Turners Falls Hydro, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Terms and Conditions, Recommendations, and Prescriptions, 53139-53140 [2019-21674]
Download as PDF
Federal Register / Vol. 84, No. 193 / Friday, October 4, 2019 / Notices
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Dated: September 30, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–21673 Filed 10–3–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2622–013]
khammond on DSKJM1Z7X2PROD with NOTICES
Turners Falls Hydro, LLC; Notice of
Application Ready for Environmental
Analysis and Soliciting Comments,
Terms and Conditions,
Recommendations, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 2622–013.
c. Date filed: February 4, 2019.
d. Applicant: Turners Falls Hydro,
LLC (Turners Falls Hydro).
e. Name of Project: Turners Falls
Project.
f. Location: On the Connecticut River,
in the power canal of the Turners Falls
Hydroelectric Project No. 1889, in
Franklin County, Massachusetts. No
federal lands are occupied by the project
works or located within the project
boundary.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Michael
Scarzello, Director, Eagle Creek
Renewable Energy, LLC, 65 Madison
Avenue, Suite 500, Morristown, NJ
07960; Phone at (973) 998–8400, or
email at michael.scarzello@
eaglecreekre.com.
i. FERC Contact: Amanda Gill, (202)
502–6773 or amanda.gill@ferc.govj.
Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS,’’ ‘‘REPLY
COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
VerDate Sep<11>2014
16:49 Oct 03, 2019
Jkt 250001
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2622–013.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is ready for environmental
analysis at this time.
l. Project Description: The proposed
Turners Falls Project would consist of:
(1) An existing 10-foot-long, 20-footwide, 12- to 22-foot-high forebay; (2) a
20-foot-wide, 22-foot-high trashrack
with 1.5-inch clear-bar spacing; (3) two
9.75-foot-wide, 10.3-foot-high
headgates; (4) an 8.5-foot-diameter, 50foot-long steel penstock; (5) a 77-footlong, 42-foot-wide powerhouse
containing one 937-kilowatt vertical
Francis-type turbine-generator unit; (6) a
50-foot-long, 10-foot-diameter draft
tube; (7) an 80-foot-long, 10-foot-wide
tailrace; (8) a 110-foot-long, 2.3-kilovolt
generator lead line that connects the
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
53139
generator to a step-up transformer; (9)
and appurtenant facilities.
When generating, the project
withdraws up to 289 cubic feet per
second from FirstLight Hydro
Generating Company’s power canal for
the Turners Falls Hydroelectric Project
No. 1889, and discharges directly into
the Connecticut River. Turners Falls
Hydro operates the project in a run-ofriver mode with an average annual
generation of approximately 1,512
megawatt-hours. Turners Falls Hydro
proposes to continue operating the
project in a run-of-river mode and does
not propose any new construction or
modifications to the project.
m. A copy of the license application
is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document (P–2622). For assistance,
contact FERC Online Support. A copy is
also available for inspection and
reproduction at the Montague Public
Library, Carnegie Library Branch located
at 201 Avenue A, Turners Falls, MA
01376.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Procedural Schedule: The application
will be processed according to the
following schedule. Revisions to the
schedule will be made as appropriate.
Milestone
Target date
Filing of comments, recommendations, terms
and conditions, and preliminary fishway prescriptions.
Commission issues Environmental Assessment.
Comments on Environmental Assessment.
November 2019.
April 2020.
May 2020.
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of this notice.
n. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
E:\FR\FM\04OCN1.SGM
04OCN1
53140
Federal Register / Vol. 84, No. 193 / Friday, October 4, 2019 / Notices
Dated: September 30, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–21674 Filed 10–3–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–495–000]
Double E Pipeline, LLC; Notice of
Schedule for Environmental Review of
the Double E Project
khammond on DSKJM1Z7X2PROD with NOTICES
On July 31, 2019, Double E Pipeline,
LLC (Double E) filed an application in
Docket No. CP19–495–000 requesting a
Certificate of Public Convenience and
Necessity pursuant to section 7(c) of the
Natural Gas Act to construct and operate
certain natural gas pipeline facilities.
The proposed project, known as the
Double E Pipeline Project (Project),
involves the construction and operation
of approximately 132.9 combined miles
of varying diameter natural gas pipeline
connecting the Delaware Basin
production areas in New Mexico and
Texas to the Waha Hub. The Project
would provide up to 1,350,000
dekatherms per day of firm capacity to
delivery points near the Waha Hub in
Reeves and Pecos Counties, Texas.
On August 14, 2019, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA—March 24, 2020
90-day Federal Authorization Decision
Deadline—June 22, 2020
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
As part of the Project, Double E would
construct and operate:
• 33.3 miles of new 30-inch-diameter
trunkline T100 from Summit
Midstream’s existing Lane Processing
Plant located in Eddy County, New
VerDate Sep<11>2014
16:49 Oct 03, 2019
Jkt 250001
Mexico, to a new Double E Poker Lake
Meter Station in Eddy County, New
Mexico.
• 81.9 miles of new 42-inch-diameter
trunkline T200 from the proposed Poker
Lake Meter Station through Loving,
Ward, and Reeves Counties, Texas to a
terminus point at Double E’s proposed
Waha Receiver and Separation Site at
the Waha Hub in Reeves County.
• Approximately 1.4 miles of new 42inch-diameter pipeline T300 from the
proposed Waha Receiver site to the final
delivery location in Pecos County,
Texas.
• Approximately 16.3 miles of new
30-inch-diameter pipeline L100 from
three existing Gas Processing Plants in
Loving, New Mexico to the proposed
T100 trunkline in Eddy County, New
Mexico.
Background
On December 11, 2018, the
Commission issued a Notice of Intent to
Prepare an Environmental Assessment
for the Proposed Double E Pipeline
Project and Request for Comments on
Environmental Issues (NOI). The NOI
was issued during the pre-filing review
of the Project in Docket No. PF18–6–000
and sent to affected landowners; federal,
state, and local government agencies;
elected officials; Native American tribes;
other interested parties; and local
libraries and newspapers. Comments
were received from the New Mexico
Department of Game and Fish, the Hopi
Tribe, Choctaw Nation of Oklahoma,
Alabama-Coushatta Tribe of Texas, and
the New Mexico Department of
Transportation. All substantive
comments received will be addressed in
the EA.
The Bureau of Land Management will
be a cooperating agency in the
preparation of the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
Number’’ excluding the last three digits
(i.e., CP19–495), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: September 30, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–21634 Filed 10–3–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14998–000]
Premium Energy Holdings, LLC; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On June 18, 2019, Premium Energy
Holdings, LLC, filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act,
proposing to study the feasibility of the
Pyramid Lake Pumped Storage Project
(Pyramid Lake Project or project) to be
located on Pyramid Lake and Truckee
River, near the community of Nixon,
Washoe County, Nevada. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would be a
closed-loop pumped storage
hydropower facility. The applicant
proposes three alternative upper
reservoirs: San Emidio Reservoir,
Tohakum Peak Reservoir, or Lake Range
Reservoir. The existing Pyramid Lake
would be the lower reservoir for each
alternative.
Upper Reservoir Alternative 1: San
Emidio Reservoir
The San Emidio alternative consists
of: (1) A 180-acre upper reservoir having
a total storage capacity of 21,550 acrefeet at a normal maximum operating
elevation of 6,700 feet mean sea level
(msl); (2) a 315-foot-high, 2,385-footlong roller compacted concrete upper
E:\FR\FM\04OCN1.SGM
04OCN1
Agencies
[Federal Register Volume 84, Number 193 (Friday, October 4, 2019)]
[Notices]
[Pages 53139-53140]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-21674]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2622-013]
Turners Falls Hydro, LLC; Notice of Application Ready for
Environmental Analysis and Soliciting Comments, Terms and Conditions,
Recommendations, and Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 2622-013.
c. Date filed: February 4, 2019.
d. Applicant: Turners Falls Hydro, LLC (Turners Falls Hydro).
e. Name of Project: Turners Falls Project.
f. Location: On the Connecticut River, in the power canal of the
Turners Falls Hydroelectric Project No. 1889, in Franklin County,
Massachusetts. No federal lands are occupied by the project works or
located within the project boundary.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Michael Scarzello, Director, Eagle Creek
Renewable Energy, LLC, 65 Madison Avenue, Suite 500, Morristown, NJ
07960; Phone at (973) 998-8400, or email at
[email protected].
i. FERC Contact: Amanda Gill, (202) 502-6773 or
[email protected].
Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
All filings must (1) bear in all capital letters the title
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Each filing must be
accompanied by proof of service on all persons listed in the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b) and 385.2010.
The Commission strongly encourages electronic filing. Please file
comments, recommendations, terms and conditions, and prescriptions
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-2622-013.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted for filing and is ready for
environmental analysis at this time.
l. Project Description: The proposed Turners Falls Project would
consist of: (1) An existing 10-foot-long, 20-foot-wide, 12- to 22-foot-
high forebay; (2) a 20-foot-wide, 22-foot-high trashrack with 1.5-inch
clear-bar spacing; (3) two 9.75-foot-wide, 10.3-foot-high headgates;
(4) an 8.5-foot-diameter, 50-foot-long steel penstock; (5) a 77-foot-
long, 42-foot-wide powerhouse containing one 937-kilowatt vertical
Francis-type turbine-generator unit; (6) a 50-foot-long, 10-foot-
diameter draft tube; (7) an 80-foot-long, 10-foot-wide tailrace; (8) a
110-foot-long, 2.3-kilovolt generator lead line that connects the
generator to a step-up transformer; (9) and appurtenant facilities.
When generating, the project withdraws up to 289 cubic feet per
second from FirstLight Hydro Generating Company's power canal for the
Turners Falls Hydroelectric Project No. 1889, and discharges directly
into the Connecticut River. Turners Falls Hydro operates the project in
a run-of-river mode with an average annual generation of approximately
1,512 megawatt-hours. Turners Falls Hydro proposes to continue
operating the project in a run-of-river mode and does not propose any
new construction or modifications to the project.
m. A copy of the license application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's website (https://www.ferc.gov), using the ``eLibrary''
link. Enter the docket number, excluding the last three digits in the
docket number field to access the document (P-2622). For assistance,
contact FERC Online Support. A copy is also available for inspection
and reproduction at the Montague Public Library, Carnegie Library
Branch located at 201 Avenue A, Turners Falls, MA 01376.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Procedural Schedule: The application will be processed according to
the following schedule. Revisions to the schedule will be made as
appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Filing of comments, recommendations, November 2019.
terms and conditions, and preliminary
fishway prescriptions.
Commission issues Environmental April 2020.
Assessment.
Comments on Environmental Assessment... May 2020.
------------------------------------------------------------------------
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of this notice.
n. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification.
[[Page 53140]]
Dated: September 30, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-21674 Filed 10-3-19; 8:45 am]
BILLING CODE 6717-01-P