Notice of Intent To Prepare an Environmental Assessment for the Texas Eastern Transmission, LP Proposed Marshall County Mine Panel 19E Project and Request for Comments on Environmental Issues, 53427-53429 [2019-21789]

Download as PDF Federal Register / Vol. 84, No. 194 / Monday, October 7, 2019 / Notices Frank, Eversheds Sutherland (US) LLP, 700 Sixth Street NW, Suite 700, Washington, DC 20001–3980 and Compliance Department, Castleton Commodities International LLC, 811 Main Street, Suite 3500, Houston, TX 77002. A final decision will be made on this application after the environmental impacts have been evaluated pursuant to DOE’s National Environmental Policy Act Implementing Procedures (10 CFR part 1021) and after DOE determines that the proposed action will not have an adverse impact on the sufficiency of supply or reliability of the U.S. electric power supply system. Copies of this application will be made available, upon request, for public inspection and copying at the address provided above, by accessing the program website at https://energy.gov/ node/11845, or by emailing Angela Troy at Angela.Troy@hq.doe.gov. Signed in Washington, DC, on October 1, 2019. Christopher Lawrence, Management and Program Analyst, Transmission Permitting and Technical Assistance Office of Electricity. [FR Doc. 2019–21815 Filed 10–4–19; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2333–091–Maine] Rumford Falls Hydro, LLC; Notice of Environmental Site Review On September 27, 2019, Rumford Falls Hydro, LLC filed a Notice of Intent (NOI) and Pre-Application Document to re-license its 44.5-megawatt Rumford Falls Hydroelectric Project No. 2333. The Federal Energy Regulatory Commission (Commission) will conduct an environmental site review for the project on October 24, 2019. The project is located on the Androscoggin River, in Oxford County, Maine. The environmental site review is being held to provide all stakeholders, interested in the project’s future relicensing proceedings, an opportunity to view the project’s facilities and surrounding areas. Under the Commission’s Integrated Licensing Process, the Commission conducts its National Environmental Policy Act (NEPA) scoping meeting within 90 days of the filing of the licensee’s NOI. An environmental site review is typically held in conjunction with that scoping meeting. However, access to some project facilities may be VerDate Sep<11>2014 18:29 Oct 04, 2019 Jkt 250001 limited by winter weather during December of 2019 when scoping for this project is currently anticipated. For this reason, the Commission will conduct the environmental site review in October before the onset of winter; additional site reviews will not be conducted in conjunction with NEPA scoping meetings for the project in December of 2019. Therefore, we are waiving 5.8(b)(viii) of the Commission’s regulations requiring an environmental site review within 30 days of issuance of a notice of commencement of proceeding to facilitate the early environmental site review. The Commission encourages all interested parties to participate in the October environmental site review to facilitate productive scoping meetings later this year. Details of the project specific environmental site review follow. Date and Time: October 24, 2019 at 9:00 a.m. Location: Rumford Falls Hydroelectric Project, 299 Prospect Avenue (Route 2), Rumford, Maine 04276. Directions and Logistics Please notify Mr. Randy Dorman of Great Lakes Hydro America at (207) 7555605 or at randy.dorman@ brookfieldrenewable.com on or before October 21, 2019, if you plan to attend the environmental site review. If you need further logistical information or directions, please contact the Mr. Randy Dorman with the information above. All other questions regarding the environmental site review or the Commission’s Integrated Licensing Process may be directed to Ryan Hansen of the Commission’s staff at (202) 502–8074 or via email at: ryan.hansen@ferc.gov. Dated: October 1, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–21791 Filed 10–4–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP19–509–000] Notice of Intent To Prepare an Environmental Assessment for the Texas Eastern Transmission, LP Proposed Marshall County Mine Panel 19E Project and Request for Comments on Environmental Issues The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 53427 environmental assessment (EA) that will discuss the environmental impacts of the Marshall County Mine Panel 19E Project involving construction and operation of facilities by Texas Eastern Transmission, LP (Texas Eastern) in Marshall County, West Virginia. The Commission will use this EA in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies about issues regarding the project. The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from its action whenever it considers the issuance of a Certificate of Public Convenience and Necessity/ authorization. NEPA also requires the Commission to discover concerns the public may have about proposals. This process is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this notice, the Commission requests public comments on the scope of issues to address in the EA. To ensure that your comments are timely and properly recorded, please submit your comments so that the Commission receives them in Washington, DC on or before 5:00 p.m. Eastern Time on October 31, 2019. You can make a difference by submitting your specific comments or concerns about the project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. Your input will help the Commission staff determine what issues they need to evaluate in the EA. Commission staff will consider all filed comments during the preparation of the EA. If you sent comments on this project to the Commission before the opening of this docket on September 4, 2019, you will need to file those comments in Docket No. CP19–509–000 to ensure they are considered as part of this proceeding. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives should notify their constituents of this proposed project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The company would E:\FR\FM\07OCN1.SGM 07OCN1 53428 Federal Register / Vol. 84, No. 194 / Monday, October 7, 2019 / Notices seek to negotiate a mutually acceptable easement agreement. You are not required to enter into an agreement. However, if the Commission approves the project, that approval conveys with it the right of eminent domain. Therefore, if you and the company do not reach an easement agreement, the pipeline company could initiate condemnation proceedings in court. In such instances, compensation would be determined by a judge in accordance with state law. Texas Eastern provided landowners with a fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ This fact sheet addresses a number of typically asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. It is also available for viewing on the FERC website (www.ferc.gov) at https:// www.ferc.gov/resources/guides/gas/ gas.pdf. Public Participation The Commission offers a free service called eSubscription which makes it easy to stay informed of all issuances and submittals regarding the dockets/ projects to which you subscribe. These instant email notifications are the fastest way to receive notification and provide a link to the document files which can reduce the amount of time you spend researching proceedings. To sign up go to www.ferc.gov/docs-filing/ esubscription.asp. For your convenience, there are three methods you can use to submit your comments to the Commission. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208–3676 or FercOnlineSupport@ferc.gov. Please carefully follow these instructions so that your comments are properly recorded. (1) You can file your comments electronically using the eComment feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. Using eComment is an easy method for submitting brief, text-only comments on a project; (2) You can file your comments electronically by using the eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on eRegister. You will be asked to select the VerDate Sep<11>2014 18:29 Oct 04, 2019 Jkt 250001 type of filing you are making; a comment on a particular project is considered a Comment on a Filing; or (3) You can file a paper copy of your comments by mailing them to the following address. Be sure to reference the project docket number (CP19–509– 000) with your submission: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426 Summary of the Proposed Project Texas Eastern proposes to excavate and elevate pipeline segments of its Lines 10, 15, 25, and 30, and these pipelines range from 30-inch to 36-inchdiameter. Concurrent with pipeline elevation, portions of Lines 10 and 15 will be replaced with new pipe to accommodate a minimum Class 2 design.1 Texas Eastern would also perform maintenance activities on segments of Lines 25 and 30. The four mainline segments will remain inservice and be elevated using sandbags and skids for about 18 months until the longwall mining activities have completed and any potential ground subsidence has settled. Once any longwall mining-induced subsidence and the 2020–2021 heating season have both ended, the four elevated pipeline segments will be re-installed belowground, hydrostatically tested, and placed back into service. Texas Eastern estimates such activities will be completed in approximately October 2021. The general location of the project facilities is shown in appendix 1.2 Land Requirements for Construction Construction workspace would disturb about 34.2 acres of land for the pipeline excavation, elevation, and/or replacement. Following construction, Texas Eastern would maintain about 12.0 acres of existing right-of-way for permanent operation of the project’s facilities; the remaining acreage would be restored and revert to former uses. 1 Lines 10 and 15 were installed prior to the Natural Gas Pipeline Safety Act, and are grandfathered to operate at greater than 72% of Specified Minimum Yield Strength. The portions of these pipelines included in this Project will be replaced with pipe that meets or exceeds the current Pipeline and Hazardous Materials Safety Administration regulations. See 49 CFR 192.611(a) (2019). 2 The appendices referenced in this notice will not appear in the Federal Register. Copies of appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called ‘‘eLibrary’’ or from the Commission’s Public Reference Room, 888 First Street NE, Washington, DC 20426, or call (202) 502– 8371. For instructions on connecting to eLibrary, refer to the last page of this notice. PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 The EA Process The EA will discuss impacts that could occur as a result of the construction and operation of the proposed project under these general headings: • Geology and soils; • water resources and wetlands; • vegetation and wildlife; • threatened and endangered species; • cultural resources; • land use; • air quality and noise; • public safety; and • cumulative impacts Commission staff will also evaluate reasonable alternatives to the proposed project or portions of the project, and make recommendations on how to lessen or avoid impacts on the various resource areas. The EA will present Commission staffs’ independent analysis of the issues. The EA will be available in electronic format in the public record through eLibrary 3 and the Commission’s website (https:// www.ferc.gov/industries/gas/enviro/ eis.asp). If eSubscribed, you will receive instant email notification when the EA is issued. The EA may be issued for an allotted public comment period. Commission staff will consider all comments on the EA before making recommendations to the Commission. To ensure Commission staff have the opportunity to address your comments, please carefully follow the instructions in the Public Participation section, beginning on page 2. With this notice, the Commission is asking agencies with jurisdiction by law and/or special expertise with respect to the environmental issues of this project to formally cooperate in the preparation of the EA.4 Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. Consultation Under Section 106 of the National Historic Preservation Act In accordance with the Advisory Council on Historic Preservation’s implementing regulations for section 106 of the National Historic Preservation Act, the Commission is using this notice to initiate consultation with the applicable State Historic Preservation Office(s), and to solicit their views and those of other 3 For instructions on connecting to eLibrary, refer to the last page of this notice. 4 The Council on Environmental Quality regulations addressing cooperating agency responsibilities are at Title 40, Code of Federal Regulations, Part 1501.6. E:\FR\FM\07OCN1.SGM 07OCN1 Federal Register / Vol. 84, No. 194 / Monday, October 7, 2019 / Notices government agencies, interested Indian tribes, and the public on the project’s potential effects on historic properties.5 The EA for this project will document findings on the impacts on historic properties and summarize the status of consultations under section 106. Environmental Mailing List The environmental mailing list includes federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project. Commission staff will update the environmental mailing list as the analysis proceeds to ensure that Commission notices related to this environmental review are sent to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project. If the Commission issues the EA for an allotted public comment period, a Notice of Availability of the EA will be sent to the environmental mailing list and will provide instructions to access the electronic document on the FERC’s website (www.ferc.gov). If you need to make changes to your name/address, or if you would like to remove your name from the mailing list, please return the attached ‘‘Mailing List Update Form’’ (appendix 2). Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website at www.ferc.gov using the eLibrary link. Click on the eLibrary link, click on General Search and enter the docket number in the Docket Number field, excluding the last three digits (i.e., CP09–509). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. Public sessions or site visits will be posted on the Commission’s calendar located at www.ferc.gov/EventCalendar/ EventsList.aspx along with other related information. Dated: October 1, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–21789 Filed 10–4–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM98–1–000] Records Governing Off-the-Record Communications; Public Notice This constitutes notice, in accordance with 18 CFR 385.2201(b), of the receipt of prohibited and exempt off-the-record communications. Order No. 607 (64 FR 51222, September 22, 1999) requires Commission decisional employees, who make or receive a prohibited or exempt off-the-record communication relevant to the merits of a contested proceeding, to deliver to the Secretary of the Commission, a copy of the communication, if written, or a summary of the substance of any oral communication. Prohibited communications are included in a public, non-decisional file Docket No. File date Prohibited: None. Exempt: CP17–40–000 ................................................. CP17–40–001 5 The Advisory Council on Historic Preservation’s regulations are at Title 36, Code of Federal Regulations, Part 800. Those regulations define VerDate Sep<11>2014 18:29 Oct 04, 2019 Jkt 250001 9–23–2019 Frm 00032 associated with, but not a part of, the decisional record of the proceeding. Unless the Commission determines that the prohibited communication and any responses thereto should become a part of the decisional record, the prohibited off-the-record communication will not be considered by the Commission in reaching its decision. Parties to a proceeding may seek the opportunity to respond to any facts or contentions made in a prohibited off-the-record communication, and may request that the Commission place the prohibited communication and responses thereto in the decisional record. The Commission will grant such a request only when it determines that fairness so requires. Any person identified below as having made a prohibited off-the-record communication shall serve the document on all parties listed on the official service list for the applicable proceeding in accordance with Rule 2010, 18 CFR 385.2010. Exempt off-the-record communications are included in the decisional record of the proceeding, unless the communication was with a cooperating agency as described by 40 CFR 1501.6, made under 18 CFR 385.2201(e) (1) (v). The following is a list of off-therecord communications recently received by the Secretary of the Commission. The communications listed are grouped by docket numbers in ascending order. These filings are available for electronic review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https:// www.ferc.gov using the eLibrary link. Enter the docket number, excluding the last three digits, in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202)502–8659. Presenter or requestor U.S. Congressman Rodney Davis. historic properties as any prehistoric or historic district, site, building, structure, or object included PO 00000 53429 Fmt 4703 Sfmt 4703 in or eligible for inclusion in the National Register of Historic Places. E:\FR\FM\07OCN1.SGM 07OCN1

Agencies

[Federal Register Volume 84, Number 194 (Monday, October 7, 2019)]
[Notices]
[Pages 53427-53429]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-21789]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP19-509-000]


Notice of Intent To Prepare an Environmental Assessment for the 
Texas Eastern Transmission, LP Proposed Marshall County Mine Panel 19E 
Project and Request for Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Marshall County Mine Panel 19E 
Project involving construction and operation of facilities by Texas 
Eastern Transmission, LP (Texas Eastern) in Marshall County, West 
Virginia. The Commission will use this EA in its decision-making 
process to determine whether the project is in the public convenience 
and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies about issues regarding the project. The National Environmental 
Policy Act (NEPA) requires the Commission to take into account the 
environmental impacts that could result from its action whenever it 
considers the issuance of a Certificate of Public Convenience and 
Necessity/authorization. NEPA also requires the Commission to discover 
concerns the public may have about proposals. This process is referred 
to as ``scoping.'' The main goal of the scoping process is to focus the 
analysis in the EA on the important environmental issues. By this 
notice, the Commission requests public comments on the scope of issues 
to address in the EA. To ensure that your comments are timely and 
properly recorded, please submit your comments so that the Commission 
receives them in Washington, DC on or before 5:00 p.m. Eastern Time on 
October 31, 2019.
    You can make a difference by submitting your specific comments or 
concerns about the project. Your comments should focus on the potential 
environmental effects, reasonable alternatives, and measures to avoid 
or lessen environmental impacts. Your input will help the Commission 
staff determine what issues they need to evaluate in the EA. Commission 
staff will consider all filed comments during the preparation of the 
EA.
    If you sent comments on this project to the Commission before the 
opening of this docket on September 4, 2019, you will need to file 
those comments in Docket No. CP19-509-000 to ensure they are considered 
as part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would

[[Page 53428]]

seek to negotiate a mutually acceptable easement agreement. You are not 
required to enter into an agreement. However, if the Commission 
approves the project, that approval conveys with it the right of 
eminent domain. Therefore, if you and the company do not reach an 
easement agreement, the pipeline company could initiate condemnation 
proceedings in court. In such instances, compensation would be 
determined by a judge in accordance with state law.
    Texas Eastern provided landowners with a fact sheet prepared by the 
FERC entitled ``An Interstate Natural Gas Facility On My Land? What Do 
I Need To Know?'' This fact sheet addresses a number of typically asked 
questions, including the use of eminent domain and how to participate 
in the Commission's proceedings. It is also available for viewing on 
the FERC website (www.ferc.gov) at https://www.ferc.gov/resources/guides/gas/gas.pdf.

Public Participation

    The Commission offers a free service called eSubscription which 
makes it easy to stay informed of all issuances and submittals 
regarding the dockets/projects to which you subscribe. These instant 
email notifications are the fastest way to receive notification and 
provide a link to the document files which can reduce the amount of 
time you spend researching proceedings. To sign up go to www.ferc.gov/docs-filing/esubscription.asp.
    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected]. Please carefully follow these 
instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to Documents and Filings. Using eComment is an easy 
method for submitting brief, text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature, which is located on the Commission's website (www.ferc.gov) 
under the link to Documents and Filings. With eFiling, you can provide 
comments in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on eRegister. You will be asked to select the type of filing you are 
making; a comment on a particular project is considered a Comment on a 
Filing; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(CP19-509-000) with your submission: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, 
Washington, DC 20426

Summary of the Proposed Project

    Texas Eastern proposes to excavate and elevate pipeline segments of 
its Lines 10, 15, 25, and 30, and these pipelines range from 30-inch to 
36-inch-diameter. Concurrent with pipeline elevation, portions of Lines 
10 and 15 will be replaced with new pipe to accommodate a minimum Class 
2 design.\1\ Texas Eastern would also perform maintenance activities on 
segments of Lines 25 and 30. The four mainline segments will remain in-
service and be elevated using sandbags and skids for about 18 months 
until the longwall mining activities have completed and any potential 
ground subsidence has settled. Once any longwall mining-induced 
subsidence and the 2020-2021 heating season have both ended, the four 
elevated pipeline segments will be re-installed belowground, 
hydrostatically tested, and placed back into service. Texas Eastern 
estimates such activities will be completed in approximately October 
2021.
---------------------------------------------------------------------------

    \1\ Lines 10 and 15 were installed prior to the Natural Gas 
Pipeline Safety Act, and are grandfathered to operate at greater 
than 72% of Specified Minimum Yield Strength. The portions of these 
pipelines included in this Project will be replaced with pipe that 
meets or exceeds the current Pipeline and Hazardous Materials Safety 
Administration regulations. See 49 CFR 192.611(a) (2019).
---------------------------------------------------------------------------

    The general location of the project facilities is shown in appendix 
1.\2\
---------------------------------------------------------------------------

    \2\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of appendices were sent to all those 
receiving this notice in the mail and are available at www.ferc.gov 
using the link called ``eLibrary'' or from the Commission's Public 
Reference Room, 888 First Street NE, Washington, DC 20426, or call 
(202) 502-8371. For instructions on connecting to eLibrary, refer to 
the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction workspace would disturb about 34.2 acres of land for 
the pipeline excavation, elevation, and/or replacement. Following 
construction, Texas Eastern would maintain about 12.0 acres of existing 
right-of-way for permanent operation of the project's facilities; the 
remaining acreage would be restored and revert to former uses.

The EA Process

    The EA will discuss impacts that could occur as a result of the 
construction and operation of the proposed project under these general 
headings:

 Geology and soils;
 water resources and wetlands;
 vegetation and wildlife;
 threatened and endangered species;
 cultural resources;
 land use;
 air quality and noise;
 public safety; and
 cumulative impacts

    Commission staff will also evaluate reasonable alternatives to the 
proposed project or portions of the project, and make recommendations 
on how to lessen or avoid impacts on the various resource areas.
    The EA will present Commission staffs' independent analysis of the 
issues. The EA will be available in electronic format in the public 
record through eLibrary \3\ and the Commission's website (https://www.ferc.gov/industries/gas/enviro/eis.asp). If eSubscribed, you will 
receive instant email notification when the EA is issued. The EA may be 
issued for an allotted public comment period. Commission staff will 
consider all comments on the EA before making recommendations to the 
Commission. To ensure Commission staff have the opportunity to address 
your comments, please carefully follow the instructions in the Public 
Participation section, beginning on page 2.
---------------------------------------------------------------------------

    \3\ For instructions on connecting to eLibrary, refer to the 
last page of this notice.
---------------------------------------------------------------------------

    With this notice, the Commission is asking agencies with 
jurisdiction by law and/or special expertise with respect to the 
environmental issues of this project to formally cooperate in the 
preparation of the EA.\4\ Agencies that would like to request 
cooperating agency status should follow the instructions for filing 
comments provided under the Public Participation section of this 
notice.
---------------------------------------------------------------------------

    \4\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultation Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, the Commission is using this notice to initiate 
consultation with the applicable State Historic Preservation Office(s), 
and to solicit their views and those of other

[[Page 53429]]

government agencies, interested Indian tribes, and the public on the 
project's potential effects on historic properties.\5\ The EA for this 
project will document findings on the impacts on historic properties 
and summarize the status of consultations under section 106.
---------------------------------------------------------------------------

    \5\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project. Commission staff will update the environmental 
mailing list as the analysis proceeds to ensure that Commission notices 
related to this environmental review are sent to all individuals, 
organizations, and government entities interested in and/or potentially 
affected by the proposed project.
    If the Commission issues the EA for an allotted public comment 
period, a Notice of Availability of the EA will be sent to the 
environmental mailing list and will provide instructions to access the 
electronic document on the FERC's website (www.ferc.gov). If you need 
to make changes to your name/address, or if you would like to remove 
your name from the mailing list, please return the attached ``Mailing 
List Update Form'' (appendix 2).

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website at www.ferc.gov using the eLibrary link. Click on the 
eLibrary link, click on General Search and enter the docket number in 
the Docket Number field, excluding the last three digits (i.e., CP09-
509). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or (866) 208-3676, or for TTY, contact (202) 
502-8659. The eLibrary link also provides access to the texts of all 
formal documents issued by the Commission, such as orders, notices, and 
rulemakings.
    Public sessions or site visits will be posted on the Commission's 
calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along 
with other related information.

    Dated: October 1, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-21789 Filed 10-4-19; 8:45 am]
 BILLING CODE 6717-01-P