Combined Notice of Filings #1, 53430-53432 [2019-21795]
Download as PDF
53430
Federal Register / Vol. 84, No. 194 / Monday, October 7, 2019 / Notices
Dated: October 1, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–21786 Filed 10–4–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL19–102–000]
Wolverine Power Supply Cooperative,
Inc. v. Midcontinent Independent
System Operator, Inc.; Notice of
Complaint
Take notice that on September 27,
2019, pursuant to sections 206 and 306
of the Federal Power Act, 16 U.S.C. 824e
and 825e and Rule 206 of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.206, Wolverine
Power Supply Cooperative, Inc.
(Complainant) filed a formal complaint
against Midcontinent Independent
System Operator, Inc., (Respondent or
MISO) alleging that, Respondent’s rules
governing the Planning Resource
Auction (PRA) is unjust and
unreasonable because the PRA fails to
establish an appropriate forward price
signal and identify the real cost of
maintaining reliability, all as more fully
explained in the complaint.
The Complainant certifies that copies
of the complaint were served on the
contacts listed for Respondent in the
Commission’s list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
VerDate Sep<11>2014
18:29 Oct 04, 2019
Jkt 250001
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for electronic
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on October 17, 2019.
Dated: October 1, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–21788 Filed 10–4–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–2908–000]
Tenaska Clear Creek Wind, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Tenaska
Clear Creek Wind, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is October 21,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: October 1, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–21792 Filed 10–4–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG19–191–000.
Applicants: Tenaska Clear Creek
Wind, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status.
Filed Date: 9/30/19.
Accession Number: 20190930–5171.
Comments Due: 5 p.m. ET 10/21/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–162–024;
ER13–1266–025; ER11–2044–029;
ER15–2211–022.
Applicants: Bishop Hill Energy II
LLC, CalEnergy, LLC, MidAmerican
Energy Company, MidAmerican Energy
Services, LLC.
Description: Notice of Non-Material
Change in Status of the Berkshire
Hathaway Central Parties, et al.
Filed Date: 9/30/19.
Accession Number: 20190930–5209.
E:\FR\FM\07OCN1.SGM
07OCN1
Federal Register / Vol. 84, No. 194 / Monday, October 7, 2019 / Notices
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19–2909–000.
Applicants: Basin Electric Power
Cooperative.
Description: Baseline eTariff Filing:
Basin Electric Submission of Rate
Schedule A to be effective 12/31/9998.
Filed Date: 9/30/19.
Accession Number: 20190930–5179.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19–2910–000.
Applicants: Basin Electric Power
Cooperative.
Description: Baseline eTariff Filing:
Basin Electric Submission of
Transmission-Related Agreements to be
effective 12/31/9998.
Filed Date: 9/30/19.
Accession Number: 20190930–5187.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19–2911–000.
Applicants: Basin Electric Power
Cooperative.
Description: Baseline eTariff Filing:
Basin Electric Submission of Open
Access Transmission Tariff and ATRR
to be effective 12/31/9998.
Filed Date: 9/30/19.
Accession Number: 20190930–5188.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19–2912–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing: Rate
Schedule Nos. 295, 296 & 297 to be
effective 12/1/2019.
Filed Date: 9/30/19.
Accession Number: 20190930–5189.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19–2913–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–09–30_Default Technology
Specific Avoidable Costs Filing to be
effective 11/30/2019.
Filed Date: 9/30/19.
Accession Number: 20190930–5190.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19–2914–000.
Applicants: Puget Sound Energy, Inc.
Description: § 205(d) Rate Filing:
NITSA, NOA, IA Between Air Products
& PSE to be effective 9/1/2019.
Filed Date: 9/30/19.
Accession Number: 20190930–5195.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19–2915–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to Operating Agreement,
Schedule 6, sec 1.5 re: Cost
Commitment to be effective 1/1/2020.
Filed Date: 9/30/19.
Accession Number: 20190930–5196.
Comments Due: 5 p.m. ET 10/21/19.
VerDate Sep<11>2014
18:29 Oct 04, 2019
Jkt 250001
Docket Numbers: ER19–2916–000.
Applicants: Calpine Mid-Merit II,
LLC.
Description: § 205(d) Rate Filing:
Reactive Power Rate Schedule to be
effective 11/1/2019.
Filed Date: 9/30/19.
Accession Number: 20190930–5197.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19–2917–000.
Applicants: Basin Electric Power
Cooperative, Inc.
Description: Request for Waivers and
Extensions of Filing Deadlines of Basin
Electric Power Cooperative.
Filed Date: 9/30/19.
Accession Number: 20190930–5205.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER20–1–000.
Applicants: Basin Electric Power
Cooperative.
Description: Baseline eTariff Filing:
Basin Electric Application for MBR
Authority and Request for Expedited
Action to be effective 12/31/9998.
Filed Date: 10/1/19.
Accession Number: 20191001–5002.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20–2–000.
Applicants: Basin Electric Power
Cooperative.
Description: Initial rate filing: Basin
Electric Submission of Wholesale Power
Contract FERC Rate Schedules 1–19 to
be effective 12/31/9998.
Filed Date: 10/1/19.
Accession Number: 20191001–5003.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20–3–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Michigan Electric Transmission
Company.
Description: § 205(d) Rate Filing:
2019–10–1_Depreciation Rate Filing
METC to be effective 12/1/2019.
Filed Date: 10/1/19.
Accession Number: 20191001–5011.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20–4–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
International Transmission Company.
Description: § 205(d) Rate Filing:
2019–10–1_Depreciation Rate Filing
ITCT to be effective 12/1/2019.
Filed Date: 10/1/19.
Accession Number: 20191001–5016.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20–5–000.
Applicants: Midcontinent
Independent System Operator, Inc., ITC
Midwest LLC.
Description: § 205(d) Rate Filing:
2019–10–1_Depreciation Rate Filing
ITCM to be effective 12/1/2019.
Filed Date: 10/1/19.
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
53431
Accession Number: 20191001–5017.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20–6–000.
Applicants: Alcoa Power Generating
Inc.
Description: § 205(d) Rate Filing:
Reactive Power Rate Schedule to be
effective 12/1/2019.
Filed Date: 10/1/19.
Accession Number: 20191001–5020.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20–7–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2900R12 KMEA NITSA NOA to be
effective 9/1/2019.
Filed Date: 10/1/19.
Accession Number: 20191001–5075.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20–8–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1313R12 Oklahoma Gas and Electric
Company NITSA and NOA to be
effective 9/1/2019.
Filed Date: 10/1/19.
Accession Number: 20191001–5109.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20–9–000.
Applicants: New York Independent
System Operator, Inc., Niagara Mohawk
Power Corporation.
Description: § 205(d) Rate Filing: Joint
LGIA filing among NYISO, NMPC and
Cassadaga Wind SA 2475 to be effective
9/17/2019.
Filed Date: 10/1/19.
Accession Number: 20191001–5113.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20–10–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing:
OATT Attachment Q—Unaccounted for
Energy to be effective 12/1/2019.
Filed Date: 10/1/19.
Accession Number: 20191001–5120.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20–11–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–10–01_True-up Filing for Order
831 Energy Offer Cap to be effective 12/
1/2019.
Filed Date: 10/1/19.
Accession Number: 20191001–5152.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20–12–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3125R7 Basin Electric Power
Cooperative NITSA and NOA to be
effective 9/1/2019.
E:\FR\FM\07OCN1.SGM
07OCN1
53432
Federal Register / Vol. 84, No. 194 / Monday, October 7, 2019 / Notices
Filed Date: 10/1/19.
Accession Number: 20191001–5158.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20–13–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–10–01_TO Attachment O’s and
ADIT Proration Filing to be effective 1/
1/2019.
Filed Date: 10/1/19.
Accession Number: 20191001–5173.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20–14–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Sunflower Solar (Lucedale Solar Project)
LGIA Filing to be effective 9/17/2019.
Filed Date: 10/1/19.
Accession Number: 20191001–5233.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20–15–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amended ISA SA No. 5227; Queue No.
AB2–158 to be effective 10/8/2018.
Filed Date: 10/1/19.
Accession Number: 20191001–5263.
Comments Due: 5 p.m. ET 10/22/19.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES19–70–000.
Applicants: West Penn Power
Company.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
West Penn Power Company.
Filed Date: 9/27/19.
Accession Number: 20190927–5194.
Comments Due: 5 p.m. ET 10/18/19.
Docket Numbers: ES19–71–000.
Applicants: Basin Electric Power
Cooperative, Inc.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Issue Securities, et al.
of Basin Electric Power Cooperative.
Filed Date: 9/30/19.
Accession Number: 20190930–5200.
Comments Due: 5 p.m. ET 10/21/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
VerDate Sep<11>2014
18:29 Oct 04, 2019
Jkt 250001
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 1, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–21795 Filed 10–4–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF19–5–000]
Notice of Intent To Prepare an
Environmental Assessment Statement
for the Sempra PALNG Holdings, LLC
Planned Port Arthur LNG Expansion
Project, and Request for Comments on
Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Port Arthur LNG Expansion Project
(Project) involving construction and
operation of facilities by Sempra
PALNG Holdings, LLC (Sempra) in
Jefferson County, Texas. The
Commission will use this EA in its
decision-making process to determine
whether the project is in the public
interest.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies about issues
regarding the project. The National
Environmental Policy Act (NEPA)
requires the Commission to take into
account the environmental impacts that
could result from its action whenever it
considers the issuance of an
authorization. NEPA also requires the
Commission to discover concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of issues to
address in the EA. To ensure that your
comments are timely and properly
recorded, please submit your comments
so that the Commission receives them in
Washington, DC on or before 5:00 p.m.
Eastern Time on November 12, 2019.
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
You can make a difference by
submitting your specific comments or
concerns about the project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. Commission staff
will consider all filed comments during
the preparation of the EA.
If you sent comments on this project
to the Commission before the opening of
this docket on June 14, 2019, you will
need to file those comments in Docket
No. PF19–5–000 to ensure they are
considered as part of this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this planned
project and encourage them to comment
on their areas of concern.
A fact sheet prepared by the FERC
entitled An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know? is available for viewing on
the FERC website (www.ferc.gov) at
https://www.ferc.gov/resources/guides/
gas/gas.pdf. This fact sheet addresses a
number of typically asked questions,
including the use of eminent domain
and how to participate in the
Commission’s proceedings.
Public Participation
The Commission offers a free service
called eSubscription which makes it
easy to stay informed of all issuances
and submittals regarding the dockets/
projects to which you subscribe. These
instant email notifications are the fastest
way to receive notification and provide
a link to the document files which can
reduce the amount of time you spend
researching proceedings. To sign up go
to www.ferc.gov/docs-filing/
esubscription.asp.
For your convenience, there are three
methods you can use to submit your
comments to the Commission. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature, which is on the Commission’s
website (www.ferc.gov) under the link to
Documents and Filings. Using
eComment is an easy method for
submitting brief, text-only comments on
a project;
E:\FR\FM\07OCN1.SGM
07OCN1
Agencies
[Federal Register Volume 84, Number 194 (Monday, October 7, 2019)]
[Notices]
[Pages 53430-53432]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-21795]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG19-191-000.
Applicants: Tenaska Clear Creek Wind, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status.
Filed Date: 9/30/19.
Accession Number: 20190930-5171.
Comments Due: 5 p.m. ET 10/21/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER12-162-024; ER13-1266-025; ER11-2044-029; ER15-
2211-022.
Applicants: Bishop Hill Energy II LLC, CalEnergy, LLC, MidAmerican
Energy Company, MidAmerican Energy Services, LLC.
Description: Notice of Non-Material Change in Status of the
Berkshire Hathaway Central Parties, et al.
Filed Date: 9/30/19.
Accession Number: 20190930-5209.
[[Page 53431]]
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19-2909-000.
Applicants: Basin Electric Power Cooperative.
Description: Baseline eTariff Filing: Basin Electric Submission of
Rate Schedule A to be effective 12/31/9998.
Filed Date: 9/30/19.
Accession Number: 20190930-5179.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19-2910-000.
Applicants: Basin Electric Power Cooperative.
Description: Baseline eTariff Filing: Basin Electric Submission of
Transmission-Related Agreements to be effective 12/31/9998.
Filed Date: 9/30/19.
Accession Number: 20190930-5187.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19-2911-000.
Applicants: Basin Electric Power Cooperative.
Description: Baseline eTariff Filing: Basin Electric Submission of
Open Access Transmission Tariff and ATRR to be effective 12/31/9998.
Filed Date: 9/30/19.
Accession Number: 20190930-5188.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19-2912-000.
Applicants: Arizona Public Service Company.
Description: Sec. 205(d) Rate Filing: Rate Schedule Nos. 295, 296
& 297 to be effective 12/1/2019.
Filed Date: 9/30/19.
Accession Number: 20190930-5189.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19-2913-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-09-30_Default
Technology Specific Avoidable Costs Filing to be effective 11/30/2019.
Filed Date: 9/30/19.
Accession Number: 20190930-5190.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19-2914-000.
Applicants: Puget Sound Energy, Inc.
Description: Sec. 205(d) Rate Filing: NITSA, NOA, IA Between Air
Products & PSE to be effective 9/1/2019.
Filed Date: 9/30/19.
Accession Number: 20190930-5195.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19-2915-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Revisions to Operating
Agreement, Schedule 6, sec 1.5 re: Cost Commitment to be effective 1/1/
2020.
Filed Date: 9/30/19.
Accession Number: 20190930-5196.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19-2916-000.
Applicants: Calpine Mid-Merit II, LLC.
Description: Sec. 205(d) Rate Filing: Reactive Power Rate Schedule
to be effective 11/1/2019.
Filed Date: 9/30/19.
Accession Number: 20190930-5197.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19-2917-000.
Applicants: Basin Electric Power Cooperative, Inc.
Description: Request for Waivers and Extensions of Filing Deadlines
of Basin Electric Power Cooperative.
Filed Date: 9/30/19.
Accession Number: 20190930-5205.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER20-1-000.
Applicants: Basin Electric Power Cooperative.
Description: Baseline eTariff Filing: Basin Electric Application
for MBR Authority and Request for Expedited Action to be effective 12/
31/9998.
Filed Date: 10/1/19.
Accession Number: 20191001-5002.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20-2-000.
Applicants: Basin Electric Power Cooperative.
Description: Initial rate filing: Basin Electric Submission of
Wholesale Power Contract FERC Rate Schedules 1-19 to be effective 12/
31/9998.
Filed Date: 10/1/19.
Accession Number: 20191001-5003.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20-3-000.
Applicants: Midcontinent Independent System Operator, Inc.,
Michigan Electric Transmission Company.
Description: Sec. 205(d) Rate Filing: 2019-10-1_Depreciation Rate
Filing METC to be effective 12/1/2019.
Filed Date: 10/1/19.
Accession Number: 20191001-5011.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20-4-000.
Applicants: Midcontinent Independent System Operator, Inc.,
International Transmission Company.
Description: Sec. 205(d) Rate Filing: 2019-10-1_Depreciation Rate
Filing ITCT to be effective 12/1/2019.
Filed Date: 10/1/19.
Accession Number: 20191001-5016.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20-5-000.
Applicants: Midcontinent Independent System Operator, Inc., ITC
Midwest LLC.
Description: Sec. 205(d) Rate Filing: 2019-10-1_Depreciation Rate
Filing ITCM to be effective 12/1/2019.
Filed Date: 10/1/19.
Accession Number: 20191001-5017.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20-6-000.
Applicants: Alcoa Power Generating Inc.
Description: Sec. 205(d) Rate Filing: Reactive Power Rate Schedule
to be effective 12/1/2019.
Filed Date: 10/1/19.
Accession Number: 20191001-5020.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20-7-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 2900R12 KMEA NITSA NOA to be
effective 9/1/2019.
Filed Date: 10/1/19.
Accession Number: 20191001-5075.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20-8-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 1313R12 Oklahoma Gas and
Electric Company NITSA and NOA to be effective 9/1/2019.
Filed Date: 10/1/19.
Accession Number: 20191001-5109.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20-9-000.
Applicants: New York Independent System Operator, Inc., Niagara
Mohawk Power Corporation.
Description: Sec. 205(d) Rate Filing: Joint LGIA filing among
NYISO, NMPC and Cassadaga Wind SA 2475 to be effective 9/17/2019.
Filed Date: 10/1/19.
Accession Number: 20191001-5113.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20-10-000.
Applicants: Arizona Public Service Company.
Description: Sec. 205(d) Rate Filing: OATT Attachment Q--
Unaccounted for Energy to be effective 12/1/2019.
Filed Date: 10/1/19.
Accession Number: 20191001-5120.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20-11-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-10-01_True-up Filing
for Order 831 Energy Offer Cap to be effective 12/1/2019.
Filed Date: 10/1/19.
Accession Number: 20191001-5152.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20-12-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3125R7 Basin Electric Power
Cooperative NITSA and NOA to be effective 9/1/2019.
[[Page 53432]]
Filed Date: 10/1/19.
Accession Number: 20191001-5158.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20-13-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-10-01_TO Attachment O's
and ADIT Proration Filing to be effective 1/1/2019.
Filed Date: 10/1/19.
Accession Number: 20191001-5173.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20-14-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: Sunflower Solar (Lucedale
Solar Project) LGIA Filing to be effective 9/17/2019.
Filed Date: 10/1/19.
Accession Number: 20191001-5233.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20-15-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amended ISA SA No. 5227;
Queue No. AB2-158 to be effective 10/8/2018.
Filed Date: 10/1/19.
Accession Number: 20191001-5263.
Comments Due: 5 p.m. ET 10/22/19.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES19-70-000.
Applicants: West Penn Power Company.
Description: Application under Section 204 of the Federal Power Act
for Authorization to Issue Securities of West Penn Power Company.
Filed Date: 9/27/19.
Accession Number: 20190927-5194.
Comments Due: 5 p.m. ET 10/18/19.
Docket Numbers: ES19-71-000.
Applicants: Basin Electric Power Cooperative, Inc.
Description: Application under Section 204 of the Federal Power Act
for Authorization to Issue Securities, et al. of Basin Electric Power
Cooperative.
Filed Date: 9/30/19.
Accession Number: 20190930-5200.
Comments Due: 5 p.m. ET 10/21/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: October 1, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-21795 Filed 10-4-19; 8:45 am]
BILLING CODE 6717-01-P