Notice of Intent To Prepare an Environmental Assessment for the Texas Eastern Transmission, LP Proposed Marshall County Mine Panel 19E Project and Request for Comments on Environmental Issues, 53427-53429 [2019-21789]
Download as PDF
Federal Register / Vol. 84, No. 194 / Monday, October 7, 2019 / Notices
Frank, Eversheds Sutherland (US) LLP,
700 Sixth Street NW, Suite 700,
Washington, DC 20001–3980 and
Compliance Department, Castleton
Commodities International LLC, 811
Main Street, Suite 3500, Houston, TX
77002.
A final decision will be made on this
application after the environmental
impacts have been evaluated pursuant
to DOE’s National Environmental Policy
Act Implementing Procedures (10 CFR
part 1021) and after DOE determines
that the proposed action will not have
an adverse impact on the sufficiency of
supply or reliability of the U.S. electric
power supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program website at https://energy.gov/
node/11845, or by emailing Angela Troy
at Angela.Troy@hq.doe.gov.
Signed in Washington, DC, on October 1,
2019.
Christopher Lawrence,
Management and Program Analyst,
Transmission Permitting and Technical
Assistance Office of Electricity.
[FR Doc. 2019–21815 Filed 10–4–19; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2333–091–Maine]
Rumford Falls Hydro, LLC; Notice of
Environmental Site Review
On September 27, 2019, Rumford
Falls Hydro, LLC filed a Notice of Intent
(NOI) and Pre-Application Document to
re-license its 44.5-megawatt Rumford
Falls Hydroelectric Project No. 2333.
The Federal Energy Regulatory
Commission (Commission) will conduct
an environmental site review for the
project on October 24, 2019. The project
is located on the Androscoggin River, in
Oxford County, Maine.
The environmental site review is
being held to provide all stakeholders,
interested in the project’s future
relicensing proceedings, an opportunity
to view the project’s facilities and
surrounding areas.
Under the Commission’s Integrated
Licensing Process, the Commission
conducts its National Environmental
Policy Act (NEPA) scoping meeting
within 90 days of the filing of the
licensee’s NOI. An environmental site
review is typically held in conjunction
with that scoping meeting. However,
access to some project facilities may be
VerDate Sep<11>2014
18:29 Oct 04, 2019
Jkt 250001
limited by winter weather during
December of 2019 when scoping for this
project is currently anticipated. For this
reason, the Commission will conduct
the environmental site review in
October before the onset of winter;
additional site reviews will not be
conducted in conjunction with NEPA
scoping meetings for the project in
December of 2019. Therefore, we are
waiving 5.8(b)(viii) of the Commission’s
regulations requiring an environmental
site review within 30 days of issuance
of a notice of commencement of
proceeding to facilitate the early
environmental site review. The
Commission encourages all interested
parties to participate in the October
environmental site review to facilitate
productive scoping meetings later this
year. Details of the project specific
environmental site review follow.
Date and Time: October 24, 2019 at
9:00 a.m.
Location: Rumford Falls Hydroelectric
Project, 299 Prospect Avenue (Route 2),
Rumford, Maine 04276.
Directions and Logistics
Please notify Mr. Randy Dorman of
Great Lakes Hydro America at (207) 7555605 or at randy.dorman@
brookfieldrenewable.com on or before
October 21, 2019, if you plan to attend
the environmental site review.
If you need further logistical
information or directions, please contact
the Mr. Randy Dorman with the
information above. All other questions
regarding the environmental site review
or the Commission’s Integrated
Licensing Process may be directed to
Ryan Hansen of the Commission’s staff
at (202) 502–8074 or via email at:
ryan.hansen@ferc.gov.
Dated: October 1, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–21791 Filed 10–4–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–509–000]
Notice of Intent To Prepare an
Environmental Assessment for the
Texas Eastern Transmission, LP
Proposed Marshall County Mine Panel
19E Project and Request for
Comments on Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
53427
environmental assessment (EA) that will
discuss the environmental impacts of
the Marshall County Mine Panel 19E
Project involving construction and
operation of facilities by Texas Eastern
Transmission, LP (Texas Eastern) in
Marshall County, West Virginia. The
Commission will use this EA in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies about issues
regarding the project. The National
Environmental Policy Act (NEPA)
requires the Commission to take into
account the environmental impacts that
could result from its action whenever it
considers the issuance of a Certificate of
Public Convenience and Necessity/
authorization. NEPA also requires the
Commission to discover concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of issues to
address in the EA. To ensure that your
comments are timely and properly
recorded, please submit your comments
so that the Commission receives them in
Washington, DC on or before 5:00 p.m.
Eastern Time on October 31, 2019.
You can make a difference by
submitting your specific comments or
concerns about the project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. Commission staff
will consider all filed comments during
the preparation of the EA.
If you sent comments on this project
to the Commission before the opening of
this docket on September 4, 2019, you
will need to file those comments in
Docket No. CP19–509–000 to ensure
they are considered as part of this
proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
E:\FR\FM\07OCN1.SGM
07OCN1
53428
Federal Register / Vol. 84, No. 194 / Monday, October 7, 2019 / Notices
seek to negotiate a mutually acceptable
easement agreement. You are not
required to enter into an agreement.
However, if the Commission approves
the project, that approval conveys with
it the right of eminent domain.
Therefore, if you and the company do
not reach an easement agreement, the
pipeline company could initiate
condemnation proceedings in court. In
such instances, compensation would be
determined by a judge in accordance
with state law.
Texas Eastern provided landowners
with a fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ This fact sheet addresses a
number of typically asked questions,
including the use of eminent domain
and how to participate in the
Commission’s proceedings. It is also
available for viewing on the FERC
website (www.ferc.gov) at https://
www.ferc.gov/resources/guides/gas/
gas.pdf.
Public Participation
The Commission offers a free service
called eSubscription which makes it
easy to stay informed of all issuances
and submittals regarding the dockets/
projects to which you subscribe. These
instant email notifications are the fastest
way to receive notification and provide
a link to the document files which can
reduce the amount of time you spend
researching proceedings. To sign up go
to www.ferc.gov/docs-filing/
esubscription.asp.
For your convenience, there are three
methods you can use to submit your
comments to the Commission. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. Using eComment is an easy
method for submitting brief, text-only
comments on a project;
(2) You can file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
eRegister. You will be asked to select the
VerDate Sep<11>2014
18:29 Oct 04, 2019
Jkt 250001
type of filing you are making; a
comment on a particular project is
considered a Comment on a Filing; or
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the project docket number (CP19–509–
000) with your submission: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426
Summary of the Proposed Project
Texas Eastern proposes to excavate
and elevate pipeline segments of its
Lines 10, 15, 25, and 30, and these
pipelines range from 30-inch to 36-inchdiameter. Concurrent with pipeline
elevation, portions of Lines 10 and 15
will be replaced with new pipe to
accommodate a minimum Class 2
design.1 Texas Eastern would also
perform maintenance activities on
segments of Lines 25 and 30. The four
mainline segments will remain inservice and be elevated using sandbags
and skids for about 18 months until the
longwall mining activities have
completed and any potential ground
subsidence has settled. Once any
longwall mining-induced subsidence
and the 2020–2021 heating season have
both ended, the four elevated pipeline
segments will be re-installed
belowground, hydrostatically tested,
and placed back into service. Texas
Eastern estimates such activities will be
completed in approximately October
2021.
The general location of the project
facilities is shown in appendix 1.2
Land Requirements for Construction
Construction workspace would
disturb about 34.2 acres of land for the
pipeline excavation, elevation, and/or
replacement. Following construction,
Texas Eastern would maintain about
12.0 acres of existing right-of-way for
permanent operation of the project’s
facilities; the remaining acreage would
be restored and revert to former uses.
1 Lines 10 and 15 were installed prior to the
Natural Gas Pipeline Safety Act, and are
grandfathered to operate at greater than 72% of
Specified Minimum Yield Strength. The portions of
these pipelines included in this Project will be
replaced with pipe that meets or exceeds the
current Pipeline and Hazardous Materials Safety
Administration regulations. See 49 CFR 192.611(a)
(2019).
2 The appendices referenced in this notice will
not appear in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE, Washington, DC 20426, or call (202) 502–
8371. For instructions on connecting to eLibrary,
refer to the last page of this notice.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
The EA Process
The EA will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils;
• water resources and wetlands;
• vegetation and wildlife;
• threatened and endangered species;
• cultural resources;
• land use;
• air quality and noise;
• public safety; and
• cumulative impacts
Commission staff will also evaluate
reasonable alternatives to the proposed
project or portions of the project, and
make recommendations on how to
lessen or avoid impacts on the various
resource areas.
The EA will present Commission
staffs’ independent analysis of the
issues. The EA will be available in
electronic format in the public record
through eLibrary 3 and the
Commission’s website (https://
www.ferc.gov/industries/gas/enviro/
eis.asp). If eSubscribed, you will receive
instant email notification when the EA
is issued. The EA may be issued for an
allotted public comment period.
Commission staff will consider all
comments on the EA before making
recommendations to the Commission.
To ensure Commission staff have the
opportunity to address your comments,
please carefully follow the instructions
in the Public Participation section,
beginning on page 2.
With this notice, the Commission is
asking agencies with jurisdiction by law
and/or special expertise with respect to
the environmental issues of this project
to formally cooperate in the preparation
of the EA.4 Agencies that would like to
request cooperating agency status
should follow the instructions for filing
comments provided under the Public
Participation section of this notice.
Consultation Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, the Commission is
using this notice to initiate consultation
with the applicable State Historic
Preservation Office(s), and to solicit
their views and those of other
3 For instructions on connecting to eLibrary, refer
to the last page of this notice.
4 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
E:\FR\FM\07OCN1.SGM
07OCN1
Federal Register / Vol. 84, No. 194 / Monday, October 7, 2019 / Notices
government agencies, interested Indian
tribes, and the public on the project’s
potential effects on historic properties.5
The EA for this project will document
findings on the impacts on historic
properties and summarize the status of
consultations under section 106.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. Commission
staff will update the environmental
mailing list as the analysis proceeds to
ensure that Commission notices related
to this environmental review are sent to
all individuals, organizations, and
government entities interested in and/or
potentially affected by the proposed
project.
If the Commission issues the EA for
an allotted public comment period, a
Notice of Availability of the EA will be
sent to the environmental mailing list
and will provide instructions to access
the electronic document on the FERC’s
website (www.ferc.gov). If you need to
make changes to your name/address, or
if you would like to remove your name
from the mailing list, please return the
attached ‘‘Mailing List Update Form’’
(appendix 2).
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on General Search and enter the
docket number in the Docket Number
field, excluding the last three digits (i.e.,
CP09–509). Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Public sessions or site visits will be
posted on the Commission’s calendar
located at www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information.
Dated: October 1, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–21789 Filed 10–4–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM98–1–000]
Records Governing Off-the-Record
Communications; Public Notice
This constitutes notice, in accordance
with 18 CFR 385.2201(b), of the receipt
of prohibited and exempt off-the-record
communications.
Order No. 607 (64 FR 51222,
September 22, 1999) requires
Commission decisional employees, who
make or receive a prohibited or exempt
off-the-record communication relevant
to the merits of a contested proceeding,
to deliver to the Secretary of the
Commission, a copy of the
communication, if written, or a
summary of the substance of any oral
communication.
Prohibited communications are
included in a public, non-decisional file
Docket No.
File date
Prohibited:
None.
Exempt:
CP17–40–000 .................................................
CP17–40–001
5 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
VerDate Sep<11>2014
18:29 Oct 04, 2019
Jkt 250001
9–23–2019
Frm 00032
associated with, but not a part of, the
decisional record of the proceeding.
Unless the Commission determines that
the prohibited communication and any
responses thereto should become a part
of the decisional record, the prohibited
off-the-record communication will not
be considered by the Commission in
reaching its decision. Parties to a
proceeding may seek the opportunity to
respond to any facts or contentions
made in a prohibited off-the-record
communication, and may request that
the Commission place the prohibited
communication and responses thereto
in the decisional record. The
Commission will grant such a request
only when it determines that fairness so
requires. Any person identified below as
having made a prohibited off-the-record
communication shall serve the
document on all parties listed on the
official service list for the applicable
proceeding in accordance with Rule
2010, 18 CFR 385.2010.
Exempt off-the-record
communications are included in the
decisional record of the proceeding,
unless the communication was with a
cooperating agency as described by 40
CFR 1501.6, made under 18 CFR
385.2201(e) (1) (v).
The following is a list of off-therecord communications recently
received by the Secretary of the
Commission. The communications
listed are grouped by docket numbers in
ascending order. These filings are
available for electronic review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s website at https://
www.ferc.gov using the eLibrary link.
Enter the docket number, excluding the
last three digits, in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
for TTY, contact (202)502–8659.
Presenter or requestor
U.S. Congressman Rodney Davis.
historic properties as any prehistoric or historic
district, site, building, structure, or object included
PO 00000
53429
Fmt 4703
Sfmt 4703
in or eligible for inclusion in the National Register
of Historic Places.
E:\FR\FM\07OCN1.SGM
07OCN1
Agencies
[Federal Register Volume 84, Number 194 (Monday, October 7, 2019)]
[Notices]
[Pages 53427-53429]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-21789]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP19-509-000]
Notice of Intent To Prepare an Environmental Assessment for the
Texas Eastern Transmission, LP Proposed Marshall County Mine Panel 19E
Project and Request for Comments on Environmental Issues
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Marshall County Mine Panel 19E
Project involving construction and operation of facilities by Texas
Eastern Transmission, LP (Texas Eastern) in Marshall County, West
Virginia. The Commission will use this EA in its decision-making
process to determine whether the project is in the public convenience
and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies about issues regarding the project. The National Environmental
Policy Act (NEPA) requires the Commission to take into account the
environmental impacts that could result from its action whenever it
considers the issuance of a Certificate of Public Convenience and
Necessity/authorization. NEPA also requires the Commission to discover
concerns the public may have about proposals. This process is referred
to as ``scoping.'' The main goal of the scoping process is to focus the
analysis in the EA on the important environmental issues. By this
notice, the Commission requests public comments on the scope of issues
to address in the EA. To ensure that your comments are timely and
properly recorded, please submit your comments so that the Commission
receives them in Washington, DC on or before 5:00 p.m. Eastern Time on
October 31, 2019.
You can make a difference by submitting your specific comments or
concerns about the project. Your comments should focus on the potential
environmental effects, reasonable alternatives, and measures to avoid
or lessen environmental impacts. Your input will help the Commission
staff determine what issues they need to evaluate in the EA. Commission
staff will consider all filed comments during the preparation of the
EA.
If you sent comments on this project to the Commission before the
opening of this docket on September 4, 2019, you will need to file
those comments in Docket No. CP19-509-000 to ensure they are considered
as part of this proceeding.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this proposed
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the proposed facilities. The company
would
[[Page 53428]]
seek to negotiate a mutually acceptable easement agreement. You are not
required to enter into an agreement. However, if the Commission
approves the project, that approval conveys with it the right of
eminent domain. Therefore, if you and the company do not reach an
easement agreement, the pipeline company could initiate condemnation
proceedings in court. In such instances, compensation would be
determined by a judge in accordance with state law.
Texas Eastern provided landowners with a fact sheet prepared by the
FERC entitled ``An Interstate Natural Gas Facility On My Land? What Do
I Need To Know?'' This fact sheet addresses a number of typically asked
questions, including the use of eminent domain and how to participate
in the Commission's proceedings. It is also available for viewing on
the FERC website (www.ferc.gov) at https://www.ferc.gov/resources/guides/gas/gas.pdf.
Public Participation
The Commission offers a free service called eSubscription which
makes it easy to stay informed of all issuances and submittals
regarding the dockets/projects to which you subscribe. These instant
email notifications are the fastest way to receive notification and
provide a link to the document files which can reduce the amount of
time you spend researching proceedings. To sign up go to www.ferc.gov/docs-filing/esubscription.asp.
For your convenience, there are three methods you can use to submit
your comments to the Commission. The Commission encourages electronic
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected]. Please carefully follow these
instructions so that your comments are properly recorded.
(1) You can file your comments electronically using the eComment
feature, which is located on the Commission's website (www.ferc.gov)
under the link to Documents and Filings. Using eComment is an easy
method for submitting brief, text-only comments on a project;
(2) You can file your comments electronically by using the eFiling
feature, which is located on the Commission's website (www.ferc.gov)
under the link to Documents and Filings. With eFiling, you can provide
comments in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on eRegister. You will be asked to select the type of filing you are
making; a comment on a particular project is considered a Comment on a
Filing; or
(3) You can file a paper copy of your comments by mailing them to
the following address. Be sure to reference the project docket number
(CP19-509-000) with your submission: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A,
Washington, DC 20426
Summary of the Proposed Project
Texas Eastern proposes to excavate and elevate pipeline segments of
its Lines 10, 15, 25, and 30, and these pipelines range from 30-inch to
36-inch-diameter. Concurrent with pipeline elevation, portions of Lines
10 and 15 will be replaced with new pipe to accommodate a minimum Class
2 design.\1\ Texas Eastern would also perform maintenance activities on
segments of Lines 25 and 30. The four mainline segments will remain in-
service and be elevated using sandbags and skids for about 18 months
until the longwall mining activities have completed and any potential
ground subsidence has settled. Once any longwall mining-induced
subsidence and the 2020-2021 heating season have both ended, the four
elevated pipeline segments will be re-installed belowground,
hydrostatically tested, and placed back into service. Texas Eastern
estimates such activities will be completed in approximately October
2021.
---------------------------------------------------------------------------
\1\ Lines 10 and 15 were installed prior to the Natural Gas
Pipeline Safety Act, and are grandfathered to operate at greater
than 72% of Specified Minimum Yield Strength. The portions of these
pipelines included in this Project will be replaced with pipe that
meets or exceeds the current Pipeline and Hazardous Materials Safety
Administration regulations. See 49 CFR 192.611(a) (2019).
---------------------------------------------------------------------------
The general location of the project facilities is shown in appendix
1.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of appendices were sent to all those
receiving this notice in the mail and are available at www.ferc.gov
using the link called ``eLibrary'' or from the Commission's Public
Reference Room, 888 First Street NE, Washington, DC 20426, or call
(202) 502-8371. For instructions on connecting to eLibrary, refer to
the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction workspace would disturb about 34.2 acres of land for
the pipeline excavation, elevation, and/or replacement. Following
construction, Texas Eastern would maintain about 12.0 acres of existing
right-of-way for permanent operation of the project's facilities; the
remaining acreage would be restored and revert to former uses.
The EA Process
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
Geology and soils;
water resources and wetlands;
vegetation and wildlife;
threatened and endangered species;
cultural resources;
land use;
air quality and noise;
public safety; and
cumulative impacts
Commission staff will also evaluate reasonable alternatives to the
proposed project or portions of the project, and make recommendations
on how to lessen or avoid impacts on the various resource areas.
The EA will present Commission staffs' independent analysis of the
issues. The EA will be available in electronic format in the public
record through eLibrary \3\ and the Commission's website (https://www.ferc.gov/industries/gas/enviro/eis.asp). If eSubscribed, you will
receive instant email notification when the EA is issued. The EA may be
issued for an allotted public comment period. Commission staff will
consider all comments on the EA before making recommendations to the
Commission. To ensure Commission staff have the opportunity to address
your comments, please carefully follow the instructions in the Public
Participation section, beginning on page 2.
---------------------------------------------------------------------------
\3\ For instructions on connecting to eLibrary, refer to the
last page of this notice.
---------------------------------------------------------------------------
With this notice, the Commission is asking agencies with
jurisdiction by law and/or special expertise with respect to the
environmental issues of this project to formally cooperate in the
preparation of the EA.\4\ Agencies that would like to request
cooperating agency status should follow the instructions for filing
comments provided under the Public Participation section of this
notice.
---------------------------------------------------------------------------
\4\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
---------------------------------------------------------------------------
Consultation Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, the Commission is using this notice to initiate
consultation with the applicable State Historic Preservation Office(s),
and to solicit their views and those of other
[[Page 53429]]
government agencies, interested Indian tribes, and the public on the
project's potential effects on historic properties.\5\ The EA for this
project will document findings on the impacts on historic properties
and summarize the status of consultations under section 106.
---------------------------------------------------------------------------
\5\ The Advisory Council on Historic Preservation's regulations
are at Title 36, Code of Federal Regulations, Part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. Commission staff will update the environmental
mailing list as the analysis proceeds to ensure that Commission notices
related to this environmental review are sent to all individuals,
organizations, and government entities interested in and/or potentially
affected by the proposed project.
If the Commission issues the EA for an allotted public comment
period, a Notice of Availability of the EA will be sent to the
environmental mailing list and will provide instructions to access the
electronic document on the FERC's website (www.ferc.gov). If you need
to make changes to your name/address, or if you would like to remove
your name from the mailing list, please return the attached ``Mailing
List Update Form'' (appendix 2).
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website at www.ferc.gov using the eLibrary link. Click on the
eLibrary link, click on General Search and enter the docket number in
the Docket Number field, excluding the last three digits (i.e., CP09-
509). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
[email protected] or (866) 208-3676, or for TTY, contact (202)
502-8659. The eLibrary link also provides access to the texts of all
formal documents issued by the Commission, such as orders, notices, and
rulemakings.
Public sessions or site visits will be posted on the Commission's
calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along
with other related information.
Dated: October 1, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-21789 Filed 10-4-19; 8:45 am]
BILLING CODE 6717-01-P