Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications; Pumped Hydro Storage, LLC, 54136-54137 [2019-22021]
Download as PDF
54136
Federal Register / Vol. 84, No. 196 / Wednesday, October 9, 2019 / Notices
Description: Joint Petition for
Temporary Waiver of Commission
Policies, Capacity Release Regulations
and Policies, et al. of Exelon Generation
Company, LLC, et al. under RP19–1644.
Filed Date: 9/30/19.
Accession Number: 20190930–5223.
Comments Due: 5 p.m. ET 10/15/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 3, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–22099 Filed 10–8–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER20–27–000]
khammond on DSKJM1Z7X2PROD with NOTICES
Wright Solar Park LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced Wright Solar Park
LLC’s application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
VerDate Sep<11>2014
17:13 Oct 08, 2019
Jkt 250001
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is October 23,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: October 3, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–22104 Filed 10–8–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14992–000]
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing
Applications; Pumped Hydro Storage,
LLC
On May 8, 2019, Pumped Hydro
Storage, LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of a
pumped storage project in Coconino
County, Arizona. On August 1, 2019, the
applicant filed a revised application for
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
the project to address Commission
staff’s June 19, 2019 comments. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed Navajo Nation Salt
Trail Canyon Pumped Storage Project
would consist of the following: (1) A
new 240-foot-high, 500-foot-long upper
dam and reservoir; (2) a new 140-foothigh, 1,000-foot-long lower dam and
reservoir; (3) six 250- megawatt, turbinegenerator units, for a total installed
capacity of 1,500 megawatts; (4) a new
20-mile-long, 500-kilovolt transmission
line from the powerhouse to the existing
Moenkopi switchyard; and (5)
appurtenant facilities. The proposed
project would have an average annual
generation of 3,300 gigawatt-hours.
Applicant Contact: Steve Irwin,
Pumped Hydro Storage, LLC, 6514 S
41st Lane, Phoenix, AZ 85041; phone:
(602) 696–3608.
FERC Contact: Tim Konnert; phone:
(202) 502–6359.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14992–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14992) in the docket number field to
E:\FR\FM\09OCN1.SGM
09OCN1
Federal Register / Vol. 84, No. 196 / Wednesday, October 9, 2019 / Notices
access the document. For assistance,
contact FERC Online Support.
Dated: October 2, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–22021 Filed 10–8–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
khammond on DSKJM1Z7X2PROD with NOTICES
Filings Instituting Proceedings
Docket Numbers: RP19–1590–001.
Applicants: Honeoye Storage
Corporation.
Description: Compliance filing
Compliance Filing Adoption of NAESB
Version 3.1 to be effective 11/1/2019.
Filed Date: 9/27/19.
Accession Number: 20190927–5084.
Comments Due: 5 p.m. ET 10/9/19.
Docket Numbers: RP19–1601–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: § 4(d) Rate Filing:
MidAmerican Energy Services—
Negotiated Rate Agreement Filing to be
effective 11/1/2019.
Filed Date: 9/27/19.
Accession Number: 20190927–5000.
Comments Due: 5 p.m. ET 10/9/19.
Docket Numbers: RP19–1602–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: § 4(d) Rate Filing:
Tenaska Marketing Ventures—
Negotiated Rate Agreement Filing to be
effective 11/1/2019.
Filed Date: 9/27/19.
Accession Number: 20190927–5001.
Comments Due: 5 p.m. ET 10/9/19.
Docket Numbers: RP19–1603–000.
Applicants: Stingray Pipeline
Company, L.L.C.
Description: § 4(d) Rate Filing:
Stingray Non-Conforming Agreements
to be effective 10/27/2019.
Filed Date: 9/27/19.
Accession Number: 20190927–5024.
Comments Due: 5 p.m. ET 10/9/19.
Docket Numbers: RP19–1604–000.
Applicants: Portland Natural Gas
Transmission System.
Description: Compliance filing PXP
Phase II Compliance Filing to be
effective 11/1/2019.
Filed Date: 9/27/19.
Accession Number: 20190927–5025.
Comments Due: 5 p.m. ET 10/9/19.
VerDate Sep<11>2014
17:13 Oct 08, 2019
Jkt 250001
Docket Numbers: RP19–1605–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: Compliance filing
Penalty Revenue Crediting Report from
January through June 2019.
Filed Date: 9/27/19.
Accession Number: 20190927–5030.
Comments Due: 5 p.m. ET 10/9/19.
Docket Numbers: RP19–1606–000.
Applicants: Tennessee Gas Pipeline
Company, L.L.C.
Description: § 4(d) Rate Filing:
Pipeline Safety and Greenhouse Gas
Cost Adjustment Mechanism—2019 to
be effective 11/1/2019.
Filed Date: 9/27/19.
Accession Number: 20190927–5041.
Comments Due: 5 p.m. ET 10/9/19.
Docket Numbers: RP19–1608–000.
Applicants: National Fuel Gas Supply
Corporation.
Description: § 4(d) Rate Filing: GT&C
Sec 42 Tracker Filing (11/2019) to be
effective 11/1/2019.
Filed Date: 9/27/19.
Accession Number: 20190927–5055.
Comments Due: 5 p.m. ET 10/9/19.
Docket Numbers: RP19–1609–000.
Applicants: Dauphin Island Gathering
Partners.
Description: § 4(d) Rate Filing:
Negotiated Rate Filing—Fieldwood 9–
27–2019 to be effective 10/1/2019.
Filed Date: 9/27/19.
Accession Number: 20190927–5060.
Comments Due: 5 p.m. ET 10/9/19.
Docket Numbers: RP19–1610–000.
Applicants: Dominion Energy
Transmission, Inc.
Description: § 4(d) Rate Filing: DETI—
Modifications to GT&C for the
Construction of Facilities to be effective
10/28/2019.
Filed Date: 9/27/19.
Accession Number: 20190927–5072.
Comments Due: 5 p.m. ET 10/9/19.
Docket Numbers: RP19–1611–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rate—MC Global 911524 to
Eco-Energy 8959558 eff 10–1–19 to be
effective 10/1/2019.
Filed Date: 9/27/19.
Accession Number: 20190927–5088.
Comments Due: 5 p.m. ET 10/9/19.
Docket Numbers: RP19–1612–000.
Applicants: MoGas Pipeline LLC.
Description: § 4(d) Rate Filing: MoGas
Negotiated Rate Tariff Filing to be
effective 10/1/2019.
Filed Date: 9/27/19.
Accession Number: 20190927–5142.
Comments Due: 5 p.m. ET 10/9/19.
Docket Numbers: RP19–1613–000.
Applicants: Maritimes & Northeast
Pipeline, L.L.C.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
54137
Description: § 4(d) Rate Filing: MNUS
FRQ 2019 Filing to be effective 11/1/
2019.
Filed Date: 9/27/19.
Accession Number: 20190927–5143.
Comments Due: 5 p.m. ET 10/9/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 2, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–22022 Filed 10–8–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC20–3–000.
Applicants: Xcel Energy Inc., Mankato
Energy Center, LLC, Mankato Energy
Center II, LLC.
Description: Joint Application
Authorization Under Section 203 of the
Federal Power Act, et al. of Xcel Energy
Inc., et al.
Filed Date: 10/3/19.
Accession Number: 20191003–5034.
Comments Due: 5 p.m. ET 10/24/19.
Docket Numbers: EC20–4–000.
Applicants: Tenaska Alabama II
Partners, L.P., Alabama Power
Company.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Tenaska
Alabama II Partners, L.P., et al.
Filed Date: 10/2/19.
Accession Number: 20191002–5219.
Comments Due: 5 p.m. ET 10/23/19.
E:\FR\FM\09OCN1.SGM
09OCN1
Agencies
[Federal Register Volume 84, Number 196 (Wednesday, October 9, 2019)]
[Notices]
[Pages 54136-54137]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-22021]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14992-000]
Notice of Preliminary Permit Application Accepted for Filing and
Soliciting Comments, Motions To Intervene, and Competing Applications;
Pumped Hydro Storage, LLC
On May 8, 2019, Pumped Hydro Storage, LLC, filed an application for
a preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of a pumped storage project
in Coconino County, Arizona. On August 1, 2019, the applicant filed a
revised application for the project to address Commission staff's June
19, 2019 comments. The sole purpose of a preliminary permit, if issued,
is to grant the permit holder priority to file a license application
during the permit term. A preliminary permit does not authorize the
permit holder to perform any land-disturbing activities or otherwise
enter upon lands or waters owned by others without the owners' express
permission.
The proposed Navajo Nation Salt Trail Canyon Pumped Storage Project
would consist of the following: (1) A new 240-foot-high, 500-foot-long
upper dam and reservoir; (2) a new 140-foot-high, 1,000-foot-long lower
dam and reservoir; (3) six 250- megawatt, turbine-generator units, for
a total installed capacity of 1,500 megawatts; (4) a new 20-mile-long,
500-kilovolt transmission line from the powerhouse to the existing
Moenkopi switchyard; and (5) appurtenant facilities. The proposed
project would have an average annual generation of 3,300 gigawatt-
hours.
Applicant Contact: Steve Irwin, Pumped Hydro Storage, LLC, 6514 S
41st Lane, Phoenix, AZ 85041; phone: (602) 696-3608.
FERC Contact: Tim Konnert; phone: (202) 502-6359.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-14992-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14992) in the docket number field to
[[Page 54137]]
access the document. For assistance, contact FERC Online Support.
Dated: October 2, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-22021 Filed 10-8-19; 8:45 am]
BILLING CODE 6717-01-P