Combined Notice of Filings #1, 53430-53432 [2019-21795]

Download as PDF 53430 Federal Register / Vol. 84, No. 194 / Monday, October 7, 2019 / Notices Dated: October 1, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–21786 Filed 10–4–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL19–102–000] Wolverine Power Supply Cooperative, Inc. v. Midcontinent Independent System Operator, Inc.; Notice of Complaint Take notice that on September 27, 2019, pursuant to sections 206 and 306 of the Federal Power Act, 16 U.S.C. 824e and 825e and Rule 206 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.206, Wolverine Power Supply Cooperative, Inc. (Complainant) filed a formal complaint against Midcontinent Independent System Operator, Inc., (Respondent or MISO) alleging that, Respondent’s rules governing the Planning Resource Auction (PRA) is unjust and unreasonable because the PRA fails to establish an appropriate forward price signal and identify the real cost of maintaining reliability, all as more fully explained in the complaint. The Complainant certifies that copies of the complaint were served on the contacts listed for Respondent in the Commission’s list of Corporate Officials. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. VerDate Sep<11>2014 18:29 Oct 04, 2019 Jkt 250001 This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on October 17, 2019. Dated: October 1, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–21788 Filed 10–4–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER19–2908–000] Tenaska Clear Creek Wind, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Tenaska Clear Creek Wind, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is October 21, 2019. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 1, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–21792 Filed 10–4–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG19–191–000. Applicants: Tenaska Clear Creek Wind, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status. Filed Date: 9/30/19. Accession Number: 20190930–5171. Comments Due: 5 p.m. ET 10/21/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER12–162–024; ER13–1266–025; ER11–2044–029; ER15–2211–022. Applicants: Bishop Hill Energy II LLC, CalEnergy, LLC, MidAmerican Energy Company, MidAmerican Energy Services, LLC. Description: Notice of Non-Material Change in Status of the Berkshire Hathaway Central Parties, et al. Filed Date: 9/30/19. Accession Number: 20190930–5209. E:\FR\FM\07OCN1.SGM 07OCN1 Federal Register / Vol. 84, No. 194 / Monday, October 7, 2019 / Notices Comments Due: 5 p.m. ET 10/21/19. Docket Numbers: ER19–2909–000. Applicants: Basin Electric Power Cooperative. Description: Baseline eTariff Filing: Basin Electric Submission of Rate Schedule A to be effective 12/31/9998. Filed Date: 9/30/19. Accession Number: 20190930–5179. Comments Due: 5 p.m. ET 10/21/19. Docket Numbers: ER19–2910–000. Applicants: Basin Electric Power Cooperative. Description: Baseline eTariff Filing: Basin Electric Submission of Transmission-Related Agreements to be effective 12/31/9998. Filed Date: 9/30/19. Accession Number: 20190930–5187. Comments Due: 5 p.m. ET 10/21/19. Docket Numbers: ER19–2911–000. Applicants: Basin Electric Power Cooperative. Description: Baseline eTariff Filing: Basin Electric Submission of Open Access Transmission Tariff and ATRR to be effective 12/31/9998. Filed Date: 9/30/19. Accession Number: 20190930–5188. Comments Due: 5 p.m. ET 10/21/19. Docket Numbers: ER19–2912–000. Applicants: Arizona Public Service Company. Description: § 205(d) Rate Filing: Rate Schedule Nos. 295, 296 & 297 to be effective 12/1/2019. Filed Date: 9/30/19. Accession Number: 20190930–5189. Comments Due: 5 p.m. ET 10/21/19. Docket Numbers: ER19–2913–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–09–30_Default Technology Specific Avoidable Costs Filing to be effective 11/30/2019. Filed Date: 9/30/19. Accession Number: 20190930–5190. Comments Due: 5 p.m. ET 10/21/19. Docket Numbers: ER19–2914–000. Applicants: Puget Sound Energy, Inc. Description: § 205(d) Rate Filing: NITSA, NOA, IA Between Air Products & PSE to be effective 9/1/2019. Filed Date: 9/30/19. Accession Number: 20190930–5195. Comments Due: 5 p.m. ET 10/21/19. Docket Numbers: ER19–2915–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Revisions to Operating Agreement, Schedule 6, sec 1.5 re: Cost Commitment to be effective 1/1/2020. Filed Date: 9/30/19. Accession Number: 20190930–5196. Comments Due: 5 p.m. ET 10/21/19. VerDate Sep<11>2014 18:29 Oct 04, 2019 Jkt 250001 Docket Numbers: ER19–2916–000. Applicants: Calpine Mid-Merit II, LLC. Description: § 205(d) Rate Filing: Reactive Power Rate Schedule to be effective 11/1/2019. Filed Date: 9/30/19. Accession Number: 20190930–5197. Comments Due: 5 p.m. ET 10/21/19. Docket Numbers: ER19–2917–000. Applicants: Basin Electric Power Cooperative, Inc. Description: Request for Waivers and Extensions of Filing Deadlines of Basin Electric Power Cooperative. Filed Date: 9/30/19. Accession Number: 20190930–5205. Comments Due: 5 p.m. ET 10/21/19. Docket Numbers: ER20–1–000. Applicants: Basin Electric Power Cooperative. Description: Baseline eTariff Filing: Basin Electric Application for MBR Authority and Request for Expedited Action to be effective 12/31/9998. Filed Date: 10/1/19. Accession Number: 20191001–5002. Comments Due: 5 p.m. ET 10/22/19. Docket Numbers: ER20–2–000. Applicants: Basin Electric Power Cooperative. Description: Initial rate filing: Basin Electric Submission of Wholesale Power Contract FERC Rate Schedules 1–19 to be effective 12/31/9998. Filed Date: 10/1/19. Accession Number: 20191001–5003. Comments Due: 5 p.m. ET 10/22/19. Docket Numbers: ER20–3–000. Applicants: Midcontinent Independent System Operator, Inc., Michigan Electric Transmission Company. Description: § 205(d) Rate Filing: 2019–10–1_Depreciation Rate Filing METC to be effective 12/1/2019. Filed Date: 10/1/19. Accession Number: 20191001–5011. Comments Due: 5 p.m. ET 10/22/19. Docket Numbers: ER20–4–000. Applicants: Midcontinent Independent System Operator, Inc., International Transmission Company. Description: § 205(d) Rate Filing: 2019–10–1_Depreciation Rate Filing ITCT to be effective 12/1/2019. Filed Date: 10/1/19. Accession Number: 20191001–5016. Comments Due: 5 p.m. ET 10/22/19. Docket Numbers: ER20–5–000. Applicants: Midcontinent Independent System Operator, Inc., ITC Midwest LLC. Description: § 205(d) Rate Filing: 2019–10–1_Depreciation Rate Filing ITCM to be effective 12/1/2019. Filed Date: 10/1/19. PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 53431 Accession Number: 20191001–5017. Comments Due: 5 p.m. ET 10/22/19. Docket Numbers: ER20–6–000. Applicants: Alcoa Power Generating Inc. Description: § 205(d) Rate Filing: Reactive Power Rate Schedule to be effective 12/1/2019. Filed Date: 10/1/19. Accession Number: 20191001–5020. Comments Due: 5 p.m. ET 10/22/19. Docket Numbers: ER20–7–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 2900R12 KMEA NITSA NOA to be effective 9/1/2019. Filed Date: 10/1/19. Accession Number: 20191001–5075. Comments Due: 5 p.m. ET 10/22/19. Docket Numbers: ER20–8–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1313R12 Oklahoma Gas and Electric Company NITSA and NOA to be effective 9/1/2019. Filed Date: 10/1/19. Accession Number: 20191001–5109. Comments Due: 5 p.m. ET 10/22/19. Docket Numbers: ER20–9–000. Applicants: New York Independent System Operator, Inc., Niagara Mohawk Power Corporation. Description: § 205(d) Rate Filing: Joint LGIA filing among NYISO, NMPC and Cassadaga Wind SA 2475 to be effective 9/17/2019. Filed Date: 10/1/19. Accession Number: 20191001–5113. Comments Due: 5 p.m. ET 10/22/19. Docket Numbers: ER20–10–000. Applicants: Arizona Public Service Company. Description: § 205(d) Rate Filing: OATT Attachment Q—Unaccounted for Energy to be effective 12/1/2019. Filed Date: 10/1/19. Accession Number: 20191001–5120. Comments Due: 5 p.m. ET 10/22/19. Docket Numbers: ER20–11–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–10–01_True-up Filing for Order 831 Energy Offer Cap to be effective 12/ 1/2019. Filed Date: 10/1/19. Accession Number: 20191001–5152. Comments Due: 5 p.m. ET 10/22/19. Docket Numbers: ER20–12–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3125R7 Basin Electric Power Cooperative NITSA and NOA to be effective 9/1/2019. E:\FR\FM\07OCN1.SGM 07OCN1 53432 Federal Register / Vol. 84, No. 194 / Monday, October 7, 2019 / Notices Filed Date: 10/1/19. Accession Number: 20191001–5158. Comments Due: 5 p.m. ET 10/22/19. Docket Numbers: ER20–13–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–10–01_TO Attachment O’s and ADIT Proration Filing to be effective 1/ 1/2019. Filed Date: 10/1/19. Accession Number: 20191001–5173. Comments Due: 5 p.m. ET 10/22/19. Docket Numbers: ER20–14–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: Sunflower Solar (Lucedale Solar Project) LGIA Filing to be effective 9/17/2019. Filed Date: 10/1/19. Accession Number: 20191001–5233. Comments Due: 5 p.m. ET 10/22/19. Docket Numbers: ER20–15–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amended ISA SA No. 5227; Queue No. AB2–158 to be effective 10/8/2018. Filed Date: 10/1/19. Accession Number: 20191001–5263. Comments Due: 5 p.m. ET 10/22/19. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES19–70–000. Applicants: West Penn Power Company. Description: Application under Section 204 of the Federal Power Act for Authorization to Issue Securities of West Penn Power Company. Filed Date: 9/27/19. Accession Number: 20190927–5194. Comments Due: 5 p.m. ET 10/18/19. Docket Numbers: ES19–71–000. Applicants: Basin Electric Power Cooperative, Inc. Description: Application under Section 204 of the Federal Power Act for Authorization to Issue Securities, et al. of Basin Electric Power Cooperative. Filed Date: 9/30/19. Accession Number: 20190930–5200. Comments Due: 5 p.m. ET 10/21/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. VerDate Sep<11>2014 18:29 Oct 04, 2019 Jkt 250001 eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 1, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–21795 Filed 10–4–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF19–5–000] Notice of Intent To Prepare an Environmental Assessment Statement for the Sempra PALNG Holdings, LLC Planned Port Arthur LNG Expansion Project, and Request for Comments on Environmental Issues The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Port Arthur LNG Expansion Project (Project) involving construction and operation of facilities by Sempra PALNG Holdings, LLC (Sempra) in Jefferson County, Texas. The Commission will use this EA in its decision-making process to determine whether the project is in the public interest. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies about issues regarding the project. The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from its action whenever it considers the issuance of an authorization. NEPA also requires the Commission to discover concerns the public may have about proposals. This process is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this notice, the Commission requests public comments on the scope of issues to address in the EA. To ensure that your comments are timely and properly recorded, please submit your comments so that the Commission receives them in Washington, DC on or before 5:00 p.m. Eastern Time on November 12, 2019. PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 You can make a difference by submitting your specific comments or concerns about the project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. Your input will help the Commission staff determine what issues they need to evaluate in the EA. Commission staff will consider all filed comments during the preparation of the EA. If you sent comments on this project to the Commission before the opening of this docket on June 14, 2019, you will need to file those comments in Docket No. PF19–5–000 to ensure they are considered as part of this proceeding. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives should notify their constituents of this planned project and encourage them to comment on their areas of concern. A fact sheet prepared by the FERC entitled An Interstate Natural Gas Facility On My Land? What Do I Need To Know? is available for viewing on the FERC website (www.ferc.gov) at https://www.ferc.gov/resources/guides/ gas/gas.pdf. This fact sheet addresses a number of typically asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. Public Participation The Commission offers a free service called eSubscription which makes it easy to stay informed of all issuances and submittals regarding the dockets/ projects to which you subscribe. These instant email notifications are the fastest way to receive notification and provide a link to the document files which can reduce the amount of time you spend researching proceedings. To sign up go to www.ferc.gov/docs-filing/ esubscription.asp. For your convenience, there are three methods you can use to submit your comments to the Commission. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208–3676 or FercOnlineSupport@ferc.gov. Please carefully follow these instructions so that your comments are properly recorded. (1) You can file your comments electronically using the eComment feature, which is on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. Using eComment is an easy method for submitting brief, text-only comments on a project; E:\FR\FM\07OCN1.SGM 07OCN1

Agencies

[Federal Register Volume 84, Number 194 (Monday, October 7, 2019)]
[Notices]
[Pages 53430-53432]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-21795]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG19-191-000.
    Applicants: Tenaska Clear Creek Wind, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status.
    Filed Date: 9/30/19.
    Accession Number: 20190930-5171.
    Comments Due: 5 p.m. ET 10/21/19.

    Take notice that the Commission received the following electric 
rate filings:
    Docket Numbers: ER12-162-024; ER13-1266-025; ER11-2044-029; ER15-
2211-022.
    Applicants: Bishop Hill Energy II LLC, CalEnergy, LLC, MidAmerican 
Energy Company, MidAmerican Energy Services, LLC.
    Description: Notice of Non-Material Change in Status of the 
Berkshire Hathaway Central Parties, et al.
    Filed Date: 9/30/19.
    Accession Number: 20190930-5209.

[[Page 53431]]

    Comments Due: 5 p.m. ET 10/21/19.

    Docket Numbers: ER19-2909-000.
    Applicants: Basin Electric Power Cooperative.
    Description: Baseline eTariff Filing: Basin Electric Submission of 
Rate Schedule A to be effective 12/31/9998.
    Filed Date: 9/30/19.
    Accession Number: 20190930-5179.
    Comments Due: 5 p.m. ET 10/21/19.

    Docket Numbers: ER19-2910-000.
    Applicants: Basin Electric Power Cooperative.
    Description: Baseline eTariff Filing: Basin Electric Submission of 
Transmission-Related Agreements to be effective 12/31/9998.
    Filed Date: 9/30/19.
    Accession Number: 20190930-5187.
    Comments Due: 5 p.m. ET 10/21/19.

    Docket Numbers: ER19-2911-000.
    Applicants: Basin Electric Power Cooperative.
    Description: Baseline eTariff Filing: Basin Electric Submission of 
Open Access Transmission Tariff and ATRR to be effective 12/31/9998.
    Filed Date: 9/30/19.
    Accession Number: 20190930-5188.
    Comments Due: 5 p.m. ET 10/21/19.

    Docket Numbers: ER19-2912-000.
    Applicants: Arizona Public Service Company.
    Description: Sec.  205(d) Rate Filing: Rate Schedule Nos. 295, 296 
& 297 to be effective 12/1/2019.
    Filed Date: 9/30/19.
    Accession Number: 20190930-5189.
    Comments Due: 5 p.m. ET 10/21/19.

    Docket Numbers: ER19-2913-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2019-09-30_Default 
Technology Specific Avoidable Costs Filing to be effective 11/30/2019.
    Filed Date: 9/30/19.
    Accession Number: 20190930-5190.
    Comments Due: 5 p.m. ET 10/21/19.

    Docket Numbers: ER19-2914-000.
    Applicants: Puget Sound Energy, Inc.
    Description: Sec.  205(d) Rate Filing: NITSA, NOA, IA Between Air 
Products & PSE to be effective 9/1/2019.
    Filed Date: 9/30/19.
    Accession Number: 20190930-5195.
    Comments Due: 5 p.m. ET 10/21/19.

    Docket Numbers: ER19-2915-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Revisions to Operating 
Agreement, Schedule 6, sec 1.5 re: Cost Commitment to be effective 1/1/
2020.
    Filed Date: 9/30/19.
    Accession Number: 20190930-5196.
    Comments Due: 5 p.m. ET 10/21/19.

    Docket Numbers: ER19-2916-000.
    Applicants: Calpine Mid-Merit II, LLC.
    Description: Sec.  205(d) Rate Filing: Reactive Power Rate Schedule 
to be effective 11/1/2019.
    Filed Date: 9/30/19.
    Accession Number: 20190930-5197.
    Comments Due: 5 p.m. ET 10/21/19.

    Docket Numbers: ER19-2917-000.
    Applicants: Basin Electric Power Cooperative, Inc.
    Description: Request for Waivers and Extensions of Filing Deadlines 
of Basin Electric Power Cooperative.
    Filed Date: 9/30/19.
    Accession Number: 20190930-5205.
    Comments Due: 5 p.m. ET 10/21/19.

    Docket Numbers: ER20-1-000.
    Applicants: Basin Electric Power Cooperative.
    Description: Baseline eTariff Filing: Basin Electric Application 
for MBR Authority and Request for Expedited Action to be effective 12/
31/9998.
    Filed Date: 10/1/19.
    Accession Number: 20191001-5002.
    Comments Due: 5 p.m. ET 10/22/19.

    Docket Numbers: ER20-2-000.
    Applicants: Basin Electric Power Cooperative.
    Description: Initial rate filing: Basin Electric Submission of 
Wholesale Power Contract FERC Rate Schedules 1-19 to be effective 12/
31/9998.
    Filed Date: 10/1/19.
    Accession Number: 20191001-5003.
    Comments Due: 5 p.m. ET 10/22/19.

    Docket Numbers: ER20-3-000.
    Applicants: Midcontinent Independent System Operator, Inc., 
Michigan Electric Transmission Company.
    Description: Sec.  205(d) Rate Filing: 2019-10-1_Depreciation Rate 
Filing METC to be effective 12/1/2019.
    Filed Date: 10/1/19.
    Accession Number: 20191001-5011.
    Comments Due: 5 p.m. ET 10/22/19.

    Docket Numbers: ER20-4-000.
    Applicants: Midcontinent Independent System Operator, Inc., 
International Transmission Company.
    Description: Sec.  205(d) Rate Filing: 2019-10-1_Depreciation Rate 
Filing ITCT to be effective 12/1/2019.
    Filed Date: 10/1/19.
    Accession Number: 20191001-5016.
    Comments Due: 5 p.m. ET 10/22/19.

    Docket Numbers: ER20-5-000.
    Applicants: Midcontinent Independent System Operator, Inc., ITC 
Midwest LLC.
    Description: Sec.  205(d) Rate Filing: 2019-10-1_Depreciation Rate 
Filing ITCM to be effective 12/1/2019.
    Filed Date: 10/1/19.
    Accession Number: 20191001-5017.
    Comments Due: 5 p.m. ET 10/22/19.

    Docket Numbers: ER20-6-000.
    Applicants: Alcoa Power Generating Inc.
    Description: Sec.  205(d) Rate Filing: Reactive Power Rate Schedule 
to be effective 12/1/2019.
    Filed Date: 10/1/19.
    Accession Number: 20191001-5020.
    Comments Due: 5 p.m. ET 10/22/19.

    Docket Numbers: ER20-7-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 2900R12 KMEA NITSA NOA to be 
effective 9/1/2019.
    Filed Date: 10/1/19.
    Accession Number: 20191001-5075.
    Comments Due: 5 p.m. ET 10/22/19.

    Docket Numbers: ER20-8-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 1313R12 Oklahoma Gas and 
Electric Company NITSA and NOA to be effective 9/1/2019.
    Filed Date: 10/1/19.
    Accession Number: 20191001-5109.
    Comments Due: 5 p.m. ET 10/22/19.

    Docket Numbers: ER20-9-000.
    Applicants: New York Independent System Operator, Inc., Niagara 
Mohawk Power Corporation.
    Description: Sec.  205(d) Rate Filing: Joint LGIA filing among 
NYISO, NMPC and Cassadaga Wind SA 2475 to be effective 9/17/2019.
    Filed Date: 10/1/19.
    Accession Number: 20191001-5113.
    Comments Due: 5 p.m. ET 10/22/19.

    Docket Numbers: ER20-10-000.
    Applicants: Arizona Public Service Company.
    Description: Sec.  205(d) Rate Filing: OATT Attachment Q--
Unaccounted for Energy to be effective 12/1/2019.
    Filed Date: 10/1/19.
    Accession Number: 20191001-5120.
    Comments Due: 5 p.m. ET 10/22/19.

    Docket Numbers: ER20-11-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2019-10-01_True-up Filing 
for Order 831 Energy Offer Cap to be effective 12/1/2019.
    Filed Date: 10/1/19.
    Accession Number: 20191001-5152.
    Comments Due: 5 p.m. ET 10/22/19.

    Docket Numbers: ER20-12-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 3125R7 Basin Electric Power 
Cooperative NITSA and NOA to be effective 9/1/2019.

[[Page 53432]]

    Filed Date: 10/1/19.
    Accession Number: 20191001-5158.
    Comments Due: 5 p.m. ET 10/22/19.

    Docket Numbers: ER20-13-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2019-10-01_TO Attachment O's 
and ADIT Proration Filing to be effective 1/1/2019.
    Filed Date: 10/1/19.
    Accession Number: 20191001-5173.
    Comments Due: 5 p.m. ET 10/22/19.

    Docket Numbers: ER20-14-000.
    Applicants: Alabama Power Company.
    Description: Sec.  205(d) Rate Filing: Sunflower Solar (Lucedale 
Solar Project) LGIA Filing to be effective 9/17/2019.
    Filed Date: 10/1/19.
    Accession Number: 20191001-5233.
    Comments Due: 5 p.m. ET 10/22/19.

    Docket Numbers: ER20-15-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Amended ISA SA No. 5227; 
Queue No. AB2-158 to be effective 10/8/2018.
    Filed Date: 10/1/19.
    Accession Number: 20191001-5263.
    Comments Due: 5 p.m. ET 10/22/19.

    Take notice that the Commission received the following electric 
securities filings:

    Docket Numbers: ES19-70-000.
    Applicants: West Penn Power Company.
    Description: Application under Section 204 of the Federal Power Act 
for Authorization to Issue Securities of West Penn Power Company.
    Filed Date: 9/27/19.
    Accession Number: 20190927-5194.
    Comments Due: 5 p.m. ET 10/18/19.

    Docket Numbers: ES19-71-000.
    Applicants: Basin Electric Power Cooperative, Inc.
    Description: Application under Section 204 of the Federal Power Act 
for Authorization to Issue Securities, et al. of Basin Electric Power 
Cooperative.
    Filed Date: 9/30/19.
    Accession Number: 20190930-5200.
    Comments Due: 5 p.m. ET 10/21/19.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: October 1, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-21795 Filed 10-4-19; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.