Notice of Intent To Prepare an Environmental Assessment Statement for the Sempra PALNG Holdings, LLC Planned Port Arthur LNG Expansion Project, and Request for Comments on Environmental Issues, 53432-53434 [2019-21793]
Download as PDF
53432
Federal Register / Vol. 84, No. 194 / Monday, October 7, 2019 / Notices
Filed Date: 10/1/19.
Accession Number: 20191001–5158.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20–13–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–10–01_TO Attachment O’s and
ADIT Proration Filing to be effective 1/
1/2019.
Filed Date: 10/1/19.
Accession Number: 20191001–5173.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20–14–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Sunflower Solar (Lucedale Solar Project)
LGIA Filing to be effective 9/17/2019.
Filed Date: 10/1/19.
Accession Number: 20191001–5233.
Comments Due: 5 p.m. ET 10/22/19.
Docket Numbers: ER20–15–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amended ISA SA No. 5227; Queue No.
AB2–158 to be effective 10/8/2018.
Filed Date: 10/1/19.
Accession Number: 20191001–5263.
Comments Due: 5 p.m. ET 10/22/19.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES19–70–000.
Applicants: West Penn Power
Company.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
West Penn Power Company.
Filed Date: 9/27/19.
Accession Number: 20190927–5194.
Comments Due: 5 p.m. ET 10/18/19.
Docket Numbers: ES19–71–000.
Applicants: Basin Electric Power
Cooperative, Inc.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Issue Securities, et al.
of Basin Electric Power Cooperative.
Filed Date: 9/30/19.
Accession Number: 20190930–5200.
Comments Due: 5 p.m. ET 10/21/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
VerDate Sep<11>2014
18:29 Oct 04, 2019
Jkt 250001
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 1, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–21795 Filed 10–4–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF19–5–000]
Notice of Intent To Prepare an
Environmental Assessment Statement
for the Sempra PALNG Holdings, LLC
Planned Port Arthur LNG Expansion
Project, and Request for Comments on
Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Port Arthur LNG Expansion Project
(Project) involving construction and
operation of facilities by Sempra
PALNG Holdings, LLC (Sempra) in
Jefferson County, Texas. The
Commission will use this EA in its
decision-making process to determine
whether the project is in the public
interest.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies about issues
regarding the project. The National
Environmental Policy Act (NEPA)
requires the Commission to take into
account the environmental impacts that
could result from its action whenever it
considers the issuance of an
authorization. NEPA also requires the
Commission to discover concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of issues to
address in the EA. To ensure that your
comments are timely and properly
recorded, please submit your comments
so that the Commission receives them in
Washington, DC on or before 5:00 p.m.
Eastern Time on November 12, 2019.
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
You can make a difference by
submitting your specific comments or
concerns about the project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. Commission staff
will consider all filed comments during
the preparation of the EA.
If you sent comments on this project
to the Commission before the opening of
this docket on June 14, 2019, you will
need to file those comments in Docket
No. PF19–5–000 to ensure they are
considered as part of this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this planned
project and encourage them to comment
on their areas of concern.
A fact sheet prepared by the FERC
entitled An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know? is available for viewing on
the FERC website (www.ferc.gov) at
https://www.ferc.gov/resources/guides/
gas/gas.pdf. This fact sheet addresses a
number of typically asked questions,
including the use of eminent domain
and how to participate in the
Commission’s proceedings.
Public Participation
The Commission offers a free service
called eSubscription which makes it
easy to stay informed of all issuances
and submittals regarding the dockets/
projects to which you subscribe. These
instant email notifications are the fastest
way to receive notification and provide
a link to the document files which can
reduce the amount of time you spend
researching proceedings. To sign up go
to www.ferc.gov/docs-filing/
esubscription.asp.
For your convenience, there are three
methods you can use to submit your
comments to the Commission. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature, which is on the Commission’s
website (www.ferc.gov) under the link to
Documents and Filings. Using
eComment is an easy method for
submitting brief, text-only comments on
a project;
E:\FR\FM\07OCN1.SGM
07OCN1
Federal Register / Vol. 84, No. 194 / Monday, October 7, 2019 / Notices
(2) You can file your comments
electronically by using the eFiling
feature, which is also on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
eRegister. You will be asked to select the
type of filing you are making; a
comment on a particular project is
considered a Comment on a Filing; or
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the project docket number (PF19–5–000)
with your submission: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426
Summary of the Planned Project
Sempra plans to construct and operate
additional liquefaction capacity at the
site of the recently approved Port Arthur
Liquefaction Project near Port Arthur,
Texas. The planned expansion would
add two liquefaction trains, increasing
liquefied natural gas production
capacity from 13.5 million metric tons
per annum (MTPA) to approximately
27.0 MTPA.
The general location of the project
facilities is shown in appendix 1.1
Land Requirements for Construction
Construction and operation of the
planned project would be wholly within
property already certificated for the Port
Arthur Liquefaction Project. No
additional land would be required. The
Project facilities, once constructed,
would occupy approximately 60 acres.
The EA Process
The EA will discuss impacts that
could occur as a result of the
construction and operation of the
planned project under these general
headings:
• Geology and soils;
• water resources and wetlands;
• vegetation and wildlife;
• threatened and endangered species;
• cultural resources;
• socioeconomics;
• land use;
• air quality and noise;
1 The appendices referenced in this notice will
not appear in the Federal Register. Copies of the
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called eLibrary or from the
Commission’s Public Reference Room, 888 First
Street NE, Washington, DC 20426, or call (202) 502–
8371. For instructions on connecting to eLibrary,
refer to the last page of this notice.
VerDate Sep<11>2014
18:29 Oct 04, 2019
Jkt 250001
• public safety; and
• cumulative impacts
Commission staff will also evaluate
possible alternatives to the planned
project or portions of the project, and
make recommendations on how to
lessen or avoid impacts on the various
resource areas.
Although no formal application has
been filed, Commission staff have
already initiated a NEPA review under
the Commission’s pre-filing process.
The purpose of the pre-filing process is
to encourage early involvement of
interested stakeholders and to identify
and resolve issues before the
Commission receives an application. As
part of the pre-filing review,
Commission staff will contact federal
and state agencies to discuss their
involvement in the scoping process and
the preparation of the EA.
The EA will present Commission
staffs’ independent analysis of the
issues. The EA will be available in
electronic format in the public record
through eLibrary 2 and the
Commission’s website (https://
www.ferc.gov/industries/gas/enviro/
eis.asp). If eSubscribed, you will receive
instant email notification when the EA
is issued. The EA may be issued for an
allotted public comment period.
Commission staff will consider all
comments on the EA before making
recommendations to the Commission.
To ensure Commission staff have the
opportunity to consider and address
your comments, please carefully follow
the instructions in the Public
Participation section, beginning on page
2.
With this notice, the Commission is
asking agencies with jurisdiction by law
and/or special expertise with respect to
the environmental issues related to this
project to formally cooperate in the
preparation of the EA.3 Agencies that
would like to request cooperating
agency status should follow the
instructions for filing comments
provided under the Public Participation
section of this notice.
Consultation Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, the Commission is
using this notice to initiate consultation
with the applicable State Historic
2 For
instructions on connecting to eLibrary, refer
to the last page of this notice.
3 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
53433
Preservation Office, and to solicit their
views and those of other government
agencies, interested Indian tribes, and
the public on the project’s potential
effects on historic properties.4 The EA
for this project will document our
findings on the impacts on historic
properties and summarize the status of
consultations under section 106.
Environmental Mailing List
The environmental mailing list
includes: Federal, state, and local
government representatives and
agencies; elected officials; and other
interested parties. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who own
homes within certain distances of
aboveground facilities as well as anyone
who submits comments on the project.
Commission staff will update the
environmental mailing list as the
analysis proceeds to ensure that
Commission notices related to this
environmental review are sent to all
individuals, organizations, and
government entities interested in and/or
potentially affected by the planned
project.
If the Commission issues the EA for
an allotted public comment period, a
Notice of Availability of the EA will be
sent to the environmental mailing list
and will provide instructions to access
the electronic document on the FERC’s
website (www.ferc.gov). If you need to
make changes to your name/address, or
if you would like to remove your name
from the mailing list, please return the
attached ‘‘Mailing List Update Form’’
(appendix 2).
Becoming an Intervenor
Once Sempra files its application with
the Commission, you may want to
become an intervenor which is an
official party to the Commission’s
proceeding. Only intervenors have the
right to seek rehearing of the
Commission’s decision and be heard by
the courts if they choose to appeal the
Commission’s final ruling. An
intervenor formally participates in the
proceeding by filing a request to
intervene pursuant to Rule 214 of the
Commission’s Rules of Practice and
Procedures (18 CFR 385.214). Motions
to intervene are more fully described at
https://www.ferc.gov/resources/guides/
how-to/intervene.asp. Please note that
the Commission will not accept requests
4 The Advisory Council on Historic Preservation
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
E:\FR\FM\07OCN1.SGM
07OCN1
53434
Federal Register / Vol. 84, No. 194 / Monday, October 7, 2019 / Notices
for intervenor status at this time. You
must wait until the Commission
receives a formal application for the
project, after which the Commission
will issue a public notice that
establishes an intervention deadline.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. Click on the eLibrary link,
click on General Search and enter the
docket number in the Docket Number
field, excluding the last three digits (i.e.,
PF19–5). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Public sessions or site visits will be
posted on the Commission’s calendar
located at www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information.
Dated: October 1, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–21793 Filed 10–4–19; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OECA–2012–0676; FRL–10000–
55–OMS]
Information Collection Request
Submitted to OMB for Review and
Approval; Comment Request; NESHAP
for Phosphoric Acid Manufacturing
and Phosphate Fertilizers Production
(Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) has submitted an
information collection request (ICR),
NESHAP for Phosphoric Acid
Manufacturing and Phosphate
Fertilizers Production (EPA ICR Number
1790.09, OMB Control Number 2060–
0361), to the Office of Management and
Budget (OMB) for review and approval
in accordance with the Paperwork
Reduction Act. This is a proposed
extension of the ICR, which is currently
approved through January 31, 2020.
SUMMARY:
VerDate Sep<11>2014
18:29 Oct 04, 2019
Jkt 250001
Public comments were previously
requested, via the Federal Register, on
May 6, 2019, during a 60-day comment
period. This notice allows for an
additional 30 days for public comments.
A fuller description of the ICR is given
below, including its estimated burden
and cost to the public. An agency may
neither conduct nor sponsor, and a
person is not required to respond to, a
collection of information unless it
displays a currently valid OMB control
number.
DATES: Additional comments may be
submitted on or before November 6,
2019.
ADDRESSES: Submit your comments,
referencing Docket ID Number EPA–
HQ–OECA–2012–0676, to: (1) EPA
online using www.regulations.gov (our
preferred method), or by email to
docket.oeca@epa.gov, or by mail to: EPA
Docket Center, Environmental
Protection Agency, Mail Code 28221T,
1200 Pennsylvania Ave. NW,
Washington, DC 20460; and (2) OMB via
email to oira_submission@omb.eop.gov.
Address comments to OMB Desk Officer
for EPA.
EPA’s policy is that all comments
received will be included in the public
docket without change, including any
personal information provided, unless
the comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI), or other
information whose disclosure is
restricted by statute.
FOR FURTHER INFORMATION CONTACT:
Patrick Yellin, Monitoring, Assistance,
and Media Programs Division, Office of
Compliance, Mail Code 2227A,
Environmental Protection Agency, 1200
Pennsylvania Ave. NW, Washington, DC
20460; telephone number: (202) 564–
2970; fax number: (202) 564–0050;
email address: yellin.patrick@epa.gov.
SUPPLEMENTARY INFORMATION:
Supporting documents, which explain
in detail the information that the EPA
will be collecting, are available in the
public docket for this ICR. The docket
can be viewed online at
www.regulations.gov, or in person at the
EPA Docket Center, WJC West, Room
3334, 1301 Constitution Ave. NW,
Washington, DC. The telephone number
for the Docket Center is 202–566–1744.
For additional information about EPA’s
public docket, visit: https://
www.epa.gov/dockets.
Abstract: The National Emission
Standards for Hazardous Air Pollutants
(NESHAP) for Phosphoric Acid
Manufacturing and Phosphate
Fertilizers Production (40 CFR part 63,
subparts AA and BB) were proposed on
December 27, 1996, promulgated on
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
June 10, 1999, and amended on: June
12, 2002; April 20, 2006, August 19,
2015, and September 28, 2017. Owners
and operators of affected facilities are
required to comply with reporting and
record-keeping requirements for the
General Provisions (40 CFR part 63,
subpart A), as well as for the specific
requirements at 40 CFR part 63 subparts
AA and BB. This includes submitting
initial notifications, performance tests
and periodic reports and results, and
maintaining records of the occurrence
and duration of any startup, shutdown,
or malfunction in the operation of an
affected facility, or any period during
which the monitoring system is
inoperative. These reports are used by
EPA to determine compliance with
these standards.
Form Numbers: None.
Respondents/affected entities:
Phosphoric acid and phosphate
fertilizer production facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63).
Estimated number of respondents: 13
(total).
Frequency of response: Quarterly and
semiannually.
Total estimated burden: 2,200 hours
(per year). Burden is defined at 5 CFR
1320.3(b).
Total estimated cost: $441,000 (per
year), which includes $186,000 in
annualized capital/startup and/or
operation & maintenance costs.
Changes in the Estimates: There is no
change in the labor hours in this ICR
compared to the previous ICR. This is
due to a zero-growth rate for the
industry.
Courtney Kerwin,
Director, Regulatory Support Division.
[FR Doc. 2019–21809 Filed 10–4–19; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2018–0651; FRL–9999–71]
Product Cancellation Order for Certain
Pesticide Registrations
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
This notice announces EPA’s
order for the cancellations, voluntarily
requested by the registrants and
accepted by the Agency, of the products
listed in Table 1 and Table 1A of Unit
II., pursuant to the Federal Insecticide,
Fungicide, and Rodenticide Act
(FIFRA). This cancellation order follows
a March 5, 2019 Federal Register Notice
SUMMARY:
E:\FR\FM\07OCN1.SGM
07OCN1
Agencies
[Federal Register Volume 84, Number 194 (Monday, October 7, 2019)]
[Notices]
[Pages 53432-53434]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-21793]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. PF19-5-000]
Notice of Intent To Prepare an Environmental Assessment Statement
for the Sempra PALNG Holdings, LLC Planned Port Arthur LNG Expansion
Project, and Request for Comments on Environmental Issues
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Port Arthur LNG Expansion
Project (Project) involving construction and operation of facilities by
Sempra PALNG Holdings, LLC (Sempra) in Jefferson County, Texas. The
Commission will use this EA in its decision-making process to determine
whether the project is in the public interest.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies about issues regarding the project. The National Environmental
Policy Act (NEPA) requires the Commission to take into account the
environmental impacts that could result from its action whenever it
considers the issuance of an authorization. NEPA also requires the
Commission to discover concerns the public may have about proposals.
This process is referred to as ``scoping.'' The main goal of the
scoping process is to focus the analysis in the EA on the important
environmental issues. By this notice, the Commission requests public
comments on the scope of issues to address in the EA. To ensure that
your comments are timely and properly recorded, please submit your
comments so that the Commission receives them in Washington, DC on or
before 5:00 p.m. Eastern Time on November 12, 2019.
You can make a difference by submitting your specific comments or
concerns about the project. Your comments should focus on the potential
environmental effects, reasonable alternatives, and measures to avoid
or lessen environmental impacts. Your input will help the Commission
staff determine what issues they need to evaluate in the EA. Commission
staff will consider all filed comments during the preparation of the
EA.
If you sent comments on this project to the Commission before the
opening of this docket on June 14, 2019, you will need to file those
comments in Docket No. PF19-5-000 to ensure they are considered as part
of this proceeding.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this planned
project and encourage them to comment on their areas of concern.
A fact sheet prepared by the FERC entitled An Interstate Natural
Gas Facility On My Land? What Do I Need To Know? is available for
viewing on the FERC website (www.ferc.gov) at https://www.ferc.gov/resources/guides/gas/gas.pdf. This fact sheet addresses a number of
typically asked questions, including the use of eminent domain and how
to participate in the Commission's proceedings.
Public Participation
The Commission offers a free service called eSubscription which
makes it easy to stay informed of all issuances and submittals
regarding the dockets/projects to which you subscribe. These instant
email notifications are the fastest way to receive notification and
provide a link to the document files which can reduce the amount of
time you spend researching proceedings. To sign up go to www.ferc.gov/docs-filing/esubscription.asp.
For your convenience, there are three methods you can use to submit
your comments to the Commission. The Commission encourages electronic
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected]. Please carefully follow these
instructions so that your comments are properly recorded.
(1) You can file your comments electronically using the eComment
feature, which is on the Commission's website (www.ferc.gov) under the
link to Documents and Filings. Using eComment is an easy method for
submitting brief, text-only comments on a project;
[[Page 53433]]
(2) You can file your comments electronically by using the eFiling
feature, which is also on the Commission's website (www.ferc.gov) under
the link to Documents and Filings. With eFiling, you can provide
comments in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on eRegister. You will be asked to select the type of filing you are
making; a comment on a particular project is considered a Comment on a
Filing; or
(3) You can file a paper copy of your comments by mailing them to
the following address. Be sure to reference the project docket number
(PF19-5-000) with your submission: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington,
DC 20426
Summary of the Planned Project
Sempra plans to construct and operate additional liquefaction
capacity at the site of the recently approved Port Arthur Liquefaction
Project near Port Arthur, Texas. The planned expansion would add two
liquefaction trains, increasing liquefied natural gas production
capacity from 13.5 million metric tons per annum (MTPA) to
approximately 27.0 MTPA.
The general location of the project facilities is shown in appendix
1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of the appendices were sent to all
those receiving this notice in the mail and are available at
www.ferc.gov using the link called eLibrary or from the Commission's
Public Reference Room, 888 First Street NE, Washington, DC 20426, or
call (202) 502-8371. For instructions on connecting to eLibrary,
refer to the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction and operation of the planned project would be wholly
within property already certificated for the Port Arthur Liquefaction
Project. No additional land would be required. The Project facilities,
once constructed, would occupy approximately 60 acres.
The EA Process
The EA will discuss impacts that could occur as a result of the
construction and operation of the planned project under these general
headings:
Geology and soils;
water resources and wetlands;
vegetation and wildlife;
threatened and endangered species;
cultural resources;
socioeconomics;
land use;
air quality and noise;
public safety; and
cumulative impacts
Commission staff will also evaluate possible alternatives to the
planned project or portions of the project, and make recommendations on
how to lessen or avoid impacts on the various resource areas.
Although no formal application has been filed, Commission staff
have already initiated a NEPA review under the Commission's pre-filing
process. The purpose of the pre-filing process is to encourage early
involvement of interested stakeholders and to identify and resolve
issues before the Commission receives an application. As part of the
pre-filing review, Commission staff will contact federal and state
agencies to discuss their involvement in the scoping process and the
preparation of the EA.
The EA will present Commission staffs' independent analysis of the
issues. The EA will be available in electronic format in the public
record through eLibrary \2\ and the Commission's website (https://www.ferc.gov/industries/gas/enviro/eis.asp). If eSubscribed, you will
receive instant email notification when the EA is issued. The EA may be
issued for an allotted public comment period. Commission staff will
consider all comments on the EA before making recommendations to the
Commission. To ensure Commission staff have the opportunity to consider
and address your comments, please carefully follow the instructions in
the Public Participation section, beginning on page 2.
---------------------------------------------------------------------------
\2\ For instructions on connecting to eLibrary, refer to the
last page of this notice.
---------------------------------------------------------------------------
With this notice, the Commission is asking agencies with
jurisdiction by law and/or special expertise with respect to the
environmental issues related to this project to formally cooperate in
the preparation of the EA.\3\ Agencies that would like to request
cooperating agency status should follow the instructions for filing
comments provided under the Public Participation section of this
notice.
---------------------------------------------------------------------------
\3\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
---------------------------------------------------------------------------
Consultation Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, the Commission is using this notice to initiate
consultation with the applicable State Historic Preservation Office,
and to solicit their views and those of other government agencies,
interested Indian tribes, and the public on the project's potential
effects on historic properties.\4\ The EA for this project will
document our findings on the impacts on historic properties and
summarize the status of consultations under section 106.
---------------------------------------------------------------------------
\4\ The Advisory Council on Historic Preservation regulations
are at Title 36, Code of Federal Regulations, Part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Environmental Mailing List
The environmental mailing list includes: Federal, state, and local
government representatives and agencies; elected officials; and other
interested parties. This list also includes all affected landowners (as
defined in the Commission's regulations) who own homes within certain
distances of aboveground facilities as well as anyone who submits
comments on the project. Commission staff will update the environmental
mailing list as the analysis proceeds to ensure that Commission notices
related to this environmental review are sent to all individuals,
organizations, and government entities interested in and/or potentially
affected by the planned project.
If the Commission issues the EA for an allotted public comment
period, a Notice of Availability of the EA will be sent to the
environmental mailing list and will provide instructions to access the
electronic document on the FERC's website (www.ferc.gov). If you need
to make changes to your name/address, or if you would like to remove
your name from the mailing list, please return the attached ``Mailing
List Update Form'' (appendix 2).
Becoming an Intervenor
Once Sempra files its application with the Commission, you may want
to become an intervenor which is an official party to the Commission's
proceeding. Only intervenors have the right to seek rehearing of the
Commission's decision and be heard by the courts if they choose to
appeal the Commission's final ruling. An intervenor formally
participates in the proceeding by filing a request to intervene
pursuant to Rule 214 of the Commission's Rules of Practice and
Procedures (18 CFR 385.214). Motions to intervene are more fully
described at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
Please note that the Commission will not accept requests
[[Page 53434]]
for intervenor status at this time. You must wait until the Commission
receives a formal application for the project, after which the
Commission will issue a public notice that establishes an intervention
deadline.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website (www.ferc.gov) using the eLibrary link. Click on the
eLibrary link, click on General Search and enter the docket number in
the Docket Number field, excluding the last three digits (i.e., PF19-
5). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
[email protected] or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of all formal documents issued by the Commission, such as orders,
notices, and rulemakings.
Public sessions or site visits will be posted on the Commission's
calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along
with other related information.
Dated: October 1, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-21793 Filed 10-4-19; 8:45 am]
BILLING CODE 6717-01-P