19–1473 into RP19–1539) to be effective 10/15/2019. Filed Date: 10/15/19. Accession Number: 20191015–5183. Comments Due: 5 p.m. ET 10/28/19. Docket Numbers: RP20–64–000. Applicants: Guardian Pipeline, L.L.C. Description: § 4(d) Rate Filing: Update to Non-Conforming Agreements RW0068 and RW0074 to be effective 11/ 1/2019. Filed Date: 10/15/19. Accession Number: 20191015–5298. Comments Due: 5 p.m. ET 10/28/19. Docket Numbers: RP20–65–000. Applicants: El Paso Natural Gas Company, L.L.C. Description: § 4(d) Rate Filing: Negotiated Rate Agreement Update (Targa) to be effective 11/15/2019. Filed Date: 10/15/19. Accession Number: 20191015–5360. Comments Due: 5 p.m. ET 10/28/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 56453 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 16, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–22969 Filed 10–21–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2206–089] Duke Energy Carolinas, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Non-project use of project lands and water. b. Project No: 2206–089. c. Date Filed: September 19, 2019. d. Applicant: Duke Energy Carolinas, LLC (licensee). e. Name of Project: Yadkin Pee-Dee Hydroelectric Project. f. Location: The project is located on the Yadkin and Pee Dee Rivers in Anson, Montgomery, Richmond, and Stanly Counties, North Carolina. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Duke Energy, Mr. Kelvin Reagan, Duke Energy Lake Services, 526 S. Church Street, EC12Q, Charlotte, NC. 28202; phone (704) 382– 9386, kelvin.reagan@duke-energy.com. i. FERC Contact: Robert Ballantine at (202) 502–6289 or robert.ballantine@ ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: November 15, 2019. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the E:\FR\FM\22OCN1.SGM 22OCN1 56454 Federal Register / Vol. 84, No. 204 / Tuesday, October 22, 2019 / Notices eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–2206–089. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: The licensee requests Commission approval of a non-project use of project lands and water for the construction and operation of a municipal water treatment plant. The proposed construction would affect 0.34 acres of project land. The Town of Norwood and Union County, North Carolina seek to withdrawal an instantaneous maximum daily withdrawal of 49.0 million gallons of water per day (MGD), with an annual average withdrawal of 19.6 MGD from Lake Tillery. A maximum monthly average of 23.3 MGD of the water withdrawn from the proposed intake would be transferred out of the Yadkin River Basin into the Rocky River Basin. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call (866) 208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and VerDate Sep<11>2014 17:45 Oct 21, 2019 Jkt 250001 reproduction at the address in item (h) above. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’; ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests, must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: October 16, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–23002 Filed 10–21–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process Project Nos. Midwest Hydro, LLC ............. Midwest Hydro, LLC ............. Midwest Hydro, LLC ............. PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 2347–051 2348–042 2373–012 Project Nos. STS Hydropower, LLC ......... 2446–051 a. Type of Filing: Notices of Intent to File License Applications and Request to Use the Traditional Licensing Process. b. Project Nos.: 2347–051, 2348–042, 2373–012, and 2446–051. c. Date Filed: August 30, 2019. d. Submitted By: Eagle Creek Renewable Energy, LLC, on behalf of Midwest Hydro, LLC (Midwest Hydro) and STS Hydropower, LLC (STS Hydropower). e. Name of Projects: Janesville Central, Beloit, Rockton, and Dixon Hydroelectric Projects. f. Location: The four existing projects are located on the Rock River. The Dixon Project is located at river mile (RM) 87 in Lee and Ogle Counties, Illinois. The Rockton Project is located at RM 159 in Winnebago County, Illinois. The Beloit Project is located at RM 163 in Rock County, Wisconsin. The Janesville Central Project is located at RM 180 in Rock County, Wisconsin. No federal lands are occupied by the project works or located within the respective project boundaries. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Potential Applicant Contact: Michael Scarzello, Regulatory Director, Eagle Creek Renewable Energy, LLC, 116 N State Street, P.O. Box 167, Neshkoro, WI 54960-0167; phone: 973– 998–8400; email—Michael.Scarzello@ eaglecreekre.com. i. FERC Contact: Laura Washington at (202) 502–6072; or email at Laura. Washington@ferc.gov. j. Midwest Hydro and STS Hydropower filed separate requests to use the Traditional Licensing Process on August 30, 2019. Midwest Hydro and STS Hydropower provided public notice of their requests on August 30, 2019. In a letter dated October 16, 2019, the Director of the Division of Hydropower Licensing approved the requests to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and/or National Oceanic and Atmospheric Administration (NOAA) Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, part 402; and NOAA Fisheries under section 305(b) of the Magnuson-Stevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920. We are also initiating consultation the Wisconsin and Illinois E:\FR\FM\22OCN1.SGM 22OCN1

Agencies

[Federal Register Volume 84, Number 204 (Tuesday, October 22, 2019)]
[Notices]
[Pages 56453-56454]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-23002]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2206-089]


Duke Energy Carolinas, LLC; Notice of Application Accepted for 
Filing and Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Non-project use of project lands and water.
    b. Project No: 2206-089.
    c. Date Filed: September 19, 2019.
    d. Applicant: Duke Energy Carolinas, LLC (licensee).
    e. Name of Project: Yadkin Pee-Dee Hydroelectric Project.
    f. Location: The project is located on the Yadkin and Pee Dee 
Rivers in Anson, Montgomery, Richmond, and Stanly Counties, North 
Carolina.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Duke Energy, Mr. Kelvin Reagan, Duke Energy 
Lake Services, 526 S. Church Street, EC12Q, Charlotte, NC. 28202; phone 
(704) 382-9386, energy.com">[email protected]energy.com.
    i. FERC Contact: Robert Ballantine at (202) 502-6289 or 
[email protected].
    j. Deadline for filing comments, motions to intervene, and 
protests: November 15, 2019.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the

[[Page 56454]]

eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-2206-089. Comments emailed to Commission staff are not 
considered part of the Commission record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: The licensee requests Commission 
approval of a non-project use of project lands and water for the 
construction and operation of a municipal water treatment plant. The 
proposed construction would affect 0.34 acres of project land. The Town 
of Norwood and Union County, North Carolina seek to withdrawal an 
instantaneous maximum daily withdrawal of 49.0 million gallons of water 
per day (MGD), with an annual average withdrawal of 19.6 MGD from Lake 
Tillery. A maximum monthly average of 23.3 MGD of the water withdrawn 
from the proposed intake would be transferred out of the Yadkin River 
Basin into the Rocky River Basin.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 
20426, or by calling (202) 502-8371. This filing may also be viewed on 
the Commission's website at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at https://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call (866) 208-3676 or email 
[email protected], for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above. Agencies may obtain copies of the application directly from 
the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS''; ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests, must set forth their 
evidentiary basis. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.

    Dated: October 16, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-23002 Filed 10-21-19; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.