Notice of Application; Sabine Pass Liquefaction, LLC, Sabine Pass LNG, L.P., 55307-55308 [2019-22524]
Download as PDF
Federal Register / Vol. 84, No. 200 / Wednesday, October 16, 2019 / Notices
55307
1060TH—MEETING, OPEN MEETING—Continued
[October 17, 2019, 10:00 a.m.]
Item No.
Docket No.
Company
H–3 .................
P–2079–081 ........................................................
Placer County Water Agency.
CERTIFICATES
C–1 .................
C–2 .................
CP19–52–000 .....................................................
CP18–186–000 ...................................................
Issued: October 10, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
A free webcast of this event is
available through https://
ferc.capitolconnection.org/. Anyone
with internet access who desires to view
this event can do so by navigating to
www.ferc.gov’s Calendar of Events and
locating this event in the Calendar. The
event will contain a link to its webcast.
The Capitol Connection provides
technical support for the free webcasts.
It also offers access to this event via
television in the DC area and via phone
bridge for a fee. If you have any
questions, visit https://
ferc.capitolconnection.org/ or contact
Shirley Al-Jarani at 703–993–3104.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
[FR Doc. 2019–22673 Filed 10–11–19; 4:15 pm]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–515–000]
khammond on DSKJM1Z7X2PROD with NOTICES
Notice of Application; Sabine Pass
Liquefaction, LLC, Sabine Pass LNG,
L.P.
Take notice that on September 27,
2019, Sabine Pass Liquefaction, LLC
(Sabine Pass Liquefaction) and Sabine
Pass LNG, L.P. (Sabine Pass LNG), 700
Milam Street, Suite 1900, Houston, TX
77002, filed an application under
section 3(a) of the Natural Gas Act for
an amendment to the authorizations
granted by the Commission on April 16,
2012, in Docket No. CP11–72–000, as
amended, which authorized the Sabine
VerDate Sep<11>2014
17:10 Oct 15, 2019
Jkt 250001
Natural Gas Pipeline Company of America LLC.
Transcontinental Gas Pipe Line Company, LLC.
Pass Liquefaction Project in Cameron
Parish, Louisiana (Liquefaction Project),
and the authorization granted by the
Commission on April 6, 2015, in Docket
No. CP13–552–000, which authorized
an expansion of the Liquefaction Project
(Liquefaction Expansion Project).
Specifically, Sabine Pass Liquefaction
and Sabine Pass LNG request
authorization to increase the total
liquefied natural gas production
capacity of the Liquefaction Project and
the Liquefaction Expansion Project from
approximately 1,509 billion cubic feet
per year (Bcf/y) to 1,661.94 Bcf/y, all as
more fully set forth in the application
which is on file with the Commission
and open to public inspection. The
filing is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application may be directed to Karri
Mahmoud, Cheniere Energy, Inc. 700
Milam Street, Suite 1900, Houston,
Texas 77002, by telephone at (713) 375–
5000, or by email at karri.mahmoud@
cheniere.com.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
3 copies of filings made with the
Commission and must provide a copy to
the applicant and to every other party.
Only parties to the proceeding can ask
for court review of Commission orders
in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
E:\FR\FM\16OCN1.SGM
16OCN1
55308
Federal Register / Vol. 84, No. 200 / Wednesday, October 16, 2019 / Notices
environmental mailing list, and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commentors
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
As of the February 27, 2018 date of
the Commission’s order in Docket No.
CP16–4–001, the Commission will
apply its revised practice concerning
out-of-time motions to intervene in any
new Natural Gas Act section 3 or section
7 proceeding.1 Persons desiring to
become a party to a certificate
proceeding are to intervene in a timely
manner. If seeking to intervene out-oftime, the movant is required to show
good cause why the time limitation
should be waived, and should provide
justification by reference to factors set
forth in Rule 214(d)(1) of the
Commission’s Rules and Regulations.2
The Commission strongly encourages
electronic filings of comments, protests,
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 3 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
Comment Date: 5:00 p.m. Eastern
Time on October 30, 2019.
Dated: October 9, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–22524 Filed 10–15–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator and Status
khammond on DSKJM1Z7X2PROD with NOTICES
Wilton Wind Energy II, LLC
Roadrunner Solar Project,
LLC.
High Lonesome Wind Power,
LLC.
Grazing Yak Solar, LLC .......
Caden Energix Hickory LLC
EG19–145–
000
EG19–146–
000
EG19–147–
000
EG19–148–
000
EG19–149–
000
1 Tennessee Gas Pipeline Company, L.L.C., 162
FERC 61,167 at 50 (2018).
2 18 CFR 385.214(d)(1).
VerDate Sep<11>2014
17:10 Oct 15, 2019
Jkt 250001
East Blackland Solar Project
1 LLC.
RE Maplewood LLC .............
RE Maplewood 2 LLC ..........
Hickory Run Energy, LLC ....
Lapetus Energy Project, LLC
Palmer Solar, LLC ................
South Field Energy LLC .......
DWW Solar II, LLC ..............
Wright Solar Park LLC .........
EG19–150–
000
EG19–151–
000
EG19–152–
000
EG19–153–
000
EG19–154–
000
EG19–155–
000
EG19–156–
000
EG19–157–
000
EG19–158–
000
Take notice that during the month of
September 2019, the status of the abovecaptioned entities as Exempt Wholesale
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a) (2019).
Dated: October 9, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–22525 Filed 10–15–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG20–7–000.
Applicants: Lincoln Clean Energy,
LLC.
Description: Notice of SelfCertification of Willow Creek Wind,
LLC.
Filed Date: 10/7/19.
Accession Number: 20191007–5139.
Comments Due: 5 p.m. ET 10/28/19.
Docket Numbers: EG20–8–000.
Applicants: Lincoln Clean Energy,
LLC.
Description: Notice of SelfCertification of EG of Plum Creek Wind,
LLC.
Filed Date: 10/7/19.
Accession Number: 20191007–5140.
Comments Due: 5 p.m. ET 10/28/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–469–002.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing: Filing
to Request Change to Effective Date from
12/3/2019 to 12/31/9998 to be effective
12/31/9998.
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
Filed Date: 10/8/19.
Accession Number: 20191008–5112.
Comments Due: 5 p.m. ET 10/29/19.
Docket Numbers: ER19–2463–001.
Applicants: Utah Red Hills Renewable
Park, LLC.
Description: Notice of Non-Material
Change in Status of Utah Red Hills
Renewable Park, LLC.
Filed Date: 10/7/19.
Accession Number: 20191007–5162.
Comments Due: 5 p.m. ET 10/28/19.
Docket Numbers: ER20–17–000.
Applicants: Tenaska Pennsylvania
Partners, LLC.
Description: Report Filing:
Informational Filing Regarding
Upstream Change in Control and
Request for Waiver to be effective N/A.
Filed Date: 10/4/19.
Accession Number: 20191004–5121.
Comments Due: 5 p.m. ET 10/25/19.
Docket Numbers: ER20–45–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing:
Revisions to OA, Schedule 6, sec 1.5 re:
Commission’s 8/30/2019 order in EL19–
61 to be effective 1/1/2020.
Filed Date: 10/7/19.
Accession Number: 20191007–5145.
Comments Due: 5 p.m. ET 10/28/19.
Docket Numbers: ER20–46–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–10–08_SA 3359 METC-IsabellaIsabella II MPFCA (J717 J728) to be
effective 9/24/2019.
Filed Date: 10/8/19.
Accession Number: 20191008–5040.
Comments Due: 5 p.m. ET 10/29/19.
Docket Numbers: ER20–47–000.
Applicants: Nevada Power Company.
Description: § 205(d) Rate Filing:
Amended and Restate Rate Schedule
Facilities Agreement to be effective 12/
8/2019.
Filed Date: 10/8/19.
Accession Number: 20191008–5086.
Comments Due: 5 p.m. ET 10/29/19.
Docket Numbers: ER20–49–000.
Applicants: Mid-Atlantic Interstate
Transmission, LLC, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
MAIT submits OIA SA No. 4577 to be
effective 12/7/2019.
Filed Date: 10/8/19.
Accession Number: 20191008–5097.
Comments Due: 5 p.m. ET 10/29/19.
Docket Numbers: ER20–50–000.
Applicants: Louisville Gas and
Electric Company.
Description: § 205(d) Rate Filing:
EKPC West Shelby CIAC to be effective
12/9/2019.
E:\FR\FM\16OCN1.SGM
16OCN1
Agencies
[Federal Register Volume 84, Number 200 (Wednesday, October 16, 2019)]
[Notices]
[Pages 55307-55308]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-22524]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP19-515-000]
Notice of Application; Sabine Pass Liquefaction, LLC, Sabine Pass
LNG, L.P.
Take notice that on September 27, 2019, Sabine Pass Liquefaction,
LLC (Sabine Pass Liquefaction) and Sabine Pass LNG, L.P. (Sabine Pass
LNG), 700 Milam Street, Suite 1900, Houston, TX 77002, filed an
application under section 3(a) of the Natural Gas Act for an amendment
to the authorizations granted by the Commission on April 16, 2012, in
Docket No. CP11-72-000, as amended, which authorized the Sabine Pass
Liquefaction Project in Cameron Parish, Louisiana (Liquefaction
Project), and the authorization granted by the Commission on April 6,
2015, in Docket No. CP13-552-000, which authorized an expansion of the
Liquefaction Project (Liquefaction Expansion Project).
Specifically, Sabine Pass Liquefaction and Sabine Pass LNG request
authorization to increase the total liquefied natural gas production
capacity of the Liquefaction Project and the Liquefaction Expansion
Project from approximately 1,509 billion cubic feet per year (Bcf/y) to
1,661.94 Bcf/y, all as more fully set forth in the application which is
on file with the Commission and open to public inspection. The filing
is available for review at the Commission in the Public Reference Room
or may be viewed on the Commission's website at https://www.ferc.gov
using the ``eLibrary'' link. Enter the docket number excluding the last
three digits in the docket number field to access the document. For
assistance, contact FERC at [email protected] or call toll-
free, (866) 208-3676 or TTY, (202) 502-8659.
Any questions regarding this application may be directed to Karri
Mahmoud, Cheniere Energy, Inc. 700 Milam Street, Suite 1900, Houston,
Texas 77002, by telephone at (713) 375-5000, or by email at
[email protected].
Pursuant to section 157.9 of the Commission's rules (18 CFR 157.9),
within 90 days of this Notice, the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the EA for this proposal. The filing of the EA in the Commission's
public record for this proceeding or the issuance of a Notice of
Schedule for Environmental Review will serve to notify federal and
state agencies of the timing for the completion of all necessary
reviews, and the subsequent need to complete all federal authorizations
within 90 days of the date of issuance of the Commission staff's EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below file with the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit 3 copies of filings made with the Commission and must provide a
copy to the applicant and to every other party. Only parties to the
proceeding can ask for court review of Commission orders in the
proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's
[[Page 55308]]
environmental mailing list, and will be notified of any meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission and will not have the right to seek court review of the
Commission's final order.
As of the February 27, 2018 date of the Commission's order in
Docket No. CP16-4-001, the Commission will apply its revised practice
concerning out-of-time motions to intervene in any new Natural Gas Act
section 3 or section 7 proceeding.\1\ Persons desiring to become a
party to a certificate proceeding are to intervene in a timely manner.
If seeking to intervene out-of-time, the movant is required to show
good cause why the time limitation should be waived, and should provide
justification by reference to factors set forth in Rule 214(d)(1) of
the Commission's Rules and Regulations.\2\
---------------------------------------------------------------------------
\1\ Tennessee Gas Pipeline Company, L.L.C., 162 FERC 61,167 at
50 (2018).
\2\ 18 CFR 385.214(d)(1).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filings of comments,
protests, and interventions in lieu of paper using the eFiling link at
https://www.ferc.gov. Persons unable to file electronically should
submit an original and 3 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426.
Comment Date: 5:00 p.m. Eastern Time on October 30, 2019.
Dated: October 9, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-22524 Filed 10-15-19; 8:45 am]
BILLING CODE 6717-01-P