TWE Bowman Solar Project, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 55570-55571 [2019-22675]

Download as PDF 55570 Federal Register / Vol. 84, No. 201 / Thursday, October 17, 2019 / Notices Filed Date: 10/10/19. Accession Number: 20191010–5042. Comments Due: 5 p.m. ET 10/31/19. Docket Numbers: ER20–75–000. Applicants: Oasis Alta, LLC. Description: Baseline eTariff Filing: MBR Application to be effective 12/10/ 2019. Filed Date: 10/10/19. Accession Number: 20191010–5043. Comments Due: 5 p.m. ET 10/31/19. Docket Numbers: ER20–76–000. Applicants: Oasis Plains Wind, LLC. Description: Baseline eTariff Filing: MBR Application to be effective 12/10/ 2019. Filed Date: 10/10/19. Accession Number: 20191010–5044. Comments Due: 5 p.m. ET 10/31/19. Docket Numbers: ER20–77–000. Applicants: Painted Hills Wind Holdings, LLC. Description: Baseline eTariff Filing: MBR Application to be effective 12/10/ 2019. Filed Date: 10/10/19. Accession Number: 20191010–5046. Comments Due: 5 p.m. ET 10/31/19. Docket Numbers: ER20–78–000. Applicants: San Jacinto Wind II, LLC. Description: Baseline eTariff Filing: MBR Application to be effective 12/10/ 2019. Filed Date: 10/10/19. Accession Number: 20191010–5047. Comments Due: 5 p.m. ET 10/31/19. Docket Numbers: ER20–79–000. Applicants: Voyager Wind IV Expansion, LLC. Description: Baseline eTariff Filing: MBR Application to be effective 12/10/ 2019. Filed Date: 10/10/19. Accession Number: 20191010–5048. Comments Due: 5 p.m. ET 10/31/19. Docket Numbers: ER20–80–000. Applicants: Meadow Lake Wind Farm VI LLC, Description: Baseline eTariff Filing: Reactive Power Compensation Filing to be effective 12/9/2019. Filed Date: 10/10/19. Accession Number: 20191010–5064. Comments Due: 5 p.m. ET 10/31/19. Docket Numbers: ER20–81–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–10–10_SA 2527 ITC-Consumers Energy 4th Rev GIA (J161 J752) to be effective 9/25/2019. Filed Date: 10/10/19. Accession Number: 20191010–5084. Comments Due: 5 p.m. ET 10/31/19. Docket Numbers: ER20–82–000. Applicants: PacifiCorp. Description: § 205(d) Rate Filing: 3 Phases Renewables (OR D.A.) Rev 2 to be effective 10/1/2019. VerDate Sep<11>2014 17:26 Oct 16, 2019 Jkt 250001 Filed Date: 10/10/19. Accession Number: 20191010–5103. Comments Due: 5 p.m. ET 10/31/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 10, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–22663 Filed 10–16–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER20–64–000] PGR Lessee L, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of PGR Lessee L, LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is October 30, 2019. PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 10, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–22678 Filed 10–16–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER20–65–000] TWE Bowman Solar Project, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of TWE Bowman Solar Project, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, E:\FR\FM\17OCN1.SGM 17OCN1 Federal Register / Vol. 84, No. 201 / Thursday, October 17, 2019 / Notices in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is October 30, 2019. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 10, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–22675 Filed 10–16–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP19–514–000] Corpus Christi Liquefaction, LLC; Notice of Application To Amend Take notice that on September 27, 2019, Corpus Christi Liquefaction, LLC (CCL), 700 Milam Street, Suite 1900, Houston, Texas 77002, filed in Docket VerDate Sep<11>2014 17:26 Oct 16, 2019 Jkt 250001 No. CP19–514–000 an application pursuant to section 3 of the Natural Gas Act (NGA) requesting authorization to increase the total liquefied natural gas (LNG) production capacity of the Liquefaction Project from the currently authorized 767 billion cubic feet per year (Bcf/y) to 875.16 Bcf/y, which represents an increase of 108.16 Bcf/y, in Nueces County, Texas. CCL states that the increase is based on certain enhancements during the engineering, design, and construction process, as well as operational experience to date. CCL states that these enhancements do not involve additional construction of new facilities nor do they require additional LNG vessel transits beyond those already authorized, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions regarding the application should be directed to Karri Mahmoud, Cheniere Energy, Inc., 700 Milam Street, Suite 1900, Houston, Texas 77002, (713) 375–5000, Karri.Mahmoud@cheniere.com; or Lisa M. Tonery, Orrick, Herrington & Sutcliffe LLP, 51 West 52nd Street, New York, New York 10019–6142, (212) 506– 3710, ltonery@orrick.com. Pursuant to section 157.9 of the Commission’s rules (18 CFR 157.9), within 90 days of this Notice, the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 55571 obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit five copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. As of the February 27, 2018 date of the Commission’s order in Docket No. CP16–4–001, the Commission will apply its revised practice concerning out-of-time motions to intervene in any E:\FR\FM\17OCN1.SGM 17OCN1

Agencies

[Federal Register Volume 84, Number 201 (Thursday, October 17, 2019)]
[Notices]
[Pages 55570-55571]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-22675]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER20-65-000]


TWE Bowman Solar Project, LLC; Supplemental Notice That Initial 
Market-Based Rate Filing Includes Request for Blanket Section 204 
Authorization

    This is a supplemental notice in the above-referenced proceeding of 
TWE Bowman Solar Project, LLC's application for market-based rate 
authority, with an accompanying rate tariff, noting that such 
application includes a request for blanket authorization, under 18 CFR 
part 34, of future issuances of securities and assumptions of 
liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426,

[[Page 55571]]

in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a 
motion to intervene or protest must serve a copy of that document on 
the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of future issuances of securities and assumptions of 
liability, is October 30, 2019.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
5 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
    The filings in the above-referenced proceeding are accessible in 
the Commission's eLibrary system by clicking on the appropriate link in 
the above list. They are also available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
eSubscription link on the website that enables subscribers to receive 
email notification when a document is added to a subscribed docket(s). 
For assistance with any FERC Online service, please email 
[email protected]. or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

    Dated: October 10, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-22675 Filed 10-16-19; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.