GA Solar 3, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 55311 [2019-22527]
Download as PDF
Federal Register / Vol. 84, No. 200 / Wednesday, October 16, 2019 / Notices
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: October 9, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–22528 Filed 10–15–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER20–57–000]
khammond on DSKJM1Z7X2PROD with NOTICES
GA Solar 3, LLC; Supplemental Notice
That Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the
above-referenced GA Solar 3, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is October 29,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
VerDate Sep<11>2014
17:10 Oct 15, 2019
Jkt 250001
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: October 9, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–22527 Filed 10–15–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–512–000]
Texas Eastern Transmission, LP;
Notice of Application
Take notice that on September 26,
2019, Texas Eastern Transmission, LP
(Texas Eastern), 5400 Westheimer Court,
Houston, Texas 77056, filed in Docket
No. CP19–512–000 an application
pursuant to section 7(c) of the Natural
Gas Act (NGA) requesting authorization
to construct new (1) 30,000 ISO-rated
horsepower (HP) compressor station
(CS) in Calcasieu Parish, Louisiana; (2)
0.2 miles of 20-inch-diameter
interconnecting piping in Cameron
Parish, Louisiana; (3) three metering and
regulating (M&R) stations and other
appurtenances in Cameron, Beauregard,
and Jefferson Davis Parishes, Louisiana
(Cameron Expansion Project). The
project will generate 750,000
dekatherms per day of additional firm
transportation capacity to a new
interconnect with TransCameron
Pipeline, LLC (TransCameron). Texas
Eastern is also seeking approval to
establish and charge initial incremental
recourse reservation and usage rates and
an incremental fuel percentage for firm
service, all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection.
The filing may also be viewed on the
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
55311
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Any questions concerning this
application may be directed to Lisa A.
Connolly, Director, Rates and
Certificates, Texas Eastern
Transmission, LP, P.O. Box 1642,
Houston, Texas 77251, by phone (713)
627–4102, fax (713) 627–5947, or email
lisa.connolly@enbridge.com.
Specifically, Texas Eastern proposes
to construct and operate (1) a new CS
in Calcasieu Parish, comprised of one
30,000 ISO-rated HP, natural gas-driven
turbine compressor unit and related
appurtenances; (2) a new delivery M&R
station and related facilities, including
0.2 miles of 20-inch-diameter
interconnecting piping, at a new
interconnect with TransCameron’s
pipeline system in Cameron Parish; (3)
a new receipt M&R station and related
facilities at a new interconnect with
Momentum Midstream, LLC in
Beauregard Parish; (4) a new bidirectional M&R station and related
facilities at a new interconnect with
Trunkline Gas Company, LLC in
Jefferson Davis Parish; (5) installation of
equipment, including a filter separator
and regulator at the Gillis CS in
Beauregard Parish; and (6) other related
auxiliary facilities and appurtenances.
The cost of the proposed project is
estimated at $149,000,000.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule will serve to notify
federal and state agencies of the timing
for the completion of all necessary
reviews, and the subsequent need to
complete all federal authorizations
within 90 days of the date of issuance
of the Commission staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
E:\FR\FM\16OCN1.SGM
16OCN1
Agencies
[Federal Register Volume 84, Number 200 (Wednesday, October 16, 2019)]
[Notices]
[Page 55311]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-22527]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER20-57-000]
GA Solar 3, LLC; Supplemental Notice That Initial Market-Based
Rate Filing Includes Request for Blanket Section 204 Authorization
This is a supplemental notice in the above-referenced GA Solar 3,
LLC's application for market-based rate authority, with an accompanying
rate tariff, noting that such application includes a request for
blanket authorization, under 18 CFR part 34, of future issuances of
securities and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is October 29, 2019.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the website that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please email
[email protected]. or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Dated: October 9, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-22527 Filed 10-15-19; 8:45 am]
BILLING CODE 6717-01-P