Combined Notice of Filings #1, 53716-53717 [2019-21974]
Download as PDF
53716
Federal Register / Vol. 84, No. 195 / Tuesday, October 8, 2019 / Notices
Attachment 3—Alternative Recovery
Efficiency Equation
How the current calculation is
written:
Where this calculation falls short is
when our first cut-out occurs into or
through subsequent draws. The
definition of Tdel,1 and Tin, 1 are
currently defined as the ‘‘average water
temperature measured during the Draws
from the start of the 24 hour
simulated-use test to the end of the first
recovery period, °F, (°C).’’
Our Proposal
Nr = number of draws that the first
recovery period occurred during.
of the stored water until cut-out; in the
case the cut-out * occurs during a
subsequent draw, the first recovery
period is to include the time until the
draw of water from the tank stops.
mi = Mass of draw i.
Cpi = Average Specific heat of draw i.
Qr = Energy consumption of water heater
from the beginning of the test to the end
of the first recovery period
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–2583–000.
Applicants: Green River Wind Farm
Phase 1, LLC.
Description: Amendment to August
13, 2019 Green River Wind Farm Phase
1, LLC. tariff filing.
Filed Date: 10/2/19.
Accession Number: 20191002–5077.
Comments Due: 5 p.m. ET 10/9/19.
Docket Numbers: ER20–16–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–10–01_Attachment P Clean-up to
be effective 12/1/2019.
Filed Date: 10/1/19.
Accession Number: 20191001–5278.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20–17–000.
Applicants: Tenaska Pennsylvania
Partners, LLC.
Description: § 205(d) Rate Filing:
Reactive Power Rate Schedule to be
effective 11/1/2019.
Filed Date: 10/1/19.
Accession Number: 20191001–5286.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20–18–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–10–02_Termination of SA 3220
Flying Cow Wind-OTP E&P (BSSB)
(J493 J510) to be effective 10/3/2019.
Filed Date: 10/2/19.
Accession Number: 20191002–5008.
Comments Due: 5 p.m. ET 10/23/19.
Docket Numbers: ER20–19–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of Service
Agreement No. 3602, Queue No. Y1–057
to be effective 7/29/2019.
Filed Date: 10/2/19.
Accession Number: 20191002–5051.
Comments Due: 5 p.m. ET 10/23/19.
Docket Numbers: ER20–20–000.
Applicants: DTE Atlantic, LLC.
Description: Baseline eTariff Filing:
DTE Atlantic LLC. MBR Tariff
Application to be effective 10/3/2019.
Filed Date: 10/2/19.
Accession Number: 20191002–5074.
Comments Due: 5 p.m. ET 10/23/19.
First Recovery Period: Is defined by
when the main burner of a storage water
heater is lit and raising the temperature
*If after the first cut-out occurs during
a subsequent draw, a subsequent cut-in
occurs prior to the draw completion, the
first recovery period is to include the
time until the subsequent cut-out
occurs, prior to another draw.
[FR Doc. 2019–21935 Filed 10–7–19; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
jbell on DSK3GLQ082PROD with NOTICES
• GD Midea Heating & Ventilating
Equipment Co., Ltd.
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC20–2–000.
Applicants: Bucksport Generation
LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Bucksport
Generation LLC.
Filed Date: 10/1/19.
Accession Number: 20191001–5288.
Comments Due: 5 p.m. ET 10/22/19.
VerDate Sep<11>2014
21:50 Oct 07, 2019
Jkt 250001
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
We would like to propose the
calculation below to avoid inflating the
energy delivered that the averaging
causes
For example, if Nr = 2
E:\FR\FM\08OCN1.SGM
08OCN1
EN08OC19.035 EN08OC19.036
Company:
• A. O. Smith Corporation
Rheem Sales Company, Inc.
Bock Water Heaters, Inc.
GIANT Factories, Inc.
Bradford White Corp.
HTP Comfort Solutions LLC
Rinnai America Corporation
Vesta DS, Inc.
Vaughn Thermal Corporation
EN08OC19.034
•
•
•
•
•
•
•
•
Attachment 2—List of Manufacturers of
Residential Gas, Oil, and Heat Pump
Storage-Type Water Heaters With a
Rated Storage Volume Greater Than or
Equal to Two Gallons
jbell on DSK3GLQ082PROD with NOTICES
Federal Register / Vol. 84, No. 195 / Tuesday, October 8, 2019 / Notices
Docket Numbers: ER20–21–000.
Applicants: Southwest Power Pool,
Inc.
Description: Notice of Cancellation of
Generator Interconnection Agreement of
Southwest Power Pool, Inc.
Filed Date: 10/2/19.
Accession Number: 20191002–5076.
Comments Due: 5 p.m. ET 10/23/19.
Docket Numbers: ER20–22–000.
Applicants: Harbor Cogeneration
Company, LLC.
Description: § 205(d) Rate Filing:
Normal filing 2019 to be effective 10/3/
2019.
Filed Date: 10/2/19.
Accession Number: 20191002–5111.
Comments Due: 5 p.m. ET 10/23/19.
Docket Numbers: ER20–23–000.
Applicants: DTE Atlantic, LLC.
Description: Baseline eTariff Filing:
DTE Atlantic LLC. MBR Tariff
Application to be effective 10/3/2019.
Filed Date: 10/2/19.
Accession Number: 20191002–5118.
Comments Due: 5 p.m. ET 10/23/19.
Docket Numbers: ER20–24–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Otter Tail Power Company.
Description: § 205(d) Rate Filing:
2019–10–02_SA 3358 OTP–OTP FSA
(G359R) Hankinson-Ellendale & Big
Stone-Blair to be effective 12/2/2019.
Filed Date: 10/2/19.
Accession Number: 20191002–5133.
Comments Due: 5 p.m. ET 10/23/19.
Docket Numbers: ER20–25–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Otter Tail Power Company.
Description: § 205(d) Rate Filing:
2019–10–02_SA 3357 OTP-Dakota
Range III FSA (J488) HankinsonEllendale to be effective 12/2/2019.
Filed Date: 10/2/19.
Accession Number: 20191002–5153.
Comments Due: 5 p.m. ET 10/23/19.
Docket Numbers: ER20–26–000.
Applicants: Northern States Power
Company, a Minnesota corporation,
Northern States Power Company, a
Wisconsin corporation.
Description: § 205(d) Rate Filing:
20191002_IA_ROE_Update to be
effective 1/1/2020.
Filed Date: 10/2/19.
Accession Number: 20191002–5175.
Comments Due: 5 p.m. ET 10/23/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
VerDate Sep<11>2014
21:50 Oct 07, 2019
Jkt 250001
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 2, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–21974 Filed 10–7–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD19–15–000]
Notice Inviting Post-Technical
Conference Comments: Managing
Transmission Line Ratings
On September 10 and September 11,
2019, Federal Energy Regulatory
Commission (Commission) staff
convened a technical conference to
discuss what transmission line ratings
and related practices might constitute
best practices, and what, if any,
Commission action in these areas might
be appropriate.
All interested persons are invited to
file initial and reply post-technical
workshop comments on any or all of the
questions listed in the attachment to
this Notice. Commenters may also
respond to the questions outlined in the
September 4, 2019 supplemental notice
of technical conference.1 Commenters
need not answer all of the questions.
Commenters should organize responses
consistent with the structure of the
attached questions. Commenters are also
invited to reference material previously
filed in this docket, including technical
workshop transcripts, but are
encouraged to avoid repetition or
replication of previous material. Initial
comments must be submitted on or
before 30 days from the date of this
notice. Reply comments must be
submitted on or before 15 days after the
deadline to submit initial comments.
For more information about this
Notice, please contact:
1 Available at https://www.ferc.gov/
CalendarFiles/20190904173327-AD19-15000supplTC.pdf.
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
53717
Dillon Kolkmann (Technical
Information), Office of Energy Policy
and Information, Federal Energy
Regulatory Commission, 888 First
Street NE, Washington, DC 20426,
(202) 502–8650, dillon.kolkmann@
ferc.gov.
Kevin Ryan (Legal Information), Office
of the General Counsel, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC
20426, (202) 502–6840, kevin.ryan@
ferc.gov.
Dated: October 2, 2019.
Kimberly D. Bose,
Secretary.
Post-Technical Conference Questions
for Comment
Commenters may respond to the
questions outlined in the September 4,
2019 supplemental notice of technical
conference.2 In addition, based on
discussions during the Managing
Transmission Line Ratings technical
conference, Staff developed the
following questions to better understand
whether Commission action might be
appropriate. To guide discussion,
ambient-adjusted ratings (AAR) are
defined as ratings that are adjusted
daily, hourly, or more frequently and
account for ambient air temperatures.
Dynamic line ratings (DLRs) are defined
as line ratings that are adjusted hourly
or more frequently and account for local
weather conditions (e.g., ambient
temperature, wind, precipitation, solar
irradiation) and/or account for
conductor parameters (conductor
temperature, tension, sag, clearance),
typically as measured by local sensors.
1. Discussion of a Possible Requirement
for Transmission Owners To Implement
AARs
a. Should transmission owners be
required to implement AARs? If so, to
which lines would the requirement
apply? What criteria (e.g., congestion,
facility age) and process would be used
to determine to which lines the
requirement would apply? What would
be the benefits or drawbacks to such a
requirement?
b. If AARs are required, should they
be required for modeling in both the
day-ahead and real-time markets?
c. What type of forecasting (e.g., how
frequently, how granularly, and of what
variables) is needed to incorporate
AARs and DLRs into both real-time and
day-ahead markets? If forecasts
submitted in day-ahead markets differ
from the real-time rating, how should
2 Available at https://www.ferc.gov/
CalendarFiles/20190904173327-AD19-15000supplTC.pdf.
E:\FR\FM\08OCN1.SGM
08OCN1
Agencies
[Federal Register Volume 84, Number 195 (Tuesday, October 8, 2019)]
[Notices]
[Pages 53716-53717]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-21974]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC20-2-000.
Applicants: Bucksport Generation LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of Bucksport Generation LLC.
Filed Date: 10/1/19.
Accession Number: 20191001-5288.
Comments Due: 5 p.m. ET 10/22/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER19-2583-000.
Applicants: Green River Wind Farm Phase 1, LLC.
Description: Amendment to August 13, 2019 Green River Wind Farm
Phase 1, LLC. tariff filing.
Filed Date: 10/2/19.
Accession Number: 20191002-5077.
Comments Due: 5 p.m. ET 10/9/19.
Docket Numbers: ER20-16-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-10-01_Attachment P
Clean-up to be effective 12/1/2019.
Filed Date: 10/1/19.
Accession Number: 20191001-5278.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20-17-000.
Applicants: Tenaska Pennsylvania Partners, LLC.
Description: Sec. 205(d) Rate Filing: Reactive Power Rate Schedule
to be effective 11/1/2019.
Filed Date: 10/1/19.
Accession Number: 20191001-5286.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20-18-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-10-02_Termination of SA
3220 Flying Cow Wind-OTP E&P (BSSB) (J493 J510) to be effective 10/3/
2019.
Filed Date: 10/2/19.
Accession Number: 20191002-5008.
Comments Due: 5 p.m. ET 10/23/19.
Docket Numbers: ER20-19-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Cancellation: Notice of Cancellation of Service
Agreement No. 3602, Queue No. Y1-057 to be effective 7/29/2019.
Filed Date: 10/2/19.
Accession Number: 20191002-5051.
Comments Due: 5 p.m. ET 10/23/19.
Docket Numbers: ER20-20-000.
Applicants: DTE Atlantic, LLC.
Description: Baseline eTariff Filing: DTE Atlantic LLC. MBR Tariff
Application to be effective 10/3/2019.
Filed Date: 10/2/19.
Accession Number: 20191002-5074.
Comments Due: 5 p.m. ET 10/23/19.
[[Page 53717]]
Docket Numbers: ER20-21-000.
Applicants: Southwest Power Pool, Inc.
Description: Notice of Cancellation of Generator Interconnection
Agreement of Southwest Power Pool, Inc.
Filed Date: 10/2/19.
Accession Number: 20191002-5076.
Comments Due: 5 p.m. ET 10/23/19.
Docket Numbers: ER20-22-000.
Applicants: Harbor Cogeneration Company, LLC.
Description: Sec. 205(d) Rate Filing: Normal filing 2019 to be
effective 10/3/2019.
Filed Date: 10/2/19.
Accession Number: 20191002-5111.
Comments Due: 5 p.m. ET 10/23/19.
Docket Numbers: ER20-23-000.
Applicants: DTE Atlantic, LLC.
Description: Baseline eTariff Filing: DTE Atlantic LLC. MBR Tariff
Application to be effective 10/3/2019.
Filed Date: 10/2/19.
Accession Number: 20191002-5118.
Comments Due: 5 p.m. ET 10/23/19.
Docket Numbers: ER20-24-000.
Applicants: Midcontinent Independent System Operator, Inc., Otter
Tail Power Company.
Description: Sec. 205(d) Rate Filing: 2019-10-02_SA 3358 OTP-OTP
FSA (G359R) Hankinson-Ellendale & Big Stone-Blair to be effective 12/2/
2019.
Filed Date: 10/2/19.
Accession Number: 20191002-5133.
Comments Due: 5 p.m. ET 10/23/19.
Docket Numbers: ER20-25-000.
Applicants: Midcontinent Independent System Operator, Inc., Otter
Tail Power Company.
Description: Sec. 205(d) Rate Filing: 2019-10-02_SA 3357 OTP-
Dakota Range III FSA (J488) Hankinson-Ellendale to be effective 12/2/
2019.
Filed Date: 10/2/19.
Accession Number: 20191002-5153.
Comments Due: 5 p.m. ET 10/23/19.
Docket Numbers: ER20-26-000.
Applicants: Northern States Power Company, a Minnesota corporation,
Northern States Power Company, a Wisconsin corporation.
Description: Sec. 205(d) Rate Filing: 20191002_IA_ROE_Update to be
effective 1/1/2020.
Filed Date: 10/2/19.
Accession Number: 20191002-5175.
Comments Due: 5 p.m. ET 10/23/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: October 2, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-21974 Filed 10-7-19; 8:45 am]