reservoir dam; (3) a 0.63-mile-long, 28foot-diameter concrete-lined headrace
tunnel; (4) a 0.5-mile-long, 25-footdiameter concrete-lined vertical shaft;
(5) a 2-mile-long, 25-foot-diameter
concrete-lined horizontal tunnel; (6) five
0.1-mile-long, 16-foot-diameter steel
penstocks; (7) a 500-foot-long, 85-footwide, 160-foot-high concrete-lined
powerhouse located in an underground
cavern, housing five pump-turbine
generator-motor units rated for 400
megawatts (MW) each; and (8) a 0.23mile-long, 30-foot-diameter concretelined tailrace tunnel discharging into
the existing Pyramid Lake.
Upper Reservoir Alternative 2:
Tohakum Peak Reservoir
The Tohakum Peak Reservoir
alternative consists of: (1) A 160-acre
upper reservoir having a total storage
capacity of 27,050 acre-feet at a normal
maximum operating elevation of 5,960
feet msl; (2) a 575-foot-high, 1,740-footlong roller compacted concrete upper
reservoir dam; (3) a 0.74-mile-long, 33foot-diameter concrete-lined headrace
tunnel; (4) a 0.28-mile-long, 29-footdiameter concrete-lined vertical shaft;
(5) a 1.6-mile-long, 29-foot-diameter
concrete-lined horizontal tunnel; (6) five
0.18-mile-long, 19-foot-diameter steel
penstocks; (7) a 500-foot-long, 85-footwide, 160-foot-high concrete-lined
powerhouse located in an underground
cavern, housing five pump-turbine
generator-motor units rated for 400 MW
each; and (8) a 0.22-mile-long, 35-footdiameter concrete-lined tailrace tunnel
discharging into the existing Pyramid
Lake.
khammond on DSKJM1Z7X2PROD with NOTICES
Upper Reservoir Alternative 3: Lake
Range Reservoir
The Lake Range Reservoir alternative
consists of: (1) A 160-acre upper
reservoir having a total storage capacity
of 26,020 acre-feet at a normal
maximum operating elevation of 6,180
feet msl; (2) a 495-foot-high, 2,474-footlong roller compacted concrete upper
reservoir dam; (3) a 0.75-mile-long, 32foot-diameter concrete-lined headrace
tunnel; (4) a 0.31-mile-long, 29-footdiameter concrete-lined vertical shaft;
(5) a 1.8-mile-long, 29-foot-diameter
concrete-lined horizontal tunnel; (6) five
0.18-mile-long, 18-foot-diameter steel
penstocks; (7) a 500-foot-long, 85-footwide, 160-foot-high concrete-lined
powerhouse located in an underground
cavern, housing five pump-turbine
generator-motor units rated for 400 MW
each; and (8) a 0.22 mile-long, 34-footdiameter concrete-lined tailrace tunnel
discharging into the existing Pyramid
Lake.
VerDate Sep<11>2014
16:49 Oct 03, 2019
Jkt 250001
Lower Reservoir: Pyramid Lake
The existing Pyramid Lake is the
discharge point of the Truckee River,
which is the sole outlet of Lake Tahoe.
It has a surface are of 121,080 acres at
3,796 feet msl, and a total storage
capacity of 23.6 million acre-feet.
53141
Dated: September 30, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–21637 Filed 10–3–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Interconnection
For each upper reservoir alternative,
project power would be transmitted to
the grid via: (1) A new, approximately
15-mile-long, 500 kilovolt (kV)
transmission line extending from the
powerhouse to the proposed Pyramid
Converter Station (the point of
interconnection); and (2) appurtenant
facilities. The estimated annual
generation of the Pyramid Lake Project
under each of the alternatives would be
6,900 gigawatt-hours.
Applicant Contact: Victor M. Rojas,
Managing Director, Premium Energy
Holdings, LLC, 355 South Lemon
Avenue, Suite A, Walnut, California
91789; phone: (909) 595–5314.
FERC Contact: Kyle Olcott; phone:
(202) 502–8963.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14998–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14998) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–2050–002.
Applicants: Midcontinent
Independent System Operator, Inc.,
GridLiance Heartland LLC.
Description: Tariff Amendment:
2019–09–26_Deficiency Response to
GridLiance Attachment O to be effective
12/31/9998.
Filed Date: 9/26/19.
Accession Number: 20190926–5112.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19–2902–000.
Applicants: New England Power Pool
Participants Committee.
Description: § 205(d) Rate Filing: Oct
2019 Membership Filing to be effective
9/1/2019.
Filed Date: 9/30/19.
Accession Number: 20190930–5066.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19–2903–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Amendments to GIA and DSA re: RB
Inyokern, SA Nos. 958 & 959 to be
effective 10/1/2019.
Filed Date: 9/30/19.
Accession Number: 20190930–5092.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19–2905–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Vallecito Energy Storage Project, GIA
and DSA, 1091 & 1092, Ntc of Canx, SA
1045 to be effective 10/1/2019.
Filed Date: 9/30/19.
Accession Number: 20190930–5124.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19–2906–000.
Applicants: Tucson Electric Power
Company.
Description: § 205(d) Rate Filing:
Concurrence to CAISO RS No. 5223 to
be effective 12/1/2019.
Filed Date: 9/30/19.
Accession Number: 20190930–5149.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19–2907–000.
Applicants: ISO New England Inc.,
Emera Maine.
E:\FR\FM\04OCN1.SGM
04OCN1
khammond on DSKJM1Z7X2PROD with NOTICES
53142
Federal Register / Vol. 84, No. 193 / Friday, October 4, 2019 / Notices
Description: § 205(d) Rate Filing: ISO–
NE and Emera Maine; First Revised
TSA–EMERA–18–01 to be effective 10/
1/2019.
Filed Date: 9/30/19.
Accession Number: 20190930–5154.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19–2908–000.
Applicants: Tenaska Clear Creek
Wind, LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization Under Section 205 of the
FPA to be effective 10/1/2019.
Filed Date: 9/30/19.
Accession Number: 20190930–5156.
Comments Due: 5 p.m. ET 10/21/19.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES19–55–000.
Applicants: ITC Great Plains, LLC.
Description: Supplement to
September 18, 2019 Application under
Section 204 of the Federal Power Act
[revised Exhibit D] of ITC Great Plains,
LLC.
Filed Date: 9/30/19.
Accession Number: 20190930–5085.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ES19–56–000.
Applicants: ITC Midwest LLC.
Description: Supplement to
September 18, 2019 Application under
Section 204 of the Federal Power Act
[revised Exhibit D] of ITC Midwest LLC.
Filed Date: 9/30/19.
Accession Number: 20190930–5086.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ES19–57–000.
Applicants: International
Transmission Company.
Description: Supplement to
September 18, 2019 Application under
Section 204 of the Federal Power Act
[revised Exhibit D] of International
Transmission Company.
Filed Date: 9/30/19.
Accession Number: 20190930–5087.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ES19–58–000.
Applicants: Michigan Electric
Transmission Company, LLC.
Description: Supplement to
September 18, 2019 Application under
Section 204 of the Federal Power Act
[revised Exhibit D] of Michigan Electric
Transmission Company, LLC.
Filed Date: 9/30/19.
Accession Number: 20190930–5088.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ES19–64–000.
Applicants: Metropolitan Edison
Company.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
Metropolitan Edison Company.
VerDate Sep<11>2014
16:49 Oct 03, 2019
Jkt 250001
Filed Date: 9/27/19.
Accession Number: 20190927–5158.
Comments Due: 5 p.m. ET 10/18/19.
Docket Numbers: ES19–65–000.
Applicants: Monongahela Power
Company.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
Monongahela Power Company.
Filed Date: 9/27/19.
Accession Number: 20190927–5162.
Comments Due: 5 p.m. ET 10/18/19.
Docket Numbers: ES19–66–000.
Applicants: Pennsylvania Electric
Company.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
Pennsylvania Electric Company.
Filed Date: 9/27/19.
Accession Number: 20190927–5178.
Comments Due: 5 p.m. ET 10/18/19.
Docket Numbers: ES19–67–000.
Applicants: Pennsylvania Power
Company.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
Pennsylvania Power Company.
Filed Date: 9/27/19.
Accession Number: 20190927–5190.
Comments Due: 5 p.m. ET 10/18/19.
Docket Numbers: ES19–68–000.
Applicants: The Potomac Edison
Company.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of The
Potomac Edison Company.
Filed Date: 9/27/19.
Accession Number: 20190927–5192.
Comments Due: 5 p.m. ET 10/18/19.
Docket Numbers: ES19–69–000.
Applicants: Trans-Allegheny
Interstate Line Company.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
Trans-Allegheny Interstate Line
Company.
Filed Date: 9/27/19.
Accession Number: 20190927–5193.
Comments Due: 5 p.m. ET 10/18/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 30, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–21633 Filed 10–3–19; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA R9–2019–06; FRL–10000–82–Region
9]
Notice of Proposed CERCLA
Administrative Settlement Agreement
and Order on Consent for Southern
Avenue Industrial Area Superfund Site,
South Gate, California
Environmental Protection
Agency (‘‘EPA’’).
ACTION: Notice of settlement; request for
public comment.
AGENCY:
Pursuant to the
Comprehensive Environmental
Response, Compensation and Liability
Act (CERCLA), the Environmental
Protection Agency (‘‘EPA’’) is hereby
providing notice of a proposed
administrative settlement agreement
and order on consent (‘‘Settlement
Agreement’’) with Joyce Mendell Brody,
as an individual and in her capacity as
the sole member and manager of 5211
Southern Avenue LLC (‘‘Settling
Party’’). The Settlement Agreement is
intended to resolve claims for the
recovery of past and future response
costs associated with EPA’s ongoing
efforts to remediate the hazardous
substances in the soil and groundwater
beneath the Southern Avenue Industrial
Area Superfund Site, in South Gate,
California. The Settlement Agreement
includes a covenant by EPA not to sue
and requires the Settling Party to
reimburse EPA $134,821.
DATES: EPA will receive written
comments relating to the Settlement
Agreement until November 4, 2019.
ADDRESSES: The Settlement Agreement
is available for public inspection at
United States Environmental Protection
Agency, Superfund Records Center, 75
Hawthorne Street, Room 3110, San
Francisco, California 94105. Telephone
415–947–8717. Comments should be
addressed to Diane Prend, Assistant
Regional Counsel, Office of Regional
Counsel (ORC–3–1), EPA Region IX, 75
SUMMARY:
E:\FR\FM\04OCN1.SGM
04OCN1
Agencies
[Federal Register Volume 84, Number 193 (Friday, October 4, 2019)]
[Notices]
[Pages 53141-53142]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-21633]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER19-2050-002.
Applicants: Midcontinent Independent System Operator, Inc.,
GridLiance Heartland LLC.
Description: Tariff Amendment: 2019-09-26_Deficiency Response to
GridLiance Attachment O to be effective 12/31/9998.
Filed Date: 9/26/19.
Accession Number: 20190926-5112.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19-2902-000.
Applicants: New England Power Pool Participants Committee.
Description: Sec. 205(d) Rate Filing: Oct 2019 Membership Filing
to be effective 9/1/2019.
Filed Date: 9/30/19.
Accession Number: 20190930-5066.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19-2903-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: Amendments to GIA and DSA
re: RB Inyokern, SA Nos. 958 & 959 to be effective 10/1/2019.
Filed Date: 9/30/19.
Accession Number: 20190930-5092.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19-2905-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: Vallecito Energy Storage
Project, GIA and DSA, 1091 & 1092, Ntc of Canx, SA 1045 to be effective
10/1/2019.
Filed Date: 9/30/19.
Accession Number: 20190930-5124.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19-2906-000.
Applicants: Tucson Electric Power Company.
Description: Sec. 205(d) Rate Filing: Concurrence to CAISO RS No.
5223 to be effective 12/1/2019.
Filed Date: 9/30/19.
Accession Number: 20190930-5149.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19-2907-000.
Applicants: ISO New England Inc., Emera Maine.
[[Page 53142]]
Description: Sec. 205(d) Rate Filing: ISO-NE and Emera Maine;
First Revised TSA-EMERA-18-01 to be effective 10/1/2019.
Filed Date: 9/30/19.
Accession Number: 20190930-5154.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ER19-2908-000.
Applicants: Tenaska Clear Creek Wind, LLC.
Description: Baseline eTariff Filing: Application for Market-Based
Rate Authorization Under Section 205 of the FPA to be effective 10/1/
2019.
Filed Date: 9/30/19.
Accession Number: 20190930-5156.
Comments Due: 5 p.m. ET 10/21/19.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES19-55-000.
Applicants: ITC Great Plains, LLC.
Description: Supplement to September 18, 2019 Application under
Section 204 of the Federal Power Act [revised Exhibit D] of ITC Great
Plains, LLC.
Filed Date: 9/30/19.
Accession Number: 20190930-5085.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ES19-56-000.
Applicants: ITC Midwest LLC.
Description: Supplement to September 18, 2019 Application under
Section 204 of the Federal Power Act [revised Exhibit D] of ITC Midwest
LLC.
Filed Date: 9/30/19.
Accession Number: 20190930-5086.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ES19-57-000.
Applicants: International Transmission Company.
Description: Supplement to September 18, 2019 Application under
Section 204 of the Federal Power Act [revised Exhibit D] of
International Transmission Company.
Filed Date: 9/30/19.
Accession Number: 20190930-5087.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ES19-58-000.
Applicants: Michigan Electric Transmission Company, LLC.
Description: Supplement to September 18, 2019 Application under
Section 204 of the Federal Power Act [revised Exhibit D] of Michigan
Electric Transmission Company, LLC.
Filed Date: 9/30/19.
Accession Number: 20190930-5088.
Comments Due: 5 p.m. ET 10/21/19.
Docket Numbers: ES19-64-000.
Applicants: Metropolitan Edison Company.
Description: Application under Section 204 of the Federal Power Act
for Authorization to Issue Securities of Metropolitan Edison Company.
Filed Date: 9/27/19.
Accession Number: 20190927-5158.
Comments Due: 5 p.m. ET 10/18/19.
Docket Numbers: ES19-65-000.
Applicants: Monongahela Power Company.
Description: Application under Section 204 of the Federal Power Act
for Authorization to Issue Securities of Monongahela Power Company.
Filed Date: 9/27/19.
Accession Number: 20190927-5162.
Comments Due: 5 p.m. ET 10/18/19.
Docket Numbers: ES19-66-000.
Applicants: Pennsylvania Electric Company.
Description: Application under Section 204 of the Federal Power Act
for Authorization to Issue Securities of Pennsylvania Electric Company.
Filed Date: 9/27/19.
Accession Number: 20190927-5178.
Comments Due: 5 p.m. ET 10/18/19.
Docket Numbers: ES19-67-000.
Applicants: Pennsylvania Power Company.
Description: Application under Section 204 of the Federal Power Act
for Authorization to Issue Securities of Pennsylvania Power Company.
Filed Date: 9/27/19.
Accession Number: 20190927-5190.
Comments Due: 5 p.m. ET 10/18/19.
Docket Numbers: ES19-68-000.
Applicants: The Potomac Edison Company.
Description: Application under Section 204 of the Federal Power Act
for Authorization to Issue Securities of The Potomac Edison Company.
Filed Date: 9/27/19.
Accession Number: 20190927-5192.
Comments Due: 5 p.m. ET 10/18/19.
Docket Numbers: ES19-69-000.
Applicants: Trans-Allegheny Interstate Line Company.
Description: Application under Section 204 of the Federal Power Act
for Authorization to Issue Securities of Trans-Allegheny Interstate
Line Company.
Filed Date: 9/27/19.
Accession Number: 20190927-5193.
Comments Due: 5 p.m. ET 10/18/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: September 30, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-21633 Filed 10-3-19; 8:45 am]
BILLING CODE 6717-01-P