Download as PDF 54502 Federal Register / Vol. 84, No. 197 / Thursday, October 10, 2019 / Rules and Regulations action must be filed in the United States Court of Appeals for the appropriate circuit by December 9, 2019. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this action for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action may not be challenged later in proceedings to enforce its requirements. See section 307(b)(2). reference, Intergovernmental relations, Particulate matter, Reporting and recordkeeping requirements, Sulfur oxides. Dated: September 25, 2019. Mary S. Walker, Regional Administrator, Region 4. 40 CFR part 52 is amended as follows: § 52.2120 PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS State effective date * * 6/25/2018 EPA approval date Explanation 10/10/2019, [insert Federal Register citation]. Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i) only. Environmental Protection Agency, 290 Broadway, 25th Floor, New York, New York 10007–1866, (212) 637–3764, or by email at Linky.Edward@epa.gov. SUPPLEMENTARY INFORMATION: [FR Doc. 2019–21956 Filed 10–9–19; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA–R02–OAR–2018–0511; FRL–10000– 78–Region 2] Approval of Air Quality Implementation Plans; New York; Infrastructure Requirements for the 2008 Ozone, 2010 Sulfur Dioxide, and 2012 Fine Particulate Matter National Ambient Air Quality Standards Environmental Protection Agency (EPA). ACTION: Final rule. AGENCY: I. What action is EPA taking? II. What is the background information? III. What is a section 110(a)(1) and (2) SIP? IV. What elements are required under section 110(a)(1) and (2)? V. What is EPA’s approach to the review of infrastructure SIP submissions? VI. What did New York submit? VII. How has the State addressed the elements of the section 110(a)(1) and (2) ‘‘infrastructure’’ provisions? VIII. What comments did EPA receive in response to the proposed action? IX. What is EPA approving? X. Statutory and Executive Order Reviews I. What action is EPA taking? The Environmental Protection Agency (EPA) is approving certain elements of New York’s State Implementation Plan (SIP) revisions, submitted to demonstrate that the State meets the requirements of the Clean Air Act (CAA) for the 2008 Ozone; 2010 Sulfur Dioxide; and 2012 particulate matter of 2.5 microns or less (PM2.5) National Ambient Air Quality Standards (NAAQS). Section 110(a) of the CAA requires that each state adopt and submit for approval into the SIP a plan for the implementation, maintenance and enforcement of each NAAQS promulgated by the EPA. DATES: This final rule is effective on November 12, 2019. FOR FURTHER INFORMATION CONTACT: Edward J. Linky, Air Programs Branch, Jkt 250001 Identification of plan. * * (e) * * * Authority: 42 U.S.C. 7401 et seq. 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS. 16:03 Oct 09, 2019 * 1. The authority citation for part 52 continues to read as follows: Provision VerDate Sep<11>2014 2. In § 52.2120, the table in paragraph (e) is amended by adding the entry ‘‘110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS’’ at the end of the table to read as follows: ■ ■ List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation by SUMMARY: Subpart PP–South Carolina The EPA is approving certain elements of the State of New York Infrastructure State Implementation Plan (SIP) as meeting the section 110(a) infrastructure requirements of the Clean Air Act (CAA) for the following National Ambient Air Quality Standards (NAAQS or standard): 2008 Ozone, 2010 sulfur dioxide (SO2), and 2012 particulate matter of 2.5 microns or less (PM2.5). As explained below, the EPA has determined that the State has the necessary infrastructure, resources, and general authority to implement the standards noted above. II. What is the background information? Section 110(a)(1) of the CAA requires states to submit for approval into the SIP a plan that provides for the PO 00000 Frm 00038 Fmt 4700 Sfmt 4700 implementation, maintenance, and enforcement of new or revised NAAQS within three years following the promulgation of such NAAQS. The EPA commonly refers to such state plans as ‘‘infrastructure SIPs.’’ • On March 12, 2008, the EPA promulgated a revised NAAQS for ozone. 73 FR 16436 (March 27, 2008). • On June 2, 2010), the EPA promulgated a revised primary NAAQS for SO2. 75 FR 35520 (June 22, 2010). • On December 14, 2012, the EPA promulgated a revised primary NAAQS for PM2.5 for the annual standard. 78 FR 3086 (Jan. 15, 2013). The New York State Department of Environmental Conservation (NYSDEC) submitted the following revisions to its Infrastructure State Implementation Plan (ISIP): • 2008 Ozone ISIP submitted on April 4, 2013 • 2010 SO2 ISIP submitted on October 3, 2013 • 2012 PM2.5 ISIP submitted on November 30, 2016 On August 26, 2016 (81 FR 58849), the EPA published its action on certain elements of NYSDEC’s April 4, 2013 SIP submittal pertaining to the 2008 Ozone ISIP. The EPA’s action addressed CAA section 110(a)(2)(D)(i)(I) which requires SIPs to include provisions prohibiting any source or other type of emissions activity in one state from contributing significantly to nonattainment of the NAAQS (commonly referred to as prong 1), or interfering with maintenance of the NAAQS (prong 2), in any other state and CAA section 110(a)(2)(D)(i)(II) which requires SIPs to include E:\FR\FM\10OCR1.SGM 10OCR1 Federal Register / Vol. 84, No. 197 / Thursday, October 10, 2019 / Rules and Regulations provisions prohibiting any source or other type of emissions activity in one state from interfering with measures required to protect visibility (prong 4). The EPA disapproved 110(a)(2)(D)(i)(I) (prongs 1 and 2) and approved 110(a)(2)(D)(i)(II) (prong 4) for the 2008 Ozone NAAQS. 81 FR 58849, 58855 (August 26, 2016). The EPA approved portions of New York’s infrastructure SIP submittals for the 2008 Ozone and 2010 SO2 NAAQS 1 pertaining to CAA sections 110(a)(2)(C), (D)(i)(II) (prong 3), and (J), including PSD interstate transport provisions.2 81 FR 95047 (December 27, 2016). III. What is a section 110(a)(1) and (2) SIP? Section 110(a)(1) provides the procedural and timing requirements for SIPs. Section 110(a)(2) lists specific elements that states must meet for ‘‘infrastructure’’ SIP requirements related to a newly established or revised NAAQS. Sections 110(a)(1) and (2) of the CAA require, in part, that states submit to the EPA plans to implement, maintain and enforce each of the NAAQS promulgated by the EPA. The EPA interprets this provision to require states to address basic SIP requirements including emission inventories, monitoring, and modeling to assure attainment and maintenance of the standards. By statute, SIPs meeting the requirements of section 110(a)(1) and (2) are to be submitted by states within three years after promulgation of a new or revised standard. IV. What elements are required under section 110(a)(1) and (2)? The infrastructure requirements of CAA sections 110(a)(1) and (2), relevant to this action, are discussed in the following EPA guidance documents: EPA’s October 2, 2007, memorandum entitled ‘‘Guidance on SIP Elements Required Under Section 110(a)(1) and (2) for the 1997 8-Hour Ozone and PM2.5 National Ambient Air Quality Standards;’’ September 25, 2009, memorandum entitled ‘‘Guidance on SIP Elements Required Under Section 110(a)(1) and (2) for the 2006 24-Hour 1 The approval also included the 2008 Lead NAAQS, which is not a subject of this action. 2 CAA 110(a)(2)(C) (requires SIPs to include a program to provide for enforcement of emission limitations and other control measures described in CAA 110(a)(2)(A)); CAA 110(a)(2)(D)(i)(II)(which requires SIPs to include provisions prohibiting any source or other type of emissions activity in one state from interfering with measures required to prevent significant deterioration of air quality in another state); CAA 110(a)(2)(J)(requirements related to consultation, public notification and PSD and visibility protection). VerDate Sep<11>2014 16:03 Oct 09, 2019 Jkt 250001 Fine Particle (PM2.5) National Ambient Air Quality Standards;’’ September 13, 2013, memorandum entitled ‘‘Guidance on Infrastructure State Implementation Plan (SIP) Elements under Clean Air Act Sections 110(a)(1) and 110(a)(2)’’ (‘‘2013 Guidance’’); 3 and March 17, 2016, ‘‘Information on Interstate Transport ‘‘Good Neighbor’’ provision for the 2012 Fine Particulate Matter (PM) National Ambient Air Quality Standards under Clean Air Act (CAA) Section 110(a)(2)(D)(i)(I).’’ The EPA reviews each infrastructure SIP submission with the applicable statutory provisions of CAA 110(a)(2). The 14 elements required to be addressed by CAA section 110(a)(2) are: • 110(a)(2)(A): Emission limits and other control measures; • 110(a)(2)(B): Ambient air quality monitoring/data system; • 110(a)(2)(C): Program for enforcement of control measures and for construction or modification of stationary sources; • 110(a)(2)(D)(i)(I) and (II): Interstate pollution transport; • 110(a)(2)(D)(ii): Interstate and international pollution abatement; • 110(a)(2)(E): Adequate resources and authority, conflict of interest, oversight of local governments and local authorities; • 110(a)(2)(F): Stationary source monitoring and reporting; • 110(a)(2)(G): Emergency powers; • 110(a)(2)(H): Future SIP revisions; • 110(a)(2)(I): Plan revisions for nonattainment areas (under part D); • 110(a)(2)(J): Consultation with government officials, public notification, and PSD and visibility protection; • 110(a)(2)(K): Air quality modeling and data; • 110(a)(2)(L): Permitting fees; • 110(a)(2)(M): Consultation/ participation by affected local entities. Two elements identified in section 110(a)(2) are not governed by the 3-year submission deadline of section 110(a)(1) because SIPs incorporating necessary local nonattainment area controls are not due within 3 years after promulgation of a new or revised NAAQS, but rather due at the time that the nonattainment area plan requirements are due pursuant to section 172 of the CAA. See 77 FR 46354 (August 3, 2012) and 77 FR 60308 (October 3, 2012, footnote 1). These requirements are: (1) Submissions required by section 110(a)(2)(C) to the 3 ‘‘Guidance on Infrastructure State Implementation Plan (SIP) Elements under Clean Air Act Sections 110(a)(1) and 110(a)(2)’’ can be found at: https://www.epa.gov/airquality/urbanair/ sipstatus/infrastructure.html. PO 00000 Frm 00039 Fmt 4700 Sfmt 4700 54503 extent that subsection refers to a permit program as required in part D Title I of the CAA, and (2) submissions required by section 110(a)(2)(I) which pertain to the nonattainment planning requirements of part D, Title I of the CAA. As a result, this action does not address the nonattainment permit program requirements of section 110(a)(2)(C) for 2012 PM2.5 or the nonattainment planning requirements related to section 110(a)(2)(I) for the 2008 Ozone, 2010 SO2, or 2012 PM2.5. This action partially addresses Element D (interstate pollution transport, interstate and international pollution abatement). As mentioned in section II, the EPA previously disapproved 110(a)(2)(D)(i)(I) (prongs 1 and 2) and approved 110(a)(2)(D)(i)(II) (prong 4) for the 2008 Ozone NAAQS. 81 FR 58849 (Aug. 26, 2016). The EPA approved 110(a)(2)(D)(i)(II) (prong 3) for the 2008 Ozone and 2010 SO2 NAAQS. 81 FR 95047 (December 27, 2016). This action addresses the remaining element D provisions for 2008 Ozone, 2010 SO2 and 2012 PM2.5 NAAQS, except for 110(a)(2)(D)(i)(I) (prongs 1 and 2) provisions for the 2010 SO2 NAAQS and the 2012 PM2.5 NAAQS, which will be addressed in a subsequent action by the EPA. Therefore, with respect to element D, this action addresses: • 110(a)(2)(D)(i)(II) (prong 3) for the 2012 PM2.5 NAAQS; • 110(a)(2)(D)(i)(II) (prong 4) for the 2010 SO2 NAAQS and 2012 PM2.5 NAAQS; and • 110(a)(2)(D)(ii) for 2008 Ozone NAAQS, 2010 SO2 NAAQS and 2012 PM2.5 NAAQS. V. What is EPA’s approach to the review of infrastructure SIP submissions? The discussion of the EPA’s approach to the review of infrastructure SIP submissions is detailed in the ‘‘Technical Support Document for the EPA’s proposed Rulemaking for the New York State Implementation Plan Revision for Meeting the Infrastructure Requirements in the Clean Air Act’’ dated 2019 (TSD). The TSD is available in the electronic docket (EPA–R02– OAR–2018–0511) at www.regulations.gov. For additional information, the reader is also referred to EPA’s Proposed Rule. 84 FR 27559 (June 13, 2019). Whenever the EPA promulgates a new or revised NAAQS, CAA section 110(a)(1) requires states to make Infrastructure SIP submissions to provide for the implementation, maintenance, and enforcement of the NAAQS. These submissions must meet the various requirements of CAA section E:\FR\FM\10OCR1.SGM 10OCR1 54504 Federal Register / Vol. 84, No. 197 / Thursday, October 10, 2019 / Rules and Regulations 110(a)(2), as applicable. Due to ambiguity in some of the language of CAA section 110(a)(2), the EPA believes that it is appropriate to interpret these provisions in the specific context of acting on infrastructure SIP submissions. The EPA has previously provided comprehensive guidance on the application of these provisions through a guidance document for infrastructure SIP submissions and through regional actions on infrastructure submissions.4 Unless otherwise noted below, we are following that existing approach in acting on these submissions. In addition, in the context of acting on such infrastructure submissions, the EPA evaluates the submitting state’s SIP for facial compliance with statutory and regulatory requirements, not for the state’s implementation of its SIP.5 The EPA has other explicit Clean Air Act authority to address issues concerning a state’s implementation of its SIP. VI. What did New York submit? NYSDEC submitted the following SIP submittals which address the infrastructure requirements for the identified NAAQS: • 2008 Ozone ISIP submitted on April 4, 2013 • 2010 SO2 ISIP submitted on October 3, 2013 • 2012 PM2.5 ISIP submitted on November 30, 2016 New York’s section 110 submittals demonstrate how the State, where applicable, has a plan in place that meets the requirements of section 110 for the 2008 Ozone, 2010 SO2, and 2012 PM2.5 NAAQS. The plans reference the current New York Air Quality SIP, the New York Codes, Rules and Regulations (NYCRR), the New York Environmental Conservation Law (ECL) and the New York Public Officer’s Law (POL). The NYCRR, ECL and POL referenced in the submittal are publicly available. New York’s SIP and air pollution control regulations that have been previously approved by the EPA and incorporated into the New York SIP can be found at 40 CFR 52.1670 and are posted on the internet at https://www.epa.gov/sips-ny. 4 EPA explains and elaborates on these ambiguities and its approach to address them in its September 13, 2013 Infrastructure SIP Guidance (available at https://www3.epa.gov/airquality/ urbanair/sipstatus/docs/Guidance_on_ Infrastructure_SIP_Elements_Multipollutant_ FINAL_Sept_2013.pdf), as well as in numerous agency actions, including EPA’s prior action on New York’s infrastructure SIP to address the Nitrogen Dioxide NAAQS, 85 FR 25066, 25067 (May 2, 2014). 5 See U.S. Court of Appeals for the Ninth Circuit decision in Montana Environmental Information Center v. Thomas, 902 F.3d 971 (Aug. 30, 2018). VerDate Sep<11>2014 16:03 Oct 09, 2019 Jkt 250001 VII. How has the State addressed the elements of the section 110(a)(1) and (2) ‘‘infrastructure’’ provisions? The EPA has determined that New York has the necessary infrastructure, resources, and general authority to address certain elements of the section 110(a)(1) and (2) infrastructure provisions for the 2008 Ozone, 2010 SO2, and 2012 PM2.5 NAAQS. In summary, the EPA is approving the following elements and sub-elements of New York’s Infrastructure SIP submittal for 2008 Ozone, 2010 SO2, and 2012 PM2.5 NAAQS (except as indicated): 110(a)(A) [emission limits and other control measures]; 110(a)(2)(B) [ambient air quality monitoring/data system]; 110(a)(2)(C) [program for enforcement of control measures] for the 2012 PM2.5 NAAQS only; 110(a)(2)(D)(i)(II) [interstate transport], Prong 3 for 2012 PM2.5 NAAQS, and Prong 4 for the 2010 SO2 NAAQS and the 2012 PM2.5 NAAQS; 110(a)(2)(D)(ii) [interstate and international pollution abatement]; 110(a)(2)(E)[adequate resources, state boards/conflict of interest, oversight of local governments and local authorities];110(a)(2)(F) [stationary source monitoring]; 110(a)(2)(G)[emergency power]; 110(a)(2)(H) [future SIP revisions]; 110(a)(2)(J) [consultation with government official, public notification, and PSD for the 2012 PM2.5 NAAQS only]; 110(a)(2)(K) [air quality and modeling/data]; 110(a)(2)(L) [permitting fees]; and 110(a)(2)(M) [consultation/ participation by affected local entities]. The EPA is not acting on New York’s submittal for 2012 PM2.5 as it relates to nonattainment provisions, including the nonattainment NSR program required by part D in section 110(a)(2)(C) and is not acting on New York’s submittals for 2008 Ozone, 2010 SO2 and 2012 PM2.5 as they relate to the measures for nonattainment required by part D in section 110(a)(2)(I), because the State’s Infrastructure SIP submittals do not include nonattainment requirements related to these 2 elements. The EPA is also not acting on the visibility protection portion of element J for the 2012 PM2.5 submittal. VIII. What comments did EPA receive in response to the proposed action? On June 13, 2019 (84 FR 27559), EPA proposed to approve certain elements of New York’s ISIP revisions, submitted to demonstrate that the State meets the requirements of the CAA for the 2008 Ozone; 2010 SO2 and 2012 PM2.5 NAAQS. EPA received an erroneously filed comment from one commenter and an adverse comment from an PO 00000 Frm 00040 Fmt 4700 Sfmt 4700 anonymous commenter, in response to the June 13, 2019 proposed action. Comment: A comment was submitted on EPA’s proposed rule to deny New York’s 126 petition submitted by Louisville Gas and Electric and Kentucky Utilities Companies. EPA Response: These comments were submitted to the Docket for this action but are not applicable to this action and are filed in error. The comments will be addressed separately in the EPA’s Response to Comments on the Proposed Action on Section 126(b) Petition from New York (Docket ID No. EPA–HQ– OAR–2018–0170). Comment: EPA must provide a complete record that New York has adequate resources and personnel to implement the SIP. EPA must audit NYSDEC to ensure proper funding and personnel to implement the SIP. EPA response: EPA disagrees with this comment. An audit of NYSDEC is not required. CAA Section 110(a)(2)(E)(i) (Element E) requires that the State provide ‘‘necessary assurances’’ that it will have adequate funding and personnel to implement the relevant NAAQS. As stated in the proposal, in the context of acting on infrastructure submissions, EPA evaluates the submitting state’s SIP for facial compliance with statutory and regulatory requirements, not for the state’s implementation of its SIP.6 The EPA has other authority to address any issues concerning a state’s implementation of the rules, regulations, consent orders, etc. that comprise its SIP. The requirements of Element E, that the State have adequate resources and personnel, are clearly demonstrated in New York’s three ISIP submittals dated April 4, 2013 (for the 2008 ozone ISIP), October 3, 2013 (for the 2010 SO2 ISIP), and November 30, 2016 (for the 2012 PM2.5 ISIP), as detailed by the EPA in its technical support document (TSD) at pages 11–12, included in this docket. The submittals indicated that NYSDEC’s Division of Air Resources (DAR) has over 200 full-time positions and receives both operating and capital funding. As New York’s submittals indicates, operating funds are allocated to DAR annually and are used for daily administrative expenses. These expenses include salaries, fringe benefit, and indirect and non-personnel services such as travel, supply and equipment costs. Indirect costs are, in turn, allocated to other Departments or 6 See U.S. Court of Appeals for the Ninth Circuit decision in Montana Environmental Information Center v. EPA, 902 F.3d 971 (August 30, 2018. Also see proposed rulemaking in this action 84 FR 27559, 27561 (June 13, 2019). E:\FR\FM\10OCR1.SGM 10OCR1 Federal Register / Vol. 84, No. 197 / Thursday, October 10, 2019 / Rules and Regulations divisions that support DAR activities. DAR is allocated operating funds from five sources: General Fund, Utility Environmental Regulatory Account, Cooperative Agreements (i.e., EPA section 103 and 105 grants) and the Clean Air Fund, which is comprised of the Title V and Mobile Source accounts. Capital funds are allocated to the DAR at the discretion of the New York State legislature and are used for the financing or acquisition of capital facilities such as the construction of an air monitoring site. DAR is allocated Capital funds from three sources: General Fund, Mobile Source Account and Rehabilitation and Improvement.’’ 7 Therefore, the EPA has determined that the NYSDEC has provided necessary assurances that it has sufficient funding and personnel to meet the requirements of section 110(a)(2)(E)(i) for the 2008 ozone, 2010 SO2 and 2012 PM2.5 NAAQS. Comment: New York does not have adequate resources to implement a Regional Haze Program and EPA must impose a FIP on New York for two sources which commenter does not identify. EPA Response: EPA disagrees that New York lacks adequate resources to implement a Regional Haze Program. As noted above, Element E, specifically CAA Section 100(a)(2)(E)(i), does not require an audit of resources and personnel. New York’s Regional Haze plan was approved into the SIP for 18 facilities. 77 FR 51915 (Aug. 28, 2012). Only two facilities, Danskammer Generating Station and Roseton Generating Station, were subject to the Federal Implementation Plan (FIP). Specifically, New York’s SO2, NOX and PM Best Available Retrofit Technology (BART) determinations and emissions limits for Danskammer Generating Station, Unit 4, and New York’s SO2 BART determinations and emissions limit for Roseton Generating Station, Units 1 and 2, were subject to the FIP. EPA’s FIP determination did not cite resources or personnel as a basis for the FIP, rather, the State had provided a regional haze SIP with supporting analysis, but EPA disagreed with the specific BART determinations with regard to specific pollutants at specific units at these facilities that the State had submitted. 77 FR 51915 (Aug. 28, 2012). Moreover, for each of the sources, the EPA subsequently approved a sourcespecific SIP revision and withdrew the FIP. 82 FR 57126 (Dec. 4, 2017) (approving the SIP for Danskammer Generating Station, Unit 4) and 83 FR 7 See submission of NY SIP for interstate transport of PM2.5. VerDate Sep<11>2014 16:03 Oct 09, 2019 Jkt 250001 6970 (Feb. 16, 2018) (approving the SIP for Roseton Generating Station, Units 1 and 2). Comment: Elements, F, H, K, L and M: EPA does not provide any rationale for approving these elements other than to refer the reader to previous actions. EPA must review each submission on its own merits. EPA Response: EPA reviewed and evaluated each submittal addressed in this action. As explained in the proposal (84 FR 27559) and the accompanying TSD for this rulemaking, and consistent with EPA’s ISIP guidance, certain elements of the Infrastructure SIP submittals are not pollutant specific. EPA proposed to find that, for certain elements, including Elements F, H, K, L and M, the information provided in these submittals is consistent with or identical to prior submittals that addressed these specific elements. As explained in the proposal, EPA’s prior actions on ISIPs included a full evaluation of the information provided by the State for each element, found the New York SIP submittal was sufficient, and approved it. New York, in each of its submittals in this action, has affirmed that the existing SIP meets the requirements of CAA sections 110(a)(1) and (2). The EPA is not aware of, and the commenter has not identified, anything about the 2008 ozone, 2010 SO2, or 2012 PM2.5 NAAQS that would cause New York’s SIP for these elements to be insufficient. In addition, New York’s submissions for the 2008 ozone, 2010 SO2, or 2012 PM2.5 NAAQS identify the basis for approving Elements F, H, K, L and M, and that is detailed in the TSD for this action at pages 12–14 for Element F, page 15–16 for Element H, page 20–21 for Element K, page 21 for Element L and pages 21– 22 for Element M. Accordingly, approval of the pending submittal for these elements is appropriate. Comment: For Element H, the EPA must disapprove this element until the EPA establishes a SHL for the PM2.5 NAAQS. In establishing the PM2.5 NAAQS under the 1997 standard the EPA stated that no SHL was able to be established so a placeholder value was being imposed at 500. EPA Response: Element H concerns future SIP revisions and does not relate to establishment of a significant harm level (SHL). The issue of establishment of an SHL relates to Element G (Emergency Powers). In promulgating the 2012 PM2.5 NAAQS, EPA retained the pre-existing level of 500 micrograms per cubic meter (ug/m3), 24-hour average, for the Air Quality Index (AQI) value of 500 and did not establish a significant harm (SHL) for PM2.5. In the PO 00000 Frm 00041 Fmt 4700 Sfmt 4700 54505 absence of a SHL, EPA maintains that the central components of a contingency plan would be to reduce emissions for the PM2.5 sources at issue and to provide public communication as needed. See 2013 Guidance at pages 47–49. NYSDEC’s November 2016 ISIP submittal addressing the Element G requirements for the 2012 PM2.5 NAAQS meets the requirements of the EPA’s 2013 guidance and, as explained in detail in the EPA’s TSD for this ISIP submittal, is acceptable to the EPA. Comment: The comment asserts that the EPA must review Element L with respect to permitting fees and reveal any defects at this time. The EPA cannot point to a previous approval of a similar or nearly similar submittal. EPA must audit the state’s title V fee collection system to affirmatively prove that adequate fees are being collected in order to implement the title V program. The EPA cannot rely on a state claim without affirmatively confirming it. EPA response: CAA 110(a)(2)(L) sets forth specific requirements that are in effect ‘‘until such fee requirement is superseded with respect to such sources by the Administrator’s approval of a fee program under subchapter V [title V].’’ The Administrator previously approved New York’s title V operating program. EPA granted interim approval to the Title V operating permit program submitted by the State of New York effective December 9, 1996. 61 FR 57589 (November 7, 1996). The final interim approval at 61 FR 57590, determines that ‘‘the State has the authority to collect sufficient fees to implement its title V program’’ and, at 61 FR 57592, allows the State to ‘‘issue operating permits pursuant to Title V of the Act to all major stationary sources.’’ See also 61 FR 63928 (Dec. 2, 1996) (correction); 40 CFR part 70, Appendix A. EPA subsequently granted full approval to New York’s program, effective November 30, 2001. 66 FR 63180 (December 5, 2011). In so doing, the Administrator found that the fee program was sufficient to cover all CAA permitting, implementation, and enforcement for new and modified major sources as well as existing major sources, which is consistent with the requirements of CAA 110(a)(2)(L). Statutory and regulatory citations related to the fee aspects of New York’s title V operating program are found in the TSD at p. 21. Accordingly, and consistent with EPA’s ISIP guidance, reliance on the existing, EPA-approved title V fee program is sufficient to approve this element and an additional examination of that approved program is not necessary. E:\FR\FM\10OCR1.SGM 10OCR1 54506 Federal Register / Vol. 84, No. 197 / Thursday, October 10, 2019 / Rules and Regulations IX. What is EPA approving? The EPA is approving New York’s submittals as meeting the infrastructure requirements for the 2008 Ozone, 2010 SO2 and 2012 PM2.5 NAAQS for all section 110(a)(2) elements and subelements, as follows: (A), (B), (C) [enforcement measures and PSD program for major sources for 2012 PM2.5 only], (D)(i)(II) prong 3 [for 2012 PM2.5 only], (D)(i)(II) prong 4 [for 2010 SO2 and 2012 PM2.5 only], D(ii), (E), (F), (G), (H), (J) [for consultation, public notification and prevention of significant deterioration 2012 PM2.5 only], (K), (L) and (M). The EPA is not acting on New York’s submittal for 2012 PM2.5 as it relates to nonattainment provisions, the NSR program required by part D, in section 110(a)(2)(C) and is not acting on New York’s submittals for 2008 Ozone, 2010 SO2 and 2012 PM2.5 NAAQS as they relate to the measures for attainment required by section 110(a)(2)(I), as part of this proposed approval because the State’s infrastructure SIP submittals do not include nonattainment requirements and the EPA will act on them when, if necessary, they are submitted. The EPA is also not acting on 110(a)(2)(D)(i)(I) provisions (prongs 1 and 2) for the 2010 SO2 NAAQS and the 2012 PM2.5 NAAQS, which will be addressed in a subsequent action by the EPA. X. Statutory and Executive Order Reviews Under the Clean Air Act, the Administrator is required to approve a SIP submission that complies with the provisions of the CAA and applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, the EPA’s role is to approve state choices, provided that they meet the criteria of the Clean Air Act. Accordingly, this action merely approves state law as meeting Federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this action: • Is not a ‘‘significant regulatory action’’ subject to review by the Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011); • Does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.); • Is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.); • Does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104–4); • Does not have Federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999); • Is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997); • Is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001); • Is not subject to requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the Clean Air Act; and • Does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994). This rulemaking pertaining to New York’s section 110(a)(2) infrastructure requirements for the 2008 Ozone NAAQS, 2012 PM2.5 NAAQS, and 2010 SO2 NAAQS does not have tribal implications as specified by Executive Order 13175 (65 FR 67249, November 9, 2000), because the SIP is not approved to apply in Indian country located in the State, and EPA notes it will not impose substantial direct costs on tribal governments or preempt tribal law. List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation by reference, Intergovernmental relations, Ozone, Particulate matter, Reporting and recordkeeping requirements, Sulfur oxides, Volatile organic compounds. Authority: 42 U.S.C. 7401 et seq. Subpart HH New York. Dated: September 23, 2019. Peter D. Lopez, Regional Administrator, Region 2. Part 52 chapter I, title 40 of the Code of Federal Regulations is amended as follows: PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS 1. The authority citation for part 52 continues to read as follows: ■ Authority: 42 U.S.C. 7401 et seq. Subpart HH—New York 2. In § 52.1670, the table in paragraph (e) is amended by adding entries for ‘‘Section 110(a)(2) Infrastructure Requirements for the 2008 Ozone NAAQS’’, ‘‘Section 110(a)(2) Infrastructure Requirements for the 2010 SO2 NAAQS’’, and ‘‘Section 110(a)(2) Infrastructure Requirements for the 2012 PM2.5 NAAQS’’ at the end of the table to read as follows. ■ § 52.1670 * Identification of plan. * * (e) * * * * * EPA-APPROVED NEW YORK NON-REGULATORY AND QUASI-REGULATORY PROVISIONS Action/SIP element Applicable geographic or nonattainment area * * Section 110(a)(2) InfrastrucStatewide ture Requirements for the 2008 Ozone NAAQS. Section 110(a)(2) InfrastrucStatewide ture Requirements for the 2010 SO2 NAAQS. VerDate Sep<11>2014 19:17 Oct 09, 2019 Jkt 250001 New York submittal date * 4/4/2013 10/3/2013 PO 00000 Frm 00042 EPA approval date Explanation * 10/10/2019, [insert Federal Register citation]. 10/10/2019, [insert Federal Register citation]. * * * This action addresses the following CAA elements: 110(a)(2)(A), (B), (D)(ii), (E), (F), (G), (H), (K), (L) and (M). This action addresses the following CAA elements: 110(a)(2)(A), (B), (D)(i)(II) prong 4, (D)(ii), (E), (F), (G), (H), (K), (L) and (M). Fmt 4700 Sfmt 4700 E:\FR\FM\10OCR1.SGM 10OCR1 Federal Register / Vol. 84, No. 197 / Thursday, October 10, 2019 / Rules and Regulations 54507 EPA-APPROVED NEW YORK NON-REGULATORY AND QUASI-REGULATORY PROVISIONS—Continued Action/SIP element Section 110(a)(2) Infrastructure Requirements for the 2012 PM2.5 NAAQS. Applicable geographic or nonattainment area Statewide New York submittal date 11/30/2016 EPA approval date Explanation 10/10/2019, [insert Federal Register citation]. This action addresses the following CAA elements: 110(a)(2)(A), (B), (C) [enforcement measures and PSD program for major sources], (D)(i)(II) prong 3, (D)(ii), (E), (F), (G), (H), (J) [for consultation, public notification and prevention of significant deterioration] (K), (L) and (M). the internet and will be publicly available only in hard copy form. Publicly available docket materials are available through https:// ENVIRONMENTAL PROTECTION www.regulations.gov, or please contact AGENCY the person identified in the FOR FURTHER INFORMATION CONTACT section for 40 CFR Part 52 additional availability information. FOR FURTHER INFORMATION CONTACT: [EPA–R03–OAR–2019–0184; FRL–10000– Gregory A. Becoat, Planning & 90–Region 3] Implementation Branch (3AD30), Air & Approval and Promulgation of Air Radiation Division, U.S. Environmental Quality Implementation Plans; District Protection Agency, Region III, 1650 of Columbia; Reasonably Available Arch Street, Philadelphia, Pennsylvania Control Technology State 19103. The telephone number is (215) Implementation Plan for Volatile 814–2036. Mr. Becoat can also be Organic Compounds Under the 2008 reached via electronic mail at Ozone National Ambient Air Quality becoat.gregory@epa.gov. Standard SUPPLEMENTARY INFORMATION: On August 29, 2018, the District of Columbia AGENCY: Environmental Protection Department of Energy and Environment Agency (EPA). (DOEE) submitted a SIP revision to ACTION: Final rule. address all the RACT requirements for SUMMARY: The Environmental Protection VOCs set forth by the CAA under the Agency (EPA) is approving a revision to 2008 8-hour ozone NAAQS (the 2018 RACT Submission). The District’s RACT the District of Columbia’s (the District) submittal for the 2008 ozone NAAQS state implementation plan (SIP) includes: (1) Certification that for submitted on August 29, 2018. The certain major sources, previously District’s SIP revision satisfies the adopted VOC RACT controls in the volatile organic compound (VOC) reasonably available control technology District’s SIP that were approved by EPA under the 1979 1-hour and 1997 8(RACT) requirements under the 2008 8hour ozone national ambient air quality hour ozone NAAQS are based on the currently available technically and standard (NAAQS). The District will economically feasible controls, and address RACT for nitrogen oxides (NOX) continue to represent RACT for in a separate SIP submission. This implementation of the 2008 8-hour action is being taken under the Clean ozone NAAQS; (2) a listing of the Air Act (CAA). Control Techniques Guidelines (CTGs) DATES: This final rule is effective on already adopted into the District’s SIP, November 12, 2019. and (3) a listing of those categories of ADDRESSES: EPA has established a sources subject to CTGs which do not docket for this action under Docket ID exist in the District and the location of Number EPA–R03–OAR–2019–0184. All prior negative declarations previously documents in the docket are listed on submitted and approved by EPA. The the https://www.regulations.gov District’s SIP submittal also includes an website. Although listed in the index, update to the 2002 Mobile Equipment some information is not publicly Repair and Refinishing (MERR) rule to available, e.g., confidential business incorporate the Ozone Transport information (CBI) or other information Commission’s (OTC) 2009 Motor whose disclosure is restricted by statute. Vehicle and Mobile Equipment NonCertain other material, such as Assembly Line Coating Operations copyrighted material, is not placed on regulations (MVMERR) rule adopted by [FR Doc. 2019–21955 Filed 10–9–19; 8:45 am] BILLING CODE 6560–50–P VerDate Sep<11>2014 19:17 Oct 09, 2019 Jkt 250001 PO 00000 Frm 00043 Fmt 4700 Sfmt 4700 the District in 2016. EPA addressed the 2009 MVMERR rule in a separate rulemaking action as it is not related to the 2008 VOC RACT SIP revision and does not impact EPA’s approval. The DOEE also submitted as an amendment to the SIP-approved 2002 MERR rule the updated 2009 MVMERR rule. As previously mentioned, the 2009 MVMERR rule was addressed in a separate rulemaking action. I. Background A. General Ozone is formed in the atmosphere by photochemical reactions between VOCs and NOX in the presence of sunlight. In order to reduce these ozone concentrations, the CAA requires control of VOC and NOX emission sources to achieve emission reductions in moderate or more serious ozone nonattainment areas. Among effective control measures, RACT controls significantly reduce VOC and NOX emissions from major stationary sources. RACT is defined as the lowest emission limitation that a particular source is capable of meeting by the application of control technology that is reasonably available considering technological and economic feasibility.1 Section 172 of the CAA sets forth general requirements for SIPs in nonattainment areas, including a requirement that SIPs must include reasonably available control measures (RACM) for attainment of the NAAQS, including emissions reductions from existing sources through adoption of RACT. CAA section 172(c)(1). Part D, subpart 2 of the CAA sets forth additional provisions for ozone nonattainment areas. CAA sections 181– 185B. Sections 182(b)(2) and 182(f)(1) of the CAA require states with moderate 1 See December 9, 1976 memorandum from Roger Strelow, Assistant Administrator for Air and Waste Management, to Regional Administrators, ‘‘Guidance for Determining Acceptability of SIP Regulations in Non-Attainment Areas.’’ see also 44 FR 53761, 53762 (September 17, 1979). E:\FR\FM\10OCR1.SGM 10OCR1

Agencies

[Federal Register Volume 84, Number 197 (Thursday, October 10, 2019)]
[Rules and Regulations]
[Pages 54502-54507]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-21955]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[EPA-R02-OAR-2018-0511; FRL-10000-78-Region 2]


Approval of Air Quality Implementation Plans; New York; 
Infrastructure Requirements for the 2008 Ozone, 2010 Sulfur Dioxide, 
and 2012 Fine Particulate Matter National Ambient Air Quality Standards

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA) is approving certain 
elements of New York's State Implementation Plan (SIP) revisions, 
submitted to demonstrate that the State meets the requirements of the 
Clean Air Act (CAA) for the 2008 Ozone; 2010 Sulfur Dioxide; and 2012 
particulate matter of 2.5 microns or less (PM2.5) National 
Ambient Air Quality Standards (NAAQS). Section 110(a) of the CAA 
requires that each state adopt and submit for approval into the SIP a 
plan for the implementation, maintenance and enforcement of each NAAQS 
promulgated by the EPA.

DATES: This final rule is effective on November 12, 2019.

FOR FURTHER INFORMATION CONTACT: Edward J. Linky, Air Programs Branch, 
Environmental Protection Agency, 290 Broadway, 25th Floor, New York, 
New York 10007-1866, (212) 637-3764, or by email at 
[email protected].

SUPPLEMENTARY INFORMATION:

I. What action is EPA taking?
II. What is the background information?
III. What is a section 110(a)(1) and (2) SIP?
IV. What elements are required under section 110(a)(1) and (2)?
V. What is EPA's approach to the review of infrastructure SIP 
submissions?
VI. What did New York submit?
VII. How has the State addressed the elements of the section 
110(a)(1) and (2) ``infrastructure'' provisions?
VIII. What comments did EPA receive in response to the proposed 
action?
IX. What is EPA approving?
X. Statutory and Executive Order Reviews

I. What action is EPA taking?

    The EPA is approving certain elements of the State of New York 
Infrastructure State Implementation Plan (SIP) as meeting the section 
110(a) infrastructure requirements of the Clean Air Act (CAA) for the 
following National Ambient Air Quality Standards (NAAQS or standard): 
2008 Ozone, 2010 sulfur dioxide (SO2), and 2012 particulate 
matter of 2.5 microns or less (PM2.5). As explained below, 
the EPA has determined that the State has the necessary infrastructure, 
resources, and general authority to implement the standards noted 
above.

II. What is the background information?

    Section 110(a)(1) of the CAA requires states to submit for approval 
into the SIP a plan that provides for the implementation, maintenance, 
and enforcement of new or revised NAAQS within three years following 
the promulgation of such NAAQS. The EPA commonly refers to such state 
plans as ``infrastructure SIPs.''
     On March 12, 2008, the EPA promulgated a revised NAAQS for 
ozone. 73 FR 16436 (March 27, 2008).
     On June 2, 2010), the EPA promulgated a revised primary 
NAAQS for SO2. 75 FR 35520 (June 22, 2010).
     On December 14, 2012, the EPA promulgated a revised 
primary NAAQS for PM2.5 for the annual standard. 78 FR 3086 
(Jan. 15, 2013).
    The New York State Department of Environmental Conservation 
(NYSDEC) submitted the following revisions to its Infrastructure State 
Implementation Plan (ISIP):

 2008 Ozone ISIP submitted on April 4, 2013
 2010 SO2 ISIP submitted on October 3, 2013
 2012 PM2.5 ISIP submitted on November 30, 2016

    On August 26, 2016 (81 FR 58849), the EPA published its action on 
certain elements of NYSDEC's April 4, 2013 SIP submittal pertaining to 
the 2008 Ozone ISIP. The EPA's action addressed CAA section 
110(a)(2)(D)(i)(I) which requires SIPs to include provisions 
prohibiting any source or other type of emissions activity in one state 
from contributing significantly to nonattainment of the NAAQS (commonly 
referred to as prong 1), or interfering with maintenance of the NAAQS 
(prong 2), in any other state and CAA section 110(a)(2)(D)(i)(II) which 
requires SIPs to include

[[Page 54503]]

provisions prohibiting any source or other type of emissions activity 
in one state from interfering with measures required to protect 
visibility (prong 4). The EPA disapproved 110(a)(2)(D)(i)(I) (prongs 1 
and 2) and approved 110(a)(2)(D)(i)(II) (prong 4) for the 2008 Ozone 
NAAQS. 81 FR 58849, 58855 (August 26, 2016).
    The EPA approved portions of New York's infrastructure SIP 
submittals for the 2008 Ozone and 2010 SO2 NAAQS \1\ 
pertaining to CAA sections 110(a)(2)(C), (D)(i)(II) (prong 3), and (J), 
including PSD interstate transport provisions.\2\ 81 FR 95047 (December 
27, 2016).
---------------------------------------------------------------------------

    \1\ The approval also included the 2008 Lead NAAQS, which is not 
a subject of this action.
    \2\ CAA 110(a)(2)(C) (requires SIPs to include a program to 
provide for enforcement of emission limitations and other control 
measures described in CAA 110(a)(2)(A)); CAA 
110(a)(2)(D)(i)(II)(which requires SIPs to include provisions 
prohibiting any source or other type of emissions activity in one 
state from interfering with measures required to prevent significant 
deterioration of air quality in another state); CAA 
110(a)(2)(J)(requirements related to consultation, public 
notification and PSD and visibility protection).
---------------------------------------------------------------------------

III. What is a section 110(a)(1) and (2) SIP?

    Section 110(a)(1) provides the procedural and timing requirements 
for SIPs. Section 110(a)(2) lists specific elements that states must 
meet for ``infrastructure'' SIP requirements related to a newly 
established or revised NAAQS.
    Sections 110(a)(1) and (2) of the CAA require, in part, that states 
submit to the EPA plans to implement, maintain and enforce each of the 
NAAQS promulgated by the EPA. The EPA interprets this provision to 
require states to address basic SIP requirements including emission 
inventories, monitoring, and modeling to assure attainment and 
maintenance of the standards. By statute, SIPs meeting the requirements 
of section 110(a)(1) and (2) are to be submitted by states within three 
years after promulgation of a new or revised standard.

IV. What elements are required under section 110(a)(1) and (2)?

    The infrastructure requirements of CAA sections 110(a)(1) and (2), 
relevant to this action, are discussed in the following EPA guidance 
documents: EPA's October 2, 2007, memorandum entitled ``Guidance on SIP 
Elements Required Under Section 110(a)(1) and (2) for the 1997 8-Hour 
Ozone and PM2.5 National Ambient Air Quality Standards;'' 
September 25, 2009, memorandum entitled ``Guidance on SIP Elements 
Required Under Section 110(a)(1) and (2) for the 2006 24-Hour Fine 
Particle (PM2.5) National Ambient Air Quality Standards;'' 
September 13, 2013, memorandum entitled ``Guidance on Infrastructure 
State Implementation Plan (SIP) Elements under Clean Air Act Sections 
110(a)(1) and 110(a)(2)'' (``2013 Guidance''); \3\ and March 17, 2016, 
``Information on Interstate Transport ``Good Neighbor'' provision for 
the 2012 Fine Particulate Matter (PM) National Ambient Air Quality 
Standards under Clean Air Act (CAA) Section 110(a)(2)(D)(i)(I).''
---------------------------------------------------------------------------

    \3\ ``Guidance on Infrastructure State Implementation Plan (SIP) 
Elements under Clean Air Act Sections 110(a)(1) and 110(a)(2)'' can 
be found at: https://www.epa.gov/airquality/urbanair/sipstatus/infrastructure.html.
---------------------------------------------------------------------------

    The EPA reviews each infrastructure SIP submission with the 
applicable statutory provisions of CAA 110(a)(2). The 14 elements 
required to be addressed by CAA section 110(a)(2) are:
     110(a)(2)(A): Emission limits and other control measures;
     110(a)(2)(B): Ambient air quality monitoring/data system;
     110(a)(2)(C): Program for enforcement of control measures 
and for construction or modification of stationary sources;
     110(a)(2)(D)(i)(I) and (II): Interstate pollution 
transport;
     110(a)(2)(D)(ii): Interstate and international pollution 
abatement;
     110(a)(2)(E): Adequate resources and authority, conflict 
of interest, oversight of local governments and local authorities;
     110(a)(2)(F): Stationary source monitoring and reporting;
     110(a)(2)(G): Emergency powers;
     110(a)(2)(H): Future SIP revisions;
     110(a)(2)(I): Plan revisions for nonattainment areas 
(under part D);
     110(a)(2)(J): Consultation with government officials, 
public notification, and PSD and visibility protection;
     110(a)(2)(K): Air quality modeling and data;
     110(a)(2)(L): Permitting fees;
     110(a)(2)(M): Consultation/participation by affected local 
entities.
    Two elements identified in section 110(a)(2) are not governed by 
the 3-year submission deadline of section 110(a)(1) because SIPs 
incorporating necessary local nonattainment area controls are not due 
within 3 years after promulgation of a new or revised NAAQS, but rather 
due at the time that the nonattainment area plan requirements are due 
pursuant to section 172 of the CAA. See 77 FR 46354 (August 3, 2012) 
and 77 FR 60308 (October 3, 2012, footnote 1). These requirements are: 
(1) Submissions required by section 110(a)(2)(C) to the extent that 
subsection refers to a permit program as required in part D Title I of 
the CAA, and (2) submissions required by section 110(a)(2)(I) which 
pertain to the nonattainment planning requirements of part D, Title I 
of the CAA. As a result, this action does not address the nonattainment 
permit program requirements of section 110(a)(2)(C) for 2012 
PM2.5 or the nonattainment planning requirements related to 
section 110(a)(2)(I) for the 2008 Ozone, 2010 SO2, or 2012 
PM2.5.
    This action partially addresses Element D (interstate pollution 
transport, interstate and international pollution abatement). As 
mentioned in section II, the EPA previously disapproved 
110(a)(2)(D)(i)(I) (prongs 1 and 2) and approved 110(a)(2)(D)(i)(II) 
(prong 4) for the 2008 Ozone NAAQS. 81 FR 58849 (Aug. 26, 2016). The 
EPA approved 110(a)(2)(D)(i)(II) (prong 3) for the 2008 Ozone and 2010 
SO2 NAAQS. 81 FR 95047 (December 27, 2016). This action 
addresses the remaining element D provisions for 2008 Ozone, 2010 
SO2 and 2012 PM2.5 NAAQS, except for 
110(a)(2)(D)(i)(I) (prongs 1 and 2) provisions for the 2010 
SO2 NAAQS and the 2012 PM2.5 NAAQS, which will be 
addressed in a subsequent action by the EPA. Therefore, with respect to 
element D, this action addresses:
     110(a)(2)(D)(i)(II) (prong 3) for the 2012 
PM2.5 NAAQS;
     110(a)(2)(D)(i)(II) (prong 4) for the 2010 SO2 
NAAQS and 2012 PM2.5 NAAQS; and
     110(a)(2)(D)(ii) for 2008 Ozone NAAQS, 2010 SO2 
NAAQS and 2012 PM2.5 NAAQS.

V. What is EPA's approach to the review of infrastructure SIP 
submissions?

    The discussion of the EPA's approach to the review of 
infrastructure SIP submissions is detailed in the ``Technical Support 
Document for the EPA's proposed Rulemaking for the New York State 
Implementation Plan Revision for Meeting the Infrastructure 
Requirements in the Clean Air Act'' dated 2019 (TSD). The TSD is 
available in the electronic docket (EPA-R02-OAR-2018-0511) at 
www.regulations.gov. For additional information, the reader is also 
referred to EPA's Proposed Rule. 84 FR 27559 (June 13, 2019).
    Whenever the EPA promulgates a new or revised NAAQS, CAA section 
110(a)(1) requires states to make Infrastructure SIP submissions to 
provide for the implementation, maintenance, and enforcement of the 
NAAQS. These submissions must meet the various requirements of CAA 
section

[[Page 54504]]

110(a)(2), as applicable. Due to ambiguity in some of the language of 
CAA section 110(a)(2), the EPA believes that it is appropriate to 
interpret these provisions in the specific context of acting on 
infrastructure SIP submissions. The EPA has previously provided 
comprehensive guidance on the application of these provisions through a 
guidance document for infrastructure SIP submissions and through 
regional actions on infrastructure submissions.\4\ Unless otherwise 
noted below, we are following that existing approach in acting on these 
submissions. In addition, in the context of acting on such 
infrastructure submissions, the EPA evaluates the submitting state's 
SIP for facial compliance with statutory and regulatory requirements, 
not for the state's implementation of its SIP.\5\ The EPA has other 
explicit Clean Air Act authority to address issues concerning a state's 
implementation of its SIP.
---------------------------------------------------------------------------

    \4\ EPA explains and elaborates on these ambiguities and its 
approach to address them in its September 13, 2013 Infrastructure 
SIP Guidance (available at https://www3.epa.gov/airquality/urbanair/sipstatus/docs/Guidance_on_Infrastructure_SIP_Elements_Multipollutant_FINAL_Sept_2013.pdf), as well as in numerous agency actions, including EPA's prior 
action on New York's infrastructure SIP to address the Nitrogen 
Dioxide NAAQS, 85 FR 25066, 25067 (May 2, 2014).
    \5\ See U.S. Court of Appeals for the Ninth Circuit decision in 
Montana Environmental Information Center v. Thomas, 902 F.3d 971 
(Aug. 30, 2018).
---------------------------------------------------------------------------

VI. What did New York submit?

    NYSDEC submitted the following SIP submittals which address the 
infrastructure requirements for the identified NAAQS:

 2008 Ozone ISIP submitted on April 4, 2013
 2010 SO2 ISIP submitted on October 3, 2013
 2012 PM2.5 ISIP submitted on November 30, 2016

    New York's section 110 submittals demonstrate how the State, where 
applicable, has a plan in place that meets the requirements of section 
110 for the 2008 Ozone, 2010 SO2, and 2012 PM2.5 
NAAQS. The plans reference the current New York Air Quality SIP, the 
New York Codes, Rules and Regulations (NYCRR), the New York 
Environmental Conservation Law (ECL) and the New York Public Officer's 
Law (POL). The NYCRR, ECL and POL referenced in the submittal are 
publicly available. New York's SIP and air pollution control 
regulations that have been previously approved by the EPA and 
incorporated into the New York SIP can be found at 40 CFR 52.1670 and 
are posted on the internet at https://www.epa.gov/sips-ny.

VII. How has the State addressed the elements of the section 110(a)(1) 
and (2) ``infrastructure'' provisions?

    The EPA has determined that New York has the necessary 
infrastructure, resources, and general authority to address certain 
elements of the section 110(a)(1) and (2) infrastructure provisions for 
the 2008 Ozone, 2010 SO2, and 2012 PM2.5 NAAQS. 
In summary, the EPA is approving the following elements and sub-
elements of New York's Infrastructure SIP submittal for 2008 Ozone, 
2010 SO2, and 2012 PM2.5 NAAQS (except as 
indicated): 110(a)(A) [emission limits and other control measures]; 
110(a)(2)(B) [ambient air quality monitoring/data system]; 110(a)(2)(C) 
[program for enforcement of control measures] for the 2012 
PM2.5 NAAQS only; 110(a)(2)(D)(i)(II) [interstate 
transport], Prong 3 for 2012 PM2.5 NAAQS, and Prong 4 for 
the 2010 SO2 NAAQS and the 2012 PM2.5 NAAQS; 
110(a)(2)(D)(ii) [interstate and international pollution abatement]; 
110(a)(2)(E)[adequate resources, state boards/conflict of interest, 
oversight of local governments and local authorities];110(a)(2)(F) 
[stationary source monitoring]; 110(a)(2)(G)[emergency power]; 
110(a)(2)(H) [future SIP revisions]; 110(a)(2)(J) [consultation with 
government official, public notification, and PSD for the 2012 
PM2.5 NAAQS only]; 110(a)(2)(K) [air quality and modeling/
data]; 110(a)(2)(L) [permitting fees]; and 110(a)(2)(M) [consultation/
participation by affected local entities].
    The EPA is not acting on New York's submittal for 2012 
PM2.5 as it relates to nonattainment provisions, including 
the nonattainment NSR program required by part D in section 
110(a)(2)(C) and is not acting on New York's submittals for 2008 Ozone, 
2010 SO2 and 2012 PM2.5 as they relate to the 
measures for nonattainment required by part D in section 110(a)(2)(I), 
because the State's Infrastructure SIP submittals do not include 
nonattainment requirements related to these 2 elements. The EPA is also 
not acting on the visibility protection portion of element J for the 
2012 PM2.5 submittal.

VIII. What comments did EPA receive in response to the proposed action?

    On June 13, 2019 (84 FR 27559), EPA proposed to approve certain 
elements of New York's ISIP revisions, submitted to demonstrate that 
the State meets the requirements of the CAA for the 2008 Ozone; 2010 
SO2 and 2012 PM2.5 NAAQS. EPA received an 
erroneously filed comment from one commenter and an adverse comment 
from an anonymous commenter, in response to the June 13, 2019 proposed 
action.
    Comment: A comment was submitted on EPA's proposed rule to deny New 
York's 126 petition submitted by Louisville Gas and Electric and 
Kentucky Utilities Companies.
    EPA Response: These comments were submitted to the Docket for this 
action but are not applicable to this action and are filed in error. 
The comments will be addressed separately in the EPA's Response to 
Comments on the Proposed Action on Section 126(b) Petition from New 
York (Docket ID No. EPA-HQ-OAR-2018-0170).
    Comment: EPA must provide a complete record that New York has 
adequate resources and personnel to implement the SIP. EPA must audit 
NYSDEC to ensure proper funding and personnel to implement the SIP.
    EPA response: EPA disagrees with this comment. An audit of NYSDEC 
is not required. CAA Section 110(a)(2)(E)(i) (Element E) requires that 
the State provide ``necessary assurances'' that it will have adequate 
funding and personnel to implement the relevant NAAQS. As stated in the 
proposal, in the context of acting on infrastructure submissions, EPA 
evaluates the submitting state's SIP for facial compliance with 
statutory and regulatory requirements, not for the state's 
implementation of its SIP.\6\ The EPA has other authority to address 
any issues concerning a state's implementation of the rules, 
regulations, consent orders, etc. that comprise its SIP.
---------------------------------------------------------------------------

    \6\ See U.S. Court of Appeals for the Ninth Circuit decision in 
Montana Environmental Information Center v. EPA, 902 F.3d 971 
(August 30, 2018. Also see proposed rulemaking in this action 84 FR 
27559, 27561 (June 13, 2019).
---------------------------------------------------------------------------

    The requirements of Element E, that the State have adequate 
resources and personnel, are clearly demonstrated in New York's three 
ISIP submittals dated April 4, 2013 (for the 2008 ozone ISIP), October 
3, 2013 (for the 2010 SO2 ISIP), and November 30, 2016 (for 
the 2012 PM2.5 ISIP), as detailed by the EPA in its 
technical support document (TSD) at pages 11-12, included in this 
docket. The submittals indicated that NYSDEC's Division of Air 
Resources (DAR) has over 200 full-time positions and receives both 
operating and capital funding. As New York's submittals indicates, 
operating funds are allocated to DAR annually and are used for daily 
administrative expenses. These expenses include salaries, fringe 
benefit, and indirect and non-personnel services such as travel, supply 
and equipment costs. Indirect costs are, in turn, allocated to other 
Departments or

[[Page 54505]]

divisions that support DAR activities. DAR is allocated operating funds 
from five sources: General Fund, Utility Environmental Regulatory 
Account, Co-operative Agreements (i.e., EPA section 103 and 105 grants) 
and the Clean Air Fund, which is comprised of the Title V and Mobile 
Source accounts.
    Capital funds are allocated to the DAR at the discretion of the New 
York State legislature and are used for the financing or acquisition of 
capital facilities such as the construction of an air monitoring site. 
DAR is allocated Capital funds from three sources: General Fund, Mobile 
Source Account and Rehabilitation and Improvement.'' \7\
---------------------------------------------------------------------------

    \7\ See submission of NY SIP for interstate transport of 
PM2.5.
---------------------------------------------------------------------------

    Therefore, the EPA has determined that the NYSDEC has provided 
necessary assurances that it has sufficient funding and personnel to 
meet the requirements of section 110(a)(2)(E)(i) for the 2008 ozone, 
2010 SO2 and 2012 PM2.5 NAAQS.
    Comment: New York does not have adequate resources to implement a 
Regional Haze Program and EPA must impose a FIP on New York for two 
sources which commenter does not identify.
    EPA Response: EPA disagrees that New York lacks adequate resources 
to implement a Regional Haze Program. As noted above, Element E, 
specifically CAA Section 100(a)(2)(E)(i), does not require an audit of 
resources and personnel. New York's Regional Haze plan was approved 
into the SIP for 18 facilities. 77 FR 51915 (Aug. 28, 2012). Only two 
facilities, Danskammer Generating Station and Roseton Generating 
Station, were subject to the Federal Implementation Plan (FIP). 
Specifically, New York's SO2, NOX and PM Best 
Available Retrofit Technology (BART) determinations and emissions 
limits for Danskammer Generating Station, Unit 4, and New York's 
SO2 BART determinations and emissions limit for Roseton 
Generating Station, Units 1 and 2, were subject to the FIP. EPA's FIP 
determination did not cite resources or personnel as a basis for the 
FIP, rather, the State had provided a regional haze SIP with supporting 
analysis, but EPA disagreed with the specific BART determinations with 
regard to specific pollutants at specific units at these facilities 
that the State had submitted. 77 FR 51915 (Aug. 28, 2012). Moreover, 
for each of the sources, the EPA subsequently approved a source-
specific SIP revision and withdrew the FIP. 82 FR 57126 (Dec. 4, 2017) 
(approving the SIP for Danskammer Generating Station, Unit 4) and 83 FR 
6970 (Feb. 16, 2018) (approving the SIP for Roseton Generating Station, 
Units 1 and 2).
    Comment: Elements, F, H, K, L and M: EPA does not provide any 
rationale for approving these elements other than to refer the reader 
to previous actions. EPA must review each submission on its own merits.
    EPA Response: EPA reviewed and evaluated each submittal addressed 
in this action. As explained in the proposal (84 FR 27559) and the 
accompanying TSD for this rulemaking, and consistent with EPA's ISIP 
guidance, certain elements of the Infrastructure SIP submittals are not 
pollutant specific. EPA proposed to find that, for certain elements, 
including Elements F, H, K, L and M, the information provided in these 
submittals is consistent with or identical to prior submittals that 
addressed these specific elements. As explained in the proposal, EPA's 
prior actions on ISIPs included a full evaluation of the information 
provided by the State for each element, found the New York SIP 
submittal was sufficient, and approved it. New York, in each of its 
submittals in this action, has affirmed that the existing SIP meets the 
requirements of CAA sections 110(a)(1) and (2). The EPA is not aware 
of, and the commenter has not identified, anything about the 2008 
ozone, 2010 SO2, or 2012 PM2.5 NAAQS that would 
cause New York's SIP for these elements to be insufficient. In 
addition, New York's submissions for the 2008 ozone, 2010 
SO2, or 2012 PM2.5 NAAQS identify the basis for 
approving Elements F, H, K, L and M, and that is detailed in the TSD 
for this action at pages 12-14 for Element F, page 15-16 for Element H, 
page 20-21 for Element K, page 21 for Element L and pages 21-22 for 
Element M. Accordingly, approval of the pending submittal for these 
elements is appropriate.
    Comment: For Element H, the EPA must disapprove this element until 
the EPA establishes a SHL for the PM2.5 NAAQS. In 
establishing the PM2.5 NAAQS under the 1997 standard the EPA 
stated that no SHL was able to be established so a placeholder value 
was being imposed at 500.
    EPA Response: Element H concerns future SIP revisions and does not 
relate to establishment of a significant harm level (SHL). The issue of 
establishment of an SHL relates to Element G (Emergency Powers). In 
promulgating the 2012 PM2.5 NAAQS, EPA retained the pre-
existing level of 500 micrograms per cubic meter (ug/m\3\), 24-hour 
average, for the Air Quality Index (AQI) value of 500 and did not 
establish a significant harm (SHL) for PM2.5. In the absence 
of a SHL, EPA maintains that the central components of a contingency 
plan would be to reduce emissions for the PM2.5 sources at 
issue and to provide public communication as needed. See 2013 Guidance 
at pages 47-49. NYSDEC's November 2016 ISIP submittal addressing the 
Element G requirements for the 2012 PM2.5 NAAQS meets the 
requirements of the EPA's 2013 guidance and, as explained in detail in 
the EPA's TSD for this ISIP submittal, is acceptable to the EPA.
    Comment: The comment asserts that the EPA must review Element L 
with respect to permitting fees and reveal any defects at this time. 
The EPA cannot point to a previous approval of a similar or nearly 
similar submittal. EPA must audit the state's title V fee collection 
system to affirmatively prove that adequate fees are being collected in 
order to implement the title V program. The EPA cannot rely on a state 
claim without affirmatively confirming it.
    EPA response: CAA 110(a)(2)(L) sets forth specific requirements 
that are in effect ``until such fee requirement is superseded with 
respect to such sources by the Administrator's approval of a fee 
program under subchapter V [title V].'' The Administrator previously 
approved New York's title V operating program. EPA granted interim 
approval to the Title V operating permit program submitted by the State 
of New York effective December 9, 1996. 61 FR 57589 (November 7, 1996). 
The final interim approval at 61 FR 57590, determines that ``the State 
has the authority to collect sufficient fees to implement its title V 
program'' and, at 61 FR 57592, allows the State to ``issue operating 
permits pursuant to Title V of the Act to all major stationary 
sources.'' See also 61 FR 63928 (Dec. 2, 1996) (correction); 40 CFR 
part 70, Appendix A. EPA subsequently granted full approval to New 
York's program, effective November 30, 2001. 66 FR 63180 (December 5, 
2011). In so doing, the Administrator found that the fee program was 
sufficient to cover all CAA permitting, implementation, and enforcement 
for new and modified major sources as well as existing major sources, 
which is consistent with the requirements of CAA 110(a)(2)(L). 
Statutory and regulatory citations related to the fee aspects of New 
York's title V operating program are found in the TSD at p. 21. 
Accordingly, and consistent with EPA's ISIP guidance, reliance on the 
existing, EPA-approved title V fee program is sufficient to approve 
this element and an additional examination of that approved program is 
not necessary.

[[Page 54506]]

IX. What is EPA approving?

    The EPA is approving New York's submittals as meeting the 
infrastructure requirements for the 2008 Ozone, 2010 SO2 and 
2012 PM2.5 NAAQS for all section 110(a)(2) elements and sub-
elements, as follows: (A), (B), (C) [enforcement measures and PSD 
program for major sources for 2012 PM2.5 only], (D)(i)(II) 
prong 3 [for 2012 PM2.5 only], (D)(i)(II) prong 4 [for 2010 
SO2 and 2012 PM2.5 only], D(ii), (E), (F), (G), 
(H), (J) [for consultation, public notification and prevention of 
significant deterioration 2012 PM2.5 only], (K), (L) and 
(M).
    The EPA is not acting on New York's submittal for 2012 
PM2.5 as it relates to nonattainment provisions, the NSR 
program required by part D, in section 110(a)(2)(C) and is not acting 
on New York's submittals for 2008 Ozone, 2010 SO2 and 2012 
PM2.5 NAAQS as they relate to the measures for attainment 
required by section 110(a)(2)(I), as part of this proposed approval 
because the State's infrastructure SIP submittals do not include 
nonattainment requirements and the EPA will act on them when, if 
necessary, they are submitted.
    The EPA is also not acting on 110(a)(2)(D)(i)(I) provisions (prongs 
1 and 2) for the 2010 SO2 NAAQS and the 2012 
PM2.5 NAAQS, which will be addressed in a subsequent action 
by the EPA.

X. Statutory and Executive Order Reviews

    Under the Clean Air Act, the Administrator is required to approve a 
SIP submission that complies with the provisions of the CAA and 
applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). 
Thus, in reviewing SIP submissions, the EPA's role is to approve state 
choices, provided that they meet the criteria of the Clean Air Act. 
Accordingly, this action merely approves state law as meeting Federal 
requirements and does not impose additional requirements beyond those 
imposed by state law. For that reason, this action:
     Is not a ``significant regulatory action'' subject to 
review by the Office of Management and Budget under Executive Order 
12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 
2011);
     Does not impose an information collection burden under the 
provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
     Is certified as not having a significant economic impact 
on a substantial number of small entities under the Regulatory 
Flexibility Act (5 U.S.C. 601 et seq.);
     Does not contain any unfunded mandate or significantly or 
uniquely affect small governments, as described in the Unfunded 
Mandates Reform Act of 1995 (Pub. L. 104-4);
     Does not have Federalism implications as specified in 
Executive Order 13132 (64 FR 43255, August 10, 1999);
     Is not an economically significant regulatory action based 
on health or safety risks subject to Executive Order 13045 (62 FR 
19885, April 23, 1997);
     Is not a significant regulatory action subject to 
Executive Order 13211 (66 FR 28355, May 22, 2001);
     Is not subject to requirements of section 12(d) of the 
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 
note) because application of those requirements would be inconsistent 
with the Clean Air Act; and
     Does not provide EPA with the discretionary authority to 
address, as appropriate, disproportionate human health or environmental 
effects, using practicable and legally permissible methods, under 
Executive Order 12898 (59 FR 7629, February 16, 1994).
    This rulemaking pertaining to New York's section 110(a)(2) 
infrastructure requirements for the 2008 Ozone NAAQS, 2012 
PM2.5 NAAQS, and 2010 SO2 NAAQS does not have 
tribal implications as specified by Executive Order 13175 (65 FR 67249, 
November 9, 2000), because the SIP is not approved to apply in Indian 
country located in the State, and EPA notes it will not impose 
substantial direct costs on tribal governments or preempt tribal law.

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Incorporation by 
reference, Intergovernmental relations, Ozone, Particulate matter, 
Reporting and recordkeeping requirements, Sulfur oxides, Volatile 
organic compounds.

    Authority:  42 U.S.C. 7401 et seq. Subpart HH New York.

    Dated: September 23, 2019.
 Peter D. Lopez,
 Regional Administrator, Region 2.

    Part 52 chapter I, title 40 of the Code of Federal Regulations is 
amended as follows:

PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

0
1. The authority citation for part 52 continues to read as follows:

    Authority: 42 U.S.C. 7401 et seq.

Subpart HH--New York

0
2. In Sec.  52.1670, the table in paragraph (e) is amended by adding 
entries for ``Section 110(a)(2) Infrastructure Requirements for the 
2008 Ozone NAAQS'', ``Section 110(a)(2) Infrastructure Requirements for 
the 2010 SO2 NAAQS'', and ``Section 110(a)(2) Infrastructure 
Requirements for the 2012 PM2.5 NAAQS'' at the end of the 
table to read as follows.


Sec.  52.1670  Identification of plan.

* * * * *
    (e) * * *

                      EPA-Approved New York Non-Regulatory and Quasi-Regulatory Provisions
----------------------------------------------------------------------------------------------------------------
                                  Applicable
                                 geographic or      New York       EPA approval
      Action/SIP element         nonattainment   submittal date        date                 Explanation
                                     area
----------------------------------------------------------------------------------------------------------------
 
                                                  * * * * * * *
Section 110(a)(2)              Statewide.......        4/4/2013  10/10/2019,      This action addresses the
 Infrastructure Requirements                                      [insert          following CAA elements:
 for the 2008 Ozone NAAQS.                                        Federal          110(a)(2)(A), (B), (D)(ii),
                                                                  Register         (E), (F), (G), (H), (K), (L)
                                                                  citation].       and (M).
Section 110(a)(2)              Statewide.......       10/3/2013  10/10/2019,      This action addresses the
 Infrastructure Requirements                                      [insert          following CAA elements:
 for the 2010 SO2 NAAQS.                                          Federal          110(a)(2)(A), (B), (D)(i)(II)
                                                                  Register         prong 4, (D)(ii), (E), (F),
                                                                  citation].       (G), (H), (K), (L) and (M).

[[Page 54507]]

 
Section 110(a)(2)              Statewide.......      11/30/2016  10/10/2019,      This action addresses the
 Infrastructure Requirements                                      [insert          following CAA elements:
 for the 2012 PM2.5 NAAQS.                                        Federal          110(a)(2)(A), (B), (C)
                                                                  Register         [enforcement measures and PSD
                                                                  citation].       program for major sources],
                                                                                   (D)(i)(II) prong 3, (D)(ii),
                                                                                   (E), (F), (G), (H), (J) [for
                                                                                   consultation, public
                                                                                   notification and prevention
                                                                                   of significant deterioration]
                                                                                   (K), (L) and (M).
----------------------------------------------------------------------------------------------------------------

[FR Doc. 2019-21955 Filed 10-9-19; 8:45 am]
 BILLING CODE 6560-50-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.